Loading...
HomeMy WebLinkAboutSDP201700047 Action Letter 2017-10-20 (3)COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 October 20, 2017 Ryan Yauger, P.E. Bohler Engineering VA, LLC 28 Blackwell Park Lane Warrenton, VA 20175 rvaueera.bohlerene. corn RE: SDP201700047 Brookhill Section 1, Phase 4A — Initial Site Plan - Action Letter Mr. Yauger: The Agent for the Board of Supervisors hereby grants administrative approval to the above referenced initial site plan with a revision date of October 11, 2017. This approval shall be valid for a period of five (5) years from the date of this letter, provided that the developer submits a final site plan for all or a portion of the site within one (1) year after the date of this letter as provided in section 32.4.3.1 of Chapter 18 of the Code of the County of Albemarle, and thereafter diligently pursues approval of the final site plan. In accordance with Chapter 18 Section 32.4.2.8 Early or Mass Grading may be permitted after the following approvals are received: 1. Engineering approval of a VSMP plan meeting the requirements of Chapter 17 of the Code of the County of Albemarle. 2. Approval of all easements for facilities for stormwater management and drainage control. 3. Submittal of a tree conservation checklist with areas for tree preservation identified. The final site plan will not be considered to have been officially submitted until the following items are received: 1. A final site plan that satisfies all of the requirements of section 32.6 of Chapter 18 of the Code. 2. A fee of $1,613. Please submit 11 copies of the final plans to the Community Development Department. The assigned Lead Reviewer will then distribute the plans to all reviewing agencies (for ACSA, please submit 3 copies of construction plans directly to them, as stated in their comments). Once you receive the first set of comments on the final site plan, please work with each reviewer individually to satisfy their requirements. The Department of Community Development shall not accept submittal of the final plat for signature until tentative approvals for the attached conditions from the following agencies/reviewers have been obtained: SRC Members: Albemarle County Planning Services (Planner) — 3 copies (Cameron Langille, blan ig'lle(&albemarle.org) Albemarle County Engineering Services (Engineer) — 1 copy (Emily Cox, ecox(calbemarle.org) Albemarle County Information Services (E911) — 1 copy (Elise Kiewra, ekiewra&albemarle.org) Albemarle County Building Inspections — 1 copy (Michael Dellinger, mdellingergalbemarle.org) Albemarle County Planning Service (Architectural Review Board) — 1 copy (Heather McMahon, hmcmahonkalbemarle.org) Albemarle County Fire & Rescue — 1 copy (Shawn Maddox, smaddoxkalbemarle.org) Albemarle County Service Authority — 1 copy (Alex Morrison, amorrisongserviceauthority.org) Rivanna Water and Sewer Authority — 1 copy (Victoria Fort, vfort(&,rivanna.org) Virginia Department of Transportation — 1 copy (Adam Moore, adam.moore(&vdot.virginia.gov) If you have any questions about these conditions or the submittal requirements please contact me at extension (434) 296- 5832 ext. 3432 or blan ig lle(a)albemarle.ora. (Sincerely, iI tt Cameron Langille Senior Planner CC: Alan Taylor Riverbend Development 321 E. Main Street Charlottesville, VA 22902 alan(a)riverb enddev. com LIRGityl�' County of Albemarle Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Memorandum To: Ryan Yauger, P.E. (ryauger(a)bohlereng com) From: Cameron Langille, Senior Planner Division: Planning Date: October 4, 2017 Revised: October 20, 2017 Subject: SDP201700047 Brookhill Section 1, Phase 4A — Initial Site Plan The Planner/Engineer for the Current Development Division of the Albemarle County Department Community Development will recommend approval of the plan referred to above when the following items have been satisfactorily addressed. The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review. [Each comment is preceded by the applicable reference to the Albemarle County Code.] 132.4.2.1 (f)] The notification fee of $215 has not been paid. The fee must be paid prior to Friday, October 20' in order for the initial site plan to be approved. Rev.1 : Comment addressed. 2. 132.5.2 (a)] The "Height of All Structures" section of the Zoning and Site Tabulations table on Sheet C-102 is incorrect. Table 2.3.2.2 from page 17 of the Brookhill Code of Development that states that there is a maximum building height of 4 stories/60' by right or 5 stories/70' with a special exception for Block 4. Rev. 1: Comment addressed. a. Please state the proposed height and number of stories for each building proposed in Phase 4A. As stated on page 17 of the Code of Development, buildings exceeding three (3) stories shall require a 26' wide, exclusive of shoulders, aerial fire apparatus access road that is no more than 30' from the building to meet Fire and Rescue Regulations. If any of the buildings exceed three stories, the aerial fire access road may be required and the site layout may be required to change. Rev. 1: Comment addressed. [ZMA201500007] On all applicable drawings, please show the boundary lines of the Route 29 buffer, as described in Section 2.4.2 of the Code of Development. The overall 100' buffer line should be shown, in addition to the 70' undisturbed buffer line and the 30' planted/reforested buffer. Rev. 1: Comment addressed. a. All buffers must be measured from the proposed property lines or edges of the public right of way. The initial site plan must verify that no proposed improvements in Phase 4A extend beyond the minimum 100' buffer. Please make all buffer lines visible across the drawings. Rev. 1: Comment addressed. 