Loading...
HomeMy WebLinkAboutSDP201700050 Review Comments Final Site Plan and Comps. 2017-11-09Short Review Comments Report for: SDP201700050 SubApplication Type: Old Trail Village-Blk. 7 - Ph. 1 - Final Final Site Development Plan Date Completed:09/24/2017 Reviewer:Johnathan Newberry CDD Planning Review Status:Requested Changes Reviews Comments:1. There are 14 AR trees shown in bold on Sheet 5. Please update the calculation and plant list accordingly. Division: Date Completed:08/24/2017 Reviewer:Emily Cox CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:08/11/2017 Reviewer:Shawn Maddox Fire Rescue Review Status:No Objection Reviews Comments:Thank you for addressing the previous comments. Please ensure there is a no parking sign on Orion Lane between Oldham Drive and Fennel Road as I do not see one shown. SNM Division: Date Completed:08/10/2017 Reviewer:Elise Kiewra CDD E911 Review Status:No Objection Reviews Comments:per site plan dated 7/31/17 Division: Date Completed:08/09/2017 Reviewer:Margaret Maliszewski CDD ARB Review Status:No Objection Reviews Comments:The ARB has determined that this block of Old Trail Development will not be visible from the Rt. 250 Entrance Corridor and, therefore, does not require ARB review/approval. Division: Date Completed:09/26/2017 Reviewer:Adam Moore VDOT Review Status:See Recommendations Reviews Comments:The Planner provided an updated plan for review. Division: Date Completed:09/13/2017 Reviewer:Alexander Morrison ACSA Review Status:See Recommendations Reviews Comments:JT, The above referenced plan is currently under construction plan review at the ACSA. I will recommend approval once we grant construction approval for the utilities. Alexander J. Morrison, P.E. Senior Civil Engineer Division: Date Completed:10/03/2017 Reviewer:Michael Dellinger CDD Inspections Review Status:No Objection Division: Page:1 of 2 County of Albemarle Printed On:November 17, 2017 Review Status:No Objection Reviews Comments: Date Completed:10/05/2017 Reviewer:Emily Cox CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:10/13/2017 Reviewer:Johnathan Newberry CDD Planning Review Status:Requested Changes Reviews Comments:1. [Section 32.7.2.3] Please extend the sidewalk adjacent to Block 6 for the full-length that Orion Lane is shown. Distribute SUB201700144 upon approval of this final site plan. Division: Date Completed:