Loading...
HomeMy WebLinkAboutSDP199700152 Plan - Approved Final Site Plan and Comps. 1997-11-18~ ' \ TRAP BOTTOM 396' 26'x26' wNISEU Xic kT SI'oNl' OIKP- IS TO BEINSTALLED 'AT Tl4E_EN0.Q_ EACH DAY'S WORK 41C9 /n*r �upn /�u '-- --TTOM\ WEIR TOP 388.5- 38"xW WEIR LENETH, 8' g:5 R U ' SA It I D, ' ' ` I�� 7 E i0NINo ORDINANCE \ .'`'.,`~^-^....T-_--NAR__ 0,875 AC WOO&O AREA 01. 11H DIAMETER WHEV MEASURED TRAP B0TT0'M­-' 44C' 6' 4BO WFIR BOTTOM 44A WEIR JOP A46 I'P`` � . '' �. DE 4 WEIR LENGTH' 51 / 5 LLED | ' ^ ' AND t 44 m 201 ��-AR - -- V_ ON TCP \ A ` ` S-2 4019 5 �- ' ' IA ' � -'` 67 . .WALK.' ` .` 62-- ` 7 - MINIMUM MTN2 SIGNS STATTNG���o .^OANr±zn QUICKSAND~ EX STORM ' TOP 4,197 INV 4-7 . -7�------�----� ' ' ' PAVED N4SHA4CK ' MININUM �^ �TTUMTNOUS ASPH41 REQUIRE[l 6" 46GA. BASE (VDOT #1) N4INT4IN POSTT�VE OPAINAGE _�TO SHE WASH W4T[R TO BE PROYIUEO WtlH � 1' MIN' 0IA HOH CHAALOTT E SVILLE ` ` ' E R 30U7H�u` GENERAL EROSION AND SED-PAIENT CONTROL NOTES E5-1: UNLESS OT*ERwl:SE INDICATED, ALL. VEGETATIVE AND STRUCTURAL EROSION AND 3B]INEmT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MIN -MUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA ERDSI0W 4NU SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS :R 62E)-02-00 EROSION AND 3EOIMENT CDNTROL REGULATIONS. ES -2- THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -- CONS TRUCT ION RECONSTRUCTI0N C0NFERENC[, ONE WEEK PRIOR TO THE COMMf:8CEM[NT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. E5-D� ALL EROSION AND SEDIMENT CONTROL MEASURES AHE TO RE PLACED PRIOR TO OR ^5 THE FIRST STEP IN CLEARING. ' E5-4� 4 COPY OF THE APPROVED EROSION �-ND SEDlNENt CDMTADi PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. ES -5: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LINITED TO, OFF-SITE 8OAA010! OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT 4 SUP,-)LENENTARY EROSION CONTROL PLAN TO THE OWNER FDR REVIEW 4ND APPROVAL BY THE PLAN ApPROYINC AUTH0R�r1, E5-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY 4DDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION uVD SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY ES-r� ALL DISTURBED AREAS ARE TO OAAI� TO 4PPROvFD 5EJIMENT CONTADL #E.ASUAE5 AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND 0UAINS SITE DEvELPMENT UHTIL FINAL STABILIZATION IS ACHIEVED E6 8� DURING DEWATERING OPERATION5. w�TER WILL- RE �UMpED IWT� �N �PPROv�D FILTERING DEVICE. ES -9 THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL !,IExS08ES PEF IODICALLY ^ND AFTER EACH RUNOFF -PRODUCING RAlMFALL EVENT. ANY NECES5AAY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE N4OE INMEOIATLLY SOIL: 21C CULPEPER FINE SANDY LOAM 12^ CMP & EW -1 TO BE ADDED AFTER SIT� IS STABlLIZEO (TO CONVERT TO STOAMWATER DETENTIDN BASIN) I�Q;V~395. 