Loading...
HomeMy WebLinkAboutWPO201700045 Calculations WPO VSMP 2017-08-10 D 0 ID 0 a) a) N a) 3 .3 Q Cr Cr 0- CD a) a) a) cc cc cc cc N O N N 0_ O s){Jewaa ai as as U)) o' a a n a i) Tu Tu -d3 a) > > > > a) aJ a) a) J J J J O) C) ) CO CO ,- M (31) M CO 0 U) V MoIJ;o y;daa J(oI. 'p o 0 ci 0 0 CO , P0Ian JA 'A CO 0 N o M , Q N M N V V > O O O O O n aoo s6uiuueLAI'u o 0 C) 0 C) _ N. O O O O C) 3 v N 0 N N Cl N (j o aa) 6wuilIauuey3 H H H H H 0 >>' 0 0 0 0 0 > H cl a D O 0 o C) > > > > > c.0 w O O O M O O O o ado's ieuipn;i6uoi'S O LL') O CO toII o CO 0 CO 0 C O O O O O y;piM wouoq o 0 0 C. 0 N O O O O L O $ (Vx)ado's apis;y6u o v v v v a (�.x)ado's apis ua� o v o v `Cr N V > r (s;o)M011JAQ� oc,-) QLD O N Ci CO as a) . N a (S;0)Moi}iii 'Zo N V O O N N O N N .- M O M O (;iSa;uI J(C)l 'OH l nO CO CO C) m m 0 I co co co ui co co ai C lc;lsa;u�JAZ 'zi N- m u' "' u' 6 " APPROVED E2 (up)'ouoo;o awi;bl 0 0 C. o o r CV by the Albemarle County ui - L; C •- Community Development Department b. Date 8/IOloll u7 wits M7Doo'S o V up o 0C) File o Pa;e�nwnooe wns VO V Co N N C. 4 O O O O O Ci O C 0 v �n O c) o luawaJoui V� v o v m CV CV o O Co Qa) = x 0 0 0 0 0 0 as Cf) co u-.) ) O CooCoao H 44903 ieuogei'0 V up Vu.) CU C ..1- C C o a 0 a a 0 0 0) CO 12 (sane) 0) Co_ rn c.,,i01 CCO) r0-) o C eaJV a6euieJp'y a 0 0 o o c\i > aJ wa3 Q J u�u 5 5 JO.;aa Pue aweN cn o o -5 f) C ca Cl) (n (n > IO J J J I— 0 RATIONAL METHOD WORKSHEET Project: Date: Shytle 17/201 7 Designer: AGF Watershed ID: LS#1/Swalel Drainage Area: 0.94 Acres c-factor: 0.48 (see worksheet) tc: 5.00 mins. (see worksheet) Q(2): 2.32 cfs Q(10): 3.03 cfs Time of Concentration Worksheet Weighted c-factor Worksheet Overland Flow Time Cover Type Area c areaxcn Source: Seelye Chart as modified in VDOT Drainage Manual(Fig.1.5.1.1 Impervious 0.07 0.90 0.06 on Page 1-13E) Lawn 0.87 0.45 0.39 Notes: 0.00 1)Length of overland flow always<=200 ft 0.00 2)Calculate a separate Tc for each ground cover condition along the flow path 0.00 c-factor= 0.48 35.00 Enter Length of Strip(ft) Sample"C"values: 2.00 Enter Slope(%or fU100ft) 0.22 Dense grass 0.90 Enter Rational Method"C"value 0.28 Average grass 0.36 Poor grass 2.34 Result Tc(minutes) 0.48 Bare soil 0.90 Pavement Shallow Concentrated Flow Time Pipe Flow Time 1 Source: SCS Velocity Graph as published in Virginia Erosion and Assumes 5 ft/s velocity in pipe Sediment Control Handbook,Third Edition(Plate 5-2 on Page V-12) 0.00 Enter Length of Flow in Pipe(ft)(estimated) Notes: 1)Not intended for well-defined channels-see channel flow calculation 0.00 Result Tc(minutes) 2)Calculate a separate Tc for each ground cover condition along the flow path 350.00 Enter Length of Flow(ft) 2.00 Enter Slope(%or fU100ft) 2.57 Result Tc(minutes)IF UNPAVED Result Tc(minutes)IF PAVED Pipe Flow Time 2 Pipe Flow Time 3 Assumes 5 ft/s velocity in pipe Assumes 5 fUs velocity in pipe 0.00 Enter Length of Flow in Pipe(ft) 0.00 Enter Length of Flow in Pipe(ft) 0.00 Result Tc(minutes) 0.00 Result Tc(minutes) Channel Flow Time 1 Channel Flow Time 2 Source: Kirpich Chart as modified in VDOT Drainage Manual Source: Kirpich Chart as modified in VDOT Drainage Manual Notes: Notes: 1)For small drainage basins. 1)For small drainage basins. 