4. [General Comment] The site plan titles mentions that this is for Phases 4A and 8A. However, it appears that all improvements associated with the future Phase 8A are shown for reference only and will be reviewed under a separate site plan application. Rev. 1: Comment addressed. a. 132.5.2 (a)] Please remove Phase 8A from the title on the Cover Sheet, and the sheet title panels on all other drawings. Rev. 1: Comment addressed. b. 132.5.2 (a)] Please remove all labels, parking, building footprints, and other improvements associated with the future development in Phase 8A that will not be constructed as part of this site plan. These features are currently visible on Sheets C-300, C-301, C-302, C-400, C-401, C-402, C-500, C-501, C-502, C-700, C-701, and C-702. Rev. 1: Comment addressed. c. [32.5.2 (a)] Please remove all information associated with future parking and buildings in Block 8A from the Zoning and Site Tabulations table on Sheet C-102. Rev. 1: Comment addressed. 5. [32.5.2 (a)] Please show and label all proposed parcel boundaries with dimensions associated with the development of Phase 4A. Include a note stating the intended timing for subdividing the Phase 4A parcel. 6. [32.5.2 (a)] Is the access drive that comes off of Road B that will serve Phase 4A and Phase 8A a proposed public street, private street, or travel way? Please label this improvement across all applicable drawings. 7. [32.5.2 (i)] The road plans for Roads A and B have not yet been approved by the County, but this is required prior to approval of the final site plan. Please be aware that the final site plan will need to accurately depict all improvements within the right-of-way of Roads A and B. Please refer to the attached VDOT comment letter for additional information. a. Please shade out all road improvements that are subject to review and approval with the road plan application. Add labels to all applicable drawings stating that Roads A and B are proposed/under review and are shown for clarity purposes only on the initial site plan for Phase 4A. The roads are currently under review as part of road plan SUB201700117. b. State "proposed public right-of-way" in the labels for Roads A and B. c. All construction details, road profiles, etc. related to the design/construction of Road A and B improvements within the proposed public right-of-way will be approved through SUB201700117. These details do not need to be included with the initial site plan. d. Please remove the Street Construction Notes on Sheet C-102. The streets comprising the internal road network of Brookhill that will provide frontage for the Phase 4A parcel are currently under review as a road plan application, SUB201700117 and all design and construction associated with the roads will take place prior to final site plan approval. [32.5.2 (a)] The proffers shown on Sheets C-103 and C-104 are not the approved proffers associated with the Brookhill rezoning. Please replace the proffer statement and exhibits on the site plan with the signed and approved proffers, dated October 21, 2016. a. On Sheet C-100, please add the ZMA application number under the "Code of Development" section. The approved application number is ZMA201500007. b. On Sheet C-100, the revision date shown for the Code of Development is incorrect. The approved Code of Development had a final revision date of October 13, 2016. Please amend the label. c. Please add a line with the Albemarle County Board of Supervisors approval date for the Code of Development, November 9, 2016. d. On Sheet C-105, please amend the date within the label for the Brookhill Phasing Plan. It currently states June 2016. The phasing plan was approved as page 7 of the Code of Development, which had a final revision date of October 13, 2016 and an approval date of November 9, 2016. 9. [32.5.2 (a)] Please provide a proffer narrative that states which proffers (if any) will be addressed through this site plan. a. Please clarify whether any affordable units will be provided as part of this site plan. The applicable proffer is #4B, related to affordable housing required for for -rent affordable housing units. 10. [32.5.2 (a)] On Sheet C-100, please state the Special Use Permit application number that was approved to allow grading activities in the Flood Hazard Overlay District. The approved application number is SP201500025 and the County approval date was November 9, 2016. a. Add the signed resolution and approved conditions of SP201500025 to Sheets C-103 and C-104. 11. 132.5.2(a)] Please state the owner names and address for each existing parcel within Brookhill on Sheet C-100. Not all parcels are currently owned by Riverbend Development. 12. 132.5.2(a)] Please amend the "Zoning and Overlay Districts" in the Zoning and Site Tabulations table on Sheet C-102. It should state Neighborhood Model Development District as the primary zoning district. The Phase 4A site lies within the following overlay districts: EC - Entrance Corridor Overlay, AIA — Airport Impact Overlay, the Managed Steep Slopes Overlay District, and the FH — Flood Hazard Overlay. 13. [32.5.2 (a)] Please amend the "Associated Plans" section in the Zoning and Site Tabulations table on Sheet C-102. It should be titled "Proffers and Code of Development" and should state the November 9, 2016 approval date by the County next to the Brookhill Code of Development. 14. 132.5.2 (a)] Please add a line to the Zoning and Site Tabulations table on Sheet C-102 titled "Block Classification" with "Urban Density Residential' as the block type for Phase 4A, as stipulated by the Brookhill Code of Development. 15. 132.5.2 (a)] Please amend the Building Yard Setbacks section in the Zoning and Site Tabulations table on Sheet C-102. Please insert Table 2.3.2.2 from page 17 of the Brookhill Code of Development that states the correct minimum and maximum setbacks for Block 4. 16. [32.5.2 (a)] Please remove the "Off Street Parking/Loading Space Yard Setbacks" section from the Zoning and Site Tabulations table on Sheet C-102. Please add the minimum setbacks and notes for parking as an accessory use from the Relegated Parking Guidelines table from Section 2.9, page 27 of the Code of Development. 4 17. [32.5.2 (b)] Please amend the "Proposed Use" section in the Zoning and Site Tabulations table on Sheet C-102. The proposed use should be "multi -family dwellings" and should state the number of bedrooms proposed (i.e. 100 1 -bedroom units and 100 2 - bedroom units). 