HomeMy WebLinkAboutWPO201700038 Permit 2017-10-10COMMONWEALTH of VIRGINIA
DEPARTMENT OF ENVIRONMENTAL QUALITY
Street address: 629 East Main Street, Richmond, Virginia 23219
Molly Joseph Ward Mailing address: P.O. Box 1105, Richmond, Virginia 23218
Secretary of Natural Resources www.deq.virginia.gov
October 10, 2017
University of Virginia Foundation
PO Box 400218
Charlottesville, VA 22904
cds7c@virginia.edu
RE: Coverage under the VPDES Construction General Permit (VAR10)
General Permit No. VARlOK327
University of Virginia Squash Facility
Commercial
Albemarle
Dear Permittee:
David K. Paylor
Director
(804) 698-4000
1-800-592-5482
DEQ has reviewed your Registration Statement received on May 08, 2017 and determined that the proposed
land -disturbing activity is covered under the General VPDES Permit for Discharges of Stormwater from
Construction Activities (VAR10). The effective date of your coverage under this general permit is July 1, 2014 or
the date of this letter, whichever is later.
A copy of the general permit can be obtained from DEQ's webpage at the following location:
http://www.deg.virginia.gov/Portals/0/DEQ/Water/Publications/CGP2014.pdf.
The general permit contains the applicable Stormwater Pollution Prevention Plan (SWPPP) requirements and
other conditions of coverage. Please print the general permit and read it carefully as you will be responsible for
compliance with all permit conditions.
DEQ staff has determined that the proposed land -disturbing activity will discharge to a surface water identified
as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of the
general permit for (i) sediment or a sediment -related parameter or (ii) nutrients. Therefore, the following general
permit (Part 1.B.4) and SWPPP requirements (Part II.A.5) must be implemented for the land -disturbing activity:
• Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after
final grade is reached on any portion of the site;
• Nutrients (e.g., fertilizers) shall be applied in accordance with manufacturer's recommendations or an
approved nutrient management plan and shall not be applied during rainfall events;
• Inspections shall be conducted at a frequency of (i) at least once every four (4) business days or (ii) at
least once every (5) business days and no later than 48 hours following a measurable storm event. In the
event that a measurable storm event occurs when there are more than 48 hours between business days,
the inspection shall be conducted on the next business day; and
• Representative inspections used by utility line installation, pipeline construction, or other similar linear
construction activities shall inspect all outfalls.
The general permit will expire on June 30, 2019. The conditions of the general permit require that you submit
a new registration statement at least 90 days prior to that date if you wish to continue coverage under the general
permit, unless permission for a later date has been granted by the Board. Permission cannot be granted to
submit the registration statement after the expiration date of the general permit.
If you have any questions about this permit, please contact the DEQ Office of Stormwater Management at
Construction GP@deq.virg inia.gov.
Sincerely,
Frederick K. Cunningham, Director
Office of Water Permits
2
COUNTY OF ALBEMARLE
Community Development
401 McIntire Road
Charlottesville, Vriginia 22902-4596
(434)296-5832
EROSION CONTROL PERMIT
Date of Application. 05/08/2017
Permit Effective Date: 10/03/2017 Number:
LANDOWNER: UNIVERSITY OF VIRGINIA HOST PROPERTIES INC Phone:
P O BOX 5307
CHARLOTTESVILLE VA22905-5307
CONTRACTOR: KJELLSTROM AND LEE CONSTRUCTION
1607 OWNBY LANE
RICHMOND, VA23220
REPONSIBLE LAND CONTOUR CONSTRUCTION - SHEILA SCOTT
DISTURBER: 1713 ALLIED ST SUITE 2B
CHARLOTTESVILLE, VA22903
Certification/License #: RLD06224
Plans Prepared By: BARTZEN + BALL
Plans Dated: 09/11/2017
Plans Entitled: UVA SQUASH FACILITY AT BOAR'S HEAD
ADDIDTION TO MSC
Tax Map: 059D2-01-00-01500
WPO -2017-00038
Phone: (804) 836-2584
Phone: (434) 466-1980
Type: Responsible Land Disturber
Last Revised: 09/25/2017
Location:
Dist. 1.39
Acreage:
Hydrological JR15
Unit:
Additional Information. Annual Maintenance Fees [Sections 11-20 & tuts or the Albemarle County Code] — Annual maintenance
fees will be assessed in March of every year this permit is active. Fees cannot be prorated after the first year
of permit issuance.
Issued By: Kenny Thacker Title: Erosion Control Officer
A /�' to -3 -17
gnature Date
Request for Pre-construction Meeting and Grading Permit
from Albemarle County -Veep
Approved Plan Number: WPO-201700038
Approved Plan Name: University Of Virginia Foundation Squash Facility at Boar's Head Addition
(Plans must be approved prior to a pre-construction meeting.)
Bond approved date: 10/2/2017
(Bonds must be approved and posted prior to a pre-construction meeting or permit.)
