Loading...
HomeMy WebLinkAboutWPO201500090 Plan - E&S Erosion Control Plan 2017-08-31GENERAL NOTES OWNER SM CHARLOTTESVILLE LLC Sheet Title 11111 SUNSET HILLS RD, COVER SHEET, PHASE I & II ESC PLAN, NOTES & DETAILS SUI TE 200 PHASE III ESC PLAN, NOTES & DETAILS RESTON, VA 20190 TAX MAP # 093A5-00-00-00100 (LOTS 9-16) DD D VTEMPORARY AREA: 48.65 AC. DIVERSION DIKE ZONING: PRD ST 093A5 -K2 -OB -00700 (LOT 7) TEMPORARY SEDIMENT TRAP AREA: 0.783 ac. SB ZONING: PRD ENGINEER: COLLINS ENGINEERING lP 200 GARRETT STREET SUITE K INLET PROTECTION CHARLOTTESVILLE, VA 22902 SFX TELEPHONE: (434)987-1631 SILT FENCE FAX: (434) 245- 0300 X CONTACT- SCOTT COLLINS, P.E. 0 EMAIL: SCOTT@COLLINS-ENGINEERING. COM USE: SINGLE-FAMILY RESIDENTIAL SUBDIVISION STREETS: ROADSIDE DITCH TOPOGRAPHY JAMES H BELL JR, PC (USGS DATUM) 336.010 1532.0 DA TE OF PHO TOGRAPH Y - FEBRUAR Y 22, 1998 3.10 DATE OF COMPILATION - MARCH 12, 1998 338,00 19893.0 ROUDABUSH, GALE & ASSOCIATES 3.12 AS -BUILT CONDITIONS FROM GLENMORE PERIMETER ROAD AS -BUILD � ROAD AND UTILITY PLANS - CARROLL CREEK ROAD AND FARRINGDON 3.32 ROAD PLANS DATED APRIL 4, 2008. TO TOPOGRAPHY VERIFIED WITH FIELD SURVEY IN JULY OF 2017 BY 3.30 ROUDABUSH, GALE & ASSOCIATES. VEGETA TION: ROLLING GRASS FIELD WITH EXISTING TREES 1 ` �rrb.� �yA E3.R rte' PROJECTi` LOCATION z Gk's VICINITY MAP SCALE: 1" = 2000' CURRENT OWNER/DEVELOPER SM CHARLOTTESVILLE LLC 11111 SUNSET HILLS ROAD, SUITE 200 RESTON, VA 20190 ENGINEER COLLINS ENGINEERING 200 GARRETT STREET, SUITE K CHARLOTTESVILLE, VA 22902 434.293.3719 EROSION CONTROL A ERSN 8c SEDIMENT CON HANDBIOOK SP ECIFICA77ON NUMBER TROL Sheet Number Sheet Title z COVER SHEET, PHASE I & II ESC PLAN, NOTES & DETAILS STB PHASE III ESC PLAN, NOTES & DETAILS STRAW BAIL BARRIER 3.04 12.20 DD D VTEMPORARY r DIVERSION DIKE 3.09 ST mpwasn-8>♦ TEMPORARY SEDIMENT TRAP 3.13 SB SEDIMENT BASIN S 3.14 lP ---�-- INLET PROTECTION 3.07 SFX ����t><rt SILT FENCE 3.05 X CE 0 CONSTRUCTION ENTRANCE 3.02 CD ' CHECK DAM 3.20 FDTEMPORARY 336.010 1532.0 FILL DIVERSION 3.10 D V 338,00 19893.0 DI VERSION 3.12 aPS � PERMANENT SEEDING 3.32 TO TO TOPSOILING 3.30 ClP wet storage: CULVERT INLET PROTECTION 3.08 DC DC DUST CONTROL 3.39 TSD 334.57 TEMPORARY SLOPE DRAIN 3.15 - SA top width of dam (ft) SAFETY FENCE 3.01 414.8 RW 328.00 TEMPORARY RIGHT-OF-WAY 3.11 approx. bottom dimensions: 2:6'x64' DI VERSION 1.6 GLENMORE m SECTION K2 SWM CONVERSION - EROSION & SEDIMENT CONTROL PLAN EROSION CONTROL NOTES & NARRATIVE PURPOSE.• THE PURPOSE OF THIS LAND DISTURBING ACTIVITY IS TO REMOVE (2) EXISTING BASINS WITHIN THE GLENMORE NEIGHBORHOOD AND CONSTRUCT A SINGLE PERMANENT STORMWATER MANAGEMENT FACILITY. 