18. [32.5.2(b)] Please state the square footage and acreage occupied by each use in Phase 4A on Sheet C-102. This includes residential uses (including square feet of individual buildings), ancillary uses (including recreational areas), non-residential uses, parking and vehicle circulation areas, percentage of open space, etc. a. Please be aware that recreation areas are classified as ancillary uses to residential uses, per Section 2.2.2 (page 10) of the Code of Development. Per Table 5 Density Regulations (Page 15), ancillary uses do not count against the maximum non- residential square footage permitted in each block. b. Please state what types of recreation facilities are being provided within the amenity area (i.e. pool, tot lot, basketball court, etc.) 19. [32.5.2 (b)] Please add Table 5 Density Regulations (page 15) of the Code of Development on Sheet C-102. a. Please add another table that states the proposed gross residential density, number of proposed residential units, and square footage of proposed non-residential buildings being provided in Phase 4A. The second table should have another column that states the number of permitted residential units and square footage of non-residential uses remaining in the rest of Phase 4. 20. [32.5.2 (b)] No loading spaces are shown, will any be provided? Any loading spaces must meet the design standards specified in Section 18-4.12.13 of the Zoning Ordinance. 21. [32.5.1 (c)] Please show the boundaries and dimensions of all Managed and Preserved Steep Slopes and wetlands areas on the existing conditions and grading drawings. 22. [32.5.2 (f)] Please state whether the property lies within a water supply watershed on Sheet C-102. 23. [32.7.7 & ZMA2015000071 Please refer to the attached PDF titled Brookhill Zoning Map Amendment ZMA2015-007 — Request for Substitution of Required Recreational Amenities, dated 9/21/2015 and prepared by Collins Engineering. a. This request was approved to allow the proposed substitutions to the minimum civic space and recreation requirements listed in Section 2.4.3 of the Code of Development. The Proposed Amenities listed under each civic area in the attached request will satisfy the minimum recreational requirements for the first 650 multifamily dwelling units and single family attached units. Once the buildout within Brookhill exceeds 650 total multifamily and single family attached units, 200 square feet of recreation space will be required per unit exceeding 650. As such, the apartments in Phase 4A do not need to contain recreation areas. b. Staff requests that a table be provided on each site plan and subdivision plat that lists the number of multi -family and single family attached dwellings approved in each phase. This will allow staff to track whether additional recreation areas are required if the amount of multi -family residential and attached single family dwellings exceeds 650 units in the overall development. 24. 132.5.2 (a)] Please amend the Block Area Summary table on Sheet C-105 so that it includes the proposed acreage of Phase 4C. 25. [32.5.2 (e)] Please provide more details about the existing landscape features as described in Section 18-32.7.9.4(c). Specify the areas of existing vegetation that will be removed through grading associated with the WPO plan. This includes any areas within the 70' undisturbed buffer portion. a. [ZMA201500007] In accordance with Code of Development Section 3.2.3, please provide the locations, species, and sizes of existing trees with dimeter at breast heights greater than 18 inches within the buffer area along Route 29. b. Staff has been informed that the existing treeline does not occupy the entire 70' portion. As discussed via email with Ryan Yauger on July 28, 2017, the applicants were to provide an arborist report or drawings that show the species, density, and locations of existing vegetation in the 70' portion. The applicants stated that they may need to perform some grading in the 70' portion, and staff stated that disturbances to the 70' buffer may be permitted if additional landscaping needs to be installed. However, this will require approval from the Director of Community Development, as specified in Section 2.4.2 (page 19) of the Code of Development. 26. [32.5.2 (a)] The building setback lines shown and labeled on the plans are incorrect, per Table 2.3.2.2 of the Code of Development. Please amend the minimum and maximum setback line locations across all applicable drawings. Label each setback line as a front, side, corner side, or rear setback and state the dimensions in the label. Setback lines should be measured from the proposed right- of-way. 27. [ZMA201500007] The seventy-two (72) parking spaces proposed on the southern end of Phase 4A are not relegated and screened from the proposed Road B in accordance with Section 2.9 (page 26) of the Code of Development. Also, the plan does not specify whether the travel way just south of those parking spaces is a proposed public street (refer to comment #2 above). If it is, these spaces may need to be relocated behind the two multi -family buildings in order to meet the relegation standards. Please provide additional information on the proposed screening measures and parcel boundaries. 28. [32.5.2 (n)] The site plan does not show any/label any sidewalks inside of the development. All sidewalk and pedestrian access improvements must be shown, labeled, and dimensioned. This includes handicap ramps leading from all proposed sidewalks within and adjacent to the parking area. 29. [32.5.2 (n)] On the site plan drawings, please label and call out the locations of the primary and secondary building entrances to each apartment building in accordance with the Urban Density Residential block regulations Section 2.2.2 (page 10) of the Code of Development. 30. [32.5.2 (n)] Are any dumpsters of trash compactors proposed on site? If so, please show the locations of these improvements on the drawings with dimensions. The dumpster pad area will need to comply with the minimum design standards set forth in Section 4.12.19 of the Zoning Ordinance. 31. [32.5.2 (k)] Please show the location of all proposed sewer and drainage easements. Label as "proposed" with a size/width measurement. 32. [32.5.2 (1)] Please show the location of all proposed utility easements. Label as "proposed" with a size/width measurement. 