HomeMy WebLinkAboutWPO201600082 Review Comments WPO VSMP 2017-10-11Short Review Comments Report for: WPO201600082 SubApplication Type: 5th Street Commercial Development Stormwater Management/BMP Plan Erosion and Sediment Control Plan Date Completed:01/26/2017 Reviewer:Emily Cox CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:03/10/2017 Reviewer:Emily Cox CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:06/12/2017 Reviewer:Emily Cox CDD Engineering Review Status:See Recommendations Reviews Comments: Division: Date Completed:06/01/2017 Reviewer:Emily Cox CDD Engineering Review Status:See Recommendations Reviews Comments:- VSMP Plan approved pending recordation of SWM deed & plat. Division: Date Completed:05/16/2017 Reviewer:Ana Kilmer CDD Review Status:Approved Reviews Comments:5/10/2017 swa submitted 5/16/2017 - swa recorded in deed book 4909, page 508 Division: Date Completed:10/11/2017 Reviewer:Emily Cox CDD Engineering Review Status:Approved Reviews Comments: Division: Page:1 of 1 County of Albemarle Printed On:October 12, 2017 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project title: 511, Street Commercial Development Project file number: WP0201600082 Plan preparer: Collins Engineering [scott@collins-engineering.com] Owner or rep.: FTV Investments LLC [randy@ralstonpc.com] Piedmont Development Group [katurahr@gmail.com] Plan received date: 12 Dec 2016 Rev. 1 Rec. date: 10 Feb 2017 Rev. 2 Rec. date: 03 May 2017 Date of comments: 26 Jan 2017 Rev. 1 Comments: 10 Mar 2017 Rev. 2 Comments: 01 Jun 2017 Reviewers: Emily Cox County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is approved pending receipt of the recorded SWM deed and plat. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Include reduced size sheets of the E&S and SWM Plans. Rev. 1: Reduced sized sheets were not provided. Please provide 2 full copies of the most up to date SWPPP. Rev. 2: Comment addressed. 2. Note that the notice of general permit coverage and delegation of authority must be inserted once obtained. Rev. 1: Comment Addressed B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. No objections. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. This VSMP plan cannot be approved until there is an approved CLOMR. Rev. 1: Comment still relevant. Rev. 2: Comment addressed. 2. Ensure that the approved floodplain and floodway from the approved CLOMR are shown on this Engineering Review Comments Page 2 of 3 plan on all applicable sheets. Rev. 1: Comment still relevant until CLOMR approved. Rev. 2: Comment addressed. 3. Please reference the table in County Code Chapter 18 Section 30.3.11. This falls under the third row in stream crossings and grading activities, therefore no grading is allowed in the floodway. VA SW Design Specification No. 2, sheet flow to filter strip or conserved open space, may assist in attaining an adequate outfall. Rev. 1: Please contact Vincent Pero with the army corps of engineers to review the proposed work in this area. His phone number is : (434) 973-0568. Rev. 2: Comment addressed. 4. SP2007-00063 does not show a 50' stream buffer. It shows a 100' buffer with a 50' mitigation line. Per County Code 17-604, improvements may be allowed in a stream buffer within the landward 50 horizontal feet, provided that a mitigation plan satisfying 17-406 is also provided. Therefore, you must provide mitigation for any improvements in that first landward 50'. Rev. 1: Comment Addressed. 5. The preservation easement note on Sheet 7 must be revised. Credits can no longer be bonded, they must be purchased before the VSMP permit is issued. Rev. 1: Please provide proof of purchase of credits. Rev. 2: Comment addressed. 6. Clearly show and label the total area to be platted as forest/open space. (5.61 AC per the VRRM spreadsheet provided). This area will need to be recorded in a SWM agreement before the plan can be approved/VSMP permit can be issued. Rev. 1: Please label the area on the plan and the plat as "SWM forest and open space easement" and add a definition for SWM=stormwater management. Also, add the following note to the plans and the plat, " The SWM Forest and Open Space Easement is subject to the guidance set forth by DEQ in the Virginia Stormwater Management Program. The areas will remain undisturbed in a natural, vegetated state, except for activities as approved by the local program authority, such as forest management, control of invasive species, replanting and revegetating, passive recreation (e.g., trails), and limited bush hogging to maintain desired vegetative community (but no more than four times a year)." Rev. 2: Comment addressed. 7. Please provide a drainage map showing that the proposed contributing DA is less than 1% of the DA of the receiving channel/stream. Rev. 1: Drainage areas not provided. Rev. 2: Comment addressed. 8. Revise underground detention emergency spillway elevation detail to say 387.5, not 378.5. Rev. 1: Comment Addressed. 9. Rev. 1: A Stormwater Management Maintenance Agreement and an Easement Plat with a Deed of Dedication will be needed before the VSMP plan can be approved. Please contact Ana Kilmer to begin the process of completing the Maintenance Agreement. The application for an easement plat can be found in the Community Development Documents section of the County's website under Subdivisions. The fee for the easement plat will be the one shown for the easement plat required with a site plan. We recommend you begin this process as soon as possible. Rev. 2: SWM agreement has been executed. Recorded easement plat and deed are still pending. 10. A drainage easement is necessary around all storm pipes conveying offsite water. This will also need a plat/deed. Contact us with any questions. Rev. 2: Comment addressed. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. The Phase II E&S Plan does not appear to match the ultimate build -out plan shown on the SWM Plan. Please explain. The ultimate build -out plan on the SWM plan would require more E&S Engineering Review Comments Page 3 of 3 features that are not shown on this plan (inlet protection, etc). Rev. 1: Comment Addressed. 