Loading...
HomeMy WebLinkAboutWPO200600084 Bond Release 2017-06-10 ytat:) .. 1„) 6„4 ct,,, /ct,t,,i h tdpo. 26c, _ 00/0s- Acv A Cash0)-NC( 11) Avirlira ,211-)"'Ai 111.1107. kilit. '/iVii--- COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 EROSION CONTROL PERFORMANCE BOND RELEASE PROJECT NAME: 8 irrx)m°0( //,\Q-e PLAN/PERMIT NO. /.✓/ ZOO(' `z'o 34( / 2007 - 00/06' DATE: /0 T� / 7 This project has been satisfactorily completed and the erosion control performance bond may be released at this time if all erosion control inspection fees invoiced have been paid. Erosion Control Inspector 6/0/0— )' o / , /weiLea-‘) kt12-� f Community Development Department All erosion control Inspection fees invoiced on the above project have been collected. Director of Community Development/County Engineer Date Accounting Department All erosion control inspection fees invoiced on the above project have been collected. Chief Accountant Date Cc: Ana Kilmer f/� /�L•DEPTCo m umy OswbnlenIomisVnspedloneEEROSION CONTROL PERFORMANCE BOND RELEASE REVISED 529 2012doe ii VJ R69() 3. County of Albemarle Department of Community Development Memorandum To: Ana Kilmer,Management Analyst Greg Harper,Water Resources Manager From: Mark Hopkins Division: Inspections—E&S Control Date: 10 June 2017 Subject: Conversion to Permanent Stormwater Management Facility The requirements of the stormwater management and water quality component of the water protection performance bond have been satisfactorily completed and this component of the bond may be released at this time. The permanent stormwater management facility(ies) should now be included in the Stormwater Inspection Program. PROJECT NAME: Birchwood Place TMP: 056000-A2-00-03000 SITE PLAN NUMBER: 2006-08400 1 FACILITY DESCRIPTION Type(s)and number of BMPs 1 —biofilter (incl.non-structural) #— [click to select type] Description of Outfall Drain to existing stream channel (Ex:24"RCP from 36"CMP riser) Water Quality Yes ® ❑No Design Storm ® l0yr ®2 Yr Any Additional Information Trash racks were ordered and installed after (incl.stream buffer mitigation) pictures were taken, bottom was reseeded and starting to grow. -- -- --- ---- A copy of the site plan and details of the BMPO) are attached) I:\DEPT\Community Development\Fonns\Inspections\SWM Bond Release Form-conversion to permanent swm facility REVISED 3 8 2010.doe STORMWATER MANAGEMENT PERFORMANCE BOND RELEASE PROJECT NAME: 231t( '''' ! ,ce /, cx�iog PLAN/PERMIT NO. -a-C206- - e'7 / ?cc 7 1 " DATE: /0 XI • This project has been satisfactorily completed and the stormwater management performance bond may be released at this time if all erosion control inspection fees invoiced have been paid. Erosion Control Inspector Accounting Department All erosion control inspection fees invoiced on the above project have been collected. Chief Accountant Date Cc: Ana Kilmer 1:1DEPTICommunily Developmen lFormsUnspecllonslSTORMWATER PERFORMANCE BOND RELEASE REVISED 3 8 2010.doc