33. [32.5.2 (n)] Please state the proposed surface materials for all parking lots, travel ways, walkways, etc. in a label on the site plan drawings. 34. [32.7.9] All landscaping such as streets trees proposed along Roads A and B, and within the buffer along Polo Grounds Road will be reviewed and approved with the road plan application, SUB201700117. These items should not be included in the Landscape Schedules on Sheets C-700 through C-704. a. Please include a label stating which landscaping items are proposed with the Phase 4A site plans, and which are part of the road plan application. 35. [32.7.9] Please move the Landscaping notes in the Zoning and Site Tabulations table on Sheet C-102 to the Landscape drawings. Refer to the following comments 436 and #37 below for changes to the current calculations shown. 36. [32.7.9.6] Please provide a calculation for the amount of landscaping required and proposed within the site in order to comply with the minimum 5% for landscaping required within a parking area. a. 132.7.9.6 (a)] Please provide a calculation for the minimum number of trees required within the parking area based on the number of proposed parking spaces. As a reminder, one (1) large or medium shade tree is required per ten (10) parking spaces or portion thereof. 37. [32.7.9.8 (a)] Please provide a calculation for the minimum tree canopy required and proposed in Phase 4A based on the proposed density of residential uses. It appears that the proposed density of Phase 4A is 18.5 du/acre, which means that the minimum tree canopy is 15%, not 10% as currently stated on Sheet C-102. 38. [General Comment] Please be aware that the TMP numbers and parcel acreages may change between the initial and final site plans. The developers have stated that they will subdivide a large parcel for Phase 4A in the near future. Staff may request that the tax map numbers, parcel acreages, and ownership information be updated on the final site plan to reflect any recorded plats that may be approved prior to final site plan approval. 39. 132.5.2 (n)] Please state the height of all proposed fences in the labels used on the drawings. Profile view details of all proposed fences and constructed screening measures will be required with the final site plan. Each will need to show the types of materials used and dimensions. 40. [32.5.2 (p)] Please add Figure 4 from Section 2.4.2 (page 19) of the Code of Development to the Landscape plans. 41. [32.7.9.5 (e)] Please provide additional shrubs that will screen the seventy-two parking spaces visible from Road A on the south side of Phase 4A. The shrubs should be planted between the proposed parking and the public street. 6 42. [32.7.9.7 (a)(2)] The seventy-two parking spaces on the south side of Phase 4A need to be screened from the future phase 8A. Please show landscaping and/or fencing along the grass strip on the north side of the travel way that is proposed at the south end of Phase 4A. a. Any proposed vegetation must comply with the minimum sizes set forth in Section 18-32.7.9.7 (c). Fencing used for screening must comply with Section 18-32.7.9.7 (e). b. Please be aware that if only vegetation will be used for screening, the strip of land separating the parking area from the travel way between Phase 4A and Phase 8A does not appear to be large enough (twenty feet wide) to accommodate the minimum depth and spacing requirements for a double staggered row of landscaping as set forth in Section 32.7.9.7 (d). Please provide additional information on how the parking will be screened in compliance with the Code. 43. [32.7.9.9] Please add a note to the Landscape plans stating "All landscaping shall be installed by the first planting season following the issuance of the first certificate of occupancy within the development." 44. [32.7.9.9] Please add a note to the Landscape plans stating "All landscaping and screening shall be maintained in a healthy condition by the current owner or a property owners' association, and replaced when necessary. Replacement material shall comply with the approved landscape plan." 45. [32.7.9] Please revise the Landscape drawings, Sheets C-700 through C-704 so that each drawing has a Landscape Schedule that specifies the species, quantity, and spacing of landscaping proposed only on that drawing. a. Please revise all Landscape Schedules so that the Botanical Name and Common Name of each species is included, the proposed caliper and height at time of installation. b. Please add a column to the Landscape Schedules stating the spacing requirements for street trees, in accordance with Section 2.8.1 and 3.2.1 of the Code of Development, and Section 32.7.9.5 the Zoning Ordinance. As a reminder, one large shade tree is required every 50' of road frontage per the Zoning Ordinance. 46. [32.6.2 (h)] Please provide a signature panel with a line for each member of the Site Review Committee. 47. 132.7.8 and 4.171 The final site plan will need to include a lighting plan showing all proposed outdoor lighting locations, luminaire types, heights, footcandle measurements inside of the property and along all proposed property lines, and include manufacturer specifications demonstrating compliance with full -cutoff standards in accordance with Section 4.17 of the Zoning Ordinance. Comments From Other Reviewers: Albemarle County Engineering Services (Engineer) — Emily Cox, ecox(&albemarle.org — Requested Changes, see attached. Albemarle County Information Services (E911) — Elise Kiewra, ekiewra@albemarle.org — Requested Changes, see attached. Albemarle County Building Inspections — Michael Dellinger, mdellingergalbemarle.org — No Objection. Albemarle County Planning Services (Architectural Review Board) — Heather McMahon, hmcmahon(a)albemarle.org — Requested Changes, see attached. Albemarle County Department of Fire Rescue — Shawn Maddox, smaddox(a)albemarle.org — Requested Changes: 1. Hydrant spacing appears to exceed 500 feet on average. See comment number 2 for further. 2. Fire Department Connections for the buildings must be shown on the plan to ensure afire hydrant is within 50 feet of the connection. By showing the FDC's and having each served by a hydrant the excessive spacing concerns in item one should be resolved. 3. 