HomeMy WebLinkAboutARB201700069 Review Comments Appeal to BOS 2017-10-12Margaret Maliszewski From: Margaret Maliszewski Sent: Thursday, October 12, 2017 11:26 AM To: 'Luke Waldron' Cc: 'Jessie Calder'; David Mitchell Subject: ARB-2017-69: North Pointe Middle Entrance Landscape Plan Attachments: resubmittal form.docx Luke, I have reviewed the plan with revision date of 25 September 2017 submitted for the North Pointe Middle Entrance Landscape application. I have the following comments: 1. To address tree/utility conflicts, the trees were removed from the median of the entrance road. Placing trees in the median is consistent with previous ARB actions for this type of development. Can the pipe be moved so the trees can remain? 2. On September 18 and October 2, the ARB considered the information in the articles you provided on the relationship between tree planting size and establishment/growth. At this time, the ARB cannot support the smaller planting size for Entrance Corridor frontage trees for this proposal. The ARB did note that they are willing to consider additional information on the subject, and acknowledged that a change of this type would require Board of Supervisors approval of a revision to the Entrance Corridor Design Guidelines. The landscape plan will need to show a 3'/2" caliper planting size for EC frontage trees at a quantity equivalent to one tree for every 35' of frontage. Please provide revised drawings addressing these conditions. Please Include updated revision dates on the drawings and submit the Revised Application Submittal form (attached) with the revisions. If you have questions, please let me know. Thanks. Margaret Margaret Maliszewski, Chief of Planning/Resource Management Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3276 mmaliszewski@albemarle.org COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 September 14, 2017 David Mitchell Great Eastern Management 2619 Hydraulic Road Charlottesville, VA 22906 RE: ARB-2017-69: North Pointe Entrance Landscaping Dear David, I have reviewed the plan with revision date of 31 August 2017 submitted for the above -referenced application. I have the following comments: 1. Regarding comment #2 from the August I 1 action letter, there appear to be several tree/utility conflicts, as outlined in red, below. Please resolve. 2. Regarding comment #3 from the August 11 action letter, a 40' landscape buffer is identified, but the 40' depth is actually only provided at the very southern end of the planting. Where the 40' dimension is noted, the depth only measures 30'. (See note outlined in blue, below.) Please revise to provide a consistent planting area depth of 40. 3. The landscape plan shows 88 shrubs provided by a total of 3 species. Consider increasing the shrub species to a minimum of 4. 4. Regarding comment #4 from the August 1 I action letter, thank you for providing the articles on the relationship between tree planting size and establishment/growth. We hope to get ARB input on the frontage tree planting size at an upcoming meeting. We will provide you with the ARB input once received. 5. I understand that you are not prepared to provide additional sign information at this time. Consequently, the final action on ARB-2017-69 will exclude the sign design. Please provide: 1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB revision dates on each drawing. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staffs review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, ZA U Margaret Maliszewski Chief of Planning/Resource Management cc: Jessie Calder, Waterstreet Studio, 418 E. Main Street, Charlottesville VA 22902 File COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: DATE: PROJECT NAME: ARB-2017-69: North Pointe Community Sign Submittal Type Requiring Revisions O indicates submittal Code County Project Number # Copies Erosion & Sediment Control Plan &5 Mitigation Plan MP Waiver Request WR Stormwater Management Plan SWMP Road Plan RP Private Road Request, with private/public comparison (PRR) Private Road Request — Develo went Area RR-DA Preliminary Site Plan (PSP) Final Site Plan or amendment FSP Final Plat P) Preliminary Plat P) Easement Plat (EP) Boundary Adjustment Plat BAP Rezoning Plan Z Special Use Permit Concept Plan (SP-CP) Reduced Concept Plan -CP Proffers P Bond Estimate Request (BER) Draft Groundwater Management Plan D-GWMP) Final Groundwater Management Plan F-GWMP Aquifer Testing Work Plan (ATWP Groundwater Assessment Report GWAR Architectural Review Board ARB ARB201700069 Other: Please explain (For staff use only) Submittal Code # Co ies Distribute To: Submittal Code # Co ies Distribute To: ARB 2 Margaret Maliszewski