774E AREA TO BE DISTURBED FOR THIS PROJECT IS COVERED UNDER APPROVED WPO -2015-0034 WITH AN ADDITIONAL AREA TO BE DISTURBED TOTALING 0.12 ACRES OUTSIDE OF THE APPROVED LIMITS OF DISTURBANCE. EXISTING SITE CONDITIONS: THE EXISTING SITE IS PREVIOUSLY DISTURBED FROM THE CONS77?UC77ON OF (2) EXISTING BASINS. THE SITE IS LOCATED TO THE NOR7H EAST OF CARROLL CREEK ROAD AND DRAINS TO THE EXISTING CARROLL CREEK. ADJACENT AREAS: THIS SITE IS BORDERED TO THE NORTH BY AN EXIS77NG S7REAM. TO THE EAST AND WEST EXISTS OPEN GRASS FIELDS. CARROLL CREEK ROAD EXISTS TO 7HE SOUTH. OFFSITE LAND DISTURBANCE.• NO OFFSITE LAND DISTURBANCE IS PROPOSED. ALL LAND DISTURBANCE IS TO OCCUR WITHIN 7HE EXISTING AND PROPOSED LIMITS OF DISTURBANCE AS SHOWN. CRITICAL AREAS.• NO DISTURBANCE SHALL OCCUR WITHIN THE 100' S7REAM BUFFER LOCATED TO 7HE NORTH OF THIS PROJECT. SOILS: SEE APPROVED WPO -2015-00034 FOR SOILS MAP AND DATA. SEQUENCE OF CONSTRUCTION: 1. N077FY ALBEMARLE COUNTY TO SCHEDULE A PRE -CONSTRUCTION MEETING AS REQUIRED. 2. NO EROSION CONTROL MEASURES MAY BE REMOVED DURING THE CONS7RUC77ON PROCESS WITHOUT THE APPROVAL FROM 7HE INSPECTOR ON THE PROJECT. J. EXIS77NG SWM ACCESS PATH SHALL SERVE AS THE CONSTRUC77ON ENTRANCE. PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY (VEHICULAR) TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY, SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEP/NG AND 7RANSPOR77NG TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. 4. INSTALL THE INI77AL CONSTRUCTION MEASURES AS SHOWN ON THE PHASE I EROSION CONTROL PLAN. THIS INCLUDES SILT FENCE AND OUTLET PROTECTION. MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP WITH ANY LAND DISTURBANCE ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 7HE FINAL INITIAL ESC MEASURE IS TO PLUG THE EXIS77NG RISERS/BARRELS ON THE (2) EXISTING BASINS TO CREATE A DRY SCENARIO DOWNSTREAM. THE EXIS77NG 100 -YEAR EMERGENCY OUTFALLS SHALL SERVE AS THE PRIMARY OU7T`ALLS FOR THE EXISTING BASINS, WHICH WILL ACT AS SEDIMENT TRAPSIDETEN77ON FOR UPSTREAM FLOW, 5. ONCE ALL THE INITIAL EROSION CONTROL ITEMS HAVE BEEN INSTALLED AS SHOWN ON THE PHASE I EROSION CONTROL PLAN AND THE INSPECTOR HAS APPROVED THE EROSION CONTROL MEASURES, 7HE CONTRACTOR CAN INSTALL 7HE POR77ONS OF 7HE NEW DAM AS SHOWN ON THE PHASE I ESC PLAN. STABILIZA77ON MEASURES SHALL BE APPLIED TO EAR7HEN STRUCTURES SUCH AS DAMS, DIKES, AND DIVERSIONS IMMEDIA TEL Y AFTER INSTALLATION. 