HomeMy WebLinkAboutARB201700052 Review Comments Architectural Review Board Approval 2017-10-04COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
October 4, 2017
Chris Schooley
UVAF
P.O. Box 400218
Charlottesville, VA 22904
RE: ARB-2017-52: UVA Indoor Golf Facility at Birdwood
Dear Chris,
We have received a revised site plan for the UVA Indoor Golf Facility at Birdwood and have reviewed it as per ARB-
2017-52. The following revisions are requested to make the proposal consistent with the design criteria that apply to the
County -wide Certificate.
1. The freestanding pole light fixture (model A on the lighting plan), Architectural Area Lighting SP1-ANG-Y5-32LED-
4K-550, emits over 3,000 lumnes (3,640) but is not a full cut-off model as required by ARB standards. Please do one of
the following:
a. Choose an Architectural Area Lighting model which emits less than 3,000 lumens or does not include the glass
canister which refracts the LED lights.
b. Option 1, Genie LTG 82122ACC, will suffice if the model chosen has a HPS wattage less than 45 watts, which
is equivalent to 3,000 lumens. If this lighting fixture, which is not a full cut-off model, is chosen, the lumen value
must be below 3,000 lumens.
c. Option 2, Beacon Urban Series URBCAP21/24NB-55/4K/UNV/T2/NRNW/XX, is a full cut-off light and is
preferred as it meets ARB standards and criteria.
2. Revise the photometric plan to reflect the chosen light fixture and the values emitted by the model of the light fixture
chosen.
a. Provide the cut sheet information for just the chosen light fixture on the site plan.
b. Add existing trees as well as proposed landscaping to the photometric plan to ensure there are no conflicts.
Within 15 days of the date of this letter, please send me a letter (by email is acceptable) indicating whether you will or
will not proceed with these revisions. If you choose not to proceed with these revisions, staff will be unable to approve
your application. If you choose to proceed with the revisions, please forward me one set of revised drawings together with
a memo summarizing the revisions you've made. Your decision to make the revisions will suspend the 60-day review
period associated with your original submittal. However, I expect to complete the review of your revised proposal within
2 weeks of your re -submittal.
If you have any questions about this action, please contact me as soon as possible. I look forward to receiving your
revisions and completing this review with an approval letter.
Sincerely,
I-)b(t. pxbr-l-
Heather McMahon
Senior Planner
cc: ARB File