Loading...
HomeMy WebLinkAboutWPO201600083 Approval - County 2017-05-08COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit Plan Review Project title: Better Living Berkmar Drive Project file number: WP0201600083 Plan preparer: Shimp Engineering Owner or rep.: B Properties LC Plan received date: 12 December 2016 (Rev. 1) 15 February 2017 (Rev. 2) 8 May 2017 Date of comments: 24 January 2017 (Rev. 1) 27 March 2017 (Rev. 2) 8 May 2017 Reviewers: Matt Wentland [Justin @ shimp-engineering.com] County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is approved. The rationale is given in the comments below. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESOP, (3) a SWMP, and (4) any TMDL measures necessary. 1. The SWPPP was not found with this submittal. (Rev. 1) Comment partially addressed. The Certification will need to be signed. (Rev. 2) Comment addressed. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. The PPP exhibit will need to be included in the SWPPP. (Rev. 1) Comment addressed. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is approved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. The 1.01 lbs/yr of nutrient credits will need to be purchased before the plans are approved. Please contact Ana Kilmer before purchasing the credits. (Rev. 1) Comment not addressed. (Rev. 2) Comment addressed. 2. Provide the soils reports/infiltration analysis for the soils in the area of the infiltration tank. The design infiltration rate may be no greater than 50% of the measured rate (BMP Spec. 8). Also include the distance from the bottom of the practice to the seasonal high water table and/or bedrock (2' minimum). (Rev. 1) Comment addressed. Engineering Review Comments Page 2 of 2 Provide a maintenance and inspection schedule for the underground practices. (Rev. 1) Comment addressed. D. Erosion and Sediment Control Plan (ESOP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESOP. This plan is approved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. The diversions on Phase 2 do not appear to function as shown (breaking grade, directed into a building, located on top of a retaining wall). (Rev. 1) Comment addressed. 2. Add more detail to the construction sequence regarding the infiltration tank, including how the underlying soils will avoid compaction. (Rev. 1) Comment addressed. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; ht!p://www.albemarle.or,-/deptforms.asp?department=cden,izwpo File: WP0201600083 Better Living Berkmar Rev2 05-08-17.doc