Loading...
HomeMy WebLinkAboutWPO201700039 Bond Estimates 2017-10-12Hollymead Town Center - Block C6 WPO file number: WP0201700039 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DID, FD, RWD) earthwork for trap #1 earthwork for trap #2 height of dam at toe height of fill at face length of dam top width (area above transition) (total width of dam) (height below transition) (area below transition) (total fill volume) length of spillway width of spillway height of dam at toe height of fill at face length of dam top width (area above transition) (total width of dam) (height below transition) (area below transition) (total fill volume) length of spillway width of spillway stone inlet protection (IP) paved construction entrance survey and layout (price per 0.1 mi.) acres mobilization ft cut at high side L ft ft cut at face ft ft length of cut ft ft width of cut ft 0 sf (area below transition 114 sf 6 ft (total width of cut) 31 ft 3 ft (depth below transitioi 0 ft 0 sf (area above transition 0 sf 0.0 cy (total cut volume) 755.8 cy _ft (TOAL CY estimate) 756 cy ft (spillway stone tons) 5.2 tons ft cut at high side ft ft cut at face ft ft length of cut ft ft width of cut ft 0 sf (area below transition 192 sf 6 ft (total width of cut) 44 ft 3 ft (depth below transitioi 0 ft 0 sf (area above transition 0 sf 0.0 cy (total cut volume) 924.4 cy _ft (TOAL CY estimate) 924 cy ft (spillway stone tons) 8.1 tons traps and basins - No. Unit Unit Cost Cost (installed acres $5,000.00 $14,300.00 315. ft $5.00 $1,575.00 ft $5.00 $500.00 ft $13.00 $18,395.00 $13.00 $9,828.00 $50.00 $260.00 $13.00 $12,012.00 $50.00 $405.00 00.00 $1,00.00 $3,5,500.00 $3,500.00 $2,450.00 $2,500.00 cost sum $67,325.00 contingency $6,732.50 Total $74,060 10/12/2017 Hollymead Town Center - Block CIS WPO file number: WPO201700039 Stormwater Management Plan Bond Estimate Item Item Number permanent diversion or ditch standard manhole frame top (not inlet) drop inlet or grate manhole structure (per ft. rise) pipe, rcp, cmp (15 to 48") in d _ ES-1,2 survey and layout (price per 0.1 mi.) acres basins mobilization No. Unit Unit Cost Cost installed $13.00 $2,990.00 ea $500.00 $500.00 Pft ea $3,500.00 $17,500.00 ft $450.00 $12,825.00 f $1,.00 $1,450450.00 $2,500.00 cost sum $49,910.00 contingency $4,991.00 Total $54,910 10/1212017