2)For concrete channels,use 0.2*Tc 2)For concrete channels,use 0.2*Tc 0.00 Enter Length of Flow(ft) 0.00 Enter Length of Flow(ft) 30.00 Enter Height of most remote point along flow path above outlet 10.00 Enter Height of most remote point along flow path above outlet 0.00 Result Tc(minutes) 0.00 Result Tc(minutes) Channel Flow Time 3 Source: Kirpich Chart as modified in VDOT Drainage Manual Notes: 1)For small drainage basins. 2)For concrete channels,use 0.2*Tc 0.00 Enter Length of Flow(ft) 1.00 Enter Height of most remote point along flow path above outlet 0.00 Result Tc(minutes) RATIONAL METHOD WORKSHEET Project: Shytle METHDate: 7/17/2017 Designer: AGF Watershed ID: LS#2/DitchL2 Drainage Area: 0.16 Acres c-factor: 0.65 (see worksheet) tc: 5.00 mins. (see worksheet) Q(2): 0.53 cfs Q(10): 0.69 cfs Time of Concentration Worksheet Weighted c-factor Worksheet Overland Flow Time Cover Type Area c areaxcn Source: Seelye Chart as modified in VDOT Drainage Manual(Fig.1.5.1.1 Impervious 0.07 0.90 0.06 on Page 1-13E) Managed Turf 0.09 0.45 0.04 Notes: 0.00 1)Length of overland flow always<=200 ft 0.00 2)Calculate a separate Tc for each ground cover condition along the flow path 0.00 c-factor= 0.65 35.00 Enter Length of Strip(ft) Sample"C"values: 2.00 Enter Slope(%or ft/100ft) 0.22 Dense grass 0.90 Enter Rational Method"C"value 0.28 Average grass 0.36 Poor grass 2.34 Result Tc(minutes) 0.48 Bare soil 0.90 Pavement Shallow Concentrated Flow Time Pipe Flow Time 1 Source: SCS Velocity Graph as published in Virginia Erosion and Assumes 5 ft/s velocity in pipe Sediment Control Handbook,Third Edition(Plate 5-2 on Page V-12) 0.00 Enter Length of Flow in Pipe(ft)(estimated) Notes: 1)Not intended for well-defined channels-see channel flow calculation 0.00 Result Tc(minutes) 2)Calculate a separate Tc for each ground cover condition along the flow path 350.00 Enter Length of Flow(ft) 2.00 Enter Slope(%or ft/100ft) 2.57 Result Tc(minutes)IF UNPAVED Result Tc(minutes)IF PAVED Pipe Flow Time 2 Pipe Flow Time 3 Assumes 5 ft/s velocity in pipe Assumes 5 ft/s velocity in pipe 0.00 Enter Length of Flow in Pipe(ft) 0.00 Enter Length of Flow in Pipe(ft) 0.00 Result Tc(minutes) 0.00 Result Tc(minutes) Channel Flow Time 1 Channel Flow Time 2 Source: Kirpich Chart as modified in VDOT Drainage Manual Source: Kirpich Chart as modified in VDOT Drainage Manual Notes: Notes: 1)For small drainage basins. 1)For small drainage basins. 2)For concrete channels,use 0.2`Tc 2)For concrete channels,use 0.2*Tc 0.00 Enter Length of Flow(ft) 0.00 Enter Length of Flow(ft) 30.00 Enter Height of most remote point along flow path above outlet 10.00 Enter Height of most remote point along flow path above outlet 0.00 Result Tc(minutes) 0.00 Result Tc(minutes) Channel Flow Time 3 Source: Kirpich Chart as modified in VDOT Drainage Manual Notes: 1)For small drainage basins. 