HomeMy WebLinkAboutWPO201700038 Calculations 2017-05-08 Dewberry I I II *tki University of Virginia I Foundation UVA Squash Facility at Boar's Head Addtion II 100% Construction Documents 1 May 8, 2017 BUY VIRGINIA SUBMITTED BY: Iiii .�,1.'TH o Dewberry tom, a4805 Lake Brook Drive Glen Allen,Virginia 23060 oms • e 804.290.7957 DEVIN M. KEELER •: SUBMITTED TO: .46 • e, iliUniversity of Virginia �g ` TO `I Foundation One Boar's Head Pointe %0NALOC$ Charlottesville,Virginia 22903 L rr err Ir ri L L L • Dewberry Engineers Inc. 804.290.7957 Dewberry. 4805 Lake Brook Drive, Suite 200 804.290.7928 fax Gler Alien,VA 23060 www.dewberry.corn UNIVERSITY OF VIRGINIA FOUNDATION UVA Squash Facility at Boar's Head Addition May 8, 2017 100% Construction Documents Division 00— PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 15 List of Drawing Sheets 05/08/2017 Division 02— Existing Conditions 02 41 19 Site Demolition 05/08/2017 ir• Division 03— Concrete 03 30 00 Cast-In-Place Concrete 05/08/2017 Division 31 - Earthwork 31 10 00 Site Preparation: Clearing and Grubbing 05/08/2017 31 20 00 Earth Moving 05/08/2017 31 23 19 Dewatering 05/08/2017 31 25 00 Erosion and Sediment Control 05/08/2017 Division 32— Exterior Improvements trl. 32 12 16 Asphalt Paving 05/08/2017 32 13 13 Concrete Paving 05/08/2017 Division 33— Utilities 33 01 00 Utility Line Testing 05/08/2017 33 05 00 Earthwork: Utilities 05/08/2017 33 05 13 Pre-Cast Concrete: Manholes 05/08/2017 33 05 26 Utility Location and Identification 05/08/2017 33 11 00 Potable Water Systems 05/08/2017 ha 33 31 13 Sanitary Sewer/Gravity Piping 05/08/2017 33 41 00 Storm Sewer Piping 05/08/2017 33 63 14 Precast Concrete: Utility Structures 05/08/2017 Appendix A Pemco Lighting Products— Light Fixture Detail 05/08/2017 los END OF SECTION 00 01 02 Dewberry Engineers Inc. Table of Contents DEI#50092624 00 01 02-1 Errs imp im. ito imr ire irr• Iwo University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 SECTION 00 01 15 LIST OF DRAWING SHEETS GENERAL T1.01 Cover Sheet 05/08/2017 CIVIL C0.01 General Notes 05/08/2017 C0.02 Erosion and Sediment Control Notes 05/08/2017 C0.03 Site Overview 05/08/2017 ,, C0.04 Soils Map 05/08/2017 C1.01 Existing Site Conditions 05/08/2017 C2.01 Demolition and E&S Control Phase I Plan 05/08/2017 C3.01 Site Plan 05/08/2017 C3.02 Grading, Drainage, and E&S Control Phase II Plan 05/08/2017 C3.03 Grading, Drainage, and E&S Control Phase II Plan 05/08/2017 C3.04 Utility Plan 05/08/2017 ii" C4.01 Utility Profiles 05/08/2017 C4.02 Utility Profiles 05/08/2017 C4.03 Utility Profiles 05/08/2017 C5.01 Erosion &Sediment Control Details 05/08/2017 C5.02 Construction Details 05/08/2017 C5.03 Construction Details 05/08/2017 C5.04 Construction Details 05/08/2017 C5.05 Construction Details 05/08/2017 C6.01 SWM Narrative and Calculations 05/08/2017 C6.02 Pre and Post Developed Drainage Area Maps 05/08/2017 C6.03 Water Quality Narrative and Calculations 05/08/2017 C6.04 Pre and Post Developed Land Cover Maps 05/08/2017 C6.05 Runoff Reduction &Storm Structures Map 05/08/2017 C6.06 Water Quantity Narrative and Calculations 05/08/2017 C6.07 Drainage Way Calculations &Narrative 05/08/2017 ire ARCHITECTURAL A2.01 Ground Floor Plan 05/08/2017 A2.02 First Floor Plan 05/08/2017 A2.03 Mezzanine Floor Plan 05/08/2017 A2.04 Exterior Elevations 05/08/2017 A2.05 Overall Exterior Elevation 05/08/2017 LANDSCAPE L1.01 Landscape Planting Plan 05/08/2017 ELECTRICAL E1.01 Electrical Site Plan 05/08/2017 END OF SECTION 00 01 15 Iwo Dewberry Engineers Inc. List of Drawing Sheets DEI#50092624 00 01 15-1 Ir it• Ile ism } • ism its I. Division 2: Existing Conditions www.dewberry.com it it it err IMO rr err i. r. it iss University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 SECTION 02 41 19 SITE DEMOLITION PART 1 -GENERAL 1�r 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplemental ire General Conditions, and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes demolition and removal of the following: 1. Existing concrete and asphaltic paving within the areas designated for new construction work shall be completely demolished and all debris removed from the site. aim 2. Utilities 1.3 REFERENCES A. ASSE A10.6- Safety& Health Program Requirements for Demolition Operations B. NFPA 241 —Standard for Safeguarding Construction, Alteration, and Demolition Operators C. Section 01 41 00—Regulatory Requirements 1.4 DEFINITIONS A. Remove: Detach items from existing construction and legally dispose of them off-site unless in- rr dicated to be removed and salvaged or recycled. B. Remove and Salvage: Detach items from existing construction and deliver them to Owner. C. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or recycled. D. Abandon in Place:Where indicated on the plans, or with written permission of the Owner, con- aim tractor may abandon underground utilities in place. Contractor shall confirm with the utility owner that the utility has been abandoned, emptied, and/or de-energized/de-pressurized. Con- tractor shall cut the utility and fill conduit with flowable fill (max strength 300 psi concrete). Con- tractor shall note on the asbuilts the location of all utilities that were abandoned in place. 1.5 MATERIALS OWNERSHIP r. A. Historic items, relics, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, antiques, and other items of interest or value to Owner that may be encountered during building demolition remain Owner's property. Carefully IN remove and-salvage each item or object in a manner to prevent damage and deliver promptly to Owner. 1.6 SUBMITTALS (rr A. Information Submittals 1. Qualification Data for the Demolition Contractor. 2. Health &Safety Plan of the Demolition Contractor indicating compliance with the refer- rr Dewberry Engineers Inc. Site Demolition DEI#50092624 02 41 19-1 fir. University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 ence standards listed above. its 3. Schedule of Demolition Activities: Indicate detailed sequence of demolition and removal work,with starting and ending dates for each activity, interruption of utility services, and locations of temporary protection and means of egress. 4. Pre-demolition Photographs: Show existing conditions of adjoining construction and site improvements that might be misconstrued as damage caused by construction operations. 5. Submit prior to the start of demolition activities. i, B. Action Submittals 1. Proposed Protection and Control Measures: Submit statement or drawing that indicates the measures proposed for use, proposed locations, and proposed time frame for their a"' operation. Identify options if proposed measures are later determined to be inadequate. Include measures for the following: a. Environmental protection. b. Dust control. c. Noise control. d. Pedestrian Protection or Detour Plan (with customized signage as required) e. Maintenance of Traffic Plan 2. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facili- ty licensed to accept hazardous wastes. 1.7 QUALITY ASSURANCE A. Demolition Firm Qualifications: An experienced firm that has specialized in demolition work similar in material and extent to that indicated for this Project. B. Regulatory Requirements: Comply with governing EPA notification regulations before begin- ning demolition. Comply with hauling and disposal regulations of authorities having jurisdiction. C. Standards: Comply with ASSE A10.6 and NFPA 241. irr 1.8 PRE-CONSTRUCTION MEETING A. Conduct a Pre-Demolition conference at the project site. At a minimum,the meeting shall in- clude the CM/GC, Demolition Contractor, Architect/Engineer, and Owner. 1.9 PROJECT CONDITIONS A. Conduct building demolition so Owner's operations will not be disrupted. B. Provide not less than 10 days notice to Owner of activities that will affect Owner's operations, including utility services. C. Maintain access to existing walkways, exits, and other adjacent occupied or used facilities. 1. Do not close or obstruct walkways, exits, roads, or other occupied or used facilities with- out written permission from authorities having jurisdiction. D. Owner assumes no responsibility for structures to be demolished. E. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far Dewberry Engineers Inc. Site Demolition DEI#50092624 02 41 19-2 IW. rrr University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 as practical. iss F. Before building demolition, Owner will remove the following items: 1. Not Applicable aro G. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work. H. If materials suspected of containing hazardous materials are encountered, do not disturb; im- mediately notify Architect/Engineer and Owner. Hazardous materials will be removed by Owner under a separate contract. I. Storage or sale of removed items or materials on-site is not permitted. 1.10 COORDINATION A. Arrange demolition schedule so as not to interfere with Owner's on-site operations. B. Contractor shall coordinate with all utility providers in the vicinity. C. Contractor shall notify Virginia's Miss Utility underground utility location and notification system. See Section 01 41 00. it 1.11 DEMOLITION LIMITS A. Demolition limits are not shown on the plan for clarity. Contractor shall demolish concrete side- walk, curb, gutter, pedestrian paths, and roadway as required to facilitate construction of the proposed improvements. All existing surfaces have been identified in the survey. lr• B. Contractor shall be responsible for replacement of all sidewalk, curb, gutter, pedestrian paths, and roadway. All new work shall be in-kind replacement to match existing conditions. C. All ancillary damage caused as a result of the construction activity shall also be removed and replaced to the satisfaction of the owner. r PART 2- PRODUCTS Not Applicable irs PART 3-EXECUTION 3.1 EXAMINATION A. Survey existing conditions and correlate with requirements indicated to determine extent of building demolition required. B. Review Project Record Documents of existing construction provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Docu- iW ments. C. Inventory and record the condition of items to be removed and salvaged. D. When unanticipated mechanical, electrical, or structural elements are encountered, investigate and measure the nature and extent of the element. Promptly submit a written report to Owner. Dewberry Engineers Inc. Site Demolition DEI#50092624 02 41 19-3 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 E. Perform an engineering survey of condition of site features to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during construction operations. F. Verify that hazardous materials have been remediated before proceeding with construction op- erations. 3.2 PREPARATION A. Temporary Shoring: Provide and maintain interior and exterior shoring, bracing, or structural support to preserve stability and prevent unexpected movement or collapse of construction be- ing demolished. B. Removed and Salvaged Items: Comply with the following: 1. Clean salvaged items of dirt and demolition debris 2. Pack or crate items after cleaning. Identify contents of containers. 3. Store items in secure area until delivery to Owner. 4. Transport items to Owner's storage area designated by Owner. 5. Protect items from damage during transport and storage. 3.3 PROTECTION A. Existing Facilities: Protect adjacent walkways, loading docks, building entries, and other build- ing facilities during demolition operations. B. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during demolition. When permitted by Owner, items may be removed to a suitable, protected elm storage location during demolition and cleaned and reinstalled in their original locations after demolition operations are complete. C. Existing Utilities: Maintain utility services indicated to remain and protect them against damage during demolition operations. D. Do not interrupt existing utilities serving adjacent occupied or operating facilities unless author- ized in writing by Owner and authorities having jurisdiction. E. Provide temporary services during interruptions to existing utilities, as acceptable to Owner and to authorities having jurisdiction. 1. Provide at least 10 days notice to Owner if shutdown of service is required during changeover. iso F. Temporary Protection: Erect temporary protection, such as walks,fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction and as indicated. G. Protect existing site improvements, appurtenances, and landscaping to remain. H. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain. iip I. Provide protection to ensure safe passage of people around construction operations area and to and from occupied portions of adjacent buildings and structures. J. Protect walls, windows, roofs, and other adjacent exterior construction that are to remain and that are exposed to construction operations. L Dewberry Engineers Inc. Site Demolition DEI#50092624 02 41 19-4 L University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 ii 3.4 DEMOLITION, GENERAL A. General: Demolish indicated items within limits shown on the drawings. Use methods required to complete the Work within limitations of governing regulations and as follows: 1. Do not use cutting torches until work area is cleared of flammable materials. Maintain fire watch and portable fire-suppression devices during flame-cutting operations. 2. Maintain adequate ventilation when using cutting torches. 3. Locate construction equipment and remove debris and materials so as not to impose ex- cessive loads on supporting walls,floors, or framing. B. Engineering Surveys: Perform surveys as the Work progresses to detect hazards that may re- sult from construction activities. C. Site Access and Temporary Controls: Conduct building demolition and debris-removal opera- 's tions to ensure minimum interference with roads, streets,walks,walkways, and other adjacent occupied and used facilities. D. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from Owner or building manager and authorities having jurisdiction. Provide alternate routes around closed or obstructed traffic ways if required by authorities having juris- diction. E. Use water mist and other suitable methods to limit spread of dust and dirt. Comply with govern- ing environmental-protection regulations. Do not use water when it may damage adjacent con- ing or create hazardous or objectionable conditions, such as ice, flooding, and pollution. F. When saw cutting asphalt or concrete surfaces (flatwork)contractor shall utilize a water spray to minimize dust. Contractor shall collect runoff water and discharge to sanitary sewer. Contrac- tor shall prevent runoff from saw cutting operations from reaching the storm sewer system and all bodies of water. G. When saw cutting concrete walks or curb, contractor shall saw cut at a control joint even if that means extending limits of demolition beyond what is necessary to construct the improvements. H. Contractor is responsible for measuring concrete scoring patterns/spacing of existing conditions prior to demolition. Contractor shall also note whether existing joints are tooled or saw cut. Contractor shall then construct new concrete to match previous scoring patterns unless indicat- ed otherwise on the plans. 3.5 EXPLOSIVE DEMOLITION A. Explosives: Use of explosives is not permitted. ire 3.6 SITE RESTORATION A. Below-Grade Areas: Completely fill below-grade areas and voids resulting from building demo- lition operations with satisfactory soil materials according to backfill requirements in Specifica- tion Sections"Earthwork: Utilities"and "Earth Moving". i'" B. General: Promptly repair damage to adjacent construction caused by building demolition opera- tions. C. Where repairs to existing surfaces are required, patch to produce surfaces suitable for new ma- terials. ir. Dewberry Engineers Inc. Site Demolition DEI#50092624 02 41 19-5 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 D. Restore exposed finishes of patched areas and extend restoration into adjoining construction in a manner that eliminates evidence of patching and refinishing. E. When restoring concrete sidewalks or driveways, contractor shall match existing joint spacing, including decorative scoring patterns. 3.7 RECYCLING DEMOLISHED MATERIALS A. General: Separate recyclable demolished materials from other demolished materials to the maximum extent possible. Separate recyclable materials by type. B. Provide containers or other storage method approved by Architect for controlling recyclable ma- terials until they are removed from Project site. C. Stockpile processed materials on-site without intermixing with other materials. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust. D. Stockpile materials away from demolition area. Do not store within drip line of remaining trees. E. Store components off the ground and protect from the weather. r F. Transport recyclable materials off Owner's property and legally dispose of them. G. Recycling Incentives: Revenues, savings, rebates, tax credits, and other incentives received for recycling building demolition materials shall accrue to Contractor. 3.8 DISPOSAL OF DEMOLISHED MATERIALS A. General: Except for items or materials indicated to be recycled reused, salvaged, reinstalled, or otherwise indicated to remain Owner's property, remove demolished materials from Project site and legally dispose of them in an EPA-approved landfill. B. Do not allow demolished materials to accumulate on-site. C. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas. D. Burning: Do not burn demolished materials. E. Disposal: Transport demolished materials off Owner's property and legally dispose of them. 3.9 CLEANING A. Clean adjacent structures and improvements of dust, dirt, and debris caused by building demoli- tion operations. Return adjacent areas to condition existing before building demolition opera- tions began. END OF SECTION 02 41 19 Dewberry Engineers Inc. Site Demolition DEI#50092624 02 41 19-6 L L aim Division 3: Concrete 6 www.dewberry.com I. kin it University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 SECTION 03 30 00 CAST-IN-PLACE CONCRETE PART 1 -GENERAL 1.1 RELATED DOCUMENTS ier A. Drawings and general provisions of the Contract, including General Conditions, Supplemental General Conditions, and Division 01 Specification Sections, apply to this Section. iw B. For grout injection repairs to shrinkage and stray cracking, see specification section 07 92 00 Joint Sealants and Division 01 Specification for allowance and unit prices. C. For backer-rod and sealant at top of Expansion Joints, refer to section 07 92 00. 1.2 SUMMARY A. This Section specifies cast-in place concrete, including formwork, reinforcement, concrete materials, mixture design, waterstops, placement procedures, and finishes, for the following work associated with the construction of the manholes and any other cast-in-place structures: 1. Manhole Walls, Base Slabs, Top Slabs, and Risers 2. Stairs 3. Sidewalks 1.3 SUBMITTALS A. Submittal Restrictions: Contractor shall be required to submit anchor bolt epoxy doweling system and wedge anchors for approval prior to preparing structural steel shop drawings as the products submitted could alter detailing of structural steel if either is different than Dewberry's basis of design (Refer to 03 30 00, section 2.9 D &2.9 E). B. Product Data: For each type of product indicated. C. Design Mixtures: For each concrete mixture. Submit alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments. 1. Indicate amounts of mixing water to be withheld for later addition at Project site. D. Steel Reinforcement Shop Drawings: Placing drawings that detail fabrication, bending, and placement. Include bar sizes, lengths, material, grade, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, splices and laps, mechanical connections, tie spacing, hoop spacing, and supports for concrete reinforcement. i., E. Formwork Shop Drawings: Prepared by or under the supervision of a qualified professional engineer detailing fabrication, assembly, and support of formwork. F. Jointing Plan: Contractor shall prepare and submit a concrete Control/Construction/Expansion Joint pattern plan. Plan sheets shall include dimensions for all concrete structures/pavement. i.. Dewberry Engineers Inc. Cast-in-Place Concrete DEI#50092624 03 30 00-1 6.1 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 arr G. Material Certificates: For each of the following, signed by manufacturers: 1. Cementitious materials. 2. Admixtures. 3. Form materials and form-release agents. 4. Steel reinforcement and accessories. 5. Waterstops. L. 6. Curing compounds. 7. Bonding agents. 8. Repair materials. 9. Adhesives. ii. 10. Joint filler strips. H. Field quality-control test and inspection reports. Minutes of Pre-installation conference. 1.4 QUALITY ASSURANCE A. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94 requirements for production facilities and equipment. 1. Manufacturer certified according to NRMCA's "Certification of Ready Mixed Concrete Production Facilities." B. Testing Agency Qualifications: An independent agency qualified according to ASTM C 1077 and ASTM E 329 for testing indicated. 1. Personnel conducting field tests shall be qualified as ACI Concrete Field Testing Technician, Grade 1,according to ACI CP-01 or an equivalent certification program. 2. Personnel performing laboratory tests shall be ACI-certified Concrete Strength Testing Technician and Concrete Laboratory Testing Technician - Grade I. Testing Agency laboratory supervisor shall be an ACI-certified Concrete Laboratory Testing Technician - L. Grade II. C. Source Limitations: Obtain each type or class of cementitious material of the same brand from the same manufacturer's plant, obtain aggregate from one source, and obtain admixtures through one source from a single manufacturer. D. ACI Publications: Comply with the following unless modified by requirements in the Contract Documents: 1. ACI 301, "Specification for Structural Concrete,"Sections 1 through 5. 2. ACI 117, "Specifications for Tolerances for Concrete Construction and Materials." Yr E. Concrete Testing Service: Engage a qualified independent testing agency to perform material evaluation tests and to design concrete mixtures. F. Preinstallation Conference: Conduct conference at project site 3 weeks before beginning work. 1. Before submitting design mixtures, review concrete design mixture and examine procedures for ensuring quality of concrete materials. Require representatives of each entity directly concerned with cast-in-place concrete to attend, including the following: int Dewberry Engineers Inc. Cast-in-Place Concrete DEI#50092624 03 30 00-2 Ir.. University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 a. Contractor's superintendent b. Independent testing agency responsible for concrete design mixtures c. Ready-mix concrete manufacturer d. Concrete subcontractor 2. Review mix design and mix test results, mixing procedure, placement procedures, finishing options and procedures, special inspection and testing and inspecting agency procedures for field quality control, concrete finishing, cold and hot weather procedures, curing procedures, construction/contraction/expansion jointing, anchor rod tolerances, steel reinforcement installation, and concrete repair procedures. 21 1.5 DELIVERY, STORAGE,AND HANDLING A. Steel Reinforcement: Deliver, store, and handle steel reinforcement to prevent bending and damage. Avoid damaging coatings on steel reinforcement. B. Waterstops: Store waterstops under cover to protect from moisture, sunlight, dirt, oil, and other lir contaminants. Store waterstops in location within the recommended storage temperature range specified by the manufacturer. PART2- PRODUCTS w 2.1 MANUFACTURERS A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product selection: 1. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, products specified. 2. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, manufacturers specified. L 2.2 FORM-FACING MATERIALS A. Smooth-Formed Finished Concrete: Form-facing panels that will provide continuous, true, and smooth concrete surfaces. Furnish in largest practicable sizes to minimize number of joints. Ems 1. Plywood, metal, or other approved panel materials. B. Rough-Formed Finished Concrete: Plywood, lumber, metal, or another approved material. Provide lumber dressed on at least two edges and one side for tight fit. C. Void Forms: Biodegradable paper surface, treated for moisture resistance, structurally sufficient to support weight of plastic concrete and other superimposed loads. is D. Chamfer Strips: Wood, metal, PVC, or rubber strips, 3/4 by 3/4 inch, minimum. E. Form-Release Agent: Commercially formulated form-release agent that will not bond with, stain, or adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces. DewberryEngineersInc. Cast-in-Place Concrete DEI#50092624 03 30 00-3 i�. iar University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 1. Formulate form-release agent with rust inhibitor for steel form-facing materials. F. Form Ties: Factory-fabricated, removable or snap-off metal or glass-fiber-reinforced plastic form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spelling of it concrete on removal. 1. Furnish units that will leave no corrodible metal closer than 1 inch to the plane of exposed concrete surface. 2. Furnish ties with integral water-barrier plates to walls indicated to receive waterproofing. 2.3 STEEL REINFORCEMENT A. Reinforcing Bars: ASTM A 615, Grade 60, deformed bars. B. Plain Steel Wire: ASTM A 82. 2.4 REINFORCEMENT ACCESSORIES A. Joint Dowel Bars: ASTM A 615, Grade 60, plain-steel bars, cut bars true to length with ends square and free of burrs. B. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded wire reinforcement in place. Manufacture bar supports from steel wire, plastic, or precast concrete according to CRSI's "Manual of Standard Practice," of greater compressive strength than concrete and as follows: 1. For concrete surfaces exposed to view where legs of wire bar supports contact forms, use CRSI Class 1 plastic-protected steel wire or CRSI Class 2 stainless-steel bar supports. 2.5 CONCRETE MATERIALS A. Cementitious Material: Use the following cementitious materials, of the same type, brand, and source,throughout Project: 1. Portland Cement: ASTM C 150, Type I. Supplement with the following: irr a. Fly Ash: ASTM C 618, Class C or F. ,,. B. Normal-Weight Aggregates: ASTM C 33, Class 4S coarse aggregate or better, graded. Provide aggregates from a single source. 1. Maximum Coarse-Aggregate Size: 3/4 inch nominal. 2. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement. C. Water: ASTM C 94 and potable. 2.6 ADMIXTURES A. Air-Entraining Admixture: ASTM C 260. Dewberry Engineers Inc. Cast-in-Place Concrete DEI#50092624 03 30 00-4 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 B. Chemical Admixtures: Provide admixtures certified by manufacturer to be compatible with other admixtures and that will not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. Do not use calcium chloride or admixtures containing calcium chloride. 1. Water-Reducing Admixture: ASTM C 494, Type A. 2. Retarding Admixture: ASTM C 494, Type B. 3. Water-Reducing and Retarding Admixture: ASTM C 494,Type D. 4. High-Range,Water-Reducing Admixture: ASTM C 494,Type F. 5. High-Range,Water-Reducing and Retarding Admixture: ASTM C 494, Type G. 6. Plasticizing and Retarding Admixture: ASTM C 1017, Type II. 7. Color Pigment: As indicated on the drawings for sidewalks and stairs to match existing site walkway color. 2.7 WATERSTOPS A. Flexible PVC Waterstops: Not Allowed. B. Self-Expanding Butyl Strip Waterstops: Manufactured half-circular strip, butyl rubber with sodium bentonite or other hydrophilic polymers, for adhesive bonding to concrete, 3/4 by 3/8 inch. 1. Available Products: a. Colloid Environmental Technologies Company; Volclay Waterstop-RX. Irr b. Concrete Sealants Inc.; Conseal CS-231. c. Greenstreak; Swellstop. d. Henry Company, Sealants Division; Hydro-Flex. e. JP Specialties, Inc.; Earthshield Type 20. f. Progress Unlimited, Inc.; Superstop. g. Carlisle Coatings &Waterproofing, Inc. C. Extruded Bead Waterstop: Manufactured, high performance, extrudable swelling waterstop consisting of one-component, polyurethane-based waterstop meeting the following requirements: a. Designed to swell up to 100% in potable water. b. Product shall be capable of sealing joints with head pressures up to 50 psi (115 ft head). i`. c. Elastic to withstand wet/dry cycling d. Temperature application rage: 50 degrees to 90 degrees e. Packaged in 20 fl oz tube. f. Tack free time of 2-3 hours at 73 degrees. 2.8 CURING MATERIALS A. Evaporation Retarder: Waterborne, monomolecular film forming, manufactured for application to fresh concrete. B. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet. C. Water: Potable. t Dewberry Engineers Inc. Cast-in-Place Concrete DEI#50092624 03 30 00-5 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 D. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B, dissipating. 