6. ONCE 7HE POR77ON OF THE DAM SHOWN ON THE PHASE / ESC PLAN HAS BEEN INSTALLED AND THE INSPECTOR HAS GIVEN APPROVAL, PHASE Il ESC PLAN CONSTRUC77ON AC77W77ES CAN BEGIN. THIS INCLUDES THE CONSTRUCTION OF THE FINAL POR77ON OF THE PROPOSED DAM & THE INSTALLATION OF THE PROPOSED RISER AND BARREL. AFTER THE DAM HAS BEEN CONSTRUCTED AND THE NEW RISER AND BARREL HAVE BEEN INSTALLED, UPSTREAM CONSTRUCTION ACTIVITIES CAN TAKE PLACE, INCLUDING 7HE REMOVAL OF 7HE EXISTING BASIN STRUCTURES, OUTFALLS, & RIPRAP. Z PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE /S REACHED ON ANY PORT70N OF THE SI7E TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. 8. ONCE 7HE NEW DAM, RISER, & BARREL HAVE BEEN INSTALLED AND THE INSPECTOR HAS GIVEN APPROVAL, 7HE CONTRACTOR CAN REMOVE THE REMAINING EXISTING PONDS AND POND S7RUCTURES AND COMPLETE 7HE GRADING FOR 7HE PROPOSED STORMWATER MANAGEMENT FACILITY AS SHOWN ON 7HE PHASE 111 EROSION CONTROL PLAN. ALL EXISTING BASINS MUST REMAIN IN PLACE FOR AS LONG AS POSSIBLE AND THEIR REMOVAL MAY ONLY BE AU7HORIZED BY A COUNTY INSPECTOR. 9. AFTER THE NEW SWM FACILITY HAS BEEN INSTALLED AND STABILIZED, AND THE INSPECTOR HAS GIVEN APPROVAL, THE 9" RISER ORIFICE CAN BE SEALED AND REPLACED W/77-1 THE ORIFICES PROPOSED ON THE SWM PLAN. ALL REMAINING EROSION CON7ROL MEASURES CAN BE REMOVED AT THIS 77ME. NO I7EM SHALL BE REMOVED UNLESS 7HE UPSTREAM AREAS ARE STABILIZED AND THE INSPECTOR GIVES PERMISSION. 10. MAINTAIN ALL EROSION CONTROL MEASURES AS SPECIFIED /N THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, REMOVING ONLY WHEN APPROVED BY THE LOCAL PROGRAM ADMINISTRATOR /N ACCORDANCE WTH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK- 11. ANDBOOK11. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED W774IN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS 07HERMSE AUTHORIZED BY THE LOCAL PROGRAM ADMINISTRATOR. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESUL77NG FROM THE DISPOS177ON OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. SHEET INDEX Sheet Number Sheet Title z COVER SHEET, PHASE I & II ESC PLAN, NOTES & DETAILS z PHASE III ESC PLAN, NOTES & DETAILS TOTAL NO. OF SHEETS Sediment Basin Designs (Phase II) z A MIN, F" Of SPUWA 2' S4txH UL CREST aF - AtE GF^tC`" ,SPPUWAY drainage area (acres) 12.20 P DESIGN NPraN bYd,TEft r basin volumes: (using 2' contour intervals) (25 -'YR. STORM r .) elevation (it) contour area (sf) volume (cy) 328,00 1028,0 0 CREST �pt� 330.00 1925,0 107.6 Err graaacF ' ����t><rt . 3003088.0 291.6 _ 77771 333 (^ 0 37 .0 ,}.?J.CXii 6�. 418.3 p r ' - F r WET . Gea�� t� 334.070 6111.0 599.5 d.LU(� 336.010 1532.0 1367.8 338,00 19893.0 2668,5 meWFT - SJORACE ps}UC - INET " S"if}!