18 feet travel lanes are approved if the buildings are fully sprinklered. Should any of these buildings be approved without sprinklers the travel lane width must be increased to 20 feet. Albemarle County Service Authority — Alex Morrison, amorrison(a)serviceauthority.org — Requested Changes, see attached. Rivanna Water and Sewer Authority — Victoria Fort, vfort -,rivanna.org, 434-977-2970, ext. 205 — Requested Changes, see attached. Virginia Department of Transportation — Adam Moore, Adam.Moore(a)vdot.vir i�gov — Requested Changes, see attached. Thomas Jefferson Health District — Alan Mazurowski, alan.mazurowski(a)vdh.vir ig nia. og_v — Approved, see attached. 4M COLLINS ENGINEERING September 21, 2015 Megan Yaniglos County of Albemarle - Department of Community Development 401 McIntire Road Charlottesville, VA 22902 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 434.293.3719 PH 434.293.2813 FX www.coirins-engineering.com RE. Brookhill Zoning Map AmendmentZMA2015-007 - Request for Substitution of Required Recreational Amenities Dear Megan Yaniglos: Please consider this request to allow substitution of the recreation facilities specified in section 18- 4.16 of the Zoning Ordinance. Per the Code of Development, the Brookhill density range is between 800 and 1550 residential units within the property. The current proposed park amenity area within the code is a total of 3.2 acres between the proposed (3) civic spaces. The current amenity space is based on the design that on average, there would be approximately 650 single family detached units and 650 single family attached or multi -family units. The overall build -out will probably be less, but the proposed amenity areas will not be decreased. However, if the proposed multi -family density is increased, then the proposed amenity areas will also be increased to ensure that 200 SF of usable park or recreational area is provided for each proposed single family attached or multi -family unit. In addition, we are seeking a modification to the ordinance as the exact type of recreational amenities required for the development. Below is a summary (based on the 650 SFA or multi -family units) of the required amenities and a list of the proposed substitutions for the amenities within Brookhill that the developer is seeking to construct. Required Amenities The following summarizes the required amenities per the ordinance: Required Recreation area: 200 s.f. x 650 units = 130,000 s.f. or 3.0 ac 3.0 acres required Twenty (20) tot lots required, each to include: • 1 swing with 4 seats • 1 slide • 2 climbers • 1 buckabout or whirl • 2 benches (4) Basketball Courts: 1/2 court/100 units x 650 units = 4 full or 7 half courts required Proposed Amenities: (3) Civic Spaces Civic Space 1: Linear Park • plaza/meeting square • pool and community center building • grass area for gatherings and active outdoor play • tot lot playground area (meeting the minimum tot lot requirements) • minimum size of this civic area shall be 60,000 SF Civic Space 2: Upland Park • plaza/meeting area • tot lot playground area (meeting the minimum tot lot requirements) • area for outside active recreation • either a tennis court or basketball court • minimum size of this civic area shall be 60,000 SF Civic Space 3: Eastern Pocket Park • meeting plaza • tot lot playground area (meeting the minimum tot lot requirements) • minimum size of this civic area shall be 17,500 SF TOTAL AREA PROVIDED: 137,500 sq. ft. or 3.2 acres Please consider this combination of recreational amenities within the (3) civic areas a valid substitution for the required recreational amenities. These proposed amenities will provide recreational opportunities to all members of this development throughout the year. In addition, Brookhill is proposing over 2 miles of primitive trails within the Greenway area, and 35% of the Brookhill property will be reserved and platted as open space for the development. This open space will be a public amenity to everyone within the development and will provide additional active and passive recreational options to the Brookhill neighborhood, in addition to the proposed (3) civic areas. Thank you for your consideration of this request. Sincerely, Scott Collins, P.E. County of Albemarle Department of Community Development Memorandum To: Cameron Langille From: Emily Cox Date: 02 Oct 2017 Subject: Brookhill — Sec. 1 Ph. 4A & 8A - ISP (SDP201700047) The initial site plan for Brookhill — Sec. 1 Ph. 4A & 8A has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. WPO Plan must be approved before final site plan can be approved. 2. Road Plan must be approved before final site plan can be approved. Road plan must include all roads encompassed by this site plan. There appears to be a road between sections 4A & 8A as well as through 8A. 3. VDOT approval is necessary before final site plan can be approved. 4. Ensure the correct proffers are shown on the plan and that all elements of the plan comply with the Code of Development as approved with ZMA 2015-007. 5. Ensure all critical slopes, buffers, etc. are shown as approved on ZMA 2015-007. 6. Show sidewalks/walkways and entrances to the buildings. 7. Ensure there are handicap accessible entrances to all walkways and buildings. 8. The title of this plan is for Sections 4A & 8A, but the only proposed improvements appear to be in 4A. Please explain or change the title. 9. The limits of disturbance are much greater than Sections 4A & 8A. Please ensure the limits of disturbance only include work for the proposed improvements of this site plan. 10. Sheet C-200 is titled demolition plan, but does not show any demolition. 11. There doesn't appear to be any loading zones or dumpster pads. 12. Provide more spots for grading in the parking areas. 