2.9 RELATED MATERIALS A. Expansion-and Isolation-Joint-Filler Strips: ASTM D 1751, asphalt-saturated cellulosic fiber. ilia B. Bonding Agent: ASTM C 1059, Type II, non-redispersible, acrylic emulsion or styrene butadiene. C. Epoxy Bonding Adhesive: ASTM C 881, two-component epoxy resin, capable of humid curing and bonding to damp surfaces, of class suitable for application temperature and of grade to suit requirements, and as follows: 1. Types IV and V, load bearing, for bonding hardened or freshly mixed concrete to hardened concrete. I�r D. High-Strength Epoxy Doweling System: Epoxy doweling system shall consist of an injectable two-part epoxy complying with the requirements of ASTM C881-90, Type IV, Grade 3, Class B and C except gel times. Epoxy doweling system shall be tested in accordance with ICC Acceptance Criteria 308 demonstrating compliance with the performance features of ACI 355.2. The epoxy doweling system shall be installed according to manufacturer's instructions. Design was based on the Hilti HAS threaded rods with HIT-HY 200 Safe Set System (ICC ESR-3187). Anchorage design is proprietary by product and is dependent on many variables including 1�r epoxy strength, steel strength, rod size, concrete thickness, embedment depth, bolt spacing, and concrete edge distances. Dewberry reserves the right to reject the submitted product or modify the anchorage design if a different product is submitted than that used for design. 1. Available Products: a. Hilti HIT-HY 200 Epoxy Adhesive Anchoring System (ICC ESR-3187) b. ITW Red Head EPCON G5 Adhesive Anchoring System (ICC ESR-1137) c. Powers AC100+ Gold Adhesive Anchor System (ICC ESR-2582) d. Simpson Strong-Tie SET-XP Epoxy Adhesive Anchors (Use of SET-PAC system ii. not allowed). (ICC ESR-2508) E. Expansion Wedge Anchors: Expansion Wedge Anchors shall consist of threaded stud bolt body and integral wedge expander, nut, and washer complying with the requirements of Federal Specification A-A-1923A, Type 4. Expansion wedge anchors shall be tested in accordance with ICC Acceptance Criteria 193 demonstrating compliance with the performance features of ACI 355.2. Anchors shall be made of stainless steel in accordance with AISI grade 304. Design was based on the Hilti Kwik Bolt 3 (ICC ESR-2302). Anchorage design is proprietary by product and is dependent on many variables including bolt strength, bolt diameter, concrete thickness, embedment depth, bolt spacing, and concrete edge distances. Dewberry reserves the right to iis reject the submitted product or modify the anchorage design if a different product is submitted than that used for design. 1. Available Products: a. Hilti Kwik Bolt 3 (KB3)Concrete Anchors(ICC ESR-2302) b. ITW Red Head TRUBOLT Wedge Anchor(ICC ESR-2251) c. Powers Power-Stud+SD1/SD2 Anchor(ICC ESR-2818/ESR-2502) d. Simpson STRONG-BOLT/STRONG-BOLT 2 Wedge Anchor(ICC ESR-1771/ESR- 3037) } Dewberry Engineers Inc. Cast-in-Place Concrete DEI#50092624 03 30 00-6 iir Iwo University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 2.10 CONCRETE MIXTURES, GENERAL A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, according to ACI 301. it 1. Use a qualified independent testing agency for preparing and reporting proposed mixture designs based on laboratory trial mixtures. B. Cementitious Materials: Limit percentage, by weight,ht, of cementitious materials other than portland cement in concrete as follows: hr 1. Fly Ash: 25 percent. C. Limit water-soluble, chloride-ion content in hardened concrete to 0.15 percent by weight of cement. D. Admixtures: Use admixtures according to manufacturer's written instructions. 1. Use water-reducing, high-range water-reducing, or plasticizing admixture in concrete, as required, for placement and workability. 2. Use water-reducing and retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions. 3. Use water-reducing admixture in pumped concrete and concrete with a water- cementitious materials ratio below 0.50. 4. Color Pigmentation: Include UVA standard color as indicated on the drawings (Soloman Ir Colors, Inc. #306 Colorflo liquid color(canvas)or approved equal by UVA). 2.11 CONCRETE MIXTURES A. Manhole Walls, Base Slabs, Top Slabs, and Risers: Proportion normal-weight concrete mixture as follows: 1. Minimum Compressive Strength at 28 days: 5,000 psi 2. Maximum Water-Cementitious Materials Ratio: 0.42 3. Slump Limit: 5 inches, plus or minus 1 inch. 8 inches for concrete with verified slump of 2 to 4 inches before adding high-range water-reducing admixture or plasticizing admixture, plus or minus 1 inch. 4. Air Content: 6 percent, plus or minus 1.5 percent at point of delivery. 5. Color Pigmentation: Required on walking, visible surfaces (Hatch risers, Stairs, sidewalks). Match UVA standard color (Soloman Colors, Inc. #306 Colorflo liquid color (canvas)or approved equal by UVA. B. Stairs and Sidewalks: Proportion normal-weight concrete mixture as follows: 1. Minimum Compressive Strength at 28 days: 4,000 psi 2. Maximum Water-Cementitious Materials Ratio: 0.50 3. Slump Limit: 5 inches, plus or minus 1 inch. 8 inches for concrete with verified slump of 2 to 4 inches before adding high-range water-reducing admixture or plasticizing admixture, plus or minus 1 inch. 4. Air Content: 6 percent, plus or minus 1.5 percent at point of delivery. 5. Color Pigmentation: Required on walking surfaces (Stairs, sidewalks). Match UVA standard color (Soloman Colors, Inc. #306 Colorflo liquid color (canvas) or approved equal by UVA. Dewberry Engineers Inc. Cast-in-Place Concrete DEI#50092624 03 30 00-7 i`. University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 2.12 FABRICATING REINFORCEMENT A. Fabricate steel reinforcement according to CRSI's"Manual of Standard Practice." in 2.13 CONCRETE MIXING A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94, and furnish batch ticket information. 1. When air temperature is between 85 and 90 deg F, reduce mixing and delivery time from IYr 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F, reduce mixing and delivery time to 60 minutes. B. Project-Site Mixing: Not allowed. PART 3- EXECUTION 3.1 FORMWORK A. Design, erect, shore, brace, and maintain formwork, according to ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads. B. Construct formwork so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117. C. Limit concrete surface irregularities, designated by ACI 347R as abrupt or gradual, as follows: 1. Class A, 1/8 inch for smooth-formed finished surfaces. 2. Class B, 1/4 inch for rough-formed finished surfaces. D. Construct forms tight enough to prevent loss of concrete mortar. E. Fabricate forms for easy removal without hammering or prying against concrete surfaces. Provide crush or wrecking plates where stripping may damage cast concrete surfaces. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical. 1. Install keyways, reglets, recesses, and the like,for easy removal. 2. Do not use rust-stained steel form-facing material. Li F. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces. Provide and secure units to support screed strips; use strike-off templates or compacting-type screeds. G. Provide temporary openings for cleanouts and inspection ports where interior area of formwork is inaccessible. Close openings with panels tightly fitted to forms and securely braced to ,,, prevent loss of concrete mortar. Locate temporary openings in forms at inconspicuous locations. H. Chamfer exterior corners and edges of permanently exposed concrete. rr. Dewberry Engineers Inc. Cast-in-Place Concrete DEI#50092624 03 30 00-8 ir. L. University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 I. Form openings, chases, offsets, sinkages, keyways, reglets, blocking, screeds, and bulkheads required in the Work. Determine sizes and locations from trades providing such items. J. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete. K. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment. L. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement. i 3.2 EMBEDDED ITEMS A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded. i 3.3 REMOVING AND REUSING FORMS A. General: Formwork for sides of walls and similar parts of the Work that does not support weight of concrete may be removed after cumulatively curing at not less than 50 deg F for 24 hours after placing concrete, if concrete is hard enough to not be damaged by form-removal operations and curing and protection operations are maintained. 1. Leave formwork for slabs, and other structural elements that supports weight of concrete in place until concrete has achieved at least 75 percent of its 28-day design compressive strength. 2. Remove forms only if shores have been arranged to permit removal of forms without loosening or disturbing shores. it B. Clean and repair surfaces of forms to be reused in the Work. Split, frayed, delaminated, or otherwise damaged form-facing material will not be acceptable for exposed surfaces. Apply new form-release agent. C. When forms are reused, clean surfaces, remove fins and laitance, and tighten to close joints. Align and secure joints to avoid offsets. Do not use patched forms for exposed concrete surfaces unless approved by Engineer. 3.4 STEEL REINFORCEMENT A. General: Comply with CRSI's"Manual of Standard Practice"for placing reinforcement. 1. Do not cut or puncture vapor retarder. Repair damage and reseal vapor retarder before placing concrete. B. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that would reduce bond to concrete. C. Accurately position, support, and secure reinforcement against displacement. Locate and support reinforcement with bar supports to maintain minimum concrete cover. Do not tack weld crossing reinforcing bars. Dewberry Engineers Inc. Cast-in-Place Concrete DEI#50092624 03 30 00-9 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 D. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces. 3.5 JOINTS A. General: Construct joints true to line with faces perpendicular to surface plane of concrete. B. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Engineer. 1. Place joints perpendicular to main reinforcement. Continue reinforcement across construction joints, unless otherwise indicated. Do not continue reinforcement through sides of strip placements of floors and slabs. 2. Form keyed joints as indicated. Embed keys at least 1-1/2 inches into concrete. r 3. Locate horizontal joints in walls and columns at underside of slabs and at the top of footings or floor slabs. 4. Space vertical joints in walls as indicated. 5. Use epoxy-bonding adhesive at locations where fresh concrete is placed against hardened or partially hardened concrete surfaces. Install in accordance with manufacturer's written instructions. C. Doweled Joints: Install dowel bars and support assemblies at joints where indicated. Lubricate or asphalt coat one-half of dowel length to prevent concrete bonding to one side of joint. . 3.6 WATERSTOPS A. Self-Expanding Waterstops: Install in construction joints and at other locations indicated, according to manufacturer's written instructions, adhesive bonding, mechanically fastening, and firmly pressing into place. Install in longest lengths practicable. B. Extruded Bead Waterstops: Install in construction joints and as otherwise indicated on the drawings. Install in accordance with manufacturer's written instructions and in continuous placement as much as practicable. 3.7 CONCRETE PLACEMENT A. Before placing concrete, verify that installation of formwork, reinforcement, and embedded items is complete and that required inspections have been performed. B. Before test sampling and placing concrete, water may be added at Project site, subject to limitations of ACI 301. 1. Do not add water to concrete after adding high-range water-reducing admixtures to mixture. iri C. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete will be placed on concrete that has hardened enough to cause seams or planes of weakness. If a section cannot be placed continuously, provide construction joints as indicated. Deposit concrete to avoid segregation. 1. Deposit concrete in horizontal layers of depth to not exceed formwork design pressures and in a manner to avoid inclined construction joints. 2. Consolidate placed concrete with mechanical vibrating equipment according to ACI 301. irraDewberry Engineers Inc. Cast-in-Place Concrete DEI#50092624 03 30 00- 10 i`. University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 3. Do not use vibrators to transport concrete inside forms. Insert and withdraw vibrators vertically at uniformly spaced locations to rapidly penetrate placed layer and at least 6 inches into preceding layer. Do not insert vibrators into lower layers of concrete that have begun to lose plasticity. At each insertion, limit duration of vibration to time necessary to consolidate concrete and complete embedment of reinforcement and other embedded items without causing mixture constituents to segregate. . D. Deposit and consolidate concrete for floors and slabs in a continuous operation, within limits of construction joints, until placement of a panel or section is complete. 1. Consolidate concrete during placement operations so concrete is thoroughly worked around reinforcement and other embedded items and into corners. 2. Maintain reinforcement in position on chairs during concrete placement. 3. Screed slab surfaces with a straightedge and strike off to correct elevations. 4. Slope surfaces uniformly to drains where required. 5. Begin initial floating using bull floats or darbies to form a uniform and open-textured surface plane, before excess bleedwater appears on the surface. Do not further disturb slab surfaces before starting finishing operations. Wr E. Cold-Weather Placement: Comply with ACI 306.1 and as follows. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures. 1. When average high and low temperature is expected to fall below 40 deg F for three successive days, maintain delivered concrete mixture temperature within the temperature range required by ACI 301. 2. Do not use frozen materials or materials containing ice or snow. Do not place concrete on frozen subgrade or on subgrade containing frozen materials. 3. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in mixture designs. F. Hot-Weather Placement: Comply with ACI 305 and as follows: 1. Maintain concrete temperature below 90 deg F at time of placement. Chilled mixing water or chopped ice may be used to control temperature, provided water equivalent of ice is calculated to total amount of mixing water. Using liquid nitrogen to cool concrete is Contractor's option. 2. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade uniformly moist without standing water, soft spots, or dry areas. e 3.8 JOINT FILLING this A. Prepare, clean, and install joint filler according to manufacturer's written instructions. Defer joint filling until concrete has aged as long as possible. Do not fill joints until construction traffic has permanently ceased. B. Remove dirt, debris, saw cuttings, curing compounds, and sealers from joints; leave contact faces of joint clean and dry. C. Install joint filler at least 2 inches deep in joints. Overfill joint and trim joint filler flush with top of joint after hardening. Dewberry Engineers Inc. Cast-in-Place Concrete DEI#50092624 03 30 00-11 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 3.9 FINISHING FORMED SURFACES A. Rough-Formed Finish: As-cast concrete texture imparted by form-facing material with tie holes and defects repaired and patched. Remove fins and other projections that exceed specified limits on formed-surface irregularities. 1. Apply to concrete surfaces not exposed to public view. i'" B. Smooth-Formed Finish: As-cast concrete texture imparted by form-facing material, arranged in an orderly and symmetrical manner with a minimum of seams. Repair and patch tie holes and defects. Remove fins and other projections that exceed specified limits on formed-surface irregularities. 1. Apply to concrete surfaces exposed to public view or to be covered with a coating or covering material applied directly to concrete. C. Related Unformed Surfaces: At tops of walls, horizontal offsets, and similar unformed surfaces adjacent to formed surfaces, strike off smooth and finish with a texture matching adjacent lr formed surfaces. Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces, unless otherwise indicated. 3.10 FINISHING SLABS A. General: Comply with ACI 302.1R recommendations for screeding, restraightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces. B. Float Finish: Consolidate surface with power-driven floats or by hand floating if area is small or inaccessible to power driven floats. Restraighten, cut down high spots, and fill low spots. Repeat float passes and restraightening until surface is left with a uniform, smooth, granular texture. 1. Apply float finish to surfaces to receive trowel finish or to be covered with sheet waterproofing. C. Trowel Finish: After applying float finish, apply first trowelingand consolidate concrete byhand �., PPY or power-driven trowel. Continue troweling passes and restraighten until surface is free of trowel marks and uniform in texture and appearance. Grind smooth any surface defects that would telegraph through applied coatings or floor coverings. 1. Apply a trowel finish to surfaces exposed to view. D. Broom Finish: Apply a broom finish to exterior concrete sidewalks, steps, ramps, and elsewhere as indicated. 1. Immediately after float finishing, slightly roughen trafficked surface by brooming with fiber-bristle broom perpendicular to main traffic route. Coordinate required final finish with Architect before application. irs 3.11 MISCELLANEOUS CONCRETE ITEMS A. Filling In: Fill in holes and openings left in concrete structures, unless otherwise indicated, after work of other trades is in place. Mix, place, and cure concrete, as specified, to blend with in- Imo Dewberry Engineers Inc. Cast-in-Place Concrete DEI#50092624 03 30 00-12 ire University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 his place construction. Provide other miscellaneous concrete filling indicated or required to complete the Work. 3.12 CONCRETE PROTECTING AND CURING A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Comply with ACI 306.1 for cold-weather protection and ACI 301 for hot-weather iir protection during curing. B. Evaporation Retarder: Apply evaporation retarder to unformed concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations. Apply according to manufacturer's written instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing. tiro C. Formed Surfaces: Cure formed concrete surfaces, including underside of supported slabs, and other similar surfaces. If forms remain during curing period, moist cure after loosening forms. If removing forms before end of curing period, continue curing for the remainder of the curing lir period. D. Unformed Surfaces: Begin curing immediately after finishing concrete. Cure unformed surfaces, including top of slabs, and other surfaces. E. Cure concrete according to ACI 308.1, by one or a combination of the following methods: 1. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches, and sealed by waterproof tape or adhesive. Cure for not less than seven days. Immediately repair any holes or tears during curing period using cover material and waterproof tape. 2. Curing Compound: Apply uniformly in continuous operation by power spray or roller according to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three hours after initial application. Maintain continuity of coating and repair damage during curing period. a. After curing period has elapsed, remove curing compound without damaging concrete surfaces by method recommended by curing compound manufacturer. 3.13 CONCRETE SURFACE REPAIRS A. Defective Concrete: Repair and patch defective areas when approved by Engineer. Remove and replace concrete that cannot be repaired and patched to Engineer's approval. B. Patching Mortar Mix dry-pack patching mortar, consisting of one part Portland cement to two tk'" and one-half parts fine aggregate passing a No. 16 sieve, using only enough water for handling and placing. C. Repairing Formed Surfaces: Surface defects include color and texture irregularities, cracks, spalls, air bubbles, honeycombs, rock pockets, fins and other projections on the surface, and stains and other discolorations that cannot be removed by cleaning. 1. Immediately after form removal, cut out honeycombs, rock pockets, and voids more than 1/2 inch in any dimension in solid concrete, but not less than 1 inch in depth. Make ir. Dewberry Engineers Inc. Cast-in-Place Concrete DEI#50092624 03 30 00-13 fir. University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 edges of cuts perpendicular to concrete surface. Clean, dampen with water, and brush- coat holes and voids with bonding agent. Fill and compact with patching mortar before bonding agent has dried. Fill form-tie voids with patching mortar or cone plugs secured in place with bonding agent. it 2. Repair defects on surfaces exposed to view by blending white Portland cement and standard Portland cement so that, when dry, patching mortar will match surrounding color. Patch a test area at inconspicuous locations to verify mixture and color match before proceeding with patching. Compact mortar in place and strike off slightly higher than surrounding surface. 3. Repair defects on concealed formed surfaces that affect concrete's durability and structural performance as determined by Engineer. ire D. Repairing Unformed Surfaces: Test unformed surfaces, such as floors and slabs, for finish and verify surface tolerances specified for each surface. Correct low and high areas. Test surfaces sloped to drain for trueness of slope and smoothness; use a sloped template. 1. Repair finished surfaces containing defects. Surface defects include spalls, popouts, honeycombs, rock pockets, crazing and cracks in excess of 0.01 inch wide or that imp penetrate to reinforcement or completely through unreinforced sections regardless of width, and other objectionable conditions. 2. After concrete has cured at least 14 days, correct high areas by grinding. 3. Repair defective areas, except random cracks and single holes 1 inch or less in diameter, by cutting out and replacing with fresh concrete. Remove defective areas with clean, square cuts and expose steel reinforcement with at least a 3/4-inch clearance all around. Dampen concrete surfaces in contact with patching concrete and apply bonding agent. Mix patching concrete of same materials and mixture as original concrete except without coarse aggregate. Place, compact, and finish to blend with adjacent finished concrete. Cure in same manner as adjacent concrete. 4. Repair random cracks and single holes 1 inch or less in diameter with patching mortar. Groove top of cracks and cut out holes to sound concrete and clean off dust, dirt, and loose particles. Dampen cleaned concrete surfaces and apply bonding agent. Place patching mortar before bonding agent has dried. Compact patching mortar and finish to match adjacent concrete. Keep patched area continuously moist for at least 72 hours. E. Perform structural repairs of concrete, subject to Engineer's approval, using epoxy adhesive and patching mortar. F. Repair materials and installation not specified above may be used, subject to Engineer's approval. 3.14 FIELD QUALITY CONTROL A. Testing and Inspecting: Owner will engage a special inspector and qualified testing and inspecting agency to perform field tests and inspections and prepare test reports. B. Inspections: 1. Steel reinforcement placement. iv 2. Verification of use of required design mixture. 3. Concrete placement, including conveying, depositing and consolidating. 4. Curing procedures and maintenance of curing temperature. 5. Verification of concrete strength before removal of shores and forms from beams and lire slabs. i. Dewberry Engineers Inc. Cast-in-Place Concrete DEI#50092624 03 30 00-14 tir it University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 C. Concrete Tests: Testing of composite samples of fresh concrete obtained according to ASTM C 172 shall be performed according to the following requirements: 1. Testing Frequency: Obtain one composite sample for each day's pour of each concrete mixture exceeding 5 cu. yd., but less than 25 cu. yd., plus one set for each additional 50 cu. yd. or fraction thereof. a. When frequency of testing will provide fewer than five compressive-strength tests for each concrete mixture, testing shall be conducted from at least five randomly selected batches or from each batch if fewer than five are used. rr 2. Slump: ASTM C 143; one test at point of placement for each composite sample, but not less than one test for each day's pour of each concrete mixture. Perform additional tests when concrete consistency appears to change. 3. Air Content: ASTM C 231, pressure method, for normal-weight concrete; one test for each composite sample, but not less than one test for each day's pour of each concrete mixture. 4. Concrete Temperature: ASTM C 1064; one test hourly when air temperature is 40 deg F and below and when 80 deg F and above, and one test for each composite sample. 5. Compression Test Specimens: ASTM C 31. a. Cast and laboratory cure one set of four standard cylinder specimens for each composite sample. 6. Compressive-Strength Tests: ASTM C 39; test one laboratory-cured specimen at 7 days and two specimens at 28 days, and retain one specimen for later testing at 56 days if 28 day strength falls below the required specified strength. imp a. A compressive-strength test shall be the average compressive strength from a set of two specimens obtained from same composite sample and tested at age indicated. Imo 7. Strength of each concrete mixture will be satisfactory if every average of any three consecutive compressive-strength tests equals or exceeds specified compressive strength and no compressive-strength test value falls below specified compressive strength by more than 500 psi. 8. Test results shall be reported in writing to Owner, Engineer, concrete manufacturer, and Contractor within 48 hours of testing. Reports of compressive-strength tests shall contain Project identification name and number, date of concrete placement, name of concrete Yr. testing and inspecting agency, location of concrete batch in Work, design compressive strength at 28 days, concrete mixture proportions and materials, compressive breaking strength, and type of break for both 7-and 28-day tests. 9. Nondestructive Testing: Impact hammer, sonoscope, or other nondestructive device may be permitted by Engineer but will not be used as sole basis for approval or rejection of concrete. 10. Additional Tests: Testing and inspecting agency shall make additional tests of concrete when test results indicate that slump, air entrainment, compressive strengths, or other requirements have not been met, as directed by Engineer. Testing and inspecting agency may conduct tests to determine adequacy of concrete by cored cylinders complying with ASTM C 42 or by other methods as directed by Engineer. hog 11. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements. 12. Correct deficiencies in the Work that test reports and inspections indicate does not comply with the Contract Documents. 13. Structurally inadequate in-place concrete: If in-place concrete is found to be structurally deficient based on inspection reports, concrete testing, core tests, or other non- Dewberry Engineers Inc. Cast-in-Place Concrete DEI#50092624 03 30 00- 15 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 destructive testing, then the rejected in-place concrete shall be repaired, or removed and tiro replaced, as directed by the owner's representative. ism END OF SECTION 03 30 00 r. his irr Dewberry Engineers Inc. Cast-in-Place Concrete DEI#50092624 03 30 00- 16 elm r. 6a, L L L L Division 31 : Earthwork www.dewberry.com Ito L L L L iro University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 SECTION 31 10 00 • SITE PREPARATION: CLEARING AND GRUBBING it PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplemental General Conditions, and Division 01 Specification Sections, apply to this Section. fr. 1.2 SUMMARY A. The purpose of this Section is to specify the methods and requirements for site preparation,clearing and grubbing. iir 1.3 REFERENCES • A. Virginia"Erosion and Sediment Control Handbook", latest edition. 1.4 DELIVERY, STORAGE,AND HANDLING A. Deliver materials to, store at the site, and handle in a manner which will maintain the materials in their original manufactured or fabricated condition until ready for use. ire PART 2- PRODUCTS Not Applicable. PART 3- EXECUTION 11. 3.1 TRAFFIC A. Conduct site clearing operations to ensure minimum interference with roads, streets, walks, businesses, and other adjacent occupied or used facilities. Do not close or obstruct streets, walks or other occupied or used facilities without prior permission from Owner, V.D.O.T., and/or authorities having jurisdiction. 