HomeMy WebLinkAboutSDP199700152 Plan - Approved Final Site Plan and Comps. 1997-11-18~
' \
TRAP BOTTOM 396' 26'x26'
wNISEU
Xic
kT
SI'oNl' OIKP- IS TO BEINSTALLED 'AT Tl4E_EN0.Q_ EACH DAY'S WORK
41C9
/n*r �upn /�u
'-- --TTOM\
WEIR TOP
388.5- 38"xW
WEIR LENETH, 8' g:5 R
U '
SA
It I
D,
'
'
`
I�� 7 E i0NINo ORDINANCE
\ .'`'.,`~^-^....T-_--NAR__
0,875 AC WOO&O AREA
01. 11H DIAMETER WHEV MEASURED TRAP B0TT0'M-' 44C'
6' 4BO WFIR BOTTOM 44A
WEIR JOP A46
I'P`` � . '' �.
DE
4
WEIR LENGTH' 51
/ 5 LLED
| ' ^ ' AND t 44
m
201 ��-AR -
--
V_
ON TCP
\
A
`
`
S-2 4019
5
�- '
'
IA
'
� -'`
67
.
.WALK.'
`
.`
62-- `
7 -
MINIMUM
MTN2 SIGNS STATTNG���o
.^OANr±zn QUICKSAND~
EX STORM
'
TOP 4,197
INV 4-7 .
-7�------�----�
'
'
'
PAVED N4SHA4CK
' MININUM �^ �TTUMTNOUS ASPH41 REQUIRE[l
6" 46GA. BASE (VDOT #1)
N4INT4IN POSTT�VE OPAINAGE _�TO SHE
WASH W4T[R TO BE PROYIUEO WtlH � 1' MIN' 0IA HOH
CHAALOTT E SVILLE
`
`
'
E R
30U7H�u`
GENERAL EROSION AND SED-PAIENT CONTROL NOTES
E5-1: UNLESS OT*ERwl:SE INDICATED, ALL. VEGETATIVE AND STRUCTURAL EROSION AND
3B]INEmT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING
TO MIN -MUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA ERDSI0W 4NU
SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS :R 62E)-02-00
EROSION AND 3EOIMENT CDNTROL REGULATIONS.
ES -2- THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE --
CONS TRUCT ION
RECONSTRUCTI0N C0NFERENC[, ONE WEEK PRIOR TO THE COMMf:8CEM[NT OF LAND
DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION.
E5-D� ALL EROSION AND SEDIMENT CONTROL MEASURES AHE TO RE PLACED PRIOR TO OR ^5
THE FIRST STEP IN CLEARING. '
E5-4� 4 COPY OF THE APPROVED EROSION �-ND SEDlNENt CDMTADi PLAN SHALL BE
MAINTAINED ON THE SITE AT ALL TIMES.
ES -5: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN
INDICATED ON THESE PLANS (INCLUDING, BUT NOT LINITED TO, OFF-SITE 8OAA010! OR
WASTE AREAS), THE CONTRACTOR SHALL SUBMIT 4 SUP,-)LENENTARY EROSION CONTROL
PLAN TO THE OWNER FDR REVIEW 4ND APPROVAL BY THE PLAN ApPROYINC AUTH0R�r1,
E5-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY 4DDITIONAL EROSION
CONTROL MEASURES NECESSARY TO PREVENT EROSION uVD SEDIMENTATION AS
DETERMINED BY THE PLAN APPROVING AUTHORITY
ES-r� ALL DISTURBED AREAS ARE TO OAAI� TO 4PPROvFD 5EJIMENT CONTADL #E.ASUAE5 AT
ALL TIMES DURING LAND DISTURBING ACTIVITIES AND 0UAINS SITE DEvELPMENT UHTIL
FINAL STABILIZATION IS ACHIEVED
E6 8� DURING DEWATERING OPERATION5. w�TER WILL- RE �UMpED IWT� �N �PPROv�D
FILTERING DEVICE.
ES -9 THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL !,IExS08ES PEF IODICALLY ^ND
AFTER EACH RUNOFF -PRODUCING RAlMFALL EVENT. ANY NECES5AAY REPAIRS OR
CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL
BE N4OE INMEOIATLLY
SOIL: 21C CULPEPER FINE SANDY LOAM
12^ CMP & EW -1 TO BE ADDED AFTER SIT� IS STABlLIZEO
(TO CONVERT TO STOAMWATER DETENTIDN BASIN)
I�Q;V~395. 5
NOT TO SC41-E
�
VICINITY
-3 C A[F i~ = L1000'
-'- "
`
----'-
Ml
.
SEDIMFwT/DETENrI0Q BASIN.