�<'+C� REDUCED � � FC 14 C'.Y,J .ACRE'; L 340.00 24661.0 4315.5 0 wet storage: 04 vast storage required (cy) (67 DA) 811.4 design high water (ft) 338.501 dewaferrng orifice elevation (ft) 334.57 fop of lona (ft) 340.00 wet storage provided at this elevation (cy) 817.4 top width of dam (ft) 10.0 available volume before cleanout (cy) (34 DA) 414.8 bottom of basin (ft) 328.00 cleanout elevation (ft) 332.92 approx. bottom dimensions: 2:6'x64' distance from cleanout to orifice (ft) (- 1') 1.6 upstream face slope: Var. 2:1 - 4.1 ` z 0 downstream face slope: 3:1 dry storaEe:, z Z dry storage required (cy) (67*1DA) 817.4 baffles: NO principle spillway crest (ft) 337.50 length of flaw, L (ft) 235 dry storage provided at this elevation (cy) 2342,2 effective width, We (ft) 76 diameter of dewatering orifice (in) 9.0 L I We (baffles not required if > 2) 3.1 diameter of flexible tubing (in) (orifice+2") 11.0 J O collars. YES runoff: LD depth of water at spillway crest (ft) 9,50 C (use 0.45 for bare earth) 0.4 s lope of upstream face (Z 1) 4:1 tc (min) 15 slope of barrel (Bb) 1.5% 1 2yr 3.50 Q 2yr 1T08 length of barrel in saturated zone (Ls) 60.64 1 25yr 5,80 Q 25yr 2& 30 number collars required 2 o dimension of collars 6.0`x6.0' principle spillway: available head (ft) 1,00 emergency spillway. NO diameter riser (in) 42 required capacity (Q25-Qp) (cfs) NIA spillway capacity, Qp (cfs) 28,30 bottom width (ft) NIA diameter trash rack (in) 60 slope of exist channel (ft/ft) N/A % barrel length (ft) 72 minimun length of exit channel (ft) NIA head on barrel through embankment (fit) 10.50 crest of spillway (ft) N/A diarneter of barrel (in) 30 i p L -r C ._ II 3 SCOTTSVILLE DISTRICT ALBEMARLE COUNTY, VIRGINIA PHASE I EROSION & SEDIMENT CONTROL PLAN General construction notes for Stormwater Management plans i. All dams and constructed fill to be within 95% of maximum dry density and 2% of optimum moisture content. All fill material to be approved by a geotechnical engineer. A geotechnical engineer is to be present during construction of dams. i. Pipe and riserjoints are to be watertight within stormwater management facilities. 3. For temporary sediment traps or basins which are to be converted to permanent stormwater management facilities; conversion is not to take place until the site is stabilized, and permission has been obtained from the County erosion control inspector. NOTE: PROJECT AREA COVERED UNDER APPROVED WPO -201.5-00034. THIS PLAN IS GRAPHIC SCALE INTENDED TO FUNCTION AS AN EROSION & SEDIMENT CONTROL PLAN FOR THE REMOVAL OF (2) EXISTING BASINS AND THEIR RELATED STRUCTURES AND THE ao 0 15 ao so azo CONSTRUCTION OF A SINGLE PERMANENT STORMWATER MANAGEMENT FACILITY. DESIGN OF THE NEW STORMWATER MANAGEMENT FACILITY CAN BE FOUND UNDER APPROVED WPO AMENDMENT WPO -2015-00090. ( IN FEET ) 1 inch = 30 ft. PHASE II EROSION & SEDIMENT CONTROL PLAN PROPOSED SEDIMENT BASIN DRAINAGE AREA (TYP.) DRAINAGE AREA =12.20 ACRES ». f PROPOSEDSWM EASEMENT Cw = 0.40, Tc =15 MIN. SFg. / EXISTING LIMITS OF DISTURBANCE INSTALL PORTION OF PROPOSED 7. PER WPO -2015-00034 (TOTAL=9.8o AC.) io' WIDE DAM, ELEV.