3.2 PROTECTION A. General: Provide temporary fences, barricades, coverings, or other protection to preserve existing items indicated to remain and to prevent injury or damage to persons or property. Provide protection for adjacent properties as required. B. Restoration/Repair: Restore damaged items to condition existing prior to start of WORK. C. Existing Trees/Vegetation: Protect existing trees and vegetation adjacent to the actual WORK area or borrow area from physical damage. Do not store equipment or materials within tree drip line. D. Roads and Walks: Keep roads and walks free of dirt and debris at all times. E. Utility Lines: Protect existing utility lines that are indicated to remain from damage. Notify ENGINEER immediately of damage to or an encounter with any unknown existing utility lines. Dewberry Engineers Inc. Site Preparation:Clearing and Grubbing DEI#50092624 31 10 00-1 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 CONTRACTOR shall be responsible for the repairs of damage to existing utility lines that are indicated or made known to CONTRACTOR prior to start of clearing and grubbing operations. When utility lines which are to be removed are encountered within the area of operations, CONTRACTOR shall notify ENGINEER and OWNER and Utility Owner within 7 days time to lag minimize interruption of the service. 3.3 EROSION/SEDIMENT CONTROL A. Provide appropriate erosion and sediment control measures for all off-site borrow areas in full compliance with the Virginia Erosion and Sediment Control Handbook and regulations of the local jurisdiction. CONTRACTOR shall be solely responsible for all borrow sites outside of the Project area. 3.4 CLEARING A. Clearing shall consist of the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared. Cut off flush with or below the original ground surface trees, stumps, roots, brush, and other vegetation in areas to be cleared, except for trees and vegetation indicated or directed to be left standing. CONTRACTOR shall coordinate all clearing with OWNER prior to proceeding. 3.5 TREE REMOVAL A. Where indicated or directed by OWNER, trim designated trees or remove designated trees and stumps and grub roots. 3.6 GRUBBING ii.. A. Remove and dispose of roots larger than 3 inches in diameter, matted roots, and stumps from the indicated grubbing areas. Excavate this material together with logs, organic and metallic debris, brush, and refuse and remove to a depth of not less than 18 inches below the original soil surface in areas indicated to be grubbed and in areas indicated as construction areas for this Project. Fill depressions made by grubbing with suitable material and compact in accordance with the requirements of the Contract Documents to make the new surface conform with the existing adjacent surface of the'ground. 3.7 DISPOSAL OF CLEARED AND GRUBBED MATERIALS A. Nonsalable Materials: Disposal shall be CONTRACTOR's responsibility. 3.8 STORING MATERIALS A. Strip and stockpile topsoiling material and other cleared materials that will be reused in the WORK. 3.9 EXISTING IMPROVEMENTS/FACILITIES A. Remove existing improvements, both above-grade and below-grade to extent indicated or as otherwise required to permit new construction and provide for proper disposal off-site. Existing Imo improvements and facilities such as mailboxes, signs, ornamental or decorative items, etc.that require temporary removal to permit new construction shall be promptly replaced and/or restored to the location and condition prior to construction. Improvements and facilities that are damaged by the CONTRACTOR during the course of construction shall be promptly replaced at the Ir. CONTRACTOR's expense. Dewberry Engineers Inc. Site Preparation:Clearing and Grubbing DEI#50092624 31 10 00-2 6. University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 3.10 SALVABLE ITEMS A. No salvable items are anticipated for this project. 3.11 FUGITIVE DUST A. Control air pollution caused by dust and dirt; comply with governing regulations. 3.12 FILLING A. Fill depressions and voids resulting from site clearing operations. Comply with the requirements lam of Specification Section 312000, "Earth Moving." 3.13 GRADING A. Grade ground surface to conform to required contours and to provide positive surface drainage away from the WORK or borrow area. h. 3.14 DISPOSAL A. Dispose of waste materials, including trash and debris, and excess topsoil, legally off-site. 3.15 BURNING A. Burning of waste materials is prohibited for this project. END OF SECTION 31 10 00 .0 ISO bit it it Dewberry Engineers Inc. Site Preparation:Clearing and Grubbing DEI#50092624 31 10 00-3 t L L INS L ti University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 SECTION 31 20 00 EARTH MOVING PART 1 - GENERAL ire 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplemental iirs General Conditions, and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Prior to beginning construction,the Geotechnical Engineer should evaluate the subgrade soils for suitability based on observations of proofrolling with a loaded dump truck or other method considered acceptable to the Geotechnical Engineer. Fill meeting the requirements herein shall h" then be placed to the grade shown. 1.3 REFERENCE SECTIONS istt A. Section 02 41 19—Site Demolition B. Section 33 05 00—Earthwork: Utilities 1.4 DEFINITIONS ,,,,, A. Excavation: Removal of material encountered to subgrade elevations and the reuse or disposal of materials removed. B. Subgrade: The uppermost surface of an excavation or the top surface of a fill or backfill immediately below subbase, drainage fill, or topsoil materials. C. Borrow: Soil material obtained off-site when sufficient approved soil material is not available from excavations. D. Subbase Course: The layer placed between the subgrade and surface of a pavement or walk. E. Design Subgrade: Elevation of bearing for foundations, bottom of porous fill beneath slabs on grade (4"below bottom of slab), bottom of turn down slabs, and bottom most portion of stairs and ramps. F. Drainage Fill: Course of washed granular material supporting slab-on-grade placed to cut off upward capillary flow of pore water. G. Unauthorized Excavation: Removing materials beyond indicated subgrade elevations or dimensions without direction by the Engineer. Unauthorized excavation, as well as remedial work directed by the Engineer, shall be at the Contractor's expense. H. Structures: Buildings,footings,foundations, retaining walls, slabs,tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below ground surface. ere I. Utilities: Include on-site underground pipes, conduits, ducts, and cables, as well as underground services within building lines. ih. Dewberry Engineers Inc. Earth Moving DEI#50092624 31 20 00- 1 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 1.5 SUBMITTALS A. General: Submit the following according to the Conditions of the Contract and Division 1 Specification Sections. B. Test Reports: In addition to test reports required under field quality control, submit the following: 1. Laboratory analysis of each soil material proposed for fill and backfill from on-site and borrow sources. 2. One optimum moisture-maximum density curve for each soil material. 3. Report of actual unconfined compressive strength and/or results of bearing tests of each stratum tested. ito C. Submit excavation support system design and details for trench excavation. i` 1.6 QUALITY ASSURANCE i A. Codes and Standards: Perform earthwork complying with requirements of authorities having jurisdiction. These include, but are not limited to, University of Virginia, City of Charlottesville, its Virginia Department of Conservation and Recreation, and the State of Virginia. B. Testing and Inspection Service: Owner shall employ a qualified independent geotechnical engineering testing agency to classify proposed on-site and borrow soils to verify that soils eire comply with specified requirements and to perform required field and laboratory testing. 1.7 PROJECT CONDITIONS wr A. Existing Utilities: Do not interrupt existing utilities serving facilities occupied by the Owner or others except when permitted in writing by the Engineer and then only after acceptable temporary utility services have been provided. 1. Provide a minimum 10 day notice to the University and receive written notice to proceed before interrupting any utility. B. Demolish and completely remove from site existing underground utilities indicated to be removed. If utilities cannot be removed due to existing field conditions they shall be filled with flowable fill (minimum 300psi)and noted as"Abandoned"on as-built drawings. Coordinate with utility companies to shutoff services if lines are active. C. Excavation support system design and details for trench excavation, shall be sealed and signed by a professional engineer licensed in the Commonwealth of Virginia, copy of design shall be filed with ENGINEER. FS it PART 2- PRODUCTS 2.1 SOIL MATERIALS A. General: Provide approved borrow soil materials from off-site when sufficient approved soil materials are not available from excavations. Contractor is responsible for locating appropriate off-site borrow areas. B. Satisfactory Soil Materials and Engineering Fill: Select material classifying CL, ML, SC, SM, SP, SW, GC, GM, GP, or GW in accordance with ASTM D 2487. The maximum particle size should not exceed 4 inches. Fill should be freeof debris, waste,frozen materials, vegetation, and any other deleterious matter. Off-site borrow materials should have a CBR value no less than 6 percent. L Dewberry Engineers Inc. Earth Moving DEI#50092624 31 20 00-2 imp University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 C. Backfill and Fill Materials: Satisfactory soil materials. D. Porous Fill: VDOT#57 stone. E. Filtering Material: Evenly graded mixture of natural or crushed gravel or crushed stone and natural sand, with 100 percent passing a 1-1/2-inch sieve and 0 to 5 percent passing a No. 50 sieve. F. Flowable Fill: Comply with ACI 229(300 psi minimum @ 28 days). G. Aggregate Base:VDOT 21B. 2.2 GEOTEXTILE FABRIC A. Medium Duty Geotextile Fabric as follows: 1. Weight: 6.0 oz/sy as per ASTM D-3776-79. 2. Grab Strength: 300 lbs as per ASTM D-4632-86. 3. Grab Elongation: 15%as per ASTM D-4632-86. 4. Trapezoid Tear Strength: 115 lbs as per ASTM D-4533-85. 5. Mullen Burst Strength: 600 psi as per ASTM D-3786-87. 6. Puncture Strength: 145 lbs as per ASTM D-4833-88. 7. Wide Width Strip Tensile: 200x230 lbs/in as per ASTM D-4595-86. 8. Wide Width Strip Elongation: 15x15% as per ASTM D-4595-86. 9. Thickness: 25 mils as per ASTM D-1777-64. 10. Permittivity: .1 sec(-1)as per ASTM D-4491-85. 11. Water Flow Rate: 9.2 gal/min/sf as per ASTM D-4491-85. 12. Apparent Opening Size: 30-70 U.S. Std Sieve as per ASTM D-4751-87. 13. Ultraviolet Stability: 90%as per ASTM D-4355-84. PART 3- EXECUTION 3.1 PREPARATION A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by for settlement, lateral movement, undermining, washout, and other hazards created by earthwork operations. B. Protect subgrades and foundation soils against freezing temperatures or frost. Provide tit protective insulating materials as necessary. C. Provide erosion control measures to prevent erosion or displacement of soils and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways. D. Prior to proceeding with construction, all topsoil and other deleterious, non-soil materials shall be iiw stripped from proposed construction area. Stripping shall extend at least 5 feet horizontally beyond building limits, and stripping of unsatisfactory soils shall be as identified by the Geotechnical Engineer. tr. E. Subgrades which are to support slabs, pavements, or compacted fill shall be proofrolled using a Scraper(i.e., Pan)or a loaded dump truck having an axle weight of at least 10 tons to identify areas of localized soft soil or unsuitable soil. Any soft or unsuitable material encountered during proofrolling shall be removed and replaced with engineered fill. The Geotechnical Engineer t" shall observe all proofrolling operations. Dewberry Engineers Inc. Earth Moving DEI#50092624 31 20 00-3 ins University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 3.2 DEWATERING A. Prevent surface water and subsurface or ground water from entering excavations,from ponding on prepared subgrades, and from flooding Project site and surrounding area. B. Protect subgrades and foundation soils from softening and damage by rain or water accumulation. C. Dewatering disposal shall be in accordance with Erosion and Sediment Control permit. 3.3 EXCAVATION Irr A. Explosives: Do not use explosives. B. Classified Excavation: See specification Section 330500, "Earthwork: Utilities"for excavation classifications. 3.4 EXCAVATION FOR STRUCTURES A. Excavate to indicated elevations and dimensions within a tolerance of plus or minus 0.10 foot. Extend excavations a sufficient distance from structures for placing and removing concrete formwork, installing services and other construction, and for inspections. 1. Excavations for Footings and Foundations: Do not disturb bottom of excavation. Excavate by hand to final grade just before placing concrete reinforcement. Trim bottoms to required lines and grades to leave solid base to receive other work. r 2. Excavation for Mechanical or Electrical Appurtenances: Excavate to elevations and dimensions indicated within a tolerance of plus or minus 0.10 foot. Do not disturb bottom of excavations intended for bearing surface. ire 3.5 APPROVAL OF SUBGRADE A. Notify Engineer when excavations have reached required subgrade. B. When Engineer determines that unforeseen unsatisfactory soil is present, continue excavation and replace with compacted backfill or fill material as directed. C. Reconstruct subgrades damaged by freezing temperatures, frost, rain, accumulated water, or construction activities, as directed by the Engineer. j 3.6 UNAUTHORIZED EXCAVATION A. Fill unauthorized excavation under foundations or wall footings by extending indicated bottom elevation of concrete foundation or footing to excavation bottom, without altering required top elevation. Lean concrete fill or flowable fill may be used to bring elevations to proper position. 3.7 STORAGE OF SOIL MATERIALS A. Stockpile excavated materials acceptable for backfill and fill soil materials, including acceptable borrow materials. Stockpile soil materials without intermixing. Place, grade, and shape stockpiles to drain surface water. Cover to prevent wind-blown dust. 3.8 BACKFILL A. Backfill excavations promptly, but not before completing the following: Dewberry Engineers Inc. Earth Moving DEI#50092624 31 20 00-4 fi L w University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 1. Acceptance of construction below finish grade including,where applicable, damp- proofing,waterproofing, and perimeter insulation. 2. Surveying locations of underground utilities for record documents. 3. Testing, inspecting, and approval of underground utilities. 4. Concrete form-work removal. 5. Removal of trash and debris from excavation. 6. Removal of temporary shoring and bracing, and sheeting. 7. Installing permanent or temporary horizontal bracing on horizontally supported walls. 3.9 SUBSURFACE DRAINAGE BACKFILL A. Subsurface Drain: Place a layer of filter fabric around perimeter of drainage trench or at footing, as indicated. Place a 6-inch compacted course of filtering material on filter fabric to support drainage pipe. After installing and testing, encase drainage pipe in a minimum of 6 inches of compacted filtering material and wrap in filter fabric, overlapping edges at least 6 inches. B. Drainage Backfill: Place and compact drainage backfill of filtering material over subsurface drain, in width indicated,to within 18 inches of final subgrade. Overlay drainage backfill with one layer of filter fabric, overlapping edges at least 6 inches. C. Impervious Fill: Place and compact impervious fill material over drainage backfill to final subgrade. ire 3.10 FILL A. Preparation: Remove vegetation,topsoil, debris,wet, and unsatisfactory soil materials, obstructions, and deleterious materials from ground surface prior to placing fills. 1. Plow strip, or break up sloped surfaces steeper than 1 vertical to 4 horizontal so fill material will bond with existing surface. B. When subgrade or existing ground surface to receive fill has a density less than that required for fill, break up ground surface to 8 inches, pulverize, moisture-condition or aerate soil and recompact to required density. C. Place fill material in layers to required elevations for each location listed below. 1. Under grass, use satisfactory excavated or borrow soil material. fr 2. Under walks and pavements, use aggregate base, or satisfactory excavated or borrow soil material. 3. Under steps and ramps, aggregate base. 4. Under building slabs, use porous fill. 5. Under footings and foundations, use engineered fill, aggregate base, or flowable fill. 6. Behind below-grade walls, use engineered fill or porous fill. 3.11 MOISTURE CONTROL A. Uniformly moisten or aerate subgrade and each subsequent fill or backfill layer before compaction to within 3 percent of optimum moisture content. 1. Do not place backfill or fill material on surfaces that are muddy,frozen, or contain frost or ice. 2. Remove and replace, or scarify and air-dry satisfactory soil material that is too wet to compact to specified density. a. Stockpile or spread and dry removed wet satisfactory soil material. b. If excavation must remain open overnight or rainfall becomes imminent while the bearing soils are exposed, place a 1 to 3 inch thick"mud mat"of lean concrete be placed on the bearing soils before the placement of reinforcing steel. Lir Dewberry Engineers Inc. Earth Moving DEI#50092624 31 20 00-5 L University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 3.12 COMPACTION A. Place backfill and fill materials in layers not more than 8 inches in loose depth for material compacted by heavy compaction equipment, and not more than 4 inches in loose depth for iis material compacted by hand-operated tampers. B. Place backfill and fill materials evenly on all sides of structures to required elevations. Place backfill and fill uniformly along the full length of each structure. C. Percentage of Maximum Dry Density Requirements: Compact soil to not less than the following percentages of maximum dry density according to ASTM D 698: 1. Under structures, slabs, and steps compact fill or backfill to 95 percent maximum dry density. 2. Under lawn compact each layer of backfill or fill material at 90 percent maximum dry density. 3.13 GRADING A. General: Uniformly grade areas to a smooth surface, free from irregular surface changes. Comply with compaction requirements and grade to cross sections, lines, and elevations indicated. • 1. Provide a smooth transition between existing adjacent grades and new grades. 2. Cut out soft spots, fill low spots, and trim high spots to conform to required surface tolerances. lir B. Site Grading: Slope grades to direct water away from buildings and to prevent ponding. Finish subgrades to required elevations within the following tolerances: 1. Lawn or Unpaved Areas: Plus or minus 0.10 foot. 2. Walks: Plus or minus 0.10 foot. lF C. Grading Inside Building Lines: Finish subgrade to a tolerance of'A inch when tested with a 10-foot straightedge. 3.14 POROUS FILL A. Under slabs-on-grade, place porous fill course on prepared subgrade. 'IV. 1. Compact porous fill to required cross sections and thickness. 3.15 FIELD QUALITY CONTROL 1 it16 A. Testing Agency Services: Allow testing agency to inspect and test each subgrade and each fill or backfill layer. Do not proceed until test results for previously completed work verify compliance with requirements. 1. Perform field in-place density tests according to ASTM D 6938, (nuclear method) provided that calibration curves are periodically checked and adjusted to correlate to tests performed using ASTM D 1556. With each density calibration check, check the calibration curves furnished with the moisture gages according to ASTM D 6938. a. When field in-place density tests are performed using nuclear methods, make calibration checks of both density and moisture gages at beginning of work, on each different type of material encountered, and at intervals as directed by the Engineer. I„ 2. Footing Subgrade: The Geotechnical Engineer shall observe all subgrades and determine suitability to support design loads. 3. Paved and Building Slab Areas: At subgrade and at each compacted fill and backfill layer, perform at least one field in-place density test for every 2,500 sq.ft. or less of paved area or building slab, but in no case fewer than three tests. 4. Foundation Wall Backfill: In each compacted backfill layer, perform at least one field Dewberry Engineers Inc. Earth Moving DEI#50092624 31 20 00-6 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 in-place density test for each 100 feet or less of wall length, but no fewer than two tests along a wall face. B. When testing agency reports that subgrades, fills, or backfills are below specified density, scarify and moisten or aerate, or remove and replace soil to the depth required, recompact and retest until required density is obtained. 3.16 PROTECTION A. Protecting Graded Areas: Protect newly graded areas from traffic, freezing, and erosion. Keep free of trash and debris. B. Repair and re-establish grades to specified tolerances where completed or partially completed surfaces become eroded, rutted, settled, or lose compaction due to subsequent construction operations or weather conditions. 1. Scarify or remove and replace material to depth directed by the Engineer; reshape and recompact at optimum moisture content to the required density. C. Settling: Where settling occurs during the Project correction period, remove finished surfacing, backfill with additional approved material, compact, and reconstruct surfacing. 1. Restore appearance,quality, and condition of finished surfacing to match adjacent work, and eliminate evidence of restoration to the greatest extent possible. 3.17 DISPOSAL OF SURPLUS AND WASTE MATERIALS A. Disposal: Remove surplus satisfactory soil and waster material, including unsatisfactory soil, trash, and debris, and legally dispose of it off the Owner's property. Contractor is responsible for all costs associated with disposal and for all erosion and sediment control measures at off-site 1,11 disposal areas. END OF SECTION 31 20 00 L err 6 iwr L Dewberry Engineers Inc. Earth Moving DEI#50092624 31 20 00-7 L L L L L L L L L L L L L L L University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 SECTION 31 2319 aim DEWATERING PART 1 —GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplemental General Conditions, and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY Keep all excavations and site structures free from water during construction. 1.3 REFERENCE SECTIONS A. Section 31 25 00—Erosion and Sediment Control 1.4 RELATED SECTIONS A. Intent: The provisions and intent of the AGREEMENT, including the General Conditions, Supplemental General Conditions, and other requirements of the Contract Documents apply to the WORK as specified in this section. WORK related to this Section is described throughout the Specifications. 1.5 SUBMITTALS A. Dewatering Plan: CONTRACTOR shall submit,for ENGINEER'S review,Drawings and data showing its proposed plan and required equipment for dewatering of all WORK areas. The Drawings and data shall include the planned method of dewatering excavations,wells,well points,sumps,collection and discharge lines,standby units proposed,and protective fills and ditches required for control of ground water, leachate and surface water. B. Schedule: The plan for dewatering shall be submitted within 7 days before the start of work. CONTRACTOR shall furnish such other information as may be required for ENGINEER'S complete understanding and analysis of the dewatering, grading and excavation plan. C. Engineer's Approval: If, during the progress of the WORK, it is determined by ENGINEER that the dewatering system grading and excavation Drawings, text and proposed methodology are inadequate,or that CONTRACTOR'S plan of construction is inoperative,CONTRACTOR shall,at its sole expense, furnish, install and operate such additional dewatering equipment and make such changes in other features of the Dewatering Plan or operation as may be necessary to perform the WORK in a manner satisfactory to ENGINEER. PART 2- PRODUCTS Not Applicable PART 3- EXECUTION Dewberry Engineers Inc. Dewatering DEI#50092624 31 23 19- 1 IWr University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 3.1 METHODS A. Method: Dewatering can be accomplished by ordinary pumping methods, by the use of underdrains fi or deep well points, whichever will produce the above results. In order to assure the continuous dewatering, duplicate units of the selected system incorporated with emergency power should be employed so that a reliable operation may be obtained. B. Location: All site WORK areas shall be dewatered where surface, leachate and/or ground water flows, if any,will adversely impact construction. C. Maintenance: All permanent improvements shall be constructed in areas free from water. Construct and maintain all permanent or temporary slopes, dikes, levees, drainage ditches, sumps, and observation wells necessary for the removal of water from WORK areas. Design, furnish, install, maintain,and operate all necessary pumping and other dewatering equipment required for dewatering the various site WORK areas and for keeping the foundation and other areas free from water from ime any and all sources. D. Schedule: All dewatering shall be performed in advance of grading, excavation and/or filling. The dewatering shall be accomplished in a manner that will prevent loss of fines from the foundation,will maintain stability of all excavated slopes and bottoms of excavations,and will permit all construction operations to be performed in the dry. Dewatering of excavations shall be performed to the extent required to permit placement of compacted fill materials in the dry and to prevent sloughing of the rim excavation side slopes. E. Requirements: Lower the ground water level a minimum of 3 feet below sub-foundation grade or as recommended by Geotechnical Engineer prior to sub-foundation preparation and placement of foundation materials. During the placement and compaction of fill or bedding materials, the water level at every point within the limits of fills being placed shall be maintained a minimum of 3 feet or greater or as recommended by Geotechnical Engineer below fill placement level in order that the ,„ required compaction can be achieved. Where conditions are such that running or standing water occur in the trench bottom or the soil in the trench bottom displays a"quick"tendency,the water shall be removed by pumps and suitable means such as well points or previous underdrain bedding until the pipe has been installed and the backfill has been placed to a sufficient height to prevent pipe flotation. No installation will be permitted in trenches unless the subgrade is dry. If, in the opinion of the ENGINEER, the CONTRACTOR has failed to obtain an absolutely dry trench bottom by use of all known methods of trench dewatering, the ENGINEER may then order the CONTRACTOR to excavate below grade and place sufficient selected fill material over the trench bottom. Additional it excavation and fill shall meet the requirements of Section 33 05 00. 3.2 PROTECTION OF FOUNDATIONS AND EXISTING FACILITIES A. Contingency: Furnish standby equipment of sufficient size and capacity to insure continuous operation of the dewatering system. All damage to structures due to a failure of dewatering equipment shall be repaired by CONTRACTOR at its expense, to the satisfaction of ENGINEER. i` CONTRACTOR may consider the use of recharge systems or other methods of protection of existing facilities. ins B. Completion: Dewatering shall be maintained in the WORK areas for as long as is necessary for the completion of WORK. Upon completion of the dewatering and.control of water operation, all temporary dewatering facilities shall be removed in a manner satisfactory to ENGINEER. 3.3 DISPOSAL OF DRAINAGE WATER it Dewberry Engineers Inc. Dewatering DEI#50092624 31 23 19-2 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or off-site property(MS-16). An adequately sized silt/sediment bag is often used. Be sure the pumping rate will not overwhelm the bag, forcing muddy water through. Concentrated runoff(such as dewater pump discharge)shall not flow down denuded slopes unless contained within an adequate temporary or permanent channel, flume or slope drain (MS-8). i✓ END OF SECTION 31 2319 is Dewberry Engineers Inc. Dewatering DEI#50092624 31 23 19-3 it eirr ita it. air ism rim jaw IAN EIMP iaro University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 SECTION 31 25 00 EROSION AND SEDIMENT CONTROL PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplemental General Conditions, and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Compliance: This WORK shall be performed in accordance with the erosion and sediment control plan of the construction Drawings and the details provided therein, and as described, detailed and required by the Virginia Department of Conservation and Recreation Division of Soil and Water Conservation in the most recent edition of the Virginia Erosion and Sediment Control Handbook. B. Details: In the event a detailed plan is not shown, CONTRACTOR shall comply with the requirements of the local authority and provide a plan if required by that authority. 