2. Please provide outlet protection details and calculations for all locations needing outlet protection. Rev. 1: Comment Addressed. 3. Please explain the note on Sheet 5 which says, "Proposed low maintenance & disturbance pedestrian trail way. No disturbance shall occur within the stream buffer for this installation". How can there be no disturbance? The trail way is shown in the buffer? Rev. 1: Comment Addressed. 4. Please show permanent seeding symbol on the plans along with temporary seeding. Rev. 1: Comment Addressed. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; hlt2://www.albemarle.org/deptfonns.asp?department--cdengno File: WP0201600082 5thStCommercial COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project title: 511, Street Commercial Development Project file number: WP0201600082 Plan preparer: Collins Engineering [scott@collins-engineering.com] Owner or rep.: FTV Investments LLC [randy@ralstonpc.com] Piedmont Development Group [katurahr@gmail.com] Plan received date: 12 Dec 2016 Rev. 1 Rec. date: 10 Feb 2017 Date of comments: 26 Jan 2017 Rev. 1 Comments: 10 Mar 2017 Reviewers: Emily Cox County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Include reduced size sheets of the E&S and SWM Plans. Rev. 1: Reduced sized sheets were not provided. Please provide 2 full copies of the most up to date SWPPP. 2. Note that the notice of general permit coverage and delegation of authority must be inserted once obtained. Rev. 1: Comment Addressed B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. No objections. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. This VSMP plan cannot be approved until there is an approved CLOMR. Rev. 1: Comment still relevant. 2. Ensure that the approved floodplain and floodway from the approved CLOMR are shown on this plan on all applicable sheets. Rev. 1: Comment still relevant until CLOMR approved. Engineering Review Comments Page 2 of 3 3. Please reference the table in County Code Chapter 18 Section 30.3.11. This falls under the third row in stream crossings and grading activities, therefore no grading is allowed in the floodway. VA SW Design Specification No. 2, sheet flow to filter strip or conserved open space, may assist in attaining an adequate outfall. Rev. 1: Please contact Vincent Pero with the army corps of engineers to review the proposed work in this area. His phone number is : (434) 973-0568. 4. SP2007-00063 does not show a 50' stream buffer. It shows a 100' buffer with a 50' mitigation line. Per County Code 17-604, improvements may be allowed in a stream buffer within the landward 50 horizontal feet, provided that a mitigation plan satisfying 17-406 is also provided. Therefore, you must provide mitigation for any improvements in that first landward 50'. Rev. 1: Comment Addressed. 5. The preservation easement note on Sheet 7 must be revised. Credits can no longer be bonded, they must be purchased before the VSMP permit is issued. Rev. 1: Please provide proof of purchase of credits. 6. Clearly show and label the total area to be platted as forest/open space. (5.61 AC per the VRRM spreadsheet provided). This area will need to be recorded in a SWM agreement before the plan can be approved/VSMP permit can be issued. Rev. 1: Please label the area on the plan and the plat as "SWM forest and open space easement" and add a definition for SWM=stormwater management. Also, add the following note to the plans and the plat, " The SWM Forest and Open Space Easement is subject to the guidance set forth by DEQ in the Virginia Stormwater Management Program. The areas will remain undisturbed in a natural, vegetated state, except for activities as approved by the local program authority, such as forest management, control of invasive species, replanting and revegetating, passive recreation (e.g., trails), and limited bush hogging to maintain desired vegetative community (but no more than four times a year)." 7. Please provide a drainage map showing that the proposed contributing DA is less than I% of the DA of the receiving channel/stream. Rev. 1: Drainage areas not provided. 8. Revise underground detention emergency spillway elevation detail to say 387.5, not 378.5. Rev. 1: Comment Addressed. 9. Rev. 1: A Stormwater Management Maintenance Agreement and an Easement Plat with a Deed of Dedication will be needed before the VSMP plan can be approved. Please contact Ana Kilmer to begin the process of completing the Maintenance Agreement. The application for an easement plat can be found in the Community Development Documents section of the County's website under Subdivisions. The fee for the easement plat will be the one shown for the easement plat required with a site plan. We recommend you begin this process as soon as possible. 10. A drainage easement is necessary around all storm pipes conveying offsite water. This will also need a plat/deed. Contact us with any questions. D. Erosion and Sediment Control Plan (ESOP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. The Phase II E&S Plan does not appear to match the ultimate build -out plan shown on the SWM Plan. Please explain. The ultimate build -out plan on the SWM plan would require more E&S features that are not shown on this plan (inlet protection, etc). Rev. 1: Comment Addressed. 2. Please provide outlet protection details and calculations for all locations needing outlet protection. Rev. 1: Comment Addressed. 3. Please explain the note on Sheet 5 which says, "Proposed low maintenance & disturbance Engineering Review Comments Page 3 of 3 pedestrian trail way. No disturbance shall occur within the stream buffer for this installation". How can there be no disturbance? The trail way is shown in the buffer? Rev. 1: Comment Addressed. 4. Please show permanent seeding symbol on the plans along with temporary seeding. Rev. 1: Comment Addressed. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle. org/deptforms.asp?department=cdengwno File: WP0201600082 5thStCommercial