----'EX SEWER
'
�
TOP OF 3[Rw� 412
WP�
TDP OF R, IS 409
DATE
ORIFICE ELEVATION- 405,3
E01T
ORlFI[E DIAMETER: 5
FLExTULE TU8ImG H'
CORP,^`
RISER DxwE[ER: 66'/
PLOT
TRASH RACK OI4METER: 98'
/
-` -
TRASH RACK *El8HT� 33
"mm`o"��"�°^
B4RREL � LE�GTH76
BARREL 5LOPF: 2,0%
BARREL oIxm�TER:
3� i SIDE SLOPES �
��s
10TOP
,Low
/ Ft AG
/
EX STORM
'
TOP 4,197
INV 4-7 .
-7�------�----�
'
'
'
PAVED N4SHA4CK
' MININUM �^ �TTUMTNOUS ASPH41 REQUIRE[l
6" 46GA. BASE (VDOT #1)
N4INT4IN POSTT�VE OPAINAGE _�TO SHE
WASH W4T[R TO BE PROYIUEO WtlH � 1' MIN' 0IA HOH
CHAALOTT E SVILLE
`
`
'
E R
30U7H�u`
GENERAL EROSION AND SED-PAIENT CONTROL NOTES
E5-1: UNLESS OT*ERwl:SE INDICATED, ALL. VEGETATIVE AND STRUCTURAL EROSION AND
3B]INEmT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING
TO MIN -MUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA ERDSI0W 4NU
SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS :R 62E)-02-00
EROSION AND 3EOIMENT CDNTROL REGULATIONS.
ES -2- THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE --
CONS TRUCT ION
RECONSTRUCTI0N C0NFERENC[, ONE WEEK PRIOR TO THE COMMf:8CEM[NT OF LAND
DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION.
E5-D� ALL EROSION AND SEDIMENT CONTROL MEASURES AHE TO RE PLACED PRIOR TO OR ^5
THE FIRST STEP IN CLEARING. '
E5-4� 4 COPY OF THE APPROVED EROSION �-ND SEDlNENt CDMTADi PLAN SHALL BE
MAINTAINED ON THE SITE AT ALL TIMES.
ES -5: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN
INDICATED ON THESE PLANS (INCLUDING, BUT NOT LINITED TO, OFF-SITE 8OAA010! OR
WASTE AREAS), THE CONTRACTOR SHALL SUBMIT 4 SUP,-)LENENTARY EROSION CONTROL
PLAN TO THE OWNER FDR REVIEW 4ND APPROVAL BY THE PLAN ApPROYINC AUTH0R�r1,
E5-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY 4DDITIONAL EROSION
CONTROL MEASURES NECESSARY TO PREVENT EROSION uVD SEDIMENTATION AS
DETERMINED BY THE PLAN APPROVING AUTHORITY
ES-r� ALL DISTURBED AREAS ARE TO OAAI� TO 4PPROvFD 5EJIMENT CONTADL #E.ASUAE5 AT
ALL TIMES DURING LAND DISTURBING ACTIVITIES AND 0UAINS SITE DEvELPMENT UHTIL
FINAL STABILIZATION IS ACHIEVED
E6 8� DURING DEWATERING OPERATION5. w�TER WILL- RE �UMpED IWT� �N �PPROv�D
FILTERING DEVICE.
ES -9 THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL !,IExS08ES PEF IODICALLY ^ND
AFTER EACH RUNOFF -PRODUCING RAlMFALL EVENT. ANY NECES5AAY REPAIRS OR
CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL
BE N4OE INMEOIATLLY
SOIL: 21C CULPEPER FINE SANDY LOAM
12^ CMP & EW -1 TO BE ADDED AFTER SIT� IS STABlLIZEO
(TO CONVERT TO STOAMWATER DETENTIDN BASIN)
I�Q;V~395. 5
NOT TO SC41-E
�
VICINITY
-3 C A[F i~ = L1000'
c
AF
Ml
\N.THOMAS MUNCASTE0.JR.
0 CERT, NO16242
4:
10,1_101917
CHECKED BY
c
AF
Ml
TM
10,1_101917
CHECKED BY
DATE
FILE,
E01T
ALE
PLOT
A
OF 5
ni
cu
co
LLJ
tL
III
_0
FT_
LLJ
Li -
LU
Lu
LU
Lu
c
AF
Ml
TM
10,1_101917
CHECKED BY
DATE
FILE,
E01T
ALE
PLOT
A
OF 5
co
LLJ
IQ_
III
_0
FT_
LLJ
Li -
DESIGNED BY
AF
TM
10,1_101917
CHECKED BY
DATE
FILE,
E01T
ALE
PLOT
A
OF 5