HomeMy WebLinkAboutWPO201500007 Correspondence WPO VSMP 2015-11-20 Todd Shifflett
From: Mike Myers<mmyers@dominioneng.com>
Sent: Friday, November 20, 2015 10:55 AM
To: Todd Shifflett
Subject: RE: WPO 2015-0007 Avemore
Thanks Todd!
From: Todd Shifflett [mailto:tshifflett@albemarle.org]
Sent: Friday, November 20, 2015 10:54 AM
To: Mike Myers
Subject: RE: WPO 2015-0007 Avemore
Thanks, someone will be in touch.
From: Mike Myers [mailto:mmyers@dominioneng.com]
Sent: Friday, November 20, 2015 10:26 AM
To:Todd Shifflett<tshifflett@albemarle.org>
Cc: Dan Upton <danuptonsr@aol.com>
Subject:WPO 2015-0007 Avemore
Todd, Per our discussion,enclosed is the revised registration statement per Michelle's approval letter(attached for your
convenience). We are hopeful that an engineer can review this in fairly short order so that we can obtain approval and
have you enter the information into the DEQ database. Please note that we have updated the SWPPP to address her
comments. I had two follow-up questions.
1) How long does it take typically for DEQ to issue their permit letter once you enter it into the computer.
It usually takes DEQ about 5-7 business days.
2) Can we get the go-ahead for Ryan to start construction once you enter the information into the computer? That
would be extremely helpful.
They have not been doing that until after the pre-construction meeting. But that is a decision that I can't
make. You would have to talk with the reviewer(I'll let you know who that will be)or Glenn Brooks once it's
entered into the system for DEQ.
Thanks so much for your help, Mike
Michael F. Myers, P.E., C.F.M.
Director of Engineering
Dominion Engineering and Design, LLC
172 South Pantops Drive
Charlottesville, VA 22911
434.979.8121 ext. 2 (office)
434.906.3161 (mobile)
Please visit our website at: www.dominioneng.com
Look for us and like us on Facebook!
1
1
r+
o<+ Dominion
Englnesring b
, Dosign, LLC
i-rt
t
2