1.3 REFERENCES A. Virginia Erosion and Sediment Control Handbook, latest edition. kri 1.4 SUBMITTALS A. Temporary Seed Mixture: Provide written notification as to the temporary seed mixture to be used. 1.5 MAINTENANCE A. Maintain all erosion and sediment control structures to be utilized during the life of the Project in compliance with the regulations of the Division of Soil and Water Conservation until vegetative cover is acceptable to the Division's field personnel and approval acceptance is received. `" B. The General Contractor shall maintain all Erosion and Sediment Controls while the UVA Landscape Department is installing plantings,vegetation, grass, mulch, etc. PART 2- PRODUCTS 2.1 STORM DRAIN INLET PROTECTION A. Sediment deposits shall be removed when deposits reach approximately one-half the design depth of the trap. ir. PART 3- EXECUTION 3.1 EROSION AND SEDIMENT CONTROL MEASURES A. Measures: Silt fence, straw bales, construction entrance, check dams, temporary vegetation, and all other items for erosion and sediment control shall be constructed as directed by the ENGINEER or in the locations shown or designated on the Drawings in accordance with the L Dewberry Engineers Inc. Erosion and Sediment Control DEI#50092624 31 25 00-1 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 details provided. he B. Schedule: CONTRACTOR shall institute the erosion and sediment control program as a part of clearing and grubbing, and prior to rough grading. The initial program shall include, however is not limited to, the installation of silt fences, staked straw bales, diversion ditches and/or gravel weirs as shown on erosion and sediment control Drawing at the limits of clearing and grubbing where silt-carrying surface water runoff may be diverted and/or filtered prior to leaving the IMP disturbed area. C. Temporary Seeding: Establish temporary cover for erosion control by seeding and/or mulching graded areas which may otherwise be exposed for a period greater than 30 days. This should tio be accomplished as soon as rough grading WORK is done. Begin temporary seeding within 72 hours after earth disturbance. D. Pipe Outfalls: All pipe outfall areas disturbed by construction shall be protected with non- erodible materials conforming to the Virginia Erosion and Sediment Control Handbook. E. Maintenance: All siltation and erosion control devices installed during the course of construction shall be maintained in proper working order at all times, and shall not be removed until final stabilization of all disturbed areas or at the direction of the ENGINEER. 3.2 CLEANING OF ROADS AND STREETS A. CONTRACTOR shall maintain a vehicle wash rack or gravel bed at all vehicle egress areas. All vehicles shall be thoroughly cleaned of mud and silt before leaving the construction site to avoid tracking mud and silt onto roads, streets, and highways. In the event that tracking does occur, CONTRACTOR shall immediately clean the street or road of all debris, mud or silt and shall pay all damages resulting therefrom. A daily survey of the condition of the adjacent streets and roads shall be made and recorded in the field log along with daily cleanup of the streets of the tracking from the site onto roads, alleys, parking lots, and highways. 3.3 PROTECTION OF STORMWATER SYSTEMS A. Stormwater structures which will receive runoff from the construction shall be protected from the buildup of mud or silt as outlined by the Virginia Erosion and Sediment Control Handbook or as directed by ENGINEER. END OF SECTION 31 25 00 Yrr L Dewberry Engineers Inc. Erosion and Sediment Control DEI#50092624 31 25 00-2 L 6.• I. Division 32: Exterior Improvements www.dewberry.com it it L L L L L L Lt. L L L L L ler University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 SECTION 32 12 16 boo ASPHALT PAVING PART 1 -GENERAL it 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplemental General Conditions, and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY hi A. The CONTRACTOR shall be responsible for repairing asphalt concrete pavement and preparing subgrade in those areas where improvements are proposed as shown on the plans. 1.3 REFERENCES A. Codes and Standards: Comply with Virginia Department of Transportation standard Lr specifications "Road and Bridge Specifications", latest edition. 1.4 SITE CONDITIONS ( A. Weather Limitations: Apply prime and tack coats when ambient temperature is above 50 degrees F. (10 degrees C), and when temperature has not been below 35 degrees F. (1 degree C.)for 12 hours immediately prior to application. Do not apply when base is wet or contains an excess of moisture. B. Construct asphalt concrete surface course when atmospheric temperature is above 40 degrees F. (4 degrees C.), and when base is dry. Base course may be placed when air temperature is above 30 degrees F. (-1 degree C.)and rising. C. Grade Control: Establish and maintain required lines and elevations. Irr PART 2- PRODUCTS ir" 2.1 MATERIALS A. Asphalt concrete paving and base course as shown on drawings. Contractor shall match i,,, existing pavement for repairs. Contractor shall incorporate a pea gravel surface where necessary to match existing pavement. B. General: Use locally available materials and gradations which exhibit a satisfactory record of aim previous installations. Materials shall meet requirements of VDOT"Road and Bridge Specifications." h C. Pavement-Marking Paint: Alkyd-resin type, ready mixed, complying with FS TT-P-115, Type I, or AASHTO M-248, Type N, Color:White. PART 3- EXECUTION Materials placement shall be in accordance with VDOT"Road and Bridge Specifications." 16. 3.1 SURFACE PREPARATION Dewberry Engineers Inc. Asphalt Paving DEI#50092624 32 12 16- 1 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 A. Remove loose material from compacted subgrade surface immediately before applying herbicide treatment or prime coat. Proof roll prepared subgrade surface to check for unstable areas and areas requiring additional compaction under the observation of the Geotechnical . Engineer. Notify Owner of unsatisfactory conditions. Do not begin paving work until deficient r subgrade areas have been corrected and are ready to receive paving. 3.2 PLACING MIX A. Place asphalt concrete mixture on prepared surface, spread and strike-off. Place inaccessible and small areas by hand. Place each course to required grade, cross-section, and compacted thickness. B. Joints: Make joints between old and new pavements, or between successive days'work,to ensure continuous bond between adjoining work. Construction joints to have same texture, density and smoothness as other sections of asphalt concrete course. Clean contact surfaces and apply tack coat. Place asphalt within 24 hours of applying tack coat. 3.3 ROLLING A. Begin rolling when mixture will bear roller weight without excessive displacement. Compact mixture with hot hand tampers or vibrating plate compactors in areas inaccessible to rollers. ime B. Patching: Remove and replace paving areas mixed with foreign materials and defective areas. Cut-out such areas and fill with fresh, hot asphalt concrete. Compact by rolling to maximum surface density and smoothness. C. Protection: After final rolling, do not permit vehicular traffic on pavement until it has cooled and hardened. D. Erect barricades to protect paving from traffic until mixture has cooled enough not to become marked. 3.4 FIELD QUALITY CONTROL A. Test in-place asphalt concrete courses for compliance with requirements for thickness, compaction, and surface smoothness. Test in-place base course for compliance with irr requirements for thickness and compaction. Repair or remove and replace unacceptable paving as directed by Architect. 3.5 AGGREGATES AND PAVING A. Open Pavement Cuts:All open cuts through pavement on existing dedicated street shall be replaced with: it - 10" VDOT 21 B material + 3" BM-25.0 base + 2" SM-9.5 surface course for roadways, - 6" VDOT 21B material + 3" BM-25.0 base + 1.5" SM-9.5 surface course for Driveways, Service Roadways, and Parking Areas END OF SECTION 32 12 16 ir. Dewberry Engineers Inc. Asphalt Paving DEI#50092624 32 12 16-2 Itr. University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 SECTION 32 13 13 CONCRETE PAVING PART 1 -GENERAL r"' 1.1 SUMMARY A. Section Includes concrete walkways. t`. 1.2 REFERENCES A. Where differences between building codes, state laws, local ordinances, industry stand- ards, utility company regulations and the Contract Documents occur,the most stringent shall govern. The Contractor shall promptly notify the Owner's Representative in writing of any such difference. B. Should the Contractor perform any work that does not comply with local codes, laws and ilm ordinances, industry standards or other governing regulations, the Work shall be cor- rected on noncompliance deficiencies with the Contractor bearing all costs. C. Codes and Standards: Comply with Virginia Department of Transportation standard specifications"Road and Bridge Specifications", latest edition. D. Specifications listed below are included by reference and are hereby incorporated into the Contract Documents. 1. University of Virginia; Facilities Design Guidelines 2. Drawings and general provisions of Contract, including General Conditions, Sup- plemental General Conditions, and Division 01 Specification sections, apply to work of this section. 3. American Concrete Institute (ACI) it 4. National Ready Mix Concrete Association (NRMCA) 1.3 DEFINITIONS A. Cementitious Materials: Portland cement alone or in combination with one or more of blended hydraulic cement, fly ash and other pozzolans, and ground granulated blast- furnace slag. 1.4 SUBMITTALS A. Product Data: For each type of product indicated. B. Samples for Initial Selection: For each type of product, ingredient, or admixture requiring color selection. C. Other Action Submittals: imp 1. Design Mixtures: For each concrete paving mixture. Include alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments. Ear 2. Concrete Color D. Qualification Data: For qualified testing agency. E. Material Certificates: For the following, from manufacturer: i`. 1. Cementitious materials. 2. Admixtures. boo 3. Curing compounds. 4. Applied finish materials. Dewberry Engineers Inc. Concrete Paving DEI#50092624 32 13 13-1 ir. „e University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 5. Bonding agent or epoxy adhesive. 6. Joint fillers. F. Field quality-control reports. 1.5 QUALITY ASSURANCE A. Detectable Warning Installer Qualifications: An employer of workers trained and approved by manufacturer of stamped concrete paving systems. B. Ready-Mix-Concrete Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment. 1. Manufacturer certified according to NRMCA's "Certification of Ready Mixed Concrete Production Facilities” (Quality Control Manual - Section 3, "Plant Certification Checklist"). C. Testing Agency Qualifications: Qualified according to ASTM C 1077 and ASTM E 329 for testing indicated. r. 1. Personnel conducting field tests shall be qualified as ACI Concrete Field Testing Technician, Grade 1, according to ACI CP-1 or an equivalent certification program. (r. D. Concrete Testing Service: Engage a qualified testing agency to perform material evaluation tests and to design concrete mixtures. E. ACI Publications: Comply with ACI 301 unless otherwise indicated. F. Mockups: Build mockups to verify selections made under sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution. 1. Build mockups of full-thickness sections of concrete paving to demonstrate typical joints; surface finish, texture, and color; curing; and standard of workmanship. 2. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Architect specifically approves such be deviations in writing. 3. Approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion. G. Preinstallation Conference: Conduct conference at Project site. 1. Review methods and procedures related to concrete paving, including but not ir. limited to, the following: a. Concrete mixture design. b. Quality control of concrete materials and concrete paving construction IMP practices. 2. Require representatives of each entity directly concerned with concrete paving to attend, including the following: a. Contractor's superintendent. b. Independent testing agency responsible for concrete design mixtures. b" c. Ready-mix concrete manufacturer. d. Concrete paving subcontractor. ir. e. Manufacturer's representative of stamped concrete paving system used for detectable warnings. i.. Dewberry Engineers Inc. Concrete Paving DEI#50092624 32 13 13-2 lir University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 1.6 PROJECT CONDITIONS A. Traffic Control: Maintain access for vehicular and pedestrian traffic as required for other construction activities. int PART 2- PRODUCTS 2.1 FORMS A. Form Materials: Plywood, metal, metal-framed plywood, or other approved panel-type materials to provide full-depth, continuous, straight, and smooth exposed surfaces. 1. Use flexible or uniformly curved forms for curves with a radius of 100 feet or less. Do not use notched and bent forms. B. Form-Release Agent: Commercially formulated form-release agent that will not bond with, stain, or adversely affect concrete surfaces and that will not impair subsequent treatments of concrete surfaces. 2.2 CONCRETE MATERIALS A. Cementitious Material: Use the following cementitious materials, of same type, brand, and source throughout Project: 1. Portland Cement: ASTM C 150, gray Portland cement Type I: a. Fly Ash: ASTM C 618, Class C. B. Normal-Weight Aggregates: ASTM C 33, Class 4S uniformly graded. Provide aggregates from a single source with documented service-record data of at least 10 years' satisfactory service in similar paving applications and service conditions using similar aggregates and cementitious materials. 1. Maximum Coarse-Aggregate Size: 1 inch nominal. 2. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement. C. Exposed Aggregate: Selected, hard, and durable; washed; free of materials with deleterious reactivity to cement or that cause staining; from a single source, with gap- graded coarse aggregate as follows: 1. Aggregate Sizes: 1/2 to 3/4 inch nominal. 2. Aggregate Source, Shape, and Color: Free of materials with deleterious reactivity to alkali in cement. D. Water: Potable and complying with ASTM C 94/C 94M. E. Air-Entraining Admixture: ASTM C 260. F. Chemical Admixtures: Admixtures certified by manufacturer to be compatible with other admixtures and to contain not more than 0.1 percent water-soluble chloride ions by mass of cementitious material. 1. Water-Reducing Admixture: ASTM C 494/C 494M, Type A. 2. Retarding Admixture: ASTM C 494/C 494M, Type B. 3. Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type D. 4. High-Range,Water-Reducing Admixture: ASTM C 494/C 494M, Type F. 5. High-Range, Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type G. 6. Plasticizing and Retarding Admixture: ASTM C 1017/C 1017M, Type II. Dewberry Engineers Inc. Concrete Paving DEI#50092624 32 13 13-3 ir. ire University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 G. Concrete Color: Concrete shall have integral color as indicated on the plans. Concrete with integral color shall include air entrainment, brown sand, and Soloman Colors, Inc. #306 Colorflow Liquid Color (Canvas) at a rate of 6.4 lbs liquid color per cubic yard of concrete or approved equal by Owner. Brown sand under concrete shall have a consistent color throughout the project. Contractor shall match color of existing adjacent walks. 2.3 CURING MATERIALS A. Absorptive Cover: AASHTO M 182, Class 3, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. dry. B. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene itrisheet. C. Water: Potable. r. D. Evaporation Retarder: Waterborne, monomolecular, film forming, manufactured for application to fresh concrete. E. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B, dissipating. F. White, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 2, Class B, dissipating. 2.4 RELATED MATERIALS A. Joint Fillers: ASTM D 1751, asphalt-saturated cellulosic fiber in preformed strips. B. Bonding Agent: ASTM C 1059, Type II, non-redispersible, acrylic emulsion or styrene butadiene. C. Epoxy Bonding Adhesive: ASTM C 881/C 881M, two-component epoxy resin capable of humid curing and bonding to damp surfaces; of class suitable for application temperature, of grade complying with requirements, and of the following types: 1. Types I and II, non-load bearing for bonding hardened or freshly mixed concrete tr. to hardened concrete. D. Chemical Surface Retarder: Water-soluble, liquid, set retarder with color dye, for horizontal concrete surface application, capable of temporarily delaying final hardening tw of concrete to a depth of 1/8 to 1/4 inch. 2.5 DETECTABLE WARNING MATERIALS A. Detectable Warning Stamp: Semirigid polyurethane mats with formed underside capable of imprinting detectable warning pattern on plastic concrete; perforated with a vent hole at each dome. 1. Size of Stamp: One piece matching detectable warning area shown on Drawings. B. Liquid Release Agent: Manufacturer's standard, clear, evaporating formulation designed to facilitate release of stamp mats. imp 2.6 CONCRETE MIXTURES A. Prepare design mixtures, proportioned according to ACI 301 for each type and strength of normal-weight concrete, and as determined by either laboratory trial mixtures or field i.. experience. 1. Use a qualified independent testing agency for preparing and reporting proposed concrete design mixtures for the trial batch method. B. Proportion mixtures to provide normal-weight concrete with the following properties: Dewberry Engineers Inc. Concrete Paving DEI#50092624 32 13 13-4 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 1. Compressive Strength (28 Days): 3000 psi for concrete sidewalks. irr 2. Maximum Water-Cementitious Materials Ratio at Point of Placement: 0.45. 3. Slump Limit: 5 inches plus or minus 1 inch. C. Add air-entraining admixture at manufacturer's prescribed rate to result in normal-weight concrete at point of placement having an air content as follows: 1. Air Content: 4-1/2 percent plus or minus 1.5 percent for 1-1/2-inch nominal maximum aggregate size. D. Chemical Admixtures: Use admixtures according to manufacturer's written instructions. 1. Use high-range, water-reducing and retarding admixture in concrete as required for placement and workability. 2. Use water-reducing and retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions. E. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than Portland cement in concrete as follows: 1. Fly Ash or Pozzolan: 25 percent. 2.7 CONCRETE MIXING rr A. Ready-Mixed Concrete: Measure, batch, and mix concrete materials and concrete according to ASTM C 94/C 94M and ASTM C 1116/C 1116M. Furnish batch certificates for each batch discharged and used in the Work. 1. When air temperature is between 85 and 90 deg F reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F, reduce mixing and delivery time to 60 minutes. ire B. Project-Site Mixing: Not allowed. PART 3- EXECUTION 3.1 EXAMINATION A. Examine exposed subgrades and subbase surfaces for compliance with requirements for dimensional, grading, and elevation tolerances. B. Proof-roll prepared subbase surface below concrete paving to identify soft pockets and areas of excess yielding. 1. Completely proof-roll subbase in one direction and repeat in perpendicular ii. direction. Limit vehicle speed to 3 mph. 2. Proof-roll with a pneumatic-tired and loaded, 10-wheel, tandem-axle dump truck weighing not less than 15 tons or similar piece of equipment. 3. Correct subbase with soft spots and areas of pumping or rutting exceeding depth of 1/2 inch according to requirements in Section 312000"Earth Moving." C. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Remove loose material from compacted subbase surface immediately before placing concrete. 3.3 EDGE FORMS AND SCREED CONSTRUCTION A. Set, brace, and secure edge forms, bulkheads, and intermediate screed guides to required lines, grades, and elevations. Install forms to allow continuous progress of work and so forms can remain in place at least 24 hours after concrete placement. i.. Dewberry Engineers Inc. Concrete Paving DEI#50092624 32 13 13-5 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 B. Clean forms after each use and coat with form-release agent to ensure separation from Ito concrete without damage. 3.4 JOINTS A. General: Form construction, isolation, and contraction joints and tool edges true to line, with faces perpendicular to surface plane of concrete. Construct transverse joints at right angles to centerline unless otherwise indicated. 1. When joining existing paving, place transverse joints to align with previously placed joints unless otherwise indicated. B. Construction Joints: Set construction joints at side and end terminations of paving and at locations where paving operations are stopped for more than one-half hour unless paving terminates at isolation joints. 1. Continue steel reinforcement across construction joints unless otherwise indicated. Do not continue reinforcement through sides of paving strips unless otherwise indicated. 2. Provide tie bars at sides of paving strips where indicated. k"` 3. Butt Joints: Use epoxy bonding adhesive at joint locations where fresh concrete is placed against hardened or partially hardened concrete surfaces. 4. Keyed Joints: Provide preformed keyway-section forms or bulkhead forms with keys unless otherwise indicated. Embed keys at least 1-1/2 inches into concrete. C. Isolation Joints: Form isolation joints of preformed joint-filler strips abutting concrete curbs, catch basins, manholes, inlets, structures, other fixed objects, and where indicated. 1. Locate expansion joints at intervals of 30 feet unless otherwise indicated. it 2. Extend joint fillers full width and depth of joint. 3. Terminate joint filler 1/4 inch below finished surface if joint sealant is indicated. 4. Place top of joint filler flush with finished concrete surface if joint sealant is not indicated. 5. Furnish joint fillers in one-piece lengths. Where more than one length is required, lace or clip joint-filler sections together. 6. During concrete placement, protect top edge of joint filler with metal, plastic, or other temporary preformed cap. Remove protective cap after concrete has been placed on both sides of joint. imo D. Contraction Joints: Form weakened-plane contraction joints, sectioning concrete into areas as indicated. Construct contraction joints for a depth equal to at least one-fourth of the concrete thickness, as follows to match jointing of existing adjacent concrete paving: 1. Grooved Joints: Form contraction joints after initial floating by grooving and finishing each edge of joint with grooving tool to a 1/4-inch radius. Repeat grooving of contraction joints after applying surface finishes. Eliminate grooving- tool marks on concrete surfaces. 2. Sawed Joints: Form contraction joints with power saws equipped with shatterproof abrasive or diamond-rimmed blades. Cut 1/8-inch wide joints into concrete when cutting action will not tear, abrade, or otherwise damage surface and before developing random contraction cracks. Dewberry Engineers Inc. Concrete Paving DEI#50092624 32 13 13-6 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 E. Edging: After initial floating, tool edges of paving, gutters, curbs, and joints in concrete he with an edging tool to a 1/4-inch radius. Repeat tooling of edges after applying surface finishes. Eliminate edging-tool marks on concrete surfaces. r`. 3.5 CONCRETE PLACEMENT A. Before placing concrete, inspect and complete formwork installation and items to be embedded or cast-in. B. Remove snow, ice, or frost from subbase surface before placing concrete. Do not place concrete on frozen surfaces. C. Moisten subbase to provide a uniform dampened condition at time concrete is placed. Do not place concrete around manholes or other structures until they are at required finish elevation and alignment. D. Comply with ACI 301 requirements for measuring, mixing, transporting, and placing concrete. E. Do not add water to concrete during delivery or at Project site. Do not add water to fresh concrete after testing. F. Deposit and spread concrete in a continuous operation between transverse joints. Do not push or drag concrete into place or use vibrators to move concrete into place. G. Consolidate concrete according to ACI 301 by mechanical vibrating equipment supplemented by hand spading, rodding, or tamping. 1. Consolidate concrete along face of forms and adjacent to transverse joints with an internal vibrator. Keep vibrator away from joint assemblies or side forms. Use only square-faced shovels for hand spreading and consolidation. Consolidate with care to prevent dislocating joint devices. H. Screed paving surface with a straightedge and strike off. I. Commence initial floating using bull floats or darbies to impart an open-textured and uniform surface plane before excess moisture or bleed water appears on the surface. Do not further disturb concrete surfaces before beginning finishing operations or iro spreading surface treatments. J. Slip-Form Paving: Use design mixture for automatic machine placement. Produce paving to required thickness, lines, grades, finish, and jointing. 1. Compact subbase and prepare subgrade of sufficient width to prevent displacement of slip-form paving machine during operations. *Ai K. Cold-Weather Placement: Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing, or low temperatures. Comply with ACI 306.1 and the following: 1. When air temperature has fallen to or is expected to fall below 40 deg F uniformly heat water and aggregates before mixing to obtain a concrete mixture temperature of not less than 50 deg F and not more than 80 deg F at point of placement. 2. Do not use frozen materials or materials containing ice or snow. 3. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in design • mixtures. L. Hot-Weather Placement: Comply with ACI 301 and as follows when hot-weather conditions exist: Dewberry Engineers Inc. Concrete Paving DEI#50092624 32 13 13-7 fr. University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boars Head Addition May 8,2017 1. Cool ingredients before mixing to maintain concrete temperature below 90 deg F at time of placement. Chilled mixing water or chopped ice may be used to control temperature,'provided water equivalent of ice is calculated in total amount of mixing water. Using liquid nitrogen to cool concrete is Contractor's option. 2. Cover steel reinforcement with water-soaked burlap so steel temperature will not exceed ambient air temperature immediately before embedding in concrete. 3. Fog-spray forms and subgrade just before placing concrete. Keep subgrade moisture uniform without standing water, soft spots, or dry areas. 3.6 FLOAT FINISHING A. General: Do not add water to concrete surfaces during finishing operations. B. Float Finish: Begin the second floating operation when bleed-water sheen has disappeared and concrete surface has stiffened sufficiently to permit operations. Float surface with power-driven floats or by hand floating if area is small or inaccessible to power units. Finish surfaces to true planes. Cut down high spots and fill low spots. Refloat surface immediately to uniform granular texture. 1. Burlap Finish: Drag a seamless strip of damp burlap across float-finished concrete, perpendicular to line of traffic, to provide a uniform, gritty texture. 2. Medium-to-Fine-Textured Broom Finish: Draw a soft-bristle broom across float- finished concrete surface perpendicular to line of traffic to provide a uniform, fine- line texture. 3. Medium-to-Coarse-Textured Broom Finish: Provide a coarse finish by striating L. float-finished concrete surface 1/16 to 1/8 inch deep with a stiff-bristled broom, perpendicular to line of traffic. 3.7 DETECTABLE WARNINGS A. Blockouts: Form blockouts in concrete for installation of detectable paving units specified on drawings. 1. Tolerance for Opening Size: Plus 1/4 inch (6 mm), no minus. B. Stamped Detectable Warnings: Install stamped detectable warnings as part of a continuous concrete paving placement and according to stamp-mat manufacturer's written instructions. 1. Before using stamp mats, verify that the vent holes are unobstructed. 