11 County of Albemarle Department of Community Development`_ 401 McIntire Road, North Wing Charlottesville, Virginia 22902 PLAN REVIEW COMMENTS - E911 APPLICATION#: SDP201700047 TMP: 04600-00-00-01800, 04600-00-00-01900 04600-00-00-018AO DATE: 9/12/2017 FROM: Elise Kiewra ekiewra@albemarle.orq Geographic Data Services (GDS) www.albemarle.org/qds (434) 296-5832 ext. 3030 This site will require a two (2) new private road names for Roads "A" and "B". Per Sec. 7-200-B of the County's Road Naming and Property Numbering Ordinance (Page 2 of PDF). "It is intended by this article that all roads within the county which serve or are designed to serve three (3) or more dwelling units or business structures shall be named." We recommend providing three (3) candidate names for each road to our office for review, in case your first choices are not acceptable. A PDF version of the Ordinance and Manual can be found here: httDs://www.albemarle.ora/UD[oad/imaaes/Forms Center/Departments/GeoaraDhic Data Service s/Forms/Road Namina and ProDerty Numberina Ordinance and Manual.Ddf Please consult the County's Road Name Index to check your road names prior to submittal. The Index can be found here: http://www.albemarle.org/albemarle/upload/images/webapps/roads/ Parcel and mapping information can be found here: http://gisweb.albemarle.org/ If you should have any questions, please do not hesitate to contact our office. Review Comments for SDP201700047 Initial Site Plan Project Name: Brookhill-Sec_ 1 _ Ph_ 4A & 8A - Initial Date Completed: Tuesday, October 03. 2017 Department1Divisiom'Agency: Review Status: Reviewer: Heather McMahon The ARB took this action at its meeting on 10-2-17: CDD ARB Requested Changes • Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c (2). (3) and (5) and recommended conditions of initial plan approval - 1_ ACertificate of Appropriateness is required prior to final site plan approval_ Regarding recommendations on the plan as it relates to the guidelines. None. • Regarding conditions to be satisfied prior to issuance of a grading permit: 1_ Clarify plan to show that no retaining wall is proposed at the historic resource in Block 19 in this first phase of development • Regarding the final site plan submittal: 1. Architecture and landscaping will be reviewed with a future submittal. A Certificate of Appropriateness is required prior to final site plan approval_ 2_ Submit material and color samples. dimensioned elevations. and floor plans of the apartment buildings for review_ 3_ Consider submitting site sections clarifying the level of visibility from the EC_ 4. Extend the buffer southward at least to align with the limits of disturbance_ Adjust the 100 -foot landscape buffer to show continuous planting throughout the 100 -foot depth integrated with existing wooded area as exhibited in the Code of Development 5. Mary the plant species in order to achieve a greater continuity with the natural environment along the EC 6_ Eliminate blankness in the planar elevations by incorporating architectural detailing and relief_ 7. Add the standard window glass note to the drawings: Window glass in the Entrance Corridors should meet the following criteria- Visible light transmittance (VLT) shall not drop below 40%. Visible light reflectance (VLR) shall not exceed 30%_ 8_ Revise the plans to show all loading and service areas. storage areas_ mechanical equipment (ground- and roof - mounted), above -ground utilities. and any proposed fencing. Show how visibility of all equipment will be eliminated. 9_ Add the standard mechanical equipment note to the site plans and architectural drawings: Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 10_ Provide a lighting plan which includes all proposed free-standing and wall -mounted lights and their photometric output. manufacturers' specifications, and cut sheets with the final site plan_ 11. Reduce the on center distances between trees lining the entrance road to 40' o.c. 12_ Add canopy trees to the 19 -30 -foot wide medians within the entrance road. 13. Provide ornamental trees and shrubbery on the north side of the entrance road to match what is proposed on the south side of the entrance road 14_ Increase the interior parking lot tree count to 37 trees 15. Coordinate the perimeter parking lot planting (trees and shrubs) with the buffer planting for a coordinated appearance 16. Increase minimum planting height of proposed shrubs on the north entrance to the parking area and along the entrance drive to 24 inches_ 17. Additional landscaping may be needed to soften the appearance of exterior walls. 18. Revise plant schedule to be comprehensive. 19. Revise the site plans to show adequate tree protection fencing and to show protection of adjacent cultural resources marked for preservation if the proposed 17 -foot tall retaining wall will be constructed in this phase 20_ Provide an additional site section from Polo Grounds Road looking north.+northeast to clarify the visibility of the apartment buildings. Page: 1 Corintr of Albemarle Printed On: I 10104,2017 Cameron Langille From: Alexander Morrison <amorrison@serviceauthority.org> Sent: Tuesday, September 26, 2017 8:16 AM To: Cameron Langille Subject: SDP201700047: Brookhill Section 1 Blocks 4A & 8A - Initial Cameron, I have reviewed the above referenced project and hereby recommend approval with the following conditions: • Water and sewer construction plan review by the ACSA will be required at the final site plan stage. Submit 3 copies of the plan along with water and data sheets to the ACSA, Attn: Alexander J. Morrison, PE, to begin the review. • RWSA Capacity Certification will be required at the final site plan stage. The ACSA will submit the request to RWSA once the water/sewer construction plan review begins. • A master water plan is required for review and approval prior to any final site plan approvals. • A sewer extension plan is required for review and approval before any final site plan approvals (unless they decide to include it under this plan). I have also requested a meeting with the engineer to review the plan requirements and approval sequencing. This meeting is separate from the Friday morning meeting that you have setup. Let me know if you have any questions. Alexander J. Morrison, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (0) 434-977-4511 Ext. 116 (C) 434-981-5577 (F) 434-979-0698 Cameron Langille From: Victoria Fort <vfort@rivanna.org> Sent: Tuesday, October 03, 2017 12:50 PM To: Cameron Langille Cc: Alex Morrison; 'dhines@bohlereng.com' Subject: SDP201700047 - Brookhill Section 1, Phases 4A & 8A Attachments: RWSA General Notes.doc Cameron, RWSA has reviewed the preliminary site plan for Brookhill — Section 1, Phases 4A & 8A as prepared by Bohler Engineering and dated 7/31/2017 and has the following comments for the applicant: Sheets C-101, 102: 1. Include the RWSA General Water and Sanitary Sewer Notes in this section of the plans (attached). Sheets C-500, 501, 504: 2. A portion of the existing RWSA 12" water line in Seminole Trail has been relocated (and upgraded to 24") since the rezoning and need to be updated in the utility plan. RWSA can provide as -built plans to the applicant upon request. 