5 NOT TO SC41-E � VICINITY -3 C A[F i~ = L1000' -'- " ` ----'- Ml . SEDIMFwT/DETENrI0Q BASIN. ----'EX SEWER ' � TOP OF 3[Rw� 412 WP� TDP OF R, IS 409 DATE ORIFICE ELEVATION- 405,3 E01T ORlFI[E DIAMETER: 5 FLExTULE TU8ImG H' CORP,^` RISER DxwE[ER: 66'/ PLOT TRASH RACK OI4METER: 98' / -` - TRASH RACK *El8HT� 33 "mm`o"��"�°^ B4RREL � LE�GTH76 BARREL 5LOPF: 2,0% BARREL oIxm�TER: 3� i SIDE SLOPES � ��s 10TOP ,Low / Ft AG / EX STORM ' TOP 4,197 INV 4-7 . -7�------�----� ' ' ' PAVED N4SHA4CK ' MININUM �^ �TTUMTNOUS ASPH41 REQUIRE[l 6" 46GA. BASE (VDOT #1) N4INT4IN POSTT�VE OPAINAGE _�TO SHE WASH W4T[R TO BE PROYIUEO WtlH � 1' MIN' 0IA HOH CHAALOTT E SVILLE ` ` ' E R 30U7H�u` GENERAL EROSION AND SED-PAIENT CONTROL NOTES E5-1: UNLESS OT*ERwl:SE INDICATED, ALL. VEGETATIVE AND STRUCTURAL EROSION AND 3B]INEmT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MIN -MUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA ERDSI0W 4NU SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS :R 62E)-02-00 EROSION AND 3EOIMENT CDNTROL REGULATIONS. ES -2- THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -- CONS TRUCT ION RECONSTRUCTI0N C0NFERENC[, ONE WEEK PRIOR TO THE COMMf:8CEM[NT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. E5-D� ALL EROSION AND SEDIMENT CONTROL MEASURES AHE TO RE PLACED PRIOR TO OR ^5 THE FIRST STEP IN CLEARING. ' E5-4� 4 COPY OF THE APPROVED EROSION �-ND SEDlNENt CDMTADi PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. ES -5: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LINITED TO, OFF-SITE 8OAA010! OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT 4 SUP,-)LENENTARY EROSION CONTROL PLAN TO THE OWNER FDR REVIEW 4ND APPROVAL BY THE PLAN ApPROYINC AUTH0R�r1, E5-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY 4DDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION uVD SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY ES-r� ALL DISTURBED AREAS ARE TO OAAI� TO 4PPROvFD 5EJIMENT CONTADL #E.ASUAE5 AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND 0UAINS SITE DEvELPMENT UHTIL FINAL STABILIZATION IS ACHIEVED E6 8� DURING DEWATERING OPERATION5. w�TER WILL- RE �UMpED IWT� �N �PPROv�D FILTERING DEVICE. ES -9 THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL !,IExS08ES PEF IODICALLY ^ND AFTER EACH RUNOFF -PRODUCING RAlMFALL EVENT. ANY NECES5AAY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE N4OE INMEOIATLLY SOIL: 21C CULPEPER FINE SANDY LOAM 12^ CMP & EW -1 TO BE ADDED AFTER SIT� IS STABlLIZEO (TO CONVERT TO STOAMWATER DETENTIDN BASIN) I�Q;V~395. 5 NOT TO SC41-E � VICINITY -3 C A[F i~ = L1000' c AF Ml \N.THOMAS MUNCASTE0.JR. 0 CERT, NO16242 4: 10,1_101917 CHECKED BY c AF Ml TM 10,1_101917 CHECKED BY DATE FILE, E01T ALE PLOT A OF 5 ni cu co LLJ tL III _0 FT_ LLJ Li - LU Lu LU Lu c AF Ml TM 10,1_101917 CHECKED BY DATE FILE, E01T ALE PLOT A OF 5 co LLJ IQ_ III _0 FT_ LLJ Li - DESIGNED BY AF TM 10,1_101917 CHECKED BY DATE FILE, E01T ALE PLOT A OF 5