2. Apply liquid release agent to the concrete surface and the stamp mat. 3. Stamping: While initially finished concrete is plastic accurately align and place stamp mats in sequence. Uniformly load, gently vibrate, and press mats into concrete to produce imprint pattern on concrete surface. Load and tamp mats ii„ directly perpendicular to the stamp-mat surface to prevent distortion in shape of domes. Press and tamp until mortar begins to come through all of the vent holes. Gently remove stamp mats. 4. Trimming: After 24 hours, cut off the tips of mortar formed by the vent holes. 5. Remove residual release agent according to manufacturer's written instructions, but no fewer than three days after stamping concrete. High-pressure-wash surface and joint patterns, taking care not to damage stamped concrete. Control, collect, and legally dispose of runoff. 3.8 CONCRETE PROTECTION AND CURING i" A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Ir. Dewberry Engineers Inc. Concrete Paving DEI#50092624 32 13 13-8 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 B. Comply with ACI 306.1 for cold-weather protection. C. Evaporation Retarder: Apply evaporation retarder to concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations. Apply according to manufacturer's written instructions after placing, screeding, and bull floating or darbying concrete but before float finishing. D. Begin curing after finishing concrete but not before free water has disappeared from concrete surface. E. Curing Methods: Cure concrete by moisture curing, moisture-retaining-cover curing, curing compound or a combination of these as follows: 1. Moisture Curing: Keep surfaces continuously moist for not less than seven days with the following materials: a. Water. b. Continuous water-fog spray. c. Absorptive cover, water saturated and kept continuously wet. Cover concrete surfaces and edges with 12-inch lap over adjacent absorptive covers. 2. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture- retaining cover, placed in widest practicable width, with sides and ends lapped at least 12 inches and sealed by waterproof tape or adhesive. Immediately repair any holes or tears occurring during installation or curing period using cover material and waterproof tape. 3. Curing Compound: Apply uniformly in continuous operation by power spray or roller according to manufacturer's written instructions. Recoat areas that have been subjected to heavy rainfall within three hours after initial application. it Maintain continuity of coating, and repair damage during curing period. 3.9 PAVING TOLERANCES A. Comply with tolerances in ACI 117 and as follows: 1. Elevation: 1/4 inch. 2. Thickness: Plus 3/8 inch, minus 1/4 inch, 3. Surface: Gap below 10-foot long, unleveled straightedge not to exceed 1/4 inch. 4. Alignment of Tie-Bar End Relative to Line Perpendicular to Paving Edge: 1/2 inch per 12 inches of tie bar. 5. Lateral Alignment and Spacing of Dowels: 1 inch. 6. Vertical Alignment of Dowels: 1/4 inch. ise 7. Alignment of Dowel-Bar End Relative to Line Perpendicular to Paving Edge: 1/4 inch per 12 inches of dowel. 8. Joint Spacing: 3 inches. 9. Contraction Joint Depth: Plus 1/4 inch, no minus. 10. Joint Width: Plus 1/8 inch, no minus. 3.10 FIELD QUALITY CONTROL . A. Testing Agency: Owner will engage a qualified testing agency to perform tests and inspections. Dewberry Engineers Inc. Concrete Paving DEI#50092624 32 13 13-9 i�. imp University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 B. Strength of each concrete mixture will be satisfactory if average of any three consecutive compressive-strength tests equals or exceeds specified compressive strength and no compressive-strength test value falls below specified compressive strength by more than 500 psi. C. Test results shall be reported in writing to Architect, concrete manufacturer, and Contractor within 48 hours of testing. Reports of compressive-strength tests shall contain Project identification name and number, date of concrete placement, name of concrete testing and inspecting agency, location of concrete batch in Work, design compressive strength at 28 days, concrete mixture proportions and materials, compressive breaking strength, and type of break for both 7-and 28-day tests. D. Nondestructive Testing: Impact hammer, sonoscope, or other nondestructive device may be permitted by Architect but will not be used as sole basis for approval or rejection of concrete. rr. E. Additional Tests: Testing and inspecting agency shall make additional tests of concrete when test results indicate that slump, air entrainment, compressive strengths, or other requirements have not been met, as directed by Architect. ii`. F. Concrete paving will be considered defective if it does not pass tests and inspections. G. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements. H. Prepare test and inspection reports. 3.11 REPAIRS AND PROTECTION air A. Remove and replace concrete paving that is broken, damaged, or defective or that does not comply with requirements in this Section. Remove work in complete sections from joint to joint unless otherwise approved by Architect. B. Drill test cores, where directed by Architect, when necessary to determine magnitude of cracks or defective areas. Fill drilled core holes in satisfactory paving areas with portland cement concrete bonded to paving with epoxy adhesive. C. Protect concrete paving from damage. Exclude traffic from paving for at least 14 days after placement. When construction traffic is permitted, maintain paving as clean as possible by removing surface stains and spillage of materials as they occur. D. Maintain concrete paving free of stains, discoloration, dirt, and other foreign material. Sweep paving not more than two days before date scheduled for Substantial Completion inspections. END OF SECTION 3213 13 tam Dewberry Engineers Inc. Concrete Paving DEI#50092624 32 13 13-10 rrr tor ire 60 �rrr ir• it ire ire Division 33: Utilities www.dewberry.com ur Ira tam ins it lrr 61 r. it big fir University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 r SECTION 33 01 00 UTILITY LINE TESTING PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract,including General Conditions,Supplemental General Conditions, and Division 01 Specification sections, apply to work of this section. 1.2 SUMMARY A. The purpose of this Section is to specify the methods and requirements for testing and quality assurance of utility lines. Seventy-Two (72) hours notice to the OWNER is required prior to undertaking any tests. 1.3 REFERENCES A. Virginia Water Works Regulations, latest revision B. Virginia Sewage Collection and Treatment Regulations, latest revision C. American Waterworks Association Standards, latest revision D. International Plumbing Code-610 1.4 QUALITY ASSURANCE A. Quality assurance testing shall be done in the presence of the OWNER and ENGINEER or his representative 1.5 FEES ale A. The CONTRACTOR shall be responsible for all costs associated with testing. him PART 2- PRODUCTS Not Applicable ir. PART 3- EXECUTION ism 3.1 TESTING OF WATER LINES A. All testing and flushing will be performed in accordance with the current revision of ANSI/AWWAC600-93, IPC-610 and NFPA 13. The Contractor shall provide the Owner or Owner's Representative with 72 hours notice prior to undertaking any tests. B. Pressure Test:After the pipe has been laid,all newly laid pipe or any valved section thereof shall be subjected to a hydrostatic pressure of at least 200 psi. Test Pressure Restrictions. Test pressures shall: 1. Not exceed pipe or thrust restraint design pressure; 2. Be of at least 2-hour duration; r. Dewberry Engineers Inc. Utility Line Testing DEI#50092624 33 01 00- 1 it INN University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 kr 3. Not exceed twice the rated pressure of the valves or hydrants when the pressure boundary of the test section includes closed gate valves or hydrants; 4. Not exceed the rated pressure of the valve. a. Pressurization: Each valved section of pipe shall be filled with water slowly and the r.r specified test pressure shall be applied by means of a pump connected to the pipe in a manner satisfactory to the Owner or Owner's Representative. The water and container used to pump up the line to be tested shall be properly disinfected. b. Air Removal:Before applying the specified test pressure,air shall be expelled completely from the pipe, valves, and hydrants. c. Examination: All exposed pipe, fittings, valves, hydrants, and joints shall be examined carefully during the test. Any damaged or defective pipe,fittings,valves,or hydrants that are discovered following the pressure test shall be repaired or replaced with sound material and the test shall be repeated until it is satisfactory to the Owner or Owner's Representative. 5. Leakage will not be accepted during waterline testing. ire 6. Testing must be completed prior to connection with the existing system. 3.2 WATERLINE DISINFECTION A. General -All domestic waterlines shall be disinfected prior to being placed in operation. Prior to disinfection all waterlines shall be flushed unless the tablet method of disinfection is used. All valves and hydrants shall be operated during this operation. Flushing velocities shall not be less than 2.5 ft./sec. If ductile iron pipe is being used,the water used to disinfect the waterline should not remain in contact with the waterline for more than 24 hours. B. Methods of Chlorine Application 1. Continuous Feed Method - Potable water shall be introduced into the pipe line at a constant flow rate. Chlorine shall be added at a constant rate to this flow so that the chlorine concentration in the water so that the chlorine concentration in the water in the pipe is at least 50 mg/I. The chlorinated water shall remain in the pipe line at least 24 hours,after which,the chlorine concentration in the water shall be at least 10 mg/I. All valves and appurtenances shall be operated while the chlorinated water remains in the pipe line. 2. Slug Method-Potable water shall be introduced into the pipe line at a constant flow rate. This water shall receive a chlorine dosage which will result in a chlorine concentration of 100 mg/I in a"slug"of the water. The chlorine shall be added long enough to insure that all portions of the pipe are exposed to the 100 mg/I chlorine solution for at least 3 hours. The chlorine residual shall be checked at regular intervals not to exceed 2,000 feet to insure that adequate disinfection is occurring. As the chlorinated water passes valves and appurtenances,they shall be operated to insure disinfection of these appurtenances. 3. Tablet Method -This method shall not be used if non-potable water or foreign material have entered the lines or if the water temperature is below 5°C(41°F). The tablets shall be placed in each pipe section and in all appurtenances. Enough tablets shall be used to insure that a chlorine concentration of 25 mg/I is provided in the water. They shall be attached by an adhesive to the top of the pipe sections and crushed or rubbed in all appurtenances. The adhesive shall be approved by the Engineer. The velocity of the potable water in the pipe line shall be less than 1 ft./sec. The water shall remain in contact with the pipe for 24 hours. All valves and appurtenances shall be operated while the chlorinated water is in the pipe. C. Final Flushing -After the required retention period, the heavily chlorinated water shall be flushed from the pipe lines using potable water and discharged to a sanitary sewer manhole. D. Testing-after the lines have been flushed to NFPA Standards,the waterlines shall be tested in the following methods: 1. All chlorine residual determinations shall be made using only those methods approved by the Virginia Department of Health. One approved method is the DPD Kit method. 2. Two water samples for bacteriological analysis must be collected at least 24 hours apart and Dewberry Engineers Inc. Utility Line Testing DEI#50092624 33 01 00-2 ir. University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 analyzed by a certified laboratory. The results of these samples must indicate no contamination before the pipe,tanks or equipment can be utilized as part of the waterworks. If contamination is indicated,then the disinfection procedure must be repeated. Samples shall be collected at regular intervals, not exceeding 2,000 feet throughout the length of pipeline. ire tr imo 1ie ar Sim Dewberry Engineers Inc. Utility Line Testing DEI#50092624 33 01 00-3 it i,,, University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 I i" TABLE 1 SPECIFICATION TIME REQUIRED FORA 1.0 PSIG PRESSURE DROP FOR SIZE AND LENGTH OF PIPE INDICATED FOR Q =0.0015 i"" PART 1A Pipe Minimum Length for Time for Specification Time for Diameter Time Minimum Longer Lenath (L)Shown (min:sec) o"' (in.) (min:sec) Time (ft) Length 100' 150' 200' 250' (sec) 4 3:46 597 .380 L 3:46 3:46 3:46 3:46 lie 6 5:40 398 .854 L 5:40 5:40 5:40 5:40 8 7:34 298 1.520 L 7:34 7:34 7:34 7:34 tie 10 9:26 239 2.374 L 9:26 9:26 9:26 9:53 12 11:20 199 3.418 L 11:20 11:20 11:24 14:15 15 14:10 159 5.342 L 14:10 14:10 17:48 22:15 ilia 18 17:00 133 7.692 L 17:00 19:13 25:38 32:03 21 19:50 114 10.470 L 19:50 26:10 34:54 43:37 24 22:40 99 13.674 L 22:47 34:11 45:34 56:58 kr 27 25:30 88 17.306 L 28:51 43:16 57:41 72:07 30 28:20 80 21.366 L 35:37 53:25 71:13 89:02 33 31:10 72 25.852 L 43:05 64:38 86:10 107:43 36 34:00 66 30.768 L 51:17 76:55 102:34 128:12 PART 1B Pipe Minimum Length for Time for Specification Time for Diameter Time Minimum Longer Length (L)Shown (min:sec) (in.) (min:sec) Time (ft) Length 300' 350' 400' 450' kr (sec) 4 3:46 597 .380 L 3:46 3:46 3:46 3:46 ire 6 5:40 398 .854 L 5:40 5:40 5:42 6:24 8 7:34 298 1.520 L 7:36 8:52 10:08 11:24 10 9:26 239 2.374 L 11:52 13:51 15:49 17:48 `ug 12 11:20 199 3.418 L 17:05 19:56 22:47 25:38 15 14:10 159 5.342 L 26:42 31:09 35:36 40:04 18 17:00 133 7.692 L 38:27 44:52 51:16 57:41 i" 21 19:50 114 10.470 L 52:21 61:00 69:48 78:31 24 22:40 99 13.674 L 68:22 79:46 91:10 102:33 imp 27 25:30 88 17.306 L 86:32 100:57 115:22 129:48 030 28:20 80 21.366 L 106:57 124:38 142:26 160:15 33 31:10 72 25.852 L 129:16 150:43 172:21 193:53 ,„ 36 34:00 66 30.768 L 153:50 179:29 205:07 230:46 The minimum acceptable time durations are shown on Table I. If the elapsed time to drop 1 psi is less than that shown on Table I, then the air loss shall be considered excessive and the section of pipe has failed the test. it r. Dewberry Engineers Inc. Utility Line Testing DEI#50092624 33 01 00-4 r. irr University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 3. Testing of Manholes and Structures air All new manholes and structures shall be tested by vacuum testing. a. Vacuum Test: Manholes and Structures shall be vacuum tested as follows: iLr All vacuum testing shall be performed prior to backfilling around all manholes and structures. All pipe openings shall be plugged by pneumatic or mechanical plugs and braced to sustain 10"mercury vacuum. The rim to cone joint shall be tested on all manholes. No one shall be inside the manhole during testing. The test shall be at 10 in. mercury. it Installation and operation of vacuum equipment and indicating devices shall be in accordance with equipment specifications for which performance information has been provided by the manufacturer. Minimum Time to hold 1 in. Mercury Drop irr MH Dia. MH Height Hg Time(Minimum) 4' 10'or less 1 in. 1 min. 0 sec. 4' 10-15' 1 in. 1 min. 15 sec. 4' 15-25' 1 in. 1 min. 30 sec. For manholes five feet in diameter, add an additional 15 seconds and for manholes six feet in diameter, add an additional 30 seconds to the time requirements for four-foot diameter manholes. If a manhole joint mastic is completely pulled out during the vacuum test, the manhole shall be disassembled and the mastic replaced. E. Deflection Test for PVC Gravity Pipe: All PVC pipe with a stiffness of 200 psi or greater may be excluded from the deflection test (Manufacturer shall certify stiffness in excess of 200 psi). Deflection tests shall be a test on installation and be performed no sooner that 30 days after final full backfill has been placed. The CONTRACTOR shall test the pipe for deflection by means of a GO- NO-GO mandrel to assure that a deflection of 5 percent has not been exceeded. The mandrel,one for each size pipe, shall be a nine arm mandrel,with proving ring, sized at 5 percent less than the ASTM dimension for the pipe in accordance with TABLE II. The mandrel shall be pulled through the sewer line manually. Ten percent of all sewer line shall be tested at locations specified by the ENGINEER. Should any of the 10% fail the test, it shall be corrected until it does pass the test, at the CONTRACTOR's expense. Additional sewer shall be awl tested at the discretion of the ENGINEER, and any sewer not passing the test shall be corrected until it does pass the test. TABLE II Nominal PVC-SDR 35 Diameter ASTM D3034 (inches) L(inches) D (inches) aro 8 8 7.50 10 10 9.33 ii,,, 12 12 11.16 15 15 13.60 18 18 16.60 ,"' L= Mandrel Arm Length D = I.D. of Proving Ring •Dewberry Engineers Inc. Utility Line Testing DEI#50092624 33 01 00-5 it University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 F. The test shall be made only under the supervision of the ENGINEER. The CONTRACTOR shall provide all equipment and perform all work required for the purposes. In case any section under test shows leakage in excess of the allowable amount,the CONTRACTOR shall make such rr repairs to the line as are required to bring the loss within the stipulated limits. L END OF SECTION 33 01 00 air abo ip w t iw tr. ire SO Dewberry Engineers Inc. Utility Line Testing DEI#50092624 33 01 00-6 bit University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 impSECTION 33 05 00 EARTHWORK: UTILITIES PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplemental General Conditions, and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. The CONTRACTOR shall furnish all labor and equipment for excavation, installation, backfill, and testing of all utility lines and appurtenances as shown on the Drawings and specified herein. This section specifies excavation and backfill for all underground utilities. 1.3 REFERENCE SECTIONS Yr A. Section 02 41 19—Site Demolition B. Section 31 20 00—Earth Moving 1.4 REFERENCES A. American Society of Testing and Materials (ASTM) B. VDOT Road and Bridge Specifications C. Occupational Safety and Health Administration Regulations(OSHA) 1.5 SUBMITTALS A. Submit Excavation support system design and details for trench excavation. Excavation support system shall be signed and sealed by a Virginia Licensed Professional Engineer. Irr 1.6 COORDINATION A. The CONTRACTOR shall be responsible for coordinating all excavations with the following: rr All planned excavations on University property require a University"Request for Excavation Permit", shall be completed and submitted to the CAM and the Utilities Department within two iti ,,, hours of contacting MISS UTILITY. The University's"Request for Excavation Permit" notifies only the University of planned excavation and does not result in notification of MISS UTILITY. The University is a subscriber to the"MISS UTILITY" underground utility location and notification system. In addition to University and MISS UTILITY requirements,the City of Charlottesville (434-971-3320)also requires that requests for excavation permits be submitted for City maintained streets or sidewalks. Any excavation of state roads requires notification and coordination with the Virginia Department of Transportation (VDOT).All planned excavations require notification of MISS UTILITY per state and federal regulations. It is the responsibility of the contractor, to notify MISS UTILITY at 1-800-552-7001 of the planned excavation and at 1- 800-552-3120 to obtain subsequent verification that utilities have been marked. era Excavation shall not proceed without a University Excavation Permit and the completion of the above requirements. 1.7 QUALITY ASSURANCE imp Dewberry Engineers Inc. Earthwork: Utilities DEI#50092624 33 05 00-1 Yr too University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 A. Standards: Testing of backfill material shall comply with the following standards. ASTM D6938 Standard Test Methods for In-Place Density and Water Content of Soil and Soil- Aggregate by Nuclear Methods (Shallow Depth). ASTM D698 Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort(12,400 ft-lbf/ft3(600 kN-m/m3)). B. Excavation support system design and details for trench excavation, shall be sealed and signed ime by a professional engineer licensed in the Commonwealth of Virginia, copy of design shall be filed with ENGINEER. yr PART 2- PRODUCTS 2.1 BACKFILL AND PIPE BEDDINGS MATERIALS: A. All new pipe installed shall use crushed aggregate or sand to meet the requirements of Aggregate Standard size No.10 as defined by VDOT standard specifications or sand, for pipe bedding. All new piping in paved area shall use backfill to meet the requirements of Aggregate Standard size No.21A or No.21 B or sand, as defined by VDOT standard specifications. All new pipe shall be backfilled in accordance with Section 31 20 00—Earth Moving. PART 3- EXECUTION aro 3.1 EXCAVATION A. General: All excavation shall be performed in accordance with the current VOSH and OSHA guidelines and all other regulatory authorities having jurisdiction. Provide adequate equipment to comply with VOSH and OSHA regulations. All excavation shall be open-cut type except where otherwise shown on the Drawings. The slope of the sides of the excavation shall be kept as nearly bpi vertical as possible consistent with the types of materials encountered. A clear area shall be maintained a sufficient distance back from the top edge of the excavation to avoid overloading which may cause slides, cave-ins or shifting of the pipe. All damage to pipes or structures occurring through settlements, heaving,water or earth pressures,slides,cave-ins or other causes shall be repaired by CONTRACTOR at its expense. CONTRACTOR has the option of shoring, including sheet piling,which shall be installed during excavation where required for the protection of workmen, banks, roadways and adjacent paving, structures, and utilities or as directed byENGINEER. B. Excavation Classification: Excavation will be classified as Common Excavation or Rock imp Excavation in accordance with the following definitions or will be designated as classified. C. Common Excavation shall be defined as the excavation of all materials that can be excavated, transported and unloaded by the use of heavy ripping equipment and wheel tractor-scrapers with pusher tractors or that can be excavated and dumped in place or loaded onto hauling equipment by means of excavators having a rated capacity of one cubic yard and equipped with attachments (such as shovel, bucket, backhoe, dragline or clam shell)appropriate to the character of the materials, and the site conditions. Common Earth Excavation includes removal and disposal of pavements and other obstructions visible to ground surface, underground structures and utilities indicated to be demolished and removed, material of any classification indicated in data on subsurface conditions, and other materials encountered that air are not classified as rock excavation. D. Rock Excavation shall be defined as any material in beds, ledges, unstratified masses, and conglomerate deposits and boulders of rock material exceeding.1 cu. yd. that cannot be removed by rock excavating equipment equivalent to late-model, track mounted hydraulic excavator; equipped with a 42-inch wide, short-tip-radius rock bucket; rated at not less than Dewberry Engineers Inc. Earthwork: Utilities DEI#50092624 33 05 00-2 t11r Yr University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 120-hp flywheel power with bucket-curling force not less than 25,000 lbf and stick-crowd force of not less than 18,700 lbf; measured according to SAE J-1179, without systematic drilling, ram hammering or ripping (blasting not permitted). +r E. Protection: Protect existing structures, utilities, sidewalks, pavements, and other facilities in areas of work. Barricade open excavations and provide warning lights. Maintain service to/from existing homes, businesses, and facilities. int F. Shoring or Sheeting: Shoring or sheeting shall be removed as the WORK progresses, unless left in place by written order of ENGINEER. Sheeting or shoring to remain after completion of the project shall be cut a minimum of 1' below finished grade. G. Trench Excavation: CONTRACTOR shall comply with all local, state and federal guidelines when excavating trenches. The width of the trench at and below the top of the pipe shall not exceed the outside diameter of the pipe plus 24 inches, except the minimum trench width shall be 36 inches in all cases. The width of the trench above the top of the pipe may be as wide as necessary for sheeting and bracing and the proper performance of the WORK. H. Sidewalls: The sidewalls of pipe trenches shall be as nearly vertical as practicable to a point above the top of the pipe. I. Over-excavation: Trenches shall be excavated to the design grade of the pipe to provide uniform bearing and support along the entire length of pipe. Care shall be taken not to over excavate. Over excavation of otherwise suitable material shall be replaced with suitable material as directed by ENGINEER. The cost of such fill shall be borne by CONTRACTOR. its J. Rock: Where the bottom of the pipe trench occurs in rock, the rock shall be excavated to a minimum of 6 inches for pipes 24-inches in diameter and smaller and 9 inches for pipes 30- inches in diameter and larger, below the trench depth indicated on the Drawings or specified elsewhere. Over depths in rock excavation and unauthorized over depths shall be backfilled with VDOT No. 10 crushed stone or gravel at CONTRACTOR'S expense. K. Unsuitable Material: Whenever wet or otherwise unsuitable material, which is incapable of properly supporting the pipe, is encountered in the trench bottom, such material shall be over- excavated to a depth necessary to allow for construction of stable pipe bedding. The trench shall be backfilled with suitable materials to proper grade. The CONTRACTOR shall notify as ENGINEER immediately when such conditions are encountered and the ENGINEER will determine the amount of over-excavation required. L. Disposal: All excavated material being disposed of off site shall be done legally. 3.2 BACKFILLING it A. Operation: CONTRACTOR shall keep trenches backfilled on a daily basis. Prior to the end of the working day, each trench will be completely backfilled. All backfill shall be brought up equally along each side of the pipe in such manner as to avoid displacement of or damage to the pipe. B. Material: Shall conform to PART 2—PRODUCTS above. `r C. No fill shall be placed until the subgrade has been checked and approved by the Geotechnical Engineer, and in no case shall fill be placed on a subgrade that is muddy, frozen, or that contains frost. D. Disposal of Unsatisfactory Material: When, in the opinion of ENGINEER,the excavated material is not satisfactory for use as backfill, the material shall be disposed of offsite legally. it Dewberry Engineers Inc. Earthwork: Utilities DEI#50092624 33 05 00-3 it University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 Select material shall be brought in by CONTRACTOR. E. Compaction: 1. VDOT No. 10 Stone Bedding Material or sand shall be brought up in layers not exceeding rr 3 inches in compacted depth for the full length of pipe. Each layer shall be thoroughly compacted by mechanical tampers or hammers. 2. Compaction of pipe backfill shall conform to the requirements of Section 312000—Earth Moving. F. Testing: The backfill shall be tested to insure that the required density is being achieved. OWNER is responsible for costs associated with testing. ENGINEER shall select the depth at which the test is to be taken. Backfill not compacted to the required density shall be removed, recompacted, and retested at CONTRACTOR'S expense until the requirements are met. G. Excess Disposal: Excess material shall be disposed of on site or off site legally at the discretion of the OWNER. H. Settlement: All backfilled areas where settlement occurs shall be filled and maintained during the life of the Project and for a period of 1 year following the date of final acceptance of all WORK. I. Hazards: When the CONTRACTOR is notified by ENGINEER or OWNER that all backfill presents a hazard, CONTRACTOR shall correct such hazardous condition at once. 3.3 BORROW h A. Availability: Where satisfactory materials are not available in sufficient quantity from required excavations, suitable materials shall be obtained from approved off-site borrow areas. B. Placement: Borrow material shall be placed and compacted only when approved by ENGINEER and a Licensed Geotechnical Engineer. C. Payment: No separate payment will be made for furnishing and placing approved borrow material. Compensation in full is included in the agreed to price paid for this Project. 