=340.00 ` ,.,:: f r v; Y EXISTING SWM EASEMENT VDOT #3 COARSE AGGREGAJE P'.F'`` ADDITIONAL LIMITS OF DISTURBANCE OUTLET PROECTION w/ f` r,y ., VED WPO-ZazS-00034 OUTSIDE OFAPPRO i% GEOTEXTILE FILTER FABRIC (TOTAL= 0.12 AC.) _ a, UNDERLAYMENT(L=16',Ws- W2=23.5',D 2 MIIN. r< REMOVE EXISTING RIPRAP OUTFALL / t r T PS r � r � ; f :r;: -. :.r . l..., �, SF _. ,, �. .. , S /J('�i: f"X�.'iL��. r.0 REM E EXISTING RIPRAP r . - -333- REMOVE EXISTING DAM ....- '< s� , /I .REMOVE EXISTING RIPRAP OUTFA INSTALL o" CL. III RCP BARREL PER APPROVED �' f t 1 ' r.yjr, .: '. u: / ..... REMOVE EXISTING OUTFALL STORMATER MANAGEMENT PLAN w j'' - REAR LOT LINE SH 00 SCOTT 4 COLLINS,-;" ,U Lie. No. 035791 � Z O U LU m V) 0_j V L z LUN W ce 01\'AL -'�(�� W z LU O U z O U LU J LU m w 0- 0 w w R h I\ 00 00 o ,-1 N M w co w � z d U U) d.LU(� 0 o Q � � Q L ,p 0 a 04 W o (N (�� 0 ° > W LU F- o 6 z_ ` z 0 a� w ) w J z Z > 0 a �� ° w U z to a z LU J J O LD 0 O 0- C + ' U) OJ U) L0. Uj C C ._ o U P-mq o 0 3 f U) W L9.! ° ° Q X LLi N ° II z .i O Y! 0 i p L -r C ._ II 3 W c: C z W LU a w Li wUj U z c� 0 LLJ w U � U)LU C/,)� n z cn > J II J O Oa J I.. LIJv �,r�7 / -0-", ULI UT L J 0 a 0 �c OC) 2 C).2 X O U � ) C LU J p O O In U LU F- -0_ O 0 LU U E _ a U)�� 0 70B NO. 0 112504 0 CO ° > II U) SCALE 75 rn L a °) O_ o SHEET NO. 1 OF 2 ° a Sediment Basin Design (Phase 111) design high water (ft) 334:.57 drainage area (acres) 12'..20 top width of clary (ft) 414.8 bottom of basin (ft) alrseelt ltrcH WATER basin nuiumes: (using 2` contour internals) 4.6 (25-YRr STORY ELVVv) elevation (ft) contour area (sf) volume (cy) 817.4 328.00 4687.0 0 length of flow, L (ft) 330.00 6386.0 408,5 '9.10 332.00 8485.0 957.4 DRr'rOr 333,00 1107,0 11113.7 *FT . STnr�DE 334.00 18379.0 1382.1 } 338.00 22107.0 2802,3 17..08 338,00 28031.0 4654.9 siicixAriour c .oKmFwr STOWE REDUCED All dimension of collars 1,00 340.00 34340.0 6961.17 required capacity (025-Qp) (cfs) wet storage: wet storage required (cy) (67*DA) dewatering orifice elevation (it) wet storage provided at this elevation (cy) available volume before cleanout (cy) (34*DA) cleanout elevation (ft) distance from cleanout to orifice (ft) (> V) dry storage: dry storage required (cy) (67*DA) principle spillway crest (ft) dry storage provided at this elevation (cy) diameter of dewatering