Responsible Land Disturber:
Print Name: Contour Construction - Sheila Scott (Project Manager)
State Certification Number: RLD06224 Exp. Date: 03/09/2020
Address 1713 Allied St. Sutie 2B
City Charlottesville State VA Zip 22903
Daytime Phone(434) 466-1980 E-mail sheila@contourconstruction.net
Primary Contractor:
Print Name Kjellstrom and Lee Construction -Jarrett Craddock (Project Manager)
Address 1607 Ownby Lane
City Richmond State VA Zip 23220
Daytime Phone(804) 836-2584 E-mail jraddock@kjellstromandlee.com
Permit Issuance and First Year Maintenance Fees: (Request must include payment)
Total acres proposed to be disturbed is contained on the approved plan and application:
VSMP:
Acres to be disturbed Fee Due at Grading Permit
Less than 1 $63A0
less than 5
5 and less than 10 $748.00
10 and less than 50 $990.00
50 and less than 100 $1,342.00
100 and m?re $2,112.00
For plans exempt from VSMP,VESCP fees were paid with the application.
•
7/1/14,Revised: 8/29/14 Page 1 of 3
Person(s)to attend the Pre-construction Meeting:
Names(type or print) Firm Contact Number or email
Josh Gibson Kjellstrom and Lee 540-292-2734
Richard Fronczak Kjellstrom and Lee 804-836-3299
Jarrett Craddock Kjellstrom and Lee 804-836-2584
Sheila Scott Contour Construction 434-466-1980
Patrick Estep Contour Construction 434-981-0358
The second part of the application fee is required to be paid with this request. This fee amount is;
FOR OFFICE USE ONLY Permit Issued Date
By who?
7/1/14,Revised: 8/29/14 Page 2 of 3
•
Information for Permit applicants;
9-Month Permanent Stabilization Deadline:
Code Sec. 17-808 Duty to stabilize denuded areas with permanent vegetation within nine months after
commencing land disturbing activity
A. When permanent vegetation required. The owner shall install on all denuded areas on the site within nine(9)
months after the date the land disturbing activity commenced, except for areas that the administrator
determines are necessary parts of the construction that are subject to an active building permit and areas where
erosion is prevented by a non-erosive surface,including,but not limited to,the following surfaces: (i)
roadways and sidewalks covered by gravel, asphalt pavement, or concrete; (ii)trails or paths covered by
gravel, stone dust, or mulch; (iii)buildings and other permanent structures; and such other surfaces that the
administrator determines would adequately provide a permanent barrier to erosion.
(see code 17-808 for information about possible extensions)
Notice to Comply and Permit Revoked for Overdue Fees
Late fees will incur interest, and enforcement actions per code section 17-210.
(1) Owners with late payments of fees required by 17-207C6 will be issued a Notice to Comply(NTC). The notice
gives 7 days to make payments.
(2) At the end of the NTC time period,the permit will be revoked, and a Stop Work Order will be issued for
working without a current permit.
Disturbed Area Reductions
Acreage for the purpose of fee computations will be the entire permitted acreage. This is the disturbed acreage on
approved plans. If fees are to be reduced,an application for plan amendment must be made, and areas reduced by
changes in limits of disturbance and appropriate plan changes. Such amendments must be approved prior to the fee
due date. Amendments to remove disturbed areas can only be approved when such areas are completely stabilized and
all erosion control measures (including traps and basins)removed.
Refunds
The County does not have a refund program. Fees will not be refunded based on completion within the year. Fees will
not be pro-rated at payment, other than the first year VSMP fee as indicated in code section 17-2098.
Re-inspection Fees
Re-Inspection Fees WiIl`bt charged for inspections following a Notice to Comply or a Stop Work Order. Fees are$250
per inspection,or as given in code sections 17-207 and 17-208.
7/1/14,Revised: 8/29/14 Page 3 of 3
*
1-1 00 -I
11
m m y
fp o n M
? 0 0�„a•
I- I W 1 ›
Q � �_ -� W o
rri
Q m o o L H Cn
W -��' c �' n C O t d_
m o� o ,-.rt.*
,ti, <. m D O < o /(�Q
Lfl N n) 3 M =_ , _,
N Q "1 Z 0 z C
i N Co Q co m oo - -
CO
�f N ,_)1 c
M Cn +1 v
CI 1
m O N
O m a1 m
a tn o ; >' C7
O y a• CD c
r m '0 �,,,
0 i m - e-h
ru __ w o
O n N
r
0 0 N ,y
W O 0 Toy c Q _ 0 0, ca i
z N -Di == m - u,`� CD
ru 0 -% m 0E o a..)° n DO
W z V Z'4 0 (AN C ".'1
ul m1:1) m x .'•y "O j
C)Z
m i)) tr-_-_•.) ZD n33 I
C7a
C Z
z
,! cn o to
c,
I m N
0i N Q
0
i(._r II\31z 7 I(:1) .� • :
I G 0-. ,Inc'. by �.�,� j
i 0