3.4 BLASTING A. Not Applicable. END OF SECTION 33 05 00 ire 6 Mw Dewberry Engineers Inc. Earthwork: Utilities DEI#50092624 33 05 00-4 irr University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 SECTION 33 0513 PRE-CAST CONCRETE: MANHOLES PART 1 - GENERAL air 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General Conditions, Supplemental General Conditions, and Division 01 Specification sections, apply to work of this section. 1.2 SUMMARY Ii. A. This work entails providing materials and installation of pre-cast Sanitary, and Storm Sewer manholes and appurtenances, including appropriate penetrations for piping, grouting the inverts, sealing the pipe penetrations and joints, and application of an epoxy liner. 1.3 REFERENCES a r A. Virginia Department of Transportation (VDOT) Road and Bridge Specifications B. American Society for Testing and Materials (ASTM) C. American Concrete Institute (ACI) 1.4 SUBMITTALS A. Submit Shop Drawings signed and sealed by a qualified professional engineer including dimensions, reinforcing, and material Specifications. 1.5 QUALITY ASSURANCE A. CONTRACTOR shall notify the UVA Utilities inspector prior to construction of all manholes. lore B. Manholes shall be manufactured and designed by the precast supplier in accordance with ASTM C890 for HS 20 loading and in accordance with the latest ACI, Standard 318, Building Code, ASTM C 478, and ACI 350. C. Standard manhole frame and cover shall be as specified on the drawings with a minimum 24" clear opening. D. Iron castings shall conform to the standard Specifications for Gray Iron Castings ASTM Specification A 48, Class 30S. 1.6 DELIVERY, STORAGE AND HANDLING A. CONTRACTOR shall provide an area on-site for off-loading and storage of pre-cast structures hir delivered to the site. The surface on which the structures are placed shall not cause eccentric loadings which may damage the items. Prior, and during installation, precast structures will be moved utilizing equipment of sufficient capacity to safely move and place such structures. Any damage to pre-cast structure shall be reported to the ENGINEER for determination as to its ability to meet its intended use.Any structure damaged such that it cannot be used as intended, will be rejected by the ENGINEER and CONTRACTOR shall replace in-kind at its sole expense. 1.7 PROHIBITED MATERIALS Dewberry Engineers Inc. Pre-Cast Concrete: Manholes DEI#50092624 33 05 13- 1 Yr imp University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 A. The use of bricks to raise manhole frame and covers to final grade is prohibited. B. Do not grout the manhole frame in place. imp PART 2- PRODUCTS 2.1 MANHOLES A. Precast Manhole: Unless authorized by ENGINEER, manholes will be of the precast concrete type as shown on the Drawings. Manholes shall be manufactured in accordance with the latest ACI Building Code, Chapter 13,for Class A,Air-Entrained Concrete. Pre-cast manholes shall conform to ASTM C-478. Manholes shall be 4 foot diameter, unless otherwise noted on the Drawings. Manholes shall be delivered to site with bitumastic waterproofing on exterior. B. Gaskets:All gaskets shall be flexible neoprene rubber and conform to the requirements of ASTM C443. Manhole section gaskets shall be of the 0-Ring gasket type with butyl rope mastic applied to the joint adjacent to the outside wall and grout applied on the inside wall as shown on the drawings. C. Manhole Frame and Cover: The manhole frame and cover shall conform to the requirements its of:ASTM A47, Grade 32510 for malleable castings,ASTM A48 Class 30S for gray iron castings, ASTM A536, Grade 60-40-18 for ductile iron castings,ASTM A27, Grade 65-35 for carbon steel castings, and ASTM A296, Grade CA-15 for Chromium alloy steel castings. Tolerances, bet workmanship, and strength requirements for castings shall conform to FS RR-F-621. All testing shall be performed in the presence of the Engineer or representative. D. Pipe Connections: All manholes shall have factory installed flexible connections for all pipe jay " penetrations, and service laterals shall enter the sewerage system at manholes. E. Inverts: The use of precast inverts is encouraged, however no additional compensation will be afforded the CONTRACTOR for replacements of bases caused by line relocation to avoid existing utilities or structures. Field constructed inverts shall be shaped in accordance with VDOT IS-1 Detail. Ir. F. Manhole Step: All manholes shall have a factory installed step designed so their foot cannot slide off the end. General dimensions shall be 12 inches wide (min.)uniformly spaced from 12 inches minimum to 16 inches maximum. Step shall be of the cast-in-place or grouted type iir manufactured and coated, and installed in accordance with the latest O.S.H.A. Regulations. G. Openings for Pipe: Shall be precast and supplied with a flexible connection boot. The boot shall be of neoprene secured to the manhole by a water tight compression ring seal to provide a flexible joint. The joint shall be of neoprene rubber. The boot shall be installed in accordance with the manufacturing instructions. Grout: Grout for inverts,joints, and other repairs, shall be a self-bonding, non-shrink, high strength cement mortar with a set time of 60 seconds or less. Grout shall conform with ASTM C150 and ASTM C144. All joints, lift holes, inlets, and outlets to be sealed and non-shrink grouted inside and out. H. Interior Coating: The interior of sanitary manholes shall have an epoxy sealant with eitherSikagard 62 High-Build Protective Coating, Cor+Gard® Protective Coating or Raven 405 Protective Coating, or approved equal. Sealant shall be field applied. I. Exterior Coating: Bitumastic waterproofing (Coal Tar Epoxy) J. Elastomeric Adhesive/Sealant: one part advanced polyurethane elastomeric sealant/adhesive Yr Dewberry Engineers Inc. Pre-Cast Concrete: Manholes DEI#50092624 33 05 13-2 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 (Sikaflex-11 FC or equal). ito PART 3- EXECUTION 3.1 DELIVERY A. The exterior of all manholes shall be coated in the bitumastic waterproofing prior to delivery to the site. 3.2 PLACEMENT A. Manholes shall be placed on a properly compacted foundation after review and approval by ENGINEER and in conformance with the manufacturers recommended practices. Prior to backfilling, the Contractor shall seal all joints, lift holes, inlets, and outlets with non-shrink grouted inside and out. Once grout has cured,field apply bitumastic over the new grout and overlap adjacent manhole sections by a minimum of 6-inches. 3.3 ARRANGEMENT ir. A. Manholes shall be of watertight construction. In streets, manhole tops shall be set by the road grade. A maximum of 12 inches of adjustment rings may be used to reach grade. In easements a minimum of 2 inches, maximum of 24 inches of manhole shall be above grade, two with ground sloping away from the manhole for a distance of 3'from the center of the cover. No adjustment rings shall be used to reach this elevation. All lift rings shall be removed and all lift holes sealed. Inverts shall be installed in a workmanlike manner, providing a smooth flow line without obstructions in accordance with the Drawings. 3.4 MANHOLE COMPLETION a"' A. After the manhole has been installed and prior to completion, the Contractor shall field apply non-shrink grout per the manufacturer's instructions at all joints and pick holes and coat with bitumastic waterproofing per the manufacturer's instructions. Apply the manufacturer's recommendation for number of coats to ensure quality control and complete coverage of the epoxy protective coating to the interior of the manhole. Surface preparation and application shall be in accordance with manufacture's specifications. 3.5 TESTING A. Testing of manholes shall be in accordance with Section 330100 - Utility Line Testing. 10 3.6 DISPOSAL A. The CONTRACTOR is responsible for legal disposal of all existing manholes that are replaced. its END OF SECTION 33 05 13 rr i. Dewberry Engineers Inc. Pre-Cast Concrete: Manholes DEI#50092624 33 05 13-3 1rr obi Igo ti•• iNN Its imp University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boars Head Addition May 8,2017 hop SECTION 33 05 26 UTILITY LOCATION AND IDENTIFICATION PART 1 - GENERAL r 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General Conditions, Supplemental General Conditions, and Division 01 Specification sections, apply to work of this section. 1.2 SUMMARY his A. The purpose of this Section is to specify the requirements for utility location tape and buried detection wire. In general, all utility pipelines shall be marked by appropriately marked metallic tape 12 to 24 inches above the conduit. Buried detection wire shall be buried just above conduit. 1.3 REFERENCES rr A. Code of Virginia 1.4 SUBMITTALS A. Product Data: For each type of manufactured material and product indicated. 1.5 SEQUENCING A. The tape or wire shall be installed at the same time as the pipeline. PART 2- PRODUCT 2.1 WARNING AND IDENTIFICATION TAPE A. Polyethylene plastic and metallic core or metallic-faced, acid-and alkali-resistant, polyethylene plastic warning tape manufactured specifically for warning and identification of buried utility lines. Provide tape on rolls, 3 inch minimum width, color coded as specified below for the intended utility with warning and identification imprinted in bold black letters continuously over the entire tape length. Warning and identification to read, "CAUTION, BURIED (intended service) LINE BELOW"or similar wording. Color and printing shall be permanent, unaffected by moisture or soil. Warning Tape Color Codes Red: Electric Yellow: Gas, Oil; Dangerous Materials Blue: Water Green: Sewer Purple: Storm B. Warning Tape for Metallic Piping: Acid and alkali-resistant polyethylene plastic tape conforming to the width, color, and printing requirements specified above. Minimum thickness of tape shall be 0.003 inch. Tape shall have a minimum strength of 1500 psi otherwise, and 1250 psi crosswise,with a maximum 350 percent elongation. irr C. Detectable Warning Tape for Non-Metallic Piping: Polyethylene plastictape conforming to the width, color and printing requirements specified above. Minimum thickness of the tape shall be 0.004 inch. Tape shall have a minimum strength of 1500 psi lengthwise and 1250 psi lei Dewberry Engineers Inc. Utility Location And Identification DEI#50092624 33 05 26- 1 ii. University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 crosswise. Tape shall be manufactured with integral wires,foil backing, or other means of enabling detection by a metal detector when tape is buried up to 3 feet deep. Encase metallic element of the tape in a protective jacket or provide with other means of corrosion protection. Color coded tape shall be installed flat with color side up to 12 inches to 24 inches over all installed utility lines including main line and service lateral or service connection. 2.2 BURIED DETECTION WIRE la" A. Detection wire shall be insulated single strand, solid copper with a minimum of 12 AWG for a buried depth of less than 4 feet and 4 AWG for a buried depth greater than or equal to 4 feet. Detection wire shall be buried directly above non-metallic piping at a distance not to exceed twelve (12) inches above the top of pipe. The wire shall extend continuously and unbroken, from point of access to point of access. The ends of the wire shall terminate with a minimum of three(3)feet of wire, coiled, remaining accessible in each tank structure, fire hydrants and inside. The wire shall be exposed at the connection between contact A&b until the connection can be made to the wire by the last contractor to make the pipe connection. J END OF SECTION 33 05 26 rr. ar r air its Dewberry Engineers Inc. Utility Location And Identification DEI#50092624 33 05 26-2 1. University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 SECTION 3311 00 POTABLE WATER SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this section. 1.2 DESCRIPTION OF WORK A. Extent of potable water systems work is indicated on drawings and by requirements of this Section. B. Refer to Division 2 Section, "Earthwork for Utilities", for excavation and backfill required for potable water systems, not work of this Section. 1.3 QUALITY ASSURANCE lig A. Manufacturer's qualifications: Firms regularly engaged in manufacture of potable water systems materials and products, of types and sizes required, whose products have been in satisfactory use in similar service. ire B. Codes and Standards: 1. The Virginia Department of Health Waterworks Regulations. 2. American WaterWorks Association (AWWA) 1.4 SUBMITTALS A. Product Data: Submit manufacturer's technical product data and installation instructions for potable water system piping and products, in accordance with requirements of Division 1. B. Record drawings:At project closeout, submit record drawings of installed potable water system piping and products, in accordance with requirements of Division 1. C. Maintenance Data: Submit maintenance data and parts lists for potable water system materials and products. Include this data, product data, shop drawings, and record drawings in maintenance manual; in accordance with requirements of Division 1. iir PART 2 - PRODUCTS 2.1 IDENTIFICATION Refer to Section 02798— Utility Location and Identification. ie. Dewberry Engineers Inc. Potable Water Systems DEI#50092624 33 11 00- 1 • lip University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 2.2 PIPE aro All pipe shall be approved by the Albemarle County Service Authority(ACSA). Unless otherwise approved in writing by the ACSA, all water mains and distribution lines shall be of the material herein listed. The ACSA reserves the right to select the type and/or class material which shall be used from the following: A. Ductile Iron Pipe: 1. Ductile iron pipe shall be centrifugally cast pipe manufactured in accordance with AWWA/ANSI C151/A21.51-02 or current revision. The joints shall be rubber gasket push-on type, unless mechanical joints are specified on the plans, in accordance with AWWA/ANSI C111/A21.11-00 or current revision. The pipe shall have an interior cement mortar lining in accordance with AWWA/ANSI C1041A21.4-03 or current revision, and an exterior asphaltic coating in accordance with AWWA/ANSI C151/A21.51-02 or current revision. Pipe 8-inches and smaller shall have a minimum wall thickness of 0.31-inch. Pipe 10-inches and larger shall have a minimum wall thickness of 0.34-inch. Pipe shall be manufactured by Griffin Pipe Products, Inc., U.S. Pipe &Foundry Co., Atlantic States Cast Iron Pipe Co., American Cast Iron Pipe Co., or equal. 2. Exposed pipe and fittings shall have flanged joints conforming to the requirements of AWWA C115. Bolts shall be high strength cast iron having an ultimate tensile strength of 75,000 psi and a minimum yield point of 45,000 psi. 3. A minimum of 5% of the pipe furnished shall be gauged for roundness full length and so marked. Pressure class of pipe shall be increased if the specific installation warrants it. 4. Products: a. Griffin Pipe Products, Inc. b. U.S. Pipe & Foundry Co. c. Atlantic States Cast Iron Pipe Co. d. American Cast Iron Pipe Co. B. Copper Pipe: 1. All piping 2 inches and smaller shall be copper pipe 2. All copper pipe shall meet the requirements of ASTM B88. Copper pipe for exterior use shall be soft type K. C. Galvanized Pipe: • 1. Galvanized steel pipe shall conform to ASTM A-102-77, or current revision, Schedule 40 or 80. 2. Galvanized pipe shall not be used below ground except for blow-off assemblies and where exposed to the atmosphere. Galvanized pipe shall not be used under wet conditions in any event except where approved by Dewberry Engineers Inc. Potable Water Systems DEI#50092624 33 11 00-2 two Ito University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 the Albemarle County Service Authority. ima 2.3 RESTRAINED JOINTS A. Restrained push-on joints shall be provided as indicated on the plans. B. Restrained push-on joints fittings shall be non-mechanical type consisting of ductile iron locking segments inserted through slots in the bell face to provide a positive axial lock between the bell interior surface and a retainer weld bead on the spigot end of the pipe. The joints shall be rubber gasket as per ism ANSI/AWWA Specification C1111A21.11, flexible-restrained push-on type. 2.4 PIPE FITTINGS A. DIP Pipe 1. All fittings for DIP Pipe shall be compatible with the pipe specified herein meeting the specifications as included in the above pipe specifications and per AWWA/ANSI C1101A21.10-03 or current revision, or AWWA/ANSI C153/A21.53 or current revision. All fittings shall have an r"' interior cement mortar lining in accordance with AWWA/ANSI C104/A21.4-03 or current revision and an exterior asphaltic coating in accordance with AWWA/ANSI C151/A21.51-02 or current revision. Fittings shall be manufactured by Tyler(with D.I. T-bolts or Corten steel bolts), Standard International (with Corten steel bolts), Union Foundry Co., Star Pipe Products, or equal. 2. DIP in buildings, tanks, and to a point 5 feet outside these premises shall be flange fitted unless mechanical joints are shown on the Drawings. imo 3. Gaskets shall be of heavy section and high durometer, single molded, in accordance with AWWA/ANSI C111/A21.11-00 or current revision. Lubricant used to facilitate assembly of joints shall be a non-toxic, Ira tasteless, odorless grease that will not support bacteria. 4. Products a. Tyler: with D.I. T-Bolts or Corten steel bolts b. Standard International: with Corten steel bolts c. Union Foundry Co. ,,, d. Star Pipe Products B. Copper Pipe a` 1. Fittings for exterior use shall be standard water works flare or compression fittings of brass for flared copper pipe and conforming to ANSI B16.26. sag C. Galvanized Pipe 1. Fittings for galvanized steel pipe shall be galvanized malleable iron in accordance with ASTM A-120-77 or current revision. Dewberry Engineers Inc. Potable Water Systems DEI#50092624 33 11 00-3 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 2.5 GATE VALVES A. Gate valves 2-inch and smaller shall be inside screw, solid bronze, tapered seat, double disc construction, and rated for 200 psi working pressure. Gate valves shall be manufactured by U.S. Pipe (Metroseal 250 resilient seated gate valve, 4"and larger), American Flow Control (Series 2500 resilient wedge valve, 2"and larger), Kennedy(Ken-Seal II resilient wedge gate valve, 4" and larger), Mueller (Series 2360 resilient wedge gate valve), American AVK (Series 45 resilient wedge gate valve), or equal. B. Gate valves shall be double disc type or resilient seated wedge type. The double disc type shall be parallel seat, bronze mounted type with non-rising stems in accordance with ANSI/AWWA C500-02. The resilient seated type shall be non-rising stem, fully encapsulated wedge in accordance with ANSI/AWWA C509-01. Gate valves 14-inches and larger shall be designed for a working pressure of no less than 150 psi and a test pressure of 300 psi. Gate valves 4- i' inches to 12-inches shall be designed for a working pressure of no less than 120 psi and a test pressure of 400 psi test pressure. C. Gate valves shall be one make and shall open by a counter-clockwise rotation of the valve stem with a 2-inch square operating nut. The operating nut shall be no greater than 3-feet below finished ground. Operating nuts placed greater than 3 feet below finished ground shall be equipped with approvied operating nut extensions to meet the minimum depth requirement. The valve shall have an unobstructed water way when fully opened equal in diameter to the nominal lie valve size. Gate valves installed in access vaults, pumping stations, etc. shall be equipped with handwheels indicating the direction of turn to open or close the valve. Gate valves shall have one "0" ring above and one "0" ring below the stem thrust collar. The thrust collar shall be lubricated with oil to assure positive operation in opening and closing. 2.6 VALVE BOXES A. The Contractor shall furnish and install cast iron valve boxes for all buried valves at the locations shown on the Drawings. Valve boxes shall be screw type a adjustable cast iron, HS-20 rated, suitable for use under heavy traffic, with 5 '/ inch inside diameter and flared base. Covers shall be marked "WATER" and bases shall be the round type. Valve boxes shall be coated with bituminous paint on both sides. All valves deeper than 4 feet shall have valve stem extenders pinned at the valve. All valves shall be capable of being operated by a 48 inch valve wrench. All valve boxes shall be placed so as not to transmit shock or stress to other valve and shall be centered and plumb over the operating nut of the valve. Valve boxes shall be manufactured by Bingham & Taylor(Fig. No. 4906, genuine Buffalo style with standard cover; extensions— Fig. No. 4905-X), Capital Foundry(cast iron screw type Pattern No. 3101- 3107/3112/3151-52, standard cover with 1-1/2" lip), East Jordan Iron Works (8550 Series, Two Piece Screw Type with 6800 Valve Box Drop Lids), or equal. Valve Box Risers shall be manufactured by East Jordan Iron Works (8500, lock- in set screw required), Acheson (valve box adjusting rings, AVAR-10 through AVAR-40), or equal. Dewberry Engineers Inc. Potable Water Systems J°' DEI#50092624 33 11 00-4 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 2.7 FIRE HYDRANTS A. Hydrants shall be manufactured in accordance with the most current revision of `ow ANSI/AWWA C502-05 and shall be approved by the National Board of Fire Underwriters. Hydrants shall have 6-inch barrel with 5.25-inch clear opening through the valve and shall be provided with a 4.5-inch pumper connection and lbw (2)2.5-inch ID hose connections. Fire Hydrants shall be manufactured by M&H (Model 129), Kennedy(Guardian Model No. K-81A), Clow Medallion, or equal. B. Fire hydrants shall be installed in such a manner as to provide the proper fire protection as approved by the County's fire prevention officer to all structures and no hydrant shall be more than 800 feet from any other hydrant measured along the centerline of the public right-of-way, private road, or other applicable access route. Generally, fire hydrants shall be placed no closer than 40 feet nor further away than 400 feet from all major structures. C. Fire hydrants shall be installed in areas where weep holes are above the prevailing groundwater table. Design elevations and the location of drainage structures shall be used to ensure the weep holes of the hydrant are not subject to groundwater immersion. If, during the course of construction, groundwater is observed in the trench, the fire hydrant shall be moved to higher ground and the separation between fire hydrants will be adjusted accordingly. If fire hydrants cannot be placed above groundwater, the weep holes shall be plugged and the hydrant shall be pumped dry. ism D. Hydrants shall be of the frost-proof and non-flooding type which will not flood in case the barrel or valve stem is damaged, with orifices for draining the hydrant when the valve is closed. A safety flange shall be provided so that the barrel will not break if struck by a vehicle or other object, and the hydrant can be repaired i'" without digging. Hydrants shall have a 42-inch minimum bury and be designed for 150 psi working pressure and 300 psi hydrostatic pressure. All working parts shall be bronze to bronze. All hydrants shall open counterclockwise and be `s preceded in the line by a gate valve. The pumper connection shall face the roadway. Fire hydrants shall have a moisture-proof chamber around operating threads filled with USDA H-1 food grade oil or grease which shall lubricate the irs threads. E. Hydrants shall be set plumb with the invert of the pumper connection 18-inches ,,, above grade. The maximum number of allowable hydrant risers for each hydrant is 2. Unless the hydrant location is specifically indicated otherwise, it shall be located so that the center is not less than 2-feet nor more than 10-feet from the back of the curb of the adjacent street, with the pumper connection facing the street, unless otherwise directed by the fire official. The connecting pipe e will have the same depth of cover as the distribution mains. The base and back of the hydrant, opposite the pipe connection, shall be firmly blocked against the vertical face of the trench with cast-in-place concrete to prevent the hydrant from blowing off the line. If the character of the soil is such that in the opinion of the Authority the hydrant cannot be securely blocked, bridle rods and rod collars and/or a pipe type bracing shall be used. Bridle rods and rod collars shall not be less than 3/4-inch stock and shall be protected by a coat of bituminous paint. Dewberry Engineers Inc. Potable Water Systems DEI#50092624 33 11 00-5 INN University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 Not less than 7-cubic feet of broken stone shall be placed around the base of the hydrant to ensure drainage. The backfill around hydrants shall be thoroughly compacted to grade line. Hydrants and valves shall have the interiors cleaned of all foreign matter before installation. Stuffing boxes shall be tightened and the hydrant or valve shall be inspected in open and closed positions, to see that all parts are in working condition. Bags shall be tied securely over all fire hydrants as soon as they are installed. These bags shall not be removed until approved w by the Authority. Each new fire hydrant shall be freshly painted. Paint for hydrant shall be Devoe DP 58106 (Safety Red BAR-OX Alkyd Industrial Gloss Enamel). Paint for caps shall be Axon Products, Inc. Silver-White 1440 Alert. lai F. The threads on the 4.5-inch pumper(steamer) connection and on the operating nut shall be National Standard threads. The threads on the hose connections shall be Albemarle County Service Authority standard thread (Charlottesville thread), 3 21/64"female, 3 9/32" male, eight threads per inch (Gauge 8-322) except for the Scottsville service area which are National Standard threads. All threads shall be thoroughly lubricated with a food grade lubricant. All of the male connections shall have caps and chains. The cap nuts and the operating nut shall be 1 1/2" Pentagon and shall open counterclockwise. alit 2.8 BLOW-OFF ASSEMBLIES A. Provisions shall be made for blow-offs by means of a regular blow-off assembly r` or hydrant assembly, as may be directed by the Albemarle County Service Authority. All pipe work for the hydrant blow-off assemblies shall conform in all respects to applicable portions of these specifications and to the plans. Blow-off assemblies shall not be connected directly to any storm drain or sanitary sewer systems. Blow-off assemblies shall be placed behind the curb, and shall be required at all dead-ends. B. Dead-end Blow-Off Assemblies (Type A) shall be installed as shown on the plans and in accordance with the following specifications: 1. Blow-off lines shall be 2-inch diameter galvanized or brass pipe. A PVC nipple shall be provided at the end of the assembly with a PVC threaded cap. The threads between the nipple and the cap shall be lubricated before installation to allow removal when needed. Ira 2. Gate valves and boxes shall be of the type described in the applicable sections of these specifications. 3. If the grade allows, a 2-inch diameter drain pipe shall be properly installed me in the meter box. C. In-line Blow-Off Assemblies (Type B) shall be located at major low points in the system as determined by the ACSA. 2.9 AIR RELIEF VALVE ASSEMBLIES A. Approved automatic air relief valves shall be installed at the high points in the system. Each assembly shall consist of a riser pipe, gate valve, fittings, and a precast concrete manhole cone section, or approved equal. Manhole cone section shall include frame and cover with the word "WATER" cast on it. ior Dewberry Engineers Inc. Potable Water Systems DEI#50092624 33 11 00-6 fti. University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 Manhole cone section, frame, and cover shall be HS-20 rated for heavy duty traffic. The riser shall be soft Type K copper pipe. Fittings shall be brass or bronze. Gate valves shall be of the type described in this Section. A 1-inch diameter air relief valve shall be used on lines smaller than 12-inches indiameter. A 2-inch diameter air relief valve shall be used on lines equal to or larger than 12- inches in diameter. Air relief valves shall be manufactured by APCO (Model No. 143C: 1", 145C: 2" combination air release valve), CLA-VAL (Model No. 361-CAV: 1", 362-CAV: 2"combination air release valve), Crispin (Model No. UL10: 1", UL20: 2" universal air release valve), ARI Valve (Model D- 040 combination air release valve: 1", 2"), or equal. B. If the grade allows, a 2-inch drain pipe shall be properly installed in the cone section of the manhole. C. Air relief valve assemblies shall not be connected directly to any storm drain or sanitary sewer systems. i'" 2.10 SERVICE CONNECTIONS A. Water service laterals are to be soft Type "K" copper tubing, installed at a minimum depth of 36-inches from the main line to a meter setting below finished grade. Detached single family and attached single family residential service laterals shall be 1-inch in diameter. Attached single family residential service laterals can also be grouped into a dual service with a shared 1-inch diameter service line. Water service laterals for 1-inch and 2-inch meter installations shall be 2-inch in diameter. Water service laterals larger than 1" diameter, crossing under existing roadways, shall be installed in sleeves of appropriate size and material, as approved by the Albemarle County Service. Meter boxes with meter yokes or coppersetters are to be installed at the end of each service lateral and are to be constructed in such a manner as to prevent conflict with proposed finished grading or other proposed construction such as driveways, drainage ditches, etc. All water service laterals must be well referenced for future location per detail. 