HomeMy WebLinkAboutSDP201700049 Action Letter 2017-10-06COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
October 6, 2017
Scott Collins
200 Garrett Street, Suite K.
Charlottesville VA 22902
SDP201700049 Dunlora Park Phase II- Initial Site Plan
Mr. Collins,
The Agent for the Board of Supervisors hereby grants administrative approval to the above referenced site plan.
This approval shall be valid for a period of five (5) years from the date of this letter, provided that the developer
submits a final site plan for all or a portion of the site within one (1) year after the date of this letter as provided in
section 32.4.3.1 of Chapter 18 of the Code of the County of Albemarle, and thereafter diligently pursues approval of
the final site plan.
The final site plan will not be considered to have been officially submitted until the following items are received:
1. A final site plan that satisfies all of the requirements of section 32.6 of Chapter 18 of the Code.
2. A fee of $1,613.
Please submit 9 copies of the final plans to the Community Development Department. The assigned Lead Reviewer
will then distribute the plans to all reviewing agencies. Once you receive the first set of comments on the final site
plan, please work with each reviewer individually to satisfy their requirements.
The Department of Community Development shall not accept submittal of the final site plan for signature until
tentative approvals for the attached conditions from the following agencies/reviewers have been obtained:
SRC Members:
Albemarle County Planning Services (Planner) - 3 copies [Christopher Perez ext 3443]
Albemarle County Engineering Services (Engineer) - 1 copy [Emily Cox ext 3565]
Albemarle County Information Services (E911) - 1 copy [Elise Kiewra ext 3030]
Albemarle County Department of Fire Rescue - 1 copy [Robbie Gilmer 434-296-5833]
Virginia Department of Transportation - 1 copy [Adam Moore 434-422-9894]
Albemarle County Building inspections — 1 copy [Michael Dellinger ext 3228]
Albemarle County Service Authority (ACSA) - 1 copy [Alex Morrison 434-977-4511 ext 116]
If you have any questions about these conditions or the submittal requirements please feel free to contact me at
Extension 3443, cperez@albemarle.org.
Sincerely,
Senior Planner
County of Albemarle
Department of Community Development
401 McIntire Road,
Charlottesville, VA, 22902
434-296-5832
Memorandum
To:
Scott Collins
From:
Christopher P. Perez, Senior Planner
Division:
Planning
Date:
September 20, 2017
Subject:
SDP201700049 Dunlora Park Phase II- Initial Site Plan
The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following
comments have been satisfactorily addressed (The following comments are those that have been identified at this time.
Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by
the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.]
1. [Comment] This application was reviewed against Site Development Plan requirements only. Lot lines are shown on
the plan, but no subdivision application was submitted. Any subdivision related comments are provided for reference
only unless necessary for site plan approval.
132.7.2.3(c)] Interconnectivity of Sidewalks or Pedestrian Ways. The County has received funding for pedestrian access
improvements to portions of Rio Road, a portion of the work fronts phase 2 (specifically fronting Lots 32 - 42). Below
I have provided a section of the plans, please revise/coordinate your final site plan to depict and incorporate this work.
Your plans should show the road improvements and curb & gutter by others, but the sidewalk & landscape
strip/landscaping should be constructed as a part of your plan and by the Dunlora Park developer. An exhibit with the
County plans provided below, if you would like the CAD files, please contact Jack Kelsey in Facilities and
Environmental Services (JKELSEY@albemarle.org)
C W TRA[.+FIN TO MA1., O'N'RI AY —OR.,
ND: W A V I D UP
PAWW TWNERENECURARY10ACNEVE CR0S55LOPE5 A AOADCURYETAA
YC
.11 IOk1AYAs• MWN ONCkOss0,11 NS �AY�E AApyF AyyTM T --
CONTRACIORTOREPLACE ANYPAVEWNTMAR 5
DAMAGED OR REMO.£D ACCORUNG TO VDOT STANDARDS
i
r lc�.a.✓..:
w,w,^ mww
^^ `-f•ROP. TEMP 011
LON91R
FASFMF VT '.Z
SNEETREFERENCE5 ® UNAVEL DRrvEWAY
:E.TYPN;AC 5ECTp -W ROM SECTION!
YSAX55 wb ROM .1AYJY CROSSsFCIIONS M CONCRT II SIDE wA
—. —r• — PRW VNOICNDRCN ROADPAVEMENT
PAAWNT RES RFACNG'
®IN IGNT Du*v DRm wAr
A' SYxA
N RNv2P
^ �
PRO, RMP J
�
CONSTR.
FASFMFNT nl '
STRIPING LEGEND
' i{
] �'DOUSlE 59LD YEL40w,At
3 E'SNMIVAkiF ANTES �C0.055 WALAl
� N'60lDNNITE INF
f DARNED NYuIF 1 nVE
�
.; ey 6 VRW.TURN ARROY.S
SITE PLAN A
:s
3. 132.5.2(a), 32.5.2(0)] Areas to be Dedicated. The portion of land fronting Phase 2 listed as "Right-of-way established
with Dunlora Park Road Plan " requires a right-of-way dedication. Provide a note stating that the land is to be
dedicated to the County for public use. Prior to final site plan approval the dedication shall take place on a plat to be
reviewed by the County, approved, and then recorded in the Clerk's Office. The DB page information of this action
shall be provided on the final site plan.
4. [30.7.5] Design Standards Retaining Walls. Within preserved slopes that have been determined less than 25% based on
new topographic information to the satisfaction of the County Engineer the following applies. The maximum height for
a single retaining wall, measured from grade to grade, shall be six (6) feet. When the overall retained height would
exceed six (6) feet, the retaining wall shall be broken into multiple stepped walls w/ 3 feet of landscaped area between
each wall. Currently the plans do not provide enough information on the retaining wall design to verify this
requirement is met. Prior to final site plan approval, on the plans provided sufficient information on the wall design to
verify the above design standards are met.
5. [32.5.2(n), 4.12.15(8)] Curb and Gutter in Parking Areas and Along Travelways. Provide curb for both sides of the
alley.
6. 114-303(E), 3.1] Alleys. Clearly depict whether the Alley is proposed on individual lots or if it is proposed within the
Open Space. Staff suggests it be provided in Open Space, but it shall be omitted front being counted in the required
open space for the project (25116), as roads or accessways are not to be in open space.
7. [14-303(E), 3.11 Alleys. Revise the label of the Alley to "Variable Width Private Alley to be Maintained by the HOA ".
8. [32.5.2(n), 32.5.1(c)] Dimensions. Dimension all proposed improvements, including buildings/dwelling units.
9. (14-303(e)] On the final plat depict and dimension an alley easement and label it as "Variable Width Private Alley
Easement to Benefit Lots 29-42 ".
10. [32.4.1.3, 32.5.2(e)] Phase Lines. Revise the phase lines to encompass Lot 29-31 and the alley connection to Varick
Street.
11. 132.8.21 Infrastructure improvement plans. All infrastructure required to construct phase II shall be review, approved,
and built or bonded before the final plat and/or final site plan approval.
12. 132.6.20)] Landscape plan. A landscape plan that complies with section 32.7.9 is required with the final site plan.
13. [ 14-317] Instrument Evidencing Maintenance of Certain Improvements. Submit with the final plat an instrument
assuring the perpetual maintenance of the alley, open space, and any other improvements that are to be maintained in
perpetuity. Please submit a draft of this document to me and I will review it and forward it to the County Attorney for
his review/approval.
14. [14-311] Infrastructure Improvement Plans. WPO amendment must be approved, all required improvements must be
built or bonded, and all required Deeds and Declarations must be reviewed and approved prior to final site plan/final
plat approval.
15. [32.7.2.1] Vehicular Access to Site. The alley entrance onto Varick Street (Public Street) shall be designed and
constructed as required by the standards of the Virginia Department of Transportation. VDOT approval of the entrance
to the site shall be required prior to final site plan and/or final plat approval.
Please contact Christopher P. Perez in the Planning Division by using gperez/a,albemarle.oor 434-296-5832 ext. 3443
for further information.
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone(434)296-5832 Fax(434)972-4126
Project title: Dunlora Park Phase I1 Townhomes — Initial Site Plan
Project file number: SDP201700049
1. Initial Site Plan must be approved prior to WPO/VSMP approval.
2. WPO Plan must be approved prior to site plan approval.
3. VDOT approval is necessary prior to site plan approval.
4. Ensure the DB & PG # is shown for all easements.
5. Correctly label all easements (example, should be "SWM forest & open space
easement").
6. The new right-of-way must be recorded on a plat. Note says shown on the road plan.
7. Add/revise the note regarding the steep slopes. Be sure to reference the name and date of
the exhibit showing the survey. Remove "as approved by County Engineer" from this
note.
8. Provide certified design of the retaining wall, considering the wall is supporting the alley
travelway.
9. Ensure all contours are labeled.
10. 2:1 slope is not allowed adjacent to the SWM pond. Refer to BMP Clearinghouse for
facility specifications.
11. Show sight distance.
12. Show spot elevations for parking spaces to ensure 5% max. slope is not exceeded.
13. Slopes steeper than 3:1 must specify ground cover, not grass.
14. 0" of BM -25 is shown on the pavement detail. Please correct or remove.
15. SWM quality control was outlined, however quantity control will also be necessary and
should be summarized.
16. Extend the private access easement for the alley to the property line.
17. The County is planning work along Rio Road. Please coordinate your plan to show this
work. Your plans should show curb & gutter by others, but the sidewalk should be
constructed as a part of your plan. An exhibit with the County plans will be provided to
you.
COMMONWEALTH of 'VIRQINIA
DEPARTMENT OF TRANSPORTATION
I&0i Orange Road
C PFZZ -1 vi!gmw 22701
Charles A. Kilpatrick, P.E.
Commissionei
September 14, 2017
Christopher Perez
Senior Planner
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Re: SUB -2017-00049- Dunlora Park — Phase Il Townhouse- Initial Site Plan
Review #1
Dear Mr. Perez:
The Department of Transportation, Charlottesville Residency Transportation and Land Use
Section, has reviewed the above referenced plan as submitted by Collins Engineering, dated May
22, 2017, revised August , 2017 and find it to be generally acceptable.
Please note that the final site plan must show conformance with the VDOT Road Design Manual
Appendices B (1) and F, as well as any other applicable standards, regulations, or other
requirements.
Please provide two copies of the revised plan along with a comment response letter. If further
information is desired, please contact Willis C. Bedsaul at 434-422-9866.
A VDOT Land Use Permit will be required prior to any work within the right of way. The
owner/developer must contact the Charlottesville Residency land Use Section at (434) 422-9399
for information pertaining to this process.
Sincerely,
Adam J. Moore, P.E.
Area Land Use Engineer
Charlottesville Residency
I'VE fl'\ EP' VIPCIINIr,
Christopher Perez
From: Alexander Morrison <amorrison@serviceauthority.org>
Sent: Tuesday, September 19, 2017 4:41 PM
To: Christopher Perez
Subject: SDP201700049: Dunlora Park Phase II - Initial
Chris,
have reviewed the above referenced initial site plan and am recommending approval with the following conditions:
Dedication of Dunlora Park Phase I will be required before final site plan approval is granted.
A water/sewer construction plan review submittal is required at the final site plan stage. Submit 3 copies of the
plan along with water and sewer data sheets to the ACSA, Attn: Alexander J. Morrison, PE, to start the review.
Let me know if you have any questions.
Alexander J. Morrison, P.E.
Senior Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(0) 434-977-4511 Ext. 116
(C) 434-981-5577
(F) 434-979-0698
County of Albemarle
a�a r Department of Community Development f
kid 401 McIntire Road, North Wing
Charlottesville Virginia 22902
PLAN REVIEW COMMENTS - E911
APPLICATION#: SDP201700049
TMP: 06100-00-00-16500
DATE: 8/21/2017
FROM: Elise Kiewra
ekiewra0albernarle.org
Geographic Data Services (GDS)
www.albemarle.org/qds
(434) 296-5832 ext. 3030
The following road will need a name:
ALLEY A
Note: As this will be a main access even if the houses front Rio it will need a road name as
emergency vehicles stopping on Rio Rd could cause a safety issue as it is a main road with lots of
traffic.
This site will require a one (1) new private road name. Per Sec. 7-200-B of the County's Road
Naming and Property Numbering Ordinance (Page 2 of PDF).
"It is intended by this article that all roads within the county which serve or are designed
to serve three (3) or more dwelling units or business structures shall be named."
Please review the procedures in the Road Naming and Property Numbering Manual to decide upon
a road name for the road accessing Old Lynchburg Road.
We recommend providing three (3) candidate names for each road to our office for
review, in case your first choices are not acceptable.
A PDF version of the Ordinance and Manual can be found here:
https://www.albemarle.ora/upload/images/Forms Center/Departments/Geographic Data Service
s/Forms/Road Namino and Propertv Numbering Ordinance and Manual.pdf
Please consult the County's Road Name Index to check your road names prior to submittal. The
Index can be found here: http://www.albemarle.org/albemarle/upload/images/webapps/roads/
Parcel and mapping information can be found here: http://gisweb.albemarle.org/
If you should have any questions, please do not hesitate to contact our office.
Review Comments for SDP201700049
Project Name: DUNLORA PARD - PHASE II --INITIAL
Date Completed: Monday, August 21, 2017
Reviewer: Robbie Gilmer
Based on plans dated 8/7/17.
No comments or objections.
Department/Division/A
i Fire Rescue
Review Comments for SDP201700049
Project Name: DUNLORA PARK - PHASE 11 --INITIAL
Date Completed: Tuesday, August 29, 2017
Reviewer: Michael Dellinger
FNo Objections
1
DepartmentlDivision/A
I CDD lnsoections