Loading...
HomeMy WebLinkAboutWPO201600078 Review Comments 2017-09-22Short Review Comments Report for: WPO201600078 SubApplication Type: Hollymead Town Center Area B Stormwater Management/BMP Plan Erosion and Sediment Control Plan Date Completed:01/06/2017 Reviewer:Matthew Wentland CDD Engineering Review Status:Denied Reviews Comments:Engineer and developer are working on a new plan Division: Date Completed:04/18/2017 Reviewer:Matthew Wentland CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:03/29/2017 Reviewer:Margaret Maliszewski CDD ARB Review Status:Requested Changes Reviews Comments:Plans showing previously approved and proposed landscaping are required for review. Division: Date Completed:09/19/2017 Reviewer:Margaret Maliszewski CDD ARB Review Status:Approved Reviews Comments:see plans with revision date of 8/18/17 Division: Date Completed:09/22/2017 Reviewer:Matthew Wentland CDD Engineering Review Status:Approved Reviews Comments: Division: Page:1 of 1 County of Albemarle Printed On:October 17, 2017 Sege **id O6 es tios46 • Dominion a`i L Engineering 172 South Pantops Drive Charlottesville, VA 22911 �� 44% it gip 434.979.8121 (p) fiteps 434.979.1681 (f) its DominionEng.com March 13, 2017 Matthew Wentland Civil Engineer II Community Development Albemarle County 401 McIntire Rd Charlottesville, VA 22902 RE: VSMP Amendment -HTC Pond- Comment-Response Letter Dear Matthew, Please find enclosed for your review, two(2)sets of VSMP Amendment. These plans have been revised to address the informal VSMP Amendment comments in email dated March 9th, 2017. Albemarle County Engineering 1. Add a turbidity curtain to the plans to help keep sediment out of the riser structure. RESPONSE: A turbidity curtail (type I) has been added to the pond to help keep sediment out of the riser structure. Permanent seeding and a stone construction entrance have also been added to the plan as the work on this pond is expected to have a quick turnaround. We trust the above adequately addresses your comments. Please let me know if you have any questions or require additional information. Sincerely, Dustin E. Greene, EIT Matthew Wentland To: Dustin Greene Cc: Frank Pohl; Kenny Thacker; Charlie A. Hurt Subject: Luxor and HTC ponds Dustin, After discussing with Charlie Hurt what is shown on the amendments submitted for Luxor (WPO201600077) and Hollymead Town Center Area B (WPO201600078), both of these VSMP plans are being rejected. As originally discussed between our inspector and Charlie on 12/14, the idea was to expand the ponds without digging them deeper than they are currently. Once we have heard back from Charlie on how he wants to proceed and received revised plans, we will continue with the review process. Thank you, Matt Wentland, P.E. Civil Engineer II