2.8 CORPORATION STOPS r. A. Corporation stops shall be furnished of sufficient size with quarter bend couplings, and shall be installed approximately 45° below the top of pipe in accordance with applicable standards and specifications. All corporations shall i„ have ball style valves and have a pressure rating of 300 psi. Corporation stops shall be manufactured by Mueller(Catalog No. B-25000), Ford (Model No. FB600-4), McDonald (Model 4701B), or equal. ire PART 3 - EXECUTION ir. 3.1 INSPECTION A. General: Examine areas and conditions under which potable water system's Iw materials and products are to be installed. Do not proceed with work until Dewberry Engineers Inc. Potable Water Systems DEI#50092624 33 11 00-7 IYr ism University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 imp unsatisfactory conditions have been corrected in a manner acceptable to the Owner. 3.2 INSTALLATION OF IDENTIFICATION Refer to Section 02798. 3.3 INSTALLATION OF PIPE, PIPE FITTINGS,AND ACCESSORIES A. General 1. Installation of pipe, fittings, valves, and associated appurtenances shall be in accordance with the requirements of the following specifications: all Ductile Iron Pipe -ANSI/AWWA C600 2. Every precaution shall be taken to insure that the entire length of pipe is supported evenly with the joints mated securely together. Pipe bedding shall be as specified by the pipe manufacturer. B. Handling 1. All materials shall be shipped, unloaded, and stored in accordance with the manufacturer's recommendations. All materials shall be handled in such a manner as to avoid damage to the material. When such damage cannot be repaired to the Engineer's satisfaction, the item shall be it replaced at the Contractor's expense. The interior of all pipe and accessories shall be kept free from dirt and foreign matter at all times. C. Trench Preparation Iry 1. Trench preparation shall be in accordance with Section 02270 - Earthwork for Utilities. D. Dewatering 1. Dewatering shall be in accordance with Section 02140 - Dewatering. E. Placement 1. Installation of all piping, fittings, valves, and appurtenances shall be to the lines, grades and locations shown on the Contract Drawings. All pipe, imp fittings, and accessories shall be carefully lowered into the trench using suitable equipment in such a manner as to prevent damage to pipe fittings. Under no circumstances shall pipe or accessories be dropped or dumped into the trench. The pipe or accessories shall be inspected fordefects prior to lowering into the trench. Any foreign matter or dirt shall be removed from the interior of pipe before lowering into position in the trench. For waterlines, if dirt that, in the opinion of the Engineer or his designee, will not be removed by the flushing operation enters the pipe, the interior of the pipe shall be cleaned and swabbed as necessary, with a Dewberry Engineers Inc. Potable Water Systems DEI#50092624 33 11 00-8 lir is University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 imp 5 percent hypochlorite disinfecting solution. ' 2. Every precaution shall be taken to prevent foreign material from entering the pipe while it is being placed in the line. If the pipe-laying crew cannot tip put the pipe in the trench and in place without getting earth into the pipe, the Engineer may require that before lowering the pipe into the trench, a heavy tightly woven canvas bag of suitable size be placed over each end left there until the connection is to be made to the adjacent pipe. During laying operations, no debris, tools, clothing, or other materials shall be placed in the pipe. When pipe laying is not in progress, the open ends of r.i pipe shall be closed by a watertight plug or other means approved by the Engineer. This provision shall apply during any suspense of work such as the noon hour as well as overnight. If water is in the trench, the seal shall ,,, remain in place until the trench is pumped completely dry. 3. The cutting of pipe for inserting valves, fittings, or closure pieces shall be done in a neat and workmanlike manner, without damage to the pipe so p"" as to leave a smooth end at right angles to the axis of the pipe. Care shall be taken to avoid damaging the lining of the pipe. Flame cutting of iron pipe with oxyacetylene torch shall not be permitted. iii F. Deflection of Pipe, r 1. Pipe Deflection: Wherever it is necessary to deflect the pipe from a straight line, either in vertical or horizontal plane, to avoid obstructions or to plumb the line for valve installation, or where long radius curves are permitted, the amount of deflection allowed shall not exceed that required for satisfactory jointing of the pipes, as specified by the manufacturer. The following table shall be used as a guideline. In no case shall these limits be exceeded. r. S. Longitudinal Deflection of Ductile Iron Pipe r. Min. Allow. Pipe Per 18' Length Offset per 18' Offset per 20' Size Radius (ft) Length (in.) Length (in.) ,, 4 205 19 21 6 205 19 21 8 205 19 21 10 205 19 21 ire 12 205 19 21 G. Valve, Fittings, and Fire Hydrants ii 1. Installation of valves, fittings and hydrants shall be done as per the details on the Contract Drawings. iii 3.4 TESTING it Dewberry Engineers Inc. Potable Water Systems DEI#50092624 33 11 00-9 Yip. University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 ism A. General 1. All pipe, valves, fittings, and appurtenances shall be tested and inspected for water-tightness and soundness before being accepted in accordance with the requirements specified herein and as directed by the Engineer. 2. All testing shall be done in the presence of the Engineer or his representative. Contractor shall provide all equipment and perform all work required for the purposes. In case any section under test shows leakage in excess of the allowable amount, the Contractor shall make such repairs to the line as are required to bring the loss within the stipulated limits. The first mile or 20% of the total quantity, whichever is less, of waterline shall be tested prior to proceeding with the project. Thereafter, line testing shall be done in increments of one mile or 20% of the total quantity, whichever is less. ion 3. The Contractor shall be responsible for all costs associated with testing. Reinspection fees are charged for retesting when initial tests fail. Contact the Albemarle County Service Authority for current rate schedules. All testing will be performed in accordance with the ANSI/AWWA C600-05 or current revision. The contractor shall provide the Albemarle County Service Authority with 48 hours notice prior to undertaking any tests. B. Pressure Testing 1. After the pipe has been laid, all newly laid pipe or any valved section thereof shall be subjected to a hydrostatic pressure of at least 200 psi. 2. Test Pressure Restrictions. Test pressures shall: a. Not exceed pipe or thrust restraint design pressure; b. Be of at least 2-hour duration; c. Not vary by more than +/-5 psi; d. Not exceed twice the rated pressure of the valves or hydrants when Ir the pressure boundary of the test section includes closed gate valves or hydrants; e. Not exceed the rated pressure of the valve. 3. Pressurization impa. Each valved section of pipe shall be filled with water slowly and the specified test pressure shall be applied by means of a pump con- nected to the pipe in a manner satisfactory to the ACSA. The water and container used to pump up the line to be tested shall be properly disinfected. 4. Air Removal ikar a. Before applying the specified test pressure, air shall be expelled Dewberry Engineers Inc. Potable Water Systems DEI#50092624 33 11 00- 10 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 completely from the pipe, valves, and hydrants. 5. Examination. Ikea, a. All exposed pipe, fittings, valves, hydrants, and joints shall be examined carefully during the test. Any damaged or defective pipe, fittings, valves, or hydrants that are discovered following the pressure test shall be repaired or replaced with sound material and the test shall be repeated until it is satisfactory to the Authority. C. Leakage 1. A leakage test shall be conducted concurrently with the pressure test. atsi 2. Leakage defined a. Leakage shall be defined as the quantity of water that must be is. supplied into the newly laid pipe, or any valved section thereof, to maintain pressure within 5 psi of the specified test pressure after the air in the pipeline has been expelled and the pipe has been filled with water. 3. Allowable leakage a. No pipe installation will be accepted if the leakage is greater than that determined by the following formula: L = S * D * PL 148,000 L =Allowable leakage, in gallons per hour S = Length of line under test, in feet D = Nominal diameter of the pipe, in inches P =Average test pressure, in pounds per square inch (gauge) b. When testing against closed metal-seated valves, an additional leakage per closed valve of 0.0078 gal./hr./in. of nominal valve size shall be allowed.When hydrants are in the test section,the test shall be made against the closed hydrant valve. irr 4. Acceptance of Installation a. Acceptance shall be determined on the basis of allowable leakage. If any test of pipe laid discloses leakage greater than the allowable amount, the contractor shall, at his own expense, locate and repair the defective material uhtil the leakage is within the specifiedallowance. All visible leaks are to be repaired regardless of the amount of leakage. D. Disinfection e Dewberry Engineers Inc. Potable Water Systems DEI#50092624 33 11 00- 11 bar a. University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 itio 1. General -All waterlines shall be disinfected prior to being placed in operation. Prior to disinfection all waterlines shall be flushed unless the tablet method of disinfection is used. All valves and hydrants shall be operated during this operation. Flushing velocities shall not be less than 6 2.5 ft/sec. If ductile iron pipe is being used, the water used to flush the waterline should not remain in contact with the waterline for more than 24 hours. Waterlines shall be disinfected in accordance with AWWA C651- ire 05 or current revision. 2. Continuous Feed Method - Potable water shall be introduced into the pipe 1. line at a constant flow rate and protected by an approved backflow prevention device. Chlorine shall be added at a constant rate to this flow so that the chlorine concentration in the water in the so that the chlorine concentration in the water in the pipe is at least 50 mg/I. The chlorinated water shall remain in the pipe line at least 24 hours, after which, the chlorine concentration in the water shall be at least 10 mg/I. All valves and appurtenances shall be operated while the chlorinated water remains e" in the pipe line. 3. Tablet Method -This method shall not be used if non-potable water or ire foreign material have entered the lines or if the water temperature is below 5°C (41°F). Tablets of calcium hypochlorite, containing 70 percent available chlorine by weight, shall be placed in each pipe section and in all r, appurtenances. Enough tablets shall be used to insure that a chlorine concentration of 50 mg/I is provided in the water. They shall be attached by a food grade adhesive to the top of the pipe sections and crushed or ito rubbed in all appurtenances. The adhesive shall be approved by the Engineer. The velocity of the potable water in the pipe line shall be less than 1 ft./sec. The water shall remain in contact with the pipe for 24 hours lir and shall have a minimum concentration of 25 mg/I. All valves and appurtenances shall be operated while the chlorinated water is in the pipe. a. Schedule of Maximum Flow Rates be 1 Pipe Diameter Flow Rate Pipe Diameter j Flow Rate 4" 40 GPM 14" 500 GPM is 6" 90 GPM 16" 600 GPM 8" 160 GPM 18" 800 GPM 10" 260 GPM 20" 1000 GPM 1 ime 12" 350 GPM 24" 1 1400 GPM j b. Number of Hypochlorite Tablets of 5-G Required for Dose of 50 t mg/I (based on three and three-quarters grams of 70% available chlorine per tablet): Joint Length Diameter of Pipe (ft) __ (inches) 2 4 I 6 8 I 10 I 12 13 or less 1 1 2 2 3 5 l" 18 l 1 1 2 31 1 5 I 6 Dewberry Engineers Inc. Potable Water Systems DEI#50092624 33 11 00- 12 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 +. 1 20 1 1 1 2 1 3 ' 5 7 I 30 1 2 3 5 7 101 40 1 2 4 6 1 9 , 14 1 6 c. Grams of HTH Powder required for Dose of 50 mg/I (based on 65% available chlorine in HTH powder): kir Joint I Diameter of Pipe Length (ft) (inches) 2 4 6 8 10 12 _) i" 13 0.6 2.5 5.56 9.88 15.45 22.24 18 0.85 2.57.69 13.69 21.39 30.80 20 0.95 3.8 1 8.56 15.21 23.76 34.22 im 30 1.43 5.7 1 12.83 22.81 35.65 51.33_ 40 1.90 7.6 f 17.11 30.42 47.53 l 68.44 la 4. Disinfection shall include hydrants and other special pipe, taps and fittings used at connections to existing piping. These shall be thoroughly Lir disinfected before installation. Excavation for such connections shall be kept free from water until the connection is completed and great care shall be exercised to prevent contamination of the pipe and connection fittings. lir 5. Connections -The inside of the existing pipe within three (3)feet of point of connection shall be disinfected by spraying with a solution containing not less than 200 mg/I of chlorine immediately before connection is made. it On completion of disinfection the piping shall be flushed thoroughly with potable water, and samples shall be taken and tested by a recognized testing laboratory. The water shall be proven safe for human consumption ix before acceptance of disinfection. Should the samples show the water is unsafe, the piping shall be disinfected until satisfactory tests are obtained. INI 6. Final Flushing - After the retention period, the main shall be flushed with potable water until the water leaving the system shows a chlorine concentration of less than 1 mg/I or no higher than that prevailing in the water used for flushing. Water with a chlorine concentration greater than 2.0 mg/I shall either be dechlorinated or the high chlorine water shall be discharged directly to sanitary sewer line. l. 7. Testing -After the lines have been flushed, the waterlines shall be tested in the following methods: a. All chlorine residual determinations shall be made using only those methods approved by the Virginia Department of Health. One approved method is the DPD Kit method. a. b. Two water samples for bacteriological analysis must be collected at least 24 hours apart and analyzed by a certified laboratory. The ikon results of these samples must indicate no contamination before the pipe, tanks or equipment can be utilized as part of the irr Dewberry Engineers Inc. Potable Water Systems DEI#50092624 33 11 00- 13 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's.Head Addition May 8,2017 ime waterworks. If contamination is indicated, then the disinfection procedure must be repeated. Samples shall be collected at regular intervals, not exceeding 2,000 feet throughout the length of pipe line. 8. It is the contractor's responsibility to ensure their operations do not contaminate the public water supply. If at any time, the water in the existing system becomes contaminated,they shall be held financially accountable for any corrective action taken by the ACSA,as well as for cost of defending and settlement of all claims resulting from their negligence, including, but not limited to, costs and attorney's fees. END OF SECTION 33 11 00 Irr r INN 11111' r hat toe Dewberry Engineers Inc. Potable Water Systems DEI#50092624 33 11 00- 14 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 SECTION 33 31 13 SANITARY SEWER/GRAVITY PIPING PART 1 - GENERAL trniv 1.1 SUMMARY This WORK shall consist of constructing all sewerage structures in accordance with these Specifications and in conformance with lines,grades,and details shown on the Drawings. In executing the WORK,CONTRACTOR shall comply with recommendations for conservation of soil,water, and related natural resources. Materials for drainage pipe shall be as shown on Drawings. 1.2 RELATED SECTIONS Ito Intent: The provisions and intent of the AGREEMENT, including the General Conditions, Supplemental Conditions, and other requirements of the Contract Documents apply to the WORK as specified in this Section. WORK related to this Section is described throughout the Specifications. 1.3 REFERENCES A. American Society for Testing Methods (ASTM) the B. American National Standards Institute (ANSI) C. American Waterworks Association (AWWA) D. Virginia Department Of Transportation (VDOT) Road and Bridge Specifications All pipe shall be installed in accordance with the manufacturer's recommendation as a minimum standard. Where two (2) different types of pipe are to be connected, the connection method and type of materials shall be a standard construction practice, submitted to ENGINEER in writing for approval. 1.4 SUBMITTALS Submit manufacturer's cutsheets for piping, gaskets and lubricants to be installed. it 1.5 JOB CONDITIONS A. Design Control: All quantities shown on Drawings are estimated. ENGINEER will provide location and benchmark controls as shown on the Drawings. Benchmark locations shown are approximate. CONTRACTOR should use B.M. (benchmark) description to locate. B. Field Control: CONTRACTOR will be responsible for establishing field controls for construction purposes. C. Quality Control: CONTRACTOR shall provide a level on the site at all times to be used by OWNER and/or ENGINEER for checking grade. D. Locations of Items Shown on Drawings:The exact locations of all utility poles,brace Dewberry Engineers Inc. Sanitary Sewer/Gravity Piping DEI#50092624 33 31 13- 1 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 imp poles, guy wires, signs, and buried utilities are unknown and may not be shown on the Drawings. Existing utility locations shown on the Drawings may indicate conflicts with the utility company's (power, telephones, gas, cable, etc.) property or equipment. All such conflicts may not be indicated on the Drawings. E. Field Verification: It is the responsibility of CONTRACTOR to field locate and verify items impacting or impacted by the construction and to contact the utility company prior to the start of excavation near existing underground utilities. F. Utility Notification: CONTRACTOR shall notify the utility company of its intent to construct the Project and inquire as to the possibility of such conflicts occurring with the utility's property or equipment. CONTRACTOR shall request the utility to field locate and mark existing underground utilities. G. Conflicts: CONTRACTOR shall notify ENGINEER of conflicts prior to the start of excavation. In the event CONTRACTOR requests work to be done by the utility, it shall be responsible for providing a written authorization to the utility stating the nature of the work required and CONTRACTOR will reimburse the utility company for their work. This work shall be included in the price for the pipe and no additional compensation will be allowed for temporary construction items required of the utility i. by OWNER. It shall be the responsibility of CONTRACTOR to fix utilities damaged during construction at no additional charge OWNER. H. Resetting Monuments: It is CONTRACTOR'S responsibility to replace property corners damaged at no additional charge. A surveyor licensed in the Commonwealth of Virginia shall accomplish resetting of monuments. I. Paving Verification: CONTRACTOR is responsible for identifying P yl g paved, concrete, and unpaved roads and parking lots. All property disturbed shall be restored to its original condition including fences, underground structures, etc. 1.6 DELIVERY, STORAGE AND HANDLING Ike A. Pipe: All pipes shall be shipped, unloaded and stored in accordance with manufacturer's recommendation. Any pipe damaged while hauling or otherwise determined to be unsuitable for use will be rejected, marked rejected, and removed Ira from the WORK area within 5 working days. All pipes shall be installed in accordance with the manufacturer's recommendation as a minimum standard. imp B. Gaskets: Rubber gaskets shall be stored in a cool place and protected from light, sunlight, heat, oil, or grease until installed. Any gaskets showing signs of checking, weathering,or other deterioration will be rejected and removed from the site within 5 working days. PART 2 - MATERIALS 2.1 PIPE Unless otherwise approved in writing by the ACSA, all sanitary sewer lines shall be of the its material herein listed. The ACSA reserves the right to select the type and/or class material Dewberry Engineers Inc. Sanitary Sewer/Gravity Piping DEI#50092624 33 31 13-2 imp i` University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 which shall be used from the following list: A. Ductile Iron Pipe & Fittings: Ductile iron pipe shall be centrifugally cast pipe manufactured in accordance with AWWA/ANSI C151/A21.51-02,or current revision. i'" Thickness Class 50, 51,or 52, as conditions require. All ductile iron pipe shall have a cement mortar lining in accordance with AWWA/ANSI C104/A21.4-03, or current revision, and an exterior asphaltic coating in accordance with AWWA/ANSI C151/A21.51-02, or current revision. Ductile iron pipe shall be manufactured by Griffin Pipe Products Co., U.S. Pipe and Foundry Co.,Atlantic States Cast Iron Pipe Co., or approved equal. as Fittings shall be standard mechanical joint fittings in accordance with AWWA/ANSI C110/A21.10-03, or current revision, or AWWA/ANSI C153/A21.52, or current revision and AWWA/ANSI C111/A21.11-00, or current revision. All fittings shall be cement mortar lined inside in accordance with AWWA/ANSI C104/A21.4-03, or current revision, and an exterior asphaltic coating in accordance with AWWA/ANSI C151/A21.51-02, or current revision. No cast iron soil pipe shall be used as a public sewer. • B. Polyvinyl Chloride (PVC) Pipe: PVC gravity sewer pipe shall be manufactured of compounds conforming to ASTM D-1784-81, or current revision. Pipe and fittings shall meet and/or exceed all of the requirements of ASTM Specification D-3034-89 PSM SDR 35, or current revision, for heavy wall PVC. PVC pipe shall be installed in strict conformance with ASTM Designation 0-2321-89, imp or current revision. PVC pipe shall be shipped and stored so that warping of pipe does not occur. PVC pipe to be stored outside should be covered to protect it against the sun's rays, per manufacturer's published recommendation. Certificates of compliance with applicable ASTM designations and strength classifications covering the pipe,joints, gaskets, and fittings will be required directly from the pipe manufacturer as deemed necessary by ACSA. 2.2 JOINTS A. Joints: Joints of ductile iron and plastic pipe shall conform to the manufacturer's published recommendations and specifications. IV Joints in sewer pipe shall conform to the following: 1. Ductile Iron: Mechanical or push-on joints in accordance with AWWA/ANSI C111/A21.11-00, or current revision,or approved rubber gasket type joint to lock against displacement. 2. PVC Pipe: PVC pipe shall be joined by bell and spigot type connections. The pipe joint shall be tightly sealed against infiltration and exfiltration by meaa sealing ring conforming to ASTM D-3212-89,or currentns of revision.locked-in The connectionrubber shall also permit the thermal expansion or like contraction of the pipe. Dewberry Engineers Inc. Sanitary Sewer/Gravity Piping DE1#50092624 33 31 13-3 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 to` B. Deformation: Rubber gaskets shall be the 0-ring type, made of neoprene. The gasket shall not be stretched more than 20 percent when placed on the spigot of the pipe. The gasket shall be of such size that,when the joint is off-center sufficiently to cause the outer surface of the tongue end of the pipe and the inner surface of the groove end of the adjacent pipe to come into contact at some portion of their periphery,the deformation in the stretched rubber gasket will not exceed 50 percent at the point of contact. At the diametrically opposite point across the pipe, the deformation will not be less than 20 percent of the normal diameter or thickness of the gasket before deformation. The gasket shall be the sole element depended i,„ upon to make the joint watertight. 2.3 GASKETS A. Gaskets for sewer pipe and fittings shall be vulcanized natural or vulcanized synthetic rubber free or porous areas, foreign material or visible defects. Rubber gaskets shall conform to all applicable provisions of AWWA C111-00, or current revision. B. Gaskets shall be protected from exposure to excessive heat, cold, direct sunlight, ozone (from electric motors and equipment), oil, grease, or other contaminants. 2.4 SEWER SERVICE LATERALS bili A. A sewer service lateral shall be required for each customer and/or lot as shown on the Drawings, unless otherwise approved by the ACSA. Sewer service laterals shall be constructed to the property line and sealed until said sewer lateral is put in use. In no case shall the lateral be less than four(4) inches inside diameter. B. All service lateral stub-outs shall be marked with a pressure treated 2x4 piece of lumber no less than four(4)feet in length. The 2x4 shall extend approximately two (2) feet above grade and shall be.painted green. The depth to the service lateral shall be noted on the 2x4. Alternate markers may be approved by ACSA. 2.5 IDENTIFICATION Refer to Section 02798— Utility Location and Identification. 2.6 MATERIAL TESTING A. Material Testing: All materials used shall be tested according to the latest ASTM Specification. Copies of test reports and manufacturers certification shall be provided to ENGINEER for all material delivered to the job. B. Material Stamps: All material delivered to the job shall be stamped showing class, date made and manufacture. PART 3 - EXECUTION Dewberry Engineers Inc. Sanitary Sewer/Gravity Piping DEI#50092624 33 31 13-4 i�r University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 ir. 3.1 GENERAL All sanitary sewer lines and associated appurtenances shall be installed in accordance with the requirement of Section 02270—"Earthwork for Utilities", and tested in accordance with the requirements of Section 02990—"Sewer System Testing". 3.2 GASKETS A. Lubrications: In making rubber gasketed joints, the gasket and the socket shall be lubricated with an approved rubber gasket lubricant. B. Placing: The gasket shall be stretched over the spigot and placed accurately in position. The spigot end shall be carefully entered in the socket of the preceding pipe so as to avoid displacement of the gasket, and the pipe shall be drawn or pushed home fully compressing the gasket. C. Adjustments: Adjustments line and grade shall be made in such a manner that the compressed rubber gasket will not be disturbed. rir D. Seating Verification: Before the proceeding with backfilling the joint shall be felt completely around to determine whether the gasket is in its proper position. If the gasket can be felt out of place,the pipe shall be withdrawn and the gasket examined for cuts or breaks. If the gasket has been damaged, it shall be replaced with a new one before the pipe is replaced. 3.3 SERVICE LATERALS ino A. Installation: All pipe from the main sewer line to the property line shall be laid in a straight line and to minimum grade of not less than one-quarter inch per foot. The minimum depth of cover shall be three(3)feet over the sewer service lateral, unless otherwise approved by ACSA. When it becomes necessary to connect to an existing sewer main, a saddle or manhole will be required at the point of connection. Saddles shall be approved by ACSA, prior to installation. B. Inspection: All in-line wyes/tees or saddles shall be left exposed for visual inspection by the ACSA, so that measurements to the nearest downstream manhole can be obtained. 