HomeMy WebLinkAboutWPO200600084 Bond Release 2017-06-10 ytat:) .. 1„) 6„4 ct,,, /ct,t,,i h tdpo. 26c, _ 00/0s-
Acv A Cash0)-NC( 11)
Avirlira ,211-)"'Ai
111.1107.
kilit. '/iVii---
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road,North Wing
Charlottesville,Virginia 22902-4596
Phone(434)296-5832 Fax(434)972-4126
EROSION CONTROL PERFORMANCE BOND RELEASE
PROJECT NAME: 8 irrx)m°0( //,\Q-e
PLAN/PERMIT NO. /.✓/ ZOO(' `z'o 34( / 2007 - 00/06'
DATE: /0 T� / 7
This project has been satisfactorily completed and the erosion control performance bond may be
released at this time if all erosion control inspection fees invoiced have been paid.
Erosion Control Inspector 6/0/0—
)' o / , /weiLea-‘) kt12-�
f
Community Development Department
All erosion control Inspection fees invoiced on the above project have been collected.
Director of Community Development/County Engineer
Date
Accounting Department
All erosion control inspection fees invoiced on the above project have been collected.
Chief Accountant
Date
Cc: Ana Kilmer
f/� /�L•DEPTCo m umy OswbnlenIomisVnspedloneEEROSION CONTROL PERFORMANCE BOND RELEASE REVISED 529 2012doe ii
VJ
R69()
3.
County of Albemarle
Department of Community Development
Memorandum
To: Ana Kilmer,Management Analyst
Greg Harper,Water Resources Manager
From: Mark Hopkins
Division: Inspections—E&S Control
Date: 10 June 2017
Subject: Conversion to Permanent Stormwater Management Facility
The requirements of the stormwater management and water quality component of the water protection
performance bond have been satisfactorily completed and this component of the bond may be released
at this time. The permanent stormwater management facility(ies) should now be included in the
Stormwater Inspection Program.
PROJECT NAME: Birchwood Place
TMP: 056000-A2-00-03000
SITE PLAN NUMBER: 2006-08400 1
FACILITY DESCRIPTION
Type(s)and number of BMPs 1 —biofilter
(incl.non-structural) #— [click to select type]
Description of Outfall Drain to existing stream channel
(Ex:24"RCP from 36"CMP riser)
Water Quality Yes
® ❑No
Design Storm ® l0yr ®2
Yr
Any Additional Information Trash racks were ordered and installed after
(incl.stream buffer mitigation) pictures were taken, bottom was reseeded and
starting to grow.
-- -- --- ----
A copy of the site plan and details of the BMPO) are attached)
I:\DEPT\Community Development\Fonns\Inspections\SWM Bond Release Form-conversion to permanent swm facility REVISED 3 8 2010.doe
STORMWATER MANAGEMENT PERFORMANCE BOND RELEASE
PROJECT NAME: 231t( '''' ! ,ce
/, cx�iog
PLAN/PERMIT NO. -a-C206- - e'7 / ?cc 7 1 "
DATE: /0 XI
•
This project has been satisfactorily completed and the stormwater management performance bond may
be released at this time if all erosion control inspection fees invoiced have been paid.
Erosion Control Inspector
Accounting Department
All erosion control inspection fees invoiced on the above project have been collected.
Chief Accountant
Date
Cc: Ana Kilmer
1:1DEPTICommunily Developmen lFormsUnspecllonslSTORMWATER PERFORMANCE BOND RELEASE REVISED 3 8 2010.doc