Loading...
HomeMy WebLinkAboutWPO200500034 Bond Release Stormwater Management Plan 2007-08-14 ,c��off ALpc. 8 C240-v, County of Albemarle Department of Community Development Memorandum To: Pam Shifflett, Management Analyst Greg Harper,Water Resources Manager From: Mike Frazier Division: Inspections—E&S Control Date: 8/14/07 Subject: Conversion To Permanent Stormwater Management Facility The construction of the project listed below has been satisfactorily completed. The stormwater management portion of the Water Protection Bond can be released and the permanent stormwater management facility(ies) should be included in the Stormwater Inspection Program. PROJECT NAME: Hardware River Farms TMP: 101-7B SITE PLAN NUMBER: WP02005-34 FACILITY DESCRIPTION Type(s) and number of BMPs 3 —biofilter (incl. non-structural) #— [click to select type] Description of Outfall 4" perforated PVC pipe with 1 cleanout on all (Ex: 24"RCP from 36"CMP riser) three. Water Quality ® Yes n No Design Storm ® 1 Oyr ® 2yr Any Additional Information (incl.stream buffer mitigation) A copy of the site plan and details of the BMP(s) are attached. File:I:\Dept\Engineer\Forms\Completed BMPs\00 conversion to permanent swm facility template.doc