2)For concrete channels.use 0.2*Tc 0.00 Enter Length of Flow(ft) 1.00 Enter Height of most remote point along flow path above outlet 0.00 Result Tc(minutes) RATIONAL METHOD VOTKSFIET Project: Date: Shytle 17/201 7 Designer: AGF Watershed ID: LS#3/DitchR2 Drainage Area: 0.90 Acres c-factor: 0.49 (see worksheet) tc: 5.00 mins. (see worksheet) Q(2): 2.23 cfs Q(10): 2.91 cfs Time of Concentration Worksheet Weighted c-factor Worksheet Overland Flow Time Cover Type Area c areaxcn Source: Seelye Chart as modified in VDOT Drainage Manual(Fig. 1.5.1.1 Impervious 0.07 0.90 0.06 on Page 1-13E) Managed Turf 0.83 0.45 0.37 Notes: 0.00 1)Length of overland flow always<=200 ft 0.00 2)Calculate a separate Tc for each ground cover condition along the flow path 0.00 c-factor= 0.49 35.00 Enter Length of Strip(ft) Sample"C"values: 2.00 Enter Slope(%or ft/100ft) 0.22 Dense grass 0.90 Enter Rational Method"C"value 0.28 Average grass 0.36 Poor grass 2.34 Result Tc(minutes) 0.48 Bare soil 0.90 Pavement Shallow Concentrated Flow Time Pipe Flow Time 1 Source: SCS Velocity Graph as published in Virginia Erosion and Assumes 5 ft/s velocity in pipe Sediment Control Handbook,Third Edition(Plate 5-2 on Page V-12) 0.00 Enter Length of Flow in Pipe(ft)(estimated) Notes: 1)Not intended for well-defined channels-see channel flow calculation 0.00 Result Tc(minutes) 2)Calculate a separate Tc for each ground cover condition along the flow path 350.00 Enter Length of Flow(ft) 2.00 Enter Slope(%or ft/100ft) 2.57 Result Tc(minutes)IF UNPAVED Result Tc(minutes)IF PAVED Pipe Flow Time 2 Pipe Flow Time 3 Assumes 5 ft/s velocity in pipe Assumes 5 ft/s velocity in pipe 0.00 Enter Length of Flow in Pipe(ft) 0.00 Enter Length of Flow in Pipe(ft) 0.00 Result Tc(minutes) 0.00 Result Tc(minutes) Channel Flow Time 1 Channel Flow Time 2 Source: Kirpich Chart as modified in VDOT Drainage Manual Source: Kirpich Chart as modified in VDOT Drainage Manual Notes: Notes. 1)For small drainage basins. 1)For small drainage basins. 2)For concrete channels,use 0.2*Tc 2)For concrete channels,use 0.2`Tc 0.00 Enter Length of Flow(ft) 0.00 Enter Length of Flow(ft) 30.00 Enter Height of most remote point along flow path above outlet 10.00 Enter Height of most remote point along flow path above outlet 0.00 Result Tc(minutes) 0.00 Result Tc(minutes) Channel Flow Time 3 Source: Kirpich Chart as modified in VDOT Drainage Manual Notes: 1)For small drainage basins. 2)For concrete channels,use 0.2'Tc 0.00 Enter Length of Flow(ft) 1.00 Enter Height of most remote point along flow path above outlet 0.00 Result Tc(minutes) RATIONAL METHOD WORKSHEET Project: Shytle Date: 7/17/2017 Designer: AGE Watershed ID: LS#4 Drainage Area: 0.36 Acres c-factor: 0.58 (see worksheet) tc: 5.00 mins. (see worksheet) Q(2): 1.06 cfs Q(10): 1.38 cfs Time of Concentration Worksheet Weighted c-factor Worksheet Overland Flow Time Cover Type Area c areaxcn Source: Seelye Chart as modified in VDOT Drainage Manual(Fig.1.5.1.1 Impervious 0.10 0.90 0.09 on Page 1-13E) Managed Turf 0.26 0.45 0.12 Notes: 0.00 1)Length of overland flow always<=200 ft 0.00 2)Calculate a separate Tc for each ground cover condition along the flow path 0.00 c-factor= 0.58 35.00 Enter Length of Strip(ft) Sample"C"values: 2.00 Enter Slope(%or ft/100ft) 0.22 Dense grass 0.90 Enter Rational Method"C"value 0.28 Average grass 0.36 Poor grass 2.34 Result Tc(minutes) 0.48 Bare soil 0.90 Pavement Shallow Concentrated Flow Time Pipe Flow Time 1 Source: SCS Velocity Graph as published in Virginia Erosion and Assumes 5 ft/s velocity in pipe Sediment Control Handbook,Third Edition(Plate 5-2 on Page V-12) 0.00 Enter Length of Flow in Pipe(ft)(estimated) Notes: 