orifice (in) diameter of flexible tubing (in) (orifice+2") runoff: C (use 0.45 fbr bare earth) tc (Ellin) I2yr 3.50 Q 2yr 125yr 5.807 Q 25yr principle spillway: available head (ft) diameter riser (in) spillway capacity, Op (cfs) diameter trash rack (in) barrel length (ft) head on barrel through embankment (ft) diameter of barrel (in) TMTHO aT f �--- _____---___. FISER CRE'4s orn'ATEMNG. DLIACe 817.4 design high water (ft) 334:.57 top of dam (ft) 178'.9,6 top width of clary (ft) 414.8 bottom of basin (ft) 3310,.00 approx. bottom dimensions: 4.6 upstream face slope, GRASS -LINED EMERGENCY downstream face slope: 817.4 baffles: 337:.50 length of flow, L (ft) 2406.3 effective width, We (ft) '9.10 L I We (baffles not required if> 2) 1 1.0 PS ,a INSTALL REMAINING PORTION collars: OF PROPOSED 1o' WIDE DAM depth 0f water at spillway crest (ft) 10.4 slope of upstream face (2:1) 15 slope of Barrel (Sb) 17..08 length of barrel in saturated zone (Ls) 28.307 number collars required All dimension of collars 1,00 emergency spillway: 42 required capacity (025-Qp) (cfs) 28.30 bottom width (€i) 601 slope of exist channel (ftift) 72 minimun length of exit channel (ft) 10.50 crest of spillway (ft) 30 err r CREST OF EME;Rea'ERce s SP6L JVAY 338.50 340 0 10.0 328.0{0 90'x95' Var. 2:1 -4:1 3:1 NO 309 86 3,6 YES 9.50 4:1 1,.` % 60.64 2 6.0'x6,0' YES 11,2. 45 25 % 30 338.50 PHASE III EROSION & SEDIMENT CONTROL PLAN PROPOSED SEDIMENT BASIN / -DRAINAGE AREA (TYP.) DRAINAGE AREA = 12.2o ACRES PROPOSED SWM EASEMENT / Cw = 0.40, Tc =15 MIN. SF CL. III RCP MULTI -STAGE RISER � R ELEV IM .=337.50 EXISTING LIMITS OF DISTURBANCE PER WPO -2015-00034 (TOTAL=9.8o AC.) EXISTING SWM EASEMENT VDOT #3 COARSE AGGREGATE ADDITIONAL LIMITS OF DISTURBANCE OUTLET PROECTION wJ `. ` . OUTSIDE OF APPROVED WPO-2o15-oo034 GEOTEXTILE FILTER FABRIC OPT { (TOTAL = 0.12 AC.) UNDERLAYMENT (L=16',W1=7-S, W2=23.5, D=2' MIIN. TAH LE 3-51-D TABLE 332-D ACC:EVYAHLE 30" CL. III RCP BARREL - 72 LF t INV. IN=329.o8, INV. OIUT=328.00 REFP RENCE Fieri )IA, REGIONS' SF 0 PROPOSED45 ' WIDE _ GRASS -LINED EMERGENCY '7 e;c�a ,SPILLWAY WITH 4:1 SIDE SLOPES Sept- [ - Feb. 15 CREST ELEV. = 338•5o t , Old Annual Ryegrass I -14h -Maintenance Lawn 200-250 lbs. (L � Ll iitT1! mu[18r,1YRg.1i) PS ,a INSTALL REMAINING PORTION IK OF PROPOSED 1o' WIDE DAM N, ELEV.=340.00' f Seasonal Nurse Crop * -2a l s l � 1 Annual Ryeb: as f i - ICKI All 'r +Ii�,r�,.r�isiilkt�,5ydt!Sd4l - Red Torp Grass 2 lbs. 7 Gerawl k illet 50 - Crownvetctm * * 20 lbs. £,S�C.likCil-itultC.