3. Label the existing RWSA water mains with size, material, and ownership (e.g. '24" RWSA DI WM'). 4. The relocated RWSA 24" water main includes a 12" stub -out (at the middle entrance, see sheet C501) intended to serve as a connection point for the Brookhill Development. This stub -out should be shown and called out in the utility plans. There is also a new ACSA fire hydrant at this location that should be shown. 5. The final site plan will need to include the following RWSA water connection notes: "Contractor shall coordinate with RWSA and ACSA during construction of the connections to the existing RWSA 24" and 12" waterlines. Contractor shall use due diligence to protect the RWSA waterlines during construction and tapping. Contractor shall verify the horizontal and vertical location, the outside diameter and the pipe material of the RWSA waterlines prior to ordering the tapping sleeve (for the 12"x12" tap). RWSA shall be contacted 3 business days in advance of the test pit and shall be present during the test pit. The tapping sleeve shall be approved by RWSA prior to being ordered. The tapping contractor shall be approved by RWSA prior to the tap. A minimum of 3 business days' notice shall be given prior to installation of the tapping sleeve. The 12"x12" tapping sleeve and valve shall be installed plumb. Following the placement of the 12"x12" tapping sleeve, a concrete pad and thrust block shall be placed under and behind the tapping sleeve and allowed to cure prior to making the tap." Also as a general note, RWSA will require a sewer flow capacity certification prior to final site plan approval. Let me know if you have any questions. Thanks, Victoria Victoria Fort, P.E. Rivanna Water and Sewer Authority 695 Moores Creek Lane Charlottesville, VA 22902 (P): (434) 977-2970 ext. 205 (F): (434) 295-1146 Rivanna Water & Sewer Authority (RWSA) General Water & Sanitary Sewer Notes Last Revised: April 2016 1. All materials and methods of construction shall comply with the latest version of the General Water and Sewer Design and Construction Standards — Version 1.0, adopted in December 2015, except as modified below or modified in special notes. 2. RWSA shall approve all construction materials and methods of construction. A preconstruction conference shall be held with RWSA prior to the start of any work. 3. The contractor shall be responsible for notifying Miss Utility (1-800-552-7001). 4. RWSA Engineer (Victoria Fort at (434) 977-2970 ext. 205) shall be notified three business days prior to the start of construction. 5. All work is subject to inspection by RWSA staff. No tie-ins to the existing system shall be made without coordination with and the presence of RWSA staff. No work shall be conducted on RWSA facilities on weekends or holidays without special written permission from RWSA. 6. For sanitary sewer line construction: RWSA may require bypass pumping for tie-ins to the existing system. All doghouse manholes must be pressure -tested before a connection is made to the system. 7. The location of existing utilities as shown on the plans is from data available at the time of design and is not necessarily complete or accurate. The Contractor shall be responsible for the verification of the location, size and depth of all existing utilities, both surface and subsurface. The Contractor shall immediately notify the Engineer of any discrepancies between the plans and field conditions. The Contractor shall use due diligence to protect all utilities and structures from damage at all times, whether shown on the plans or not. Damage to any existing utilities shall be repaired by the Contractor to the original condition at no additional cost to the Owner. 8. Erosion and sediment control facilities shall not be permitted in the RWSA easement without special written permission from RWSA. No grading shall be permitted in the RWSA easement unless permitted otherwise by RWSA in writing. 9. No blasting shall be permitted within 100 feet of RWSA facilities without written permission and RWSA approval of the blasting plan. Ground monitoring during blasting and a pre -blast survey may be required. For blasting within 100 feet of any operative RWSA sewerlines, bypass pumping and/or pre- and post -CCTV may be required. RWSA may also require certification from a licensed professional engineer stating that the proposed blasting will not damage any RWSA facilities. Damage to any utilities due to blasting shall be repaired by the Contractor to the original condition at no additional cost to the Owner. 10. The contractor shall observe minimum separation requirements for utility crossings. When a crossing is made under an existing facility, adequate structural support shall be provided for the existing pipe. The area of the crossing shall be backfilled with compacted 57 stone to the springline of the existing pipe. 11. New water main installations shall be pressure tested, chlorinated, flushed and have water samples approved prior to making any permanent connection to the public water system. Approved methods of filling and flushing new water mains will be required to prevent any contamination of the public water system. 12. All easements for new RWSA facilities shall be recorded prior to placing the new facilities into service. 