1)Not intended for well-defined channels-see channel flow calculation 0.00 Result Tc(minutes) 2)Calculate a separate Tc for each ground cover condition along the flow path 350.00 Enter Length of Flow(ft) 2.00 Enter Slope(%or ft/100ft) 2.57 Result Tc(minutes)IF UNPAVED Result Tc(minutes)IF PAVED Pipe Flow Time 2 Pipe Flow Time 3 Assumes 5 ft/s velocity in pipe Assumes 5 ft/s velocity in pipe 0.00 Enter Length of Flow in Pipe(ft) 0.00 Enter Length of Flow in Pipe(ft) 0.00 Result Tc(minutes) 0.00 Result Tc(minutes) Channel Flow Time 1 Channel Flow Time 2 Source: Kirpich Chart as modified in VDOT Drainage Manual Source: Kirpich Chart as modified in VDOT Drainage Manual Notes: Notes: 1)For small drainage basins. 1)For small drainage basins. 2)For concrete channels,use 0.2*Tc 2)For concrete channels,use 0.2*Tc 0.00 Enter Length of Flow(ft) 0.00 Enter Length of Flow(ft) 30.00 Enter Height of most remote point along flow path above outlet 10.00 Enter Height of most remote point along flow path above outlet 0.00 Result Tc(minutes) 0.00 Result Tc(minutes) Channel Flow Time 3 Source: Kirpich Chart as modified in VDOT Drainage Manual Notes: 1)For small drainage basins. 2)For concrete channels,use 0.2*Tc 0.00 Enter Length of Flow(ft) 1.00 Enter Height of most remote point along flow path above outlet 0.00 Result Tc(minutes) RATIONAL METHOD WORKSHEET Project: Date: Shytle 17/201 7 Designer: AGE Watershed ID: DitchLl Drainage Area: 0.12 Acres c-factor: 0.68 (see worksheet) tc: 5.00 mins. (see worksheet) Q(2): 0.41 cfs Q(10): 0.54 cfs Time of Concentration Worksheet Weighted c-factor Worksheet Overland Flow Time Cover Type Area c areaxcn Source: Seelye Chart as modified in VDOT Drainage Manual(Fig.1.5.1.1 Impervious 0.06 0.90 0.05 on Page 1-13E) Managed Turf 0.06 0.45 0.03 Notes: 0.00 1)Length of overland flow always<=200 ft 0.00 2)Calculate a separate Tc for each ground cover condition along the flow path 0.00 c-factor= 0.68 35.00 Enter Length of Strip(ft) Sample"C"values: 2.00 Enter Slope(%or ft/100ft) 0.22 Dense grass 0.90 Enter Rational Method"C"value 0.28 Average grass 0.36 Poor grass 2.34 Result Tc(minutes) 0.48 Bare soil 0.90 Pavement Shallow Concentrated Flow Time Pipe Flow Time 1 Source: SCS Velocity Graph as published in Virginia Erosion and Assumes 5 ft/s velocity in pipe Sediment Control Handbook,Third Edition(Plate 5-2 on Page V-12) 0.00 Enter Length of Flow in Pipe(ft)(estimated) Notes: 1)Not intended for well-defined channels-see channel flow calculation 0.00 Result Tc(minutes) 2)Calculate a separate Tc for each ground cover condition along the flow path 350.00 Enter Length of Flow(ft) 2.00 Enter Slope(%or ft/100ft) 2.57 Result Tc(minutes)IF UNPAVED Result Tc(minutes)IF PAVED Pipe Flow Time 2 Pipe Flow Time 3 Assumes 5 ft/s velocity in pipe Assumes 5 fUs velocity in pipe 0.00 Enter Length of Flow in Pipe(ft) 0.00 Enter Length of Flow in Pipe(ft) 0.00 Result Tc(minutes) 0.00 Result Tc(minutes) Channel Flow Time 1 Channel Flow Time 2 Source: Kirpich Chart as modified in VDOT Drainage Manual Source: Kirpich Chart as modified in VDOT Drainage Manual Notes: Notes: 1)For small drainage basins. 1)For small drainage basins. 