�) 150 lbs. srmree: Wa. DSWC' ll seasonal nurse crap in accordance with seeding dates as ;Mated below: Febmary 16tla through April . ..................... Annual Rye May lst throuigh August 15th ... _. ....... Foxtail Millet err r August 16th through October ...................... Annual Rye ylfr.. ** Substitute Serice a lespedeza for C.rownveteh east of Farmville, Va. (May r through September use hulled Sericea, all other periods, use ulthulled Sericea.). If F'latpea is used in Bell of Clrowavetch, increase rate to 30 tbs./acre, All legume seed must be properly inoculated. 'Weeping Lovegra5s may ba added to any Shope r a a r _ PS. / s rr :i � ` FILL baa rJ, .. .1. \ .'y. r-- �., i.;.?,.��;,. �..;i✓: rd{t:.:. - ACC A� `. TABLE 111-A LIMING REQUIREMENTS FOR TEMPORARY SITES Recommended Application ll, -I 'rest of Agricultural Limestone below 4.2 3 tans per acre 4.2 to 5.2 2 tons per acre 5.2 to 6 1 ton per acre Source: Va.II GENERAL SLOPE (3:1 OR LESS) TOTAL LBS PER ACRE KENTUCKY 31 FESCUE 128 LBS RED TOP GRASS 2 LBS SEASONAL NURSE CROP 20 LBS 150 LBS SEASONAL NURSE CROP FEBRUARY 16 THROUGH APRIL ANNUAL RYE MAY 1 THROUGH AUGUST 15 FOXTAIL MILLET AUGUST 16 THROUGH OCTOBER ANNUAL RYE NOVEMBER THROUGH FEBRUARY 15 WINTER RYE NOTES: 1. LIME AND FERTILIZER NEEDS SHALL BE DETERMINED BY SOIL TESTS AND APPLIED IN ACCORDANCE WITH VESCH STD. 3.32. 2. SEEDINGS TO BE MULCHED IMMEDIATELY UPON COMPLETION OF SEED APPLICATION, IN ACCORDANCE W/ VESCH STD 3.35. 0PS PERMANENT SEEDING SCHEDULE NO SCALE (STD. & SPEC. 3.32 OF VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK, 3RD ED.) 1. SET POSTS AND EXCA VA TE A 4"X4" TRENCH UPSLOPE ALONG THE LINE OF POSTS. I i FLOW -- - GRAPHIC SCALE 30 0 15 30 60 1.992 3.32 TAH LE 3-51-D TABLE 332-D ACC:EVYAHLE TEMPORkRN SEEDING PLANT iINUIEKIAL5 t °FLICK REFP RENCE Fieri )IA, REGIONS' P r Aere 0 Minimum Care Lawn Rain Pi -in n� llarte� '7 e;c�a SCI."c. 'aca Sept- [ - Feb. 15 50150 MN of t , - Kentucky Bluegrass 0-5% Annual Ryegrass I -14h -Maintenance Lawn 200-250 lbs. (L � Ll iitT1! mu[18r,1YRg.1i) General Slope l3:1 oar less IK 50-100 C Cereal (*ner) stye f Seasonal Nurse Crop * -2a l s 150 lbs. Feb. 16 � Arin ,10 Annual Ryeb: as f i - ICKI - Kentucky 3'1 Fescue 108 Ibs. 'r +Ii�,r�,.r�isiilkt�,5ydt!Sd4l - Red Torp Grass 2 lbs. May I - Aug 31 Gerawl k illet 50 - Crownvetctm * * 20 lbs. £,S�C.likCil-itultC.�) 150 lbs. srmree: Wa. DSWC' ll seasonal nurse crap in accordance with seeding dates as ;Mated below: 1. SET POSTS AND EXCA VA TE A 4"X4" TRENCH UPSLOPE ALONG THE LINE OF POSTS. I i FLOW -- - GRAPHIC SCALE 30 0 15 30 60 1.992 3.32 ® TABLE 332-D SI"IT, SPECIFIC SEEDING MIXTURES FOR PIEDMONT Ai3EA t Total Lbs. L9 P r Aere 0 Minimum Care Lawn rn = t ¢ c Commercial or Residential 17.5-200 lbs. Kentucky 31 of