13. No permanent structural facilities will be permitted in the RWSA easement. This includes building overhangs, retaining walls, footers for any structure, drainage structures, etc. 14. Trees are not permitted in the RWSA easement. Charles A. Kilpatrick, P.E. Commissioner COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper. Virginia 22701 September 26, 2017 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Cameron Langille Re: Brookhill Section 1 Blocks 4A & 8A — Initial Site Plan SDP -2017-00047 Review #1 Dear Mr. Langille: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Bohler Engineering, dated 31 July 2017. This plan contains much of the same information concerning roadway design as SUB - 2017 -00117; therefore the below comments from our 25 September 2017 review letter for that plan are applicable to this plan. Note that drainage comments may be addressed on the SUB plan, 1. All "connector" roads shown on the rezoning plan should be designed as Collector roads. Entrance spacing may need to be revised. 2. Provide total buildout ADT for all roads. 3. VDOT Standard endwalls must be called out on plans and profiles and the Standard detail(s) provided. 4. Provide post development hydrologic calculations, including total buildout drainage areas. 5. The profile for structure B02 -out needs an end section. 6. Where DI -3s are greater than 8 feet deep, DI-3AA, -3BB, or -3CC should be specified as applicable and those details should be provided. 7. For culverts: Hw/D should not exceed I.5 and at least 18" of freeboard is required. Please revisit culverts on Route 643. 8. Details and Standards from the latest revision of the Virginia Work Area Protection Manual should be provided for the MOT plans. Those provided are from the 2009 revision. MOT plans are also needed for the work in and around the Route 29 ROW. 9. A signal plan must be provided and approved by the VDOT Culpeper District Traffic Engineering Section prior to permit issuance. Roundabout 10. The roundabout is too large for a single lane. Circulation lanes for a single lane roundabout are generally between 16' and 20'. The appropriate size should be determined by Sidra Intersection and auto -turn analyses. 11. A truck apron is required around the center island. VirginiaDOT.org WE KEEP VIRGINIA MOVING September 26, 2017 Cameron Langille Page 2 12. The roundabout slopes from west to east instead of from center outward. This can cause drainage and freezing problems against the center island. 13. There does not appear to be enough deflection at the approaches to reduce the vehicle speed entering the roundabout. The engineer may need to utilize reverse curves. 14. Required signage for roundabouts include the outside yield sign and the right chevron sign in the center island at each approach. 15. The exit legs of the proposed roundabout should have dashed white lines and not solid white lines. 16. Please reference NCHRP Report 672 for roundabout design criteria. Traffic Engineering 17. On Rte. 643, include the limits of the posted speed limit changes from the proposed 35mph to the existing posted speed of 45mph; A speed study is required to make changes to the existing posted speed limit. 18. Proposed speed Iimit signs appear to be in excess on Rte. 643. 19. The detectable warning surface (CG -12) at NE corner of the intersection of Rte.29/Rte.643 is missing. 20. The right turn lane from Rte. 643 to Rte. 29 is missing a stop bar. 21. Relocate the stop bar at the intersection of Road B and Rte. 643 closer to the proposed cross walk to match the location of the decision point for intersection sight distance as shown on Sheet C-823. 22. Keep right signage is recommended on raised median locations. 23. Provide dimensions of all proposed roadway signs. 24. The limits of gore areas are typically marked with solid double yellow line. 25. At the intersection of Rte. 643 and Road A, relocate the stop bar closer to the proposed cross walk to match the location of the decision point for intersection sight distance as shown on Sheet C-824. 26. The proposed centerline pavement marking should cut-off just prior to the intersection of Rte. 643 and Road A and pick back up after the intersection. 27. The limits of gore areas are typically marked with solid double yellow line. 28. On Road B, why are some sections of the raised median marked with solid white line and some marked with solid yellow line? 29. On Road A, the stop sign and pavement markings on the left turn lane should be removed. 30. Show limits of the No Parking area on the proposed No Parking signs. 31. Proposed pedestrian crossing signs are for school zones; unless there is a school within the vicinity, appropriate pedestrian crossing signs should be shown. 32. What sign is being proposed for the sign post shown between sta. 11+00 and sta. 12+00? Please provide two copies of the revised plan along with a comment response letter. If further information is desired, please contact Justin Deel at 434-422-9894. VirginiaDOT.org WE KEEP VIRGINIA MOVING September 26, 2017 Cameron Langille Page 3 A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, v�vts�� Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING COMMONWEALTH of VIRGINIA In Cooperation with the Thomas Jefferson Health District ALBEMARLE- CHARLOTTESVILLE State Department of Health FLUVANN TY (STAY IRALMVRA) 1138 Rose Hill Drive GREENE COUNTY ISTANTY(LO LLE) LOVISA COVNTY)LOVISA) Phone (434) 972-6219 P. O. Box 7546 NELSON COUNTY (LOVINGSTON) Fax (434)972-4310 Charlottesville. Virginia 22906 October 3, 2017 Cameron Langille, Senior Planner Albemarle County Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Brookhill — Sec 1, Ph 4A & 8A - Initial SDP201700047 Tax Map/Parcels: 46-18, 18A, & 19 Mr. Langille: As requested, I've reviewed the Initial Site Plan, dated July 31, 2017, for the subject property. The plan indicates all water and sewage disposal will be provided by public systems. Also, it does not appear the location of the existing farmhouse will be impacted during this phase of development. However, if there are any existing water wells associated with that structure, future site plans will need to include that information to document those locations and so that guidance can be provided regarding proper abandonment procedures. Recommendation: Approval Conditions: None If there are any questions or concerns, I can be contacted at 434-972-4306. Sincerely Alan Mazurowski Environmental Health Supervisor Thomas Jefferson Health District alan.mazurowski(&,vdh.vir ig nia.gov