HomeMy WebLinkAboutWPO200500034 Bond Release Stormwater Management Plan 2007-08-14 ,c��off ALpc.
8 C240-v,
County of Albemarle
Department of Community Development
Memorandum
To: Pam Shifflett, Management Analyst
Greg Harper,Water Resources Manager
From: Mike Frazier
Division: Inspections—E&S Control
Date: 8/14/07
Subject: Conversion To Permanent Stormwater Management Facility
The construction of the project listed below has been satisfactorily completed. The stormwater
management portion of the Water Protection Bond can be released and the permanent stormwater
management facility(ies) should be included in the Stormwater Inspection Program.
PROJECT NAME: Hardware River Farms
TMP: 101-7B
SITE PLAN NUMBER: WP02005-34
FACILITY DESCRIPTION
Type(s) and number of BMPs 3 —biofilter
(incl. non-structural) #— [click to select type]
Description of Outfall 4" perforated PVC pipe with 1 cleanout on all
(Ex: 24"RCP from 36"CMP riser) three.
Water Quality ® Yes n No
Design Storm ® 1 Oyr ® 2yr
Any Additional Information
(incl.stream buffer mitigation)
A copy of the site plan and details of the BMP(s) are attached.
File:I:\Dept\Engineer\Forms\Completed BMPs\00 conversion to permanent swm facility template.doc