Turf -Type "fall Fescue 95-100% T Improved Perennial Ryegrass 0-5% t , - Kentucky Bluegrass 0-5% Z I -14h -Maintenance Lawn 200-250 lbs. - Kentucky 3-1. or TurfJype "fall Fescue 100% General Slope l3:1 oar less 0') Kentucky 31 Fescue 128 lbs. C Red Top Grass 2 Ibs. f Seasonal Nurse Crop * -2a l s 150 lbs. Low-Maintena"nce Slone. (Steet)er-L 1) 4 - Kentucky 3'1 Fescue 108 Ibs. - Red Torp Grass 2 lbs. - Seasonal Niurse Crop 20 lbs, LU - Crownvetctm * * 20 lbs. 150 lbs. ll seasonal nurse crap in accordance with seeding dates as ;Mated below: Febmary 16tla through April . ..................... Annual Rye May lst throuigh August 15th ... _. ....... Foxtail Millet I August 16th through October ...................... Annual Rye November thrrough February 15th .. . ................ Winter Rye ** Substitute Serice a lespedeza for C.rownveteh east of Farmville, Va. (May through September use hulled Sericea, all other periods, use ulthulled Sericea.). If F'latpea is used in Bell of Clrowavetch, increase rate to 30 tbs./acre, All legume seed must be properly inoculated. 'Weeping Lovegra5s may ba added to any Shope 0 or law -maintenance mix during warmer seeding periods; add 10-20 Iles./acre in a mixes. 2. STAPLE WIRE FENCIING TO THE POSTS. ( IN FEET ) 1 inch = 30 ft. ATTACH FILTER FABRIC - TO STAKES OR POSTS & EXTEND IT INTO TRENCH 3. A TTA CH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND 1 T INTO THE TRENCH. 120 OROGEN STAKE STEEL POST, = 5" MIN. EXCAVATED SOIL BACKFILLED AND COMPACTED illi 4"x4" TRENCH SILT FENCE sF (WITHOUT WIRE SUPPORT, 05-2 NO SCALE 4. BACKFILL AND COMPACT THE EXCA VA TED SOIL. W / EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. VYH °p,�; rRf OSCOTT 'R. COLLINS-Z;' Lie. No. 030791 n G��SSrIONAL, ~vI�C1 Z I w s � r U z i :D T U w J ZY U-1 I ED � J Q LU i 0- C) w Ln LU I\ t\ n Lu , -1 o a\o 0 00 00 00 ® Q ; v� t Zwmf L9 0 n Z O rn = t ¢ c �_ 1 Z Lu �w l- t , Z r I W 0') U C f Z I w s � r U z i :D T U w J ZY U-1 I ED � J Q LU i 0- C) w Ln LU I\ t\ n Lu , -1 o a\o 0 00 00 00 z L9 Z Cyd : 0') U 4 U) d- LU 0 I j 7 >2 0 - CN CDCN 0 a a � (0 a a� i / LU Q < o L LJ > � z z W � aLLJ ) Z 0 0-6a � Z w t� U)� j M L U -)V a z � 1,1„1 J E -1 - L U o 1^i - 0 O O _j -6- � a Q z rn 0 U _ � ` a U O iVi A IW � � O � 9 M W U In a> u) a. V �} >ti V) ox O � � Q x 1U a O o LL9 I-� C a D z I --- i E 0 0 / I'1 1J J" 0 a � c . a 3 �� Q E Z z m �_ Y w a Z W U iL z C� 0 LL, z F_ Lj w - U W f J0a 1 LIJ J C J O U O W 0 ryaT � 0 0 �E Q 0 .� T5 U O Ste, J Lj x O U O � C Lu J a o +0O U LLJ C�_ E r-1 re 111 w S U E a. U? -oa - 0 JOB NO. 112504 o � o m Q rn > SCALE a 1 It 301 C U a c a Q o SHEET NO. L OF2 0 0 � t