2)For concrete channels,use 0.2*Tc 2)For concrete channels,use 0.2`Tc 0.00 Enter Length of Flow(ft) 0.00 Enter Length of Flow(ft) 30.00 Enter Height of most remote point along flow path above outlet 10.00 Enter Height of most remote point along flow path above outlet 0.00 Result Tc(minutes) 0.00 Result Tc(minutes) Channel Flow Time 3 Source: Kirpich Chart as modified in VDOT Drainage Manual Notes:: 1)For small drainage basins. 2)For concrete channels,use 0.2*Tc 0.00 Enter Length of Flow(ft) 1.00 Enter Height of most remote point along flow path above outlet 0.00 Result Tc(minutes) • RATIONAL METHOD 'y ORKSHEET Project: Shytle Date: 7/17/2017 Designer: AGF Watershed ID: DitchRl Drainage Area: 1.29 Acres c-factor: 0.50 (see worksheet) tc: 11.72 mins. (see worksheet) Q(2): 2.43 cfs Q(10): 3.23 cfs Time of Concentration Worksheet Weighted c-factor Worksheet Overland Flow Time(from LS#3) Cover Type Area c areaxcn Source: Seelye Chart as modified in VDOT Drainage Manual(Fig.1.5.1.1 Impervious 0.06 0.90 0.05 on Page 1-13E) Managed Turf 0.33 0.45 0.15 Notes: Impervious from LS#3 0.07 0.90 0.06 1)Length of overland flow always<=200 ft Managed Turf from LS#3 0.83 0.45 0.37 2)Calculate a separate Tc for each ground cover condition along the flow path 0.00 c-factor= 0.50 200.00 Enter Length of Strip(ft) Sample"C"values: 7.00 Enter Slope(%or ft/100ft) 0.22 Dense grass 0.30 Enter Rational Method"C"value 0.28 Average grass 0.36 Poor grass 11.51 Result Tc(minutes) 0.48 Bare soil 0.90 Pavement Shallow Concentrated Flow Time Pipe Flow Time 1 Source: SCS Velocity Graph as published in Virginia Erosion and Assumes 5 ft/s velocity in pipe Sediment Control Handbook,Third Edition(Plate 5-2 on Page V-12) 0.00 Enter Length of Flow in Pipe(ft)(estimated) Notes: 1)Nof intended for well-defined channels-see channel flow calculation 0.00 Result Tc(minutes) 2)Calculate a separate Tc for each ground cover condition along the flow path 60.00 Enter Length of Flow(ft) 8.33 Enter Slope(%or ft/100ft) 0.21 Result Tc(minutes)IF UNPAVED Result Tc(minutes)IF PAVED Pipe Flow Time 2 Pipe Flow Time 3 Assumes 5 ft/s velocity in pipe Assumes 5 ft/s velocity in pipe 0.00 Enter Length of Flow in Pipe(ft) 0.00 Enter Length of Flow in Pipe(ft) 0.00 Result Tc(minutes) 0.00 Result Tc(minutes) Channel Flow Time 1 Channel Flow Time 2 Source: Kirpich Chart as modified in VDOT Drainage Manual Source: Kirpich Chart as modified in VDOT Drainage Manual Notes: Notes: 1)For small drainage basins. 1)For small drainage basins. 2)For concrete channels,use 0.2`Tc 2)For concrete channels,use 0.2*Tc 0.00 Enter Length of Flow(ft) 0.00 Enter Length of Flow(ft) 30.00 Enter Height of most remote point along flow path above outlet 10.00 Enter Height of most remote point along flow path above outlet 0.00 Result Tc(minutes) 0.00 Result Tc(minutes) Channel Flow Time 3 Source: Kirpich Chart as modified in VDOT Drainage Manual Notes: 1)For small drainage basins. 