HomeMy WebLinkAboutWPO201600077 Review Comments WPO VSMP 2017-06-28Short Review Comments Report for:
WPO201600077
SubApplication Type:
Luxor Amendment
Stormwater Management/BMP Plan
Erosion and Sediment Control Plan
Date Completed:01/06/2017
Reviewer:Matthew Wentland CDD Engineering
Review Status:Denied
Reviews Comments:Engineer and developer are working on a new plan
Division:
Date Completed:06/28/2017
Reviewer:Matthew Wentland CDD Engineering
Review Status:Approved
Reviews Comments:
Division:
Page:1 of 1 County of Albemarle Printed On:October 17, 2017
s11101
Ce 01s
4',0.40 40- Dominion
:§1111 k Engineering 172 South Pantops Drive
Charlottesville, VA 22911
`A19 434.979.8121 (p)
'eye ers 434.979.1681 (f)
c'ts DominionEng.com
May 26, 2017
Matthew Wentland
Civil Engineer II
Community Development
Albemarle County
401 McIntire Rd
Charlottesville, VA 22902
RE: VSMP Amendment -Luxor&North Pantops Commercial- Comment-Response Letter
Dear Matthew,
Please find enclosed for your review, two(2) sets of VSMP Amendment. These plans have been revised
to address the informal VSMP Amendment comments in email dated March 9th, 2017.
Albemarle County Engineering
1. The Luxor pond doesn't show the aquatic bench.
RESPONSE: An aquatic bench has been shown for the proposed changes to the pond.
2. The proposed grading wipes out the access to the forebay and structure..
RESPONSE: Grading for the pond has been updated so that the access for maintaining the
forebay and structure has been preserved.
We trust the above adequately addresses your comments. Please let me know if you have any questions
or require additional information.
Sincerely,
Dustin E. Greene, EIT
Matthew Wentland
To: Dustin Greene
Cc: Frank Pohl; Kenny Thacker; Charlie A. Hurt
Subject: Luxor and HTC ponds
Dustin,
After discussing with Charlie Hurt what is shown on the amendments submitted for Luxor (WPO201600077) and
Hollymead Town Center Area B (WPO201600078), both of these VSMP plans are being rejected. As originally discussed
between our inspector and Charlie on 12/14, the idea was to expand the ponds without digging them deeper than they
are currently. Once we have heard back from Charlie on how he wants to proceed and received revised plans, we will
continue with the review process.
Thank you,
Matt Wentland, P.E.
Civil Engineer II