3.4 SITE CONDITIONS AND CLEAN UP ion A. All property disturbed shall be restored to original condition including fences, driveways, underground structures, etc., on private and public property. During construction the WORK area shall be kept in an orderly and neat condition. All WORK within 500 feet of the forward progress shall be complete with the exception of testing. B. CONTRACTORS forward progress that is subject to being suspended if, in the ire Dewberry Engineers Inc. Sanitary Sewer/Gravity Piping DEI#50092624 33 31 13-5 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 opinion of ENGINEER, the above requirement is not met. CONTRACTOR shall receive no consideration for time extension or compensation for production time lost while not in compliance with requirements for cleanup. END OF SECTION 02720 los ir. iw rw► I. Dewberry Engineers Inc. Sanitary Sewer/Gravity Piping DEI#50092624 33 31 13-6 ir. University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 SECTION 33 41 00 STORM SEWER PIPING PART 1 - GENERAL ikvo 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplemental General Conditions, and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Work under this section shall consist of providing all labor, plant facilities, materials, tools, equipment, shop drawings and supervision necessary and required to install all of the storm drainage facilities, including piping, fittings, structures, bedding, and backfilling, as specified in he accordance with the contract documents. 1.3 REFERENCE SECTIONS A. Section 33 05 00—Earthwork: Utilities 1.4 REFERENCE STANDARDS irrt- A. American Society For Testing and Materials (ASTM) 1. A185—Steel Welded Wire Fabric, Plain,for Concrete Reinforcement ,,, 2. A615—Deformed and Plain Billet-Steel Bars for Concrete Reinforcement 3. C76—Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe 4. C478—Precast Reinforced Concrete Manhole Sections 5. C913—Precast Concrete Water and Wastewater Structures it 6. C1479— Installation of Reinforced Concrete Pipe 7. C990-01A — Joints for Concrete Pipe, Manholes, and Precast Box Sections Using Pre- formed Flexible Joint Sealants 8. D2321 — Installation of Thermoplastic Pipe for Sewer/Gravity-Flow Applications 9. D3034—Type PSM Poly(Vinyl Chloride) (PVC) Sewer Pipe and Fittings 10. D3212—Joints for Drain and Sewer Plastic Pipes Using Elastomeric Seals 11. F477—Elastomeric Seals (Gaskets)for Joining Plastic Pipe 12. F794—Poly(Vinyl Chloride) (PVC) Profile Gravity Sewer Pipe and Fittings Based on Con- trolled Inside Diameter 13. F949 — Poly(Vinyl Chloride) (PVC) Corrugated Sewer Pipe With a Smooth Interior and Fittings B. American Association of State Highway and Transportation Officials (AASHTO) 1. M198 — Joints for Circular Concrete Sewer and Culvert Pipe Using Flexible WatertightGaskets 2. M252—Corrugated Polyethylene Drainage Tubing 3. M294—Corrugated Polyehtylene Pipe. iir 4. M199—Standard Specification for Precast Reinforced Concrete Manhole Sections C. American Water Works Association (AWWA) 1. C110—Ductile-Iron and Gray-Iron Fittings, 3 in through 48 in (75 mm through 1200 mm), for Water and Other Liquids (revision of ANSI/AWWA C110/A21.10-93) 2. C111 —Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings 3. C151 —Ductile-Iron Pipe, Centrifugally Cast,for Water D. American Concrete Institute(ACI) it Dewberry Engineers Inc. Storm Sewer Piping DEI#50062624 33 41 00-1 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 1. 301 —Structural Concrete for Buildings, Specifications for 2. 318—Building Code Requirements for Structural Plain Concrete 1.5 PROJECT RECORD DOCUMENTS A. Accurately record as-built locations of pipe runs, connections, catch basins, cleanouts, top ele- vations and invert elevations. ilia B. Identify and describe unexpected variations of subsurface conditions and location of any utilities encountered. 1.6 QUALITY ASSURANCE A. All costs related to reinspection due to failures shall be paid for by the Contractor at no addi- tional expense to the Owner. Owner reserves the right to direct any inspection that is deemed necessary. Contractor shall provide free access to site for inspection activities. 1.7 PROJECT CONDITIONS Irr A. Removal/Relocation of Existing Utilities: The contractor shall be responsible for removal and/or relocation of existing utilities, whether shown or not shown on the drawings, at locations where conflicts occur with proposed storm drainage improvements at no additional cost to the owner. imp 1.8 SUBMITTALS A. The General Contractor and the Subcontractor shall execute the conformance submittal(s)for materials within this section. iir PART 2- PRODUCTS 2.1 PIPES AND FITTINGS A. Reinforced Concrete Pipe(RCP) 1. ASTM C76, Class III unless otherwise noted on drawings; and, 2. Butyl mastic sealant shall meet the requirements of ASTM C990-01a or AASHTO M198 for Type B flexible plastic gaskets. B. Polyvinyl Chloride Pipe (PVC) 1. Pipe shall meet the requirements of ASTM D1784, and 1785 for Schedule 40 pipe; and, 2. PVC pipe shall be joined by solvent weld joint type connections. The pipe joints shall be tightly sealed against infiltration and exfiltration. 3. Maximum permitted diameter of 12 inches. C. Ductile Iron Pipe (DIP) 1. Pipe shall meet the requirements of AWWA C151; and, 2. Fittings shall meet the requirements of AWWA C110 with rubber gaskets conforming to SectioAWWA C111. D. High Density Polyethylene Pipe (HDPE)Smooth Interior 1. HDPE shall be dual wall, smooth interior type pipe. 2. Pipe and fittings shall conform to AASHTO M252 and M294; 3. Rubber gaskets shall meet the requirements of ASTM F477 with joints conforming to ASTM D3212; and, 4. Maximum permitted diameter of 24 inches. Dewberry Engineers Inc. Storm Sewer Piping DEI#50062624 33 41 00-2 ib imp University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 kr' E. Subdrains 1. Shall be perforated PVC Schedule 40 or HDPE; and, 2. PVC pipe shall be limited to pipe diameters less than 12-inches; and, 3. PVC pipe shall be joined by solvent weld joint type connections. The pipe joints shall be tightly sealed against infiltration and exfiltration. 4. HDPE Pipe shall be limited to diameters less than 12 inches. ire 2.2 DRAINAGE STRUCTURES, DROP INLETS, CATCH BASINS, AND JUNCTION BOXES (ALL STRUCTURES SHALL BE PRECAST UNLESS OTHERWISE APPROVED BY THE OWNER) ,., REFER TO SPECIFICATION SECTION 33 05 13"PRE-CAST MANHOLES" FOR CONSTRUCTION AND INSTALLATION OF STORM MANHOLES. A. Structures: i"" 1. Precast Concrete Drainage Structures; 2. Heavy-duty traffic rated (HS-20) conforming to ASTM C478, ASTM C913 and ASTM C890. it B. Steps 1. Shall meet the requirements of AASHTO M199 for design, materials, and dimensions; 2. Built into the walls of all structures over 3 feet 6 inches in height; and, 3. Steps shall be 16 inches on center with lowest step being no more than 16 inches from the bottom. C. Reinforcement 1. Deformed reinforcing bars, grade 40 or 60, meeting the requirements of ASTM A615; and, 2. Wire fabric meeting the requirements of ASTM A185. D. All joints in precast structures shall be patched inside and out with non-shrink grout. See spec 33 05 13"Pre-Cast Concrete: Manholes"for grout requirements. E. All precast structures shall have entire outside coated with bitumastic. F. All manholes shall be provided with flexible neoprene rubber boots on all pipe penetrations. 10 2.3 CLEANOUTS& PLUGS „ A. Installation shall be in accordance with the details and at locations shown on the drawings. B. All Cleanouts shall have a concrete apron as shown on the details. h. 2.4 BEDDING AND BACKFILL MATERIAL A. Where the foundation material is found to be of poor supporting value or of rock, the Owner may make minor adjustments in the location of the pipe to provide a more suitable foundation. Where this is not practical, the foundation shall be conditioned by removing the existing founda- tion material by undercutting to the depth as directed by the geotechnical engineer and backfill- ` ing with either a suitable local material secured from unclassified excavation or borrow excava- tion at the nearest accessible location along the project, or foundation conditioning material consisting of crushed stone or gravel or a combination of sand and crushed stone or gravel ap- proved by geotechnical engineer as being suitable for the purpose intended. The selection of the type of backfill material to be used for foundation conditioning will be made by the geotech- nical engineer. Dewberry Engineers Inc. Storm Sewer Piping DEI#50062624 33 41 00-3 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 2.5 CONCRETE A. No concrete or masonry shall be placed when the temperature is below 40 degrees Fahrenheit, t,,m or when indications are for lower temperatures within 24 hours, unless protection of concrete and masonry is approved by the Owner. Damage to the structure because of freezing shall be corrected by the Contractor at his own expense, to the satisfaction of the Owner. i" B. Concrete shall conform to ACI 301 and applicable referenced specifications and shall have a 28 day compressive strength of 4,000 psi. 2.6 AREA DRAINS A. Dura-coated cast iron body with promenade frame and heavy-duty, heel-proof grate with com- bined membrane flashing clamp/gravel guard. Drain shall be 12"square with a grate open ar- ia ea equal to 44 sq. in. B. The drain shall be able to connect to pipes 10-inches in diameter or smaller. C. Drains shall be set in concrete for stabilization. No concrete shall be visible from surface unless otherwise noted in the construction drawings. 2.7 YARD DRAINS A. Dura-coated cast iron body with promenade frame and heavy-duty, heel-proof grate with corn- ,., bined membrane flashing clamp/gravel guard. Drain shall be 18"square. B. The structure shall be 4,000 psi. precast 2' x 2' square inside dimension and 4' tall max. Inlet shaping shall be installed per VDOT Detail IS-1. ins C. Storm connections shall contain a flexible boot connector PART 3- EXECUTION 3.1 GENERAL A. The Contractor shall install all drainage structures and pipe in the locations shown on the draw- ings and/or as approved by the Owner. Pipe shall be of the type and sizes specified on the drawings and shall be laid accurately to line and grade. Structures shall be accurately located and properly oriented. B. Excavation and Backfill—The provisions in Section 33 05 00, "Earthwork: Utilities"shall govern all work under this Section. C. Storage and Handling of Pipe—All pipe shall be protected against impact, shock and free fall, e and only equipment of sufficient capacity and proper design shall be used in the handling of the pipe. Storage of pipe on the job shall be in accordance with the pipe manufacturer's recom- mendations. D. Damage to Pipe 1. Pipe which is defective from any cause, including damage caused by handling, and de- termined by the Owner as unrepairable, shall be unacceptable for installation and shall kr, be replaced at no cost to the Owner and as directed by the Owner; and, 2. Pipe that is damaged or disturbed through any cause prior to acceptance of the work, Dewberry Engineers Inc. Storm Sewer Piping DEI#50062624 33 41 00-4 iir University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 shall be repaired realigned or replaced as directed by the Owner, at the Contractor's ex- `' pense. E. Manholes, catch basins and drain inlets shall be constructed as soon as the pipe laying reaches ili,,, the location of the structures. Should the Contractor continue his pipe laying without making provisions for completion of the structures, the Owner shall have the authority to stop the pipe laying operations until the structure is completed. a"" F. Any structure, which is mislocated or oriented improperly, shall be removed and re-built in its proper location, alignment and orientation at the Contractor's expense. 3.2 BEDDING A. Bedding material, when required, shall be in accordance with Section 330500, "Earthwork: Utili- ties"for work described within this Section. 3.3 PIPE INSTALLATION A. Comply with Section 33 05 00, "Earthwork: Utilities" B. Laying Pipe 1. Unloading and Handling: All pipes shall be unloaded and handled with reasonable care. Pipes shall not be rolled or dragged over gravel or rock during handling. The Contractor shall take necessary precautions to ensure the method used in lifting or placing the pipe does not induce stress fatigue in the pipe and the lifting device used uniformly distributes Ike the weight of the pipe along its axis or circumference; 2. Each length of pipe shall be inspected for defects and cracks before carefully lowered in- to the trench. Any damaged or any pipe that has had its grade disturbed after laying shall be removed and replaced. Bituminous coated pipe shall be handled with special care and repair of damaged coating shall conform with AASHTO M190; 3. Lay pipe on prepared foundation starting at the downgrade end according to line and grade with the necessary drainage structures, fittings, bends and appurtenances as shown on the drawings. Rigid pipes shall be laid with the bell or groove ends upgrade with the spigot or tongue fully inserted. Flexible pipes shall be laid with the inside circum- ferential laps pointing downstream and with the longitudinal laps at the side or quarter points. Reinforced concrete pipe shall be installed in accordance with ASTM C1479. i"' HDPE pipes shall be installed in accordance with pipe manufacture's installation guide- lines for heavy duty drainage applications and ASTM D2321; and, 4. Pipe sections shall be firmly joined together with appropriate gaskets or bands. 3.4 DROP INLET, CATCH BASIN, MANHOLE, AND JUNCTION BOX INSTALLATION REFER TO SPECIFICATION SECTION 33 05 13"PRE-CAST MANHOLES" FOR imp CONSTRUCTION AND INSTALLATION OF STORM MANHOLES. A. Pre-cast Drainage Structures 1. Structure units shall be assembled in accordance with the manufacturer's instructions to form a sound structural unit. 2. Patch joints of pre-cast pieces from inside and outside with non-shrink grout and finish smooth. 3. Waterproof from outside with bituminous coating per the manufacturer recommendations. Coal Tar Epoxy shall have a minimum dry film thickness of 16 millimeters (22 milimeters wet). Apply a minimum of two coats of bituminous coating. Each coat to be 8-10 millime- ters thick(dry thickness). Dewberry Engineers Inc. Storm Sewer Piping DEI#50062624 33 41 00-5 il.r ear University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 4. Minimum Drop Inlet size is 2'x2'for up to 4' depth and minimum 4' inside dimensions for depths over 4' per modified VDOT DI-1, both with minimum grate size of 24". B. Fittings and Connections `,. 1. Pipe connections shall be made so that the pipe is flush with the inside wall of the drain- age structure, and shall be grouted as necessary to make smooth and uniform surfaces on the inside of the structure. Boxes to have bottoms filled with concrete to provide a bench between pipe inverts. be 2. Flexible boots shall be used for all pipe connections. C. Frames, Grates and Hoods ii,. 1. Shall be set to grade in accordance with the drawings; 2. Firmly embedded in mortar approximately 1 inch thick and aligned to fit the top section of the structure; and, 3. Concrete set in mortar used to adjust the frame to finished grade shall be limited to no more than four courses for pre-cast structures and have a minimum wall thickness of 8". 4. Shall be HS 20 rated and installed with 24" minimum clear opening. D. Interface with Existing Facilities 1. Compliance with Facility Owner Requirements: Connections made into existing drainage facilities shall be performed in accordance with the requirements of the Owner of the fa- cility, and all pipes shall be cut flush with wall of structure. Pipe connections to existing structures shall be made through the installation of a wall sleeve and grout, and then the use of a flexible boot connector. The Contractor will be required to comply with all such requirements, including securing of all required permits, and paying the costs thereof. as The cost of making the connections in accordance with the requirements of the Owner of the existing facility shall be included in the Contract Sum; and, 2. Requirements: The Contractor shall make all required connections of the proposed drainage facilities into existing drainage facilities, where and as shown on the Drawings iir and/or as approved by the Owner. • 3.5 CONSTRUCTION WITHIN THE PUBLIC R.O.W. A. Construction within the public right-of-way shall conform to all requirements of the regulatory au- thority having jurisdiction. 3.6 MODIFICATIONS OF EXISTING STRUCTURES A. General: The Contractor shall alter, reconstruct and/or convert existing structures where and as Ira shown on the drawings, and/or as approved by the Owner. In general, alterations shall be per- formed with the same type of material used in the original construction unless otherwise indicat- ed on the drawings or approved by the Owner. B. Damage to Existing Installations: The Contractor shall exercise extreme care during such alter- ation, reconstruction and/or conversions so as not to damage any portions of the structure and/or pipe shown to remain. Any such damage shall be repaired by the Contractor at his own expense and to the satisfaction of the Owner. 3.7 ROOF DRAINS AND LEADERS A. The Site Contractor shall install roof downspout leaders as provided on the drawings to within 5 feet of building limits. If work by others is complete then the Contractor shall complete the con- nection. If future connections will be required by others, Contractor shall install plugging and material apparatus as necessary to protect and mark his work. Dewberry Engineers Inc. Storm Sewer Piping DEI#50062624 33 41 00-6 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 B. All piping connections shall utilize a prefabricated fittings or drainage structure. C. A cleanout shall be installed on the roof downspout leaders as provided on the drawings. 3.8 AS-BUILT DOCUMENTATION A. Prior to backfill, contractor shall have the UVA Geospatial Resource Center(GRC)locate the utility and related appurtenances as constructed with GPS equipment. boo B. UVA GRC requires 5 day notice to schedule as-built survey. 3.9 CONCRETE PLACEMENT A. Place cast-in-place concrete according to ACI 318 and ACI 350R. 3.10 PROTECTION AND CLEANING A. The Contractor shall maintain all pipe installations and drainage structures in a condition such trr that they will function continuously and shall be kept clean of silt, debris and other foreign matter from the pipe and drainage structure is installed until the project is accepted. 3.11 FINAL INSPECTION h. A. Upon completion of the work and before final acceptance by the Owner, the entire drainage sys- tem shall be subject to a final inspection in the presence of the Owner and/or Site Engineer. The inne work shall not be considered as complete until all requirements for line, grade, cleanliness, and workmanship have been completed. B. Storm Sewer Pipe Testing: Storm sewer pipes and structures shall be visually inspected by the CONTRACTOR and testing agency of the OWNER prior to backfilling. END OF SECTION 33 41 00 it Dewberry Engineers Inc. Storm Sewer Piping DEI#50062624 33 41 00-7 L L L L L L L a a University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 SECTION 33 63 14 l` PRECAST CONCRETE: UTILITY STRUCTURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings andgeneral 9 provisions of the Contract, including General Conditions, and Supplemental General Conditions and Division 1 Specification Sections, apply to this Section. ins 1.2 SUMMARY A. This Section specifies the construction and installation of underground precast concrete utility structures, including heating hot water pipe box culvert(tunnels). 1.3 PERFORMANCE REQUIREMENTS A. Underground precast concrete utility structures shall be adequately designed to support HS-20 highway loading and the amount of backfill indicated on drawings. Underground precast imp structures shall be designed to resist hydrostatic uplift forces using the assumption that groundwater level could reach ground surface elevation. Underground precast structures shall be watertight with zero leakage and openings shall be coordinated to prevent the necessity of field adjustments. Tunnel will be monitored for leakage for 1 year as part of the warranty period. Contractor shall be responsible for injection grout or other methods at no cost to owner should water infiltration be observed. Underground precast structure walls, top slab, and base slab shall have a minimum thickness of 8 inches (concrete construction tolerance: -0", +3/8"). 1.4 SUBMITTALS A. Submittal Restrictions: Subsequent submittal changes after the initial submittal shall be clouded. Unclouded changes will not be considered part of the construction documents. B. Product Data: For each type of manufactured material and product indicated. C. Design Mixes: For each concrete mix. Include alternate mix designs when characteristics of materials, project conditions, weather, test results, or other circumstances warrant adjustments. Indicate amounts of mix water to be withheld for later addition at Project site. D. Precast Concrete Utility Structure Shop Drawings: Details of structure dimensions, elevations, reinforcing, and openings. Include special reinforcement required for openings. E. Lay Schedule: Manufacturer shall provide a detailed layout drawing showing all precast structures and the order they shall be installed in the field. F. Structural Calculations: Structural analysis and design calculations for precast concrete utility structures signed and sealed by a registered professional engineer responsible for its design. Design shall consider the following: a. Loads indicated in the General Structural Notes of the Construction Drawings. b. Vertical and lateral pressures induced by soil loads (For depth of tunnel cover, refer to the Civil tunnel profile shown on the Construction Drawings). Dewberry Engineers Inc. Precast Concrete: Utility Structures DEI#50092624 33 63 14- 1 1. r. University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 c. HS-20-44 Traffic Loading in addition to earth pressures. d. Future piping as indicated on the structural drawings. e. Thermal expansion through control and/or expansion joints. `„ G. Concrete Compressive Strength: Concrete 28-day compression strength test results for precast concrete structure. H. Material Certificates: Signed by manufacturers certifying that each of the following items complies with requirements: 1. Cementitious materials and aggregates. 2. Steel reinforcement and reinforcement accessories. 3. Admixtures. boo1.5 QUALITY ASSURANCE A. Manufacturer Qualifications: A firm experienced in manufacturing precast concrete structures. Manufacturer's precast plant shall be certified tin the Prestressed Concrete Institute's (PCI) Plant Certification Program or the National Precast Concrete Association's (NCPA) Plant Certification Program. B. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing engineering services of the kind indicated. aim C. Publications: Comply with the following, unless more stringent provisions are indicated: 1. ACI 301, "Specification for Structural Concrete." 2. ACI 318, "Building Code Requirements for Structural Concrete". 3. ASTM C 891, "Standard Practice for Installation of Underground Precast Concrete Utility Structures." 1.6 DELIVERY, STORAGE, AND HANDLING i. A. Deliver, store, and handle precast concrete utility structures in accordance with ASTM C 891 and the manufacturer's recommendation using methods that will prevent damage to the components and their joint surfaces. imp PART 2- PRODUCTS 2.1 STEEL REINFORCEMENT A. Reinforcing Bars: ASTM A 615, Grade 60, deformed. B. Plain-Steel Wire: ASTM A 82, as drawn. imp 2.2 CONCRETE MATERIALS A. Portland Cement: ASTM C 150, Type I. Dewberry Engineers Inc. Precast Concrete: Utility Structures DEI#50092624 33 63 14-2 University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 B. Normal-Weight Aggregate: ASTM C 33, uniformly graded. C. Water: Potable and complying with ASTM C 94. w 2.3 ADMIXTURES A. General: Admixtures certified by manufacturer to contain not more than 0.1 percent water- soluble chloride ions by mass of cementitious material and to be compatible with other admixtures and cementitious materials. Do not use admixtures containing calcium chloride. tier B. Air-Entraining Admixture: ASTM C 260. 2.4 RELATED MATERIALS A. Lift Loops: Lift loops shall be ASTM A 416 steel strand. B. Flexible Joint Sealants: Flexible joint sealants shall be butyl rubber based conforming to Federal Specifications SS-S-210A, AASHTO M-198, Type B — Butyl Rubber and suitable for application temperatures between 10 and 100 degrees F. tw C. Joint Sealant: Waterproofing sealant shall be used at all joints between precast conduit base and precast covers and at joints between adjacent precast concrete sections and building. The sealants shall be butyl resin or one part polyurethane. Polyurethane sealants shall be equal toSikaswell S and butyl resin sealants shall be equal to Conseal. D. Waterproofing Membrane: A waterproofing membrane shall be installed over the entire top and sides of all precast concrete utility structures. The membrane shall continue to the face the proposed structure and/or building to seal the joint between the utility structures and building. See specification section 071326, "Self-Adhering Sheet Waterproofing" for materials and installation. E. Drains in Precast Box Culvert(Tunnels): Provide mild slope from side walls to tunnel centerline. Do not provide"keyway"type drains in Precast Box Culvert(Tunnels). bre 2.5 CONCRETE MIXES A. Concrete shall conform to ASTM C 478, shall be normal-weight, and shall be proportioned as follows: rW 1. Compressive Strength (28 Days): 5,000 psi, minimum. 2. Cement: Type I,ASTM C-150. Minimum of 564 pounds per cubic yard. 3. Air Content: 4 percent minimum. it 2.6 FABRICATION A. Concrete finish: 1. As-cast, smooth form finish. 2. Remove fins, patch tie holes and imperfections. tar 6. Dewberry Engineers Inc. Precast Concrete: Utility Structures DEI#50092624 336314-3 o University of Virginia Foundation 100%Construction Documents UVA Squash Facility at Boar's Head Addition May 8,2017 B. Label Units in accordance with the Lay Schedule Submittal. Labels shall be painted on the inside the tunnel wall to verify precast units were installed in the proper sequence in accordance with the Lay schedule. 1r. C. Manufacturer shall physically test all shiplap joint connections between adjacent precast units at the manufacturing facility. Manufacturer shall verify each joint can be properly installed and will meet field installation tolerances before being shipped to the project site. D. Overlap between precast units shall be 8-inches minimum (length of the shiplap joint overlap). PART 3- EXECUTION 3.1 INSTALLATION A. Install precast units in conformance with: 1. The Shop Drawings reviewed by the Engineer. 2. The manufacturer's recommendations. B. Precast structures shall be installed on a firm stabilized foundation so prepared to prevent iro settlement and misalignment. A minimum layer of compacted 12 inch VDOT 21B stone shall be used as a base. tio 3.2 FIELD QUALITY CONTROL A. Installation Tolerances of Precast Units shall be: it 1. Horizontal: ±1" from project alignment centerline as indicated on plan sheet C-3.00 - Tunnel Layout and Dimension Plan. 2. Vertical: ±1" from tunnel profile centerline as indicated on plan sheet C-4.01 & C-4.02 — ibis Utility Tunnel Profiles. 3. Tolerances shall be determined to be acceptable based on the inside walls and floors of the tunnel. B. Contractor shall employ a land surveyor(LS) licensed in the Commonwealth of Virginia to verify the tunnel has been installed within the specified tolerances above. 1. The LS shall locate each individual precast unit, verify, and report each unit has been installed within the specified tolerances above. 2. Contractor shall issue a drawing, signed and sealed, to verify tolerances were achieved. Drawing shall note the deviation from the design centerline/elevation of each precast unit. 3. This drawing shall be issued to the University and NE within 36 hours of a precast unit being set in its final location. in END OF SECTION 33 63 14 iW. ime Dewberry Engineers Inc. Precast Concrete: Utility Structures DEI#50092624 33 63 14-4 iL. i�. rr. it Yr it ilr Appendix A: Utility Test Holes www.dewberry.com i.. ism he hi hi LCATALOG PART NUMBERS LUMINA—Ft:7.e: WI N—W 1—PC—R 3/ -SMS-25 0Mii-PS-M I-STD COLOR LUMINAIRE: "WINSION" SERIES S',OF,7/-,RNS: 1PLAT i---- 26" -4.-1 7 DISIRILUILSW: 1TYPL t OR "ILLL IL: 01-F" , I f LIGHT SOUEIL: 250W ..,,J,LSL 4:AR.: M.L. , . I 36" , u% , WOLTASE: MjIT7-TAP (PLEASE IPEO:Pq 1 ''' , 1„.-1; 1 kINISE: POLILSTER .i'OWPLA ;OA". WA.' OOLOR) ' 1 , OTTIONS: SO1:D MID-SEOTIO L r ,1 , L , 1 L J ARM: PPMB-1 7-MOD-BK f , STYLP: S:NGIE, PDLZ-MCUNT ARM .... ... ',INTEL: POLYESTER EOWDER Cf...A: (STD COLOR) Li OPTIONS: IN I PLB 41 8 5 18 St:100TR t :TILE: LZICRAIIVE RX,ND LIRA:GH: POLE L . : I MATERIAL: SRAFT EGSI ALUM., S56 ALUM. ALLOY CAST EASI , . LIAM., l" TALI, .:F,13 WALL TE:CKNES1 FINISE: P,:LTESTER POWDER COAT (STD CCLOR! OPTIONS: L a= H. .„ ..........„...____,_, - __,I ,,q' - I. If. i 1 iC illi ' ONO 0,A ik i{RN,l1tP! 00 1, SIZES RIPREE3ENTLE ARE NOMJNAL* ...-- .7.7.-..-- '...-='".......-. "" - ...,,,--...„....,A... ....... ..,.. .,..,„..--......,....,_ N- 111.0111 I I r i I IMF MEW LIGHTING PRODUCTS, INC. ais 150 PEMCO WAY-WILMINGTON,DE 19804-3535 P-(302)892-9003 F-(302)892-9005 WWW.PEMCOUGH11NG.COM or 1.• ism tap 611 www.dewberry.com