2)For concrete channels,use 0.2*Tc 0.00 Enter Length of Flow(ft) 1.00 Enter Height of most remote point along flow path above outlet 0.00 Result Tc(minutes) • RATIONAL METHOD WORKSHEET ORKSHEE :1 Project: Shytle Date: 7/17/2017 Designer: AGF Watershed ID: Driveway Culvert Drainage Area: 2.00 Acres c-factor: 0.43 (see worksheet) tc: 11.77 mins. (see worksheet) Q(2): 3.23 cfs Q(10): 4.29 cfs Time of Concentration Worksheet Weighted c-factor Worksheet Overland Flow Time(from LS#3) Cover Type Area c areaxcn Source: Seelye Chart as modified in VDOT Drainage Manual(Fig.1.5.1.1 Impervious 0.13 0.90 0.12 on Page 1-13E) Managed Turf 1.16 0.45 0.52 Notes: Undeveloped Land 0.71 0.30 0.21 1)Length of overland flow always<=200 ft 0.00 2)Calculate a separate Tc for each ground cover condition along the flow path 0.00 c-factor= 0.43 200.00 Enter Length of Strip(ft) Sample"C"values: 7.00 Enter Slope(%or fU100ft) 0.22 Dense grass 0.30 Enter Rational Method"C"value 0.28 Average grass 0.36 Poor grass 11.51 Result Tc(minutes) 0.48 Bare soil 0.90 Pavement Shallow Concentrated Flow Time Pipe Flow Time 1 Source: SCS Velocity Graph as published in Virginia Erosion and Assumes 5 Ws velocity in pipe Sediment Control Handbook,Third Edition(Plate 5-2 on Page V-12) 0.00 Enter Length of Flow in Pipe(ft)(estimated) Notes: 1)Not intended for well-defined channels-see channel flow calculation 0.00 Result Tc(minutes) 2)Calculate a separate Tc for each ground cover condition along the flow path 75.00 Enter Length of Flow(ft) 8.33 Enter Slope(%or fU100ft) 0.27 Result Tc(minutes)IF UNPAVED Result Tc(minutes)IF PAVED Pipe Flow Time 2 Pipe Flow Time 3 Assumes 5 ft/s velocity in pipe Assumes 5 ft/s velocity in pipe 0.00 Enter Length of Flow in Pipe(ft) 0.00 Enter Length of Flow in Pipe(ft) 0.00 Result Tc(minutes) 0.00 Result Tc(minutes) Channel Flow Time 1 Channel Flow Time 2 Source: Kirpich Chart as modified in VDOT Drainage Manual Source: Kirpich Chart as modified in VDOT Drainage Manual Notes: Notes: 1)For small drainage basins. 1)For small drainage basins. 2)For concrete channels,use 0.2*Tc 2)For concrete channels,use 0.2*Tc 0.00 Enter Length of Flow(ft) 0.00 Enter Length of Flow(ft) 30.00 Enter Height of most remote point along flow path above outlet 10.00 Enter Height of most remote point along flow path above outlet 0.00 Result Tc(minutes) 0.00 Result Tc(minutes) Channel Flow Time 3 Source: Kirpich Chart as modified in VDOT Drainage Manual Notes: 1)For small drainage basins. 2)For concrete channels,use 0.2*Tc 0.00 Enter Length of Flow(ft) 1.00 Enter Height of most remote point along flow path above outlet 0.00 Result Tc(minutes) Culvert Report Hydraflow Express Extension for Autodesk®AutoCAD®Civil 3D®by Autodesk,Inc. Monday,Jul 17 2017 18 Inch RCP Culvert Invert Elev Dn (ft) = 733.00 Calculations Pipe Length (ft) = 20.00 Qmin (cfs) = 4.00 Slope (%) = 1.25 Qmax (cfs) = 5.00 Invert Elev Up (ft) = 733.25 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 18.0 Shape = Circular Highlighted Span (in) = 18.0 Qtotal (cfs) = 4.00 No. Barrels = 1 Qpipe (cfs) = 4.00 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 2.79 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 4.39 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 734.13 HGL Up (ft) = 734.02 Embankment Hw Elev (ft) = 734.36 Top Elevation (ft) = 735.00 Hw/D (ft) = 0.74 Top Width (ft) = 19.00 Flow Regime = Inlet Control Crest Width (ft) = 50.00 Elev(ft) 18 Inch RCP Culvert Hw Dean in) 736.00 275 735.50 2.25 735 00 1 75 736.50 1.25 -. Inlet control 736.00 075 7350 025 733.00 - -0.25 732.50 -0.75 0 2 4 6 8 10 12 Id 16 18 20 22 24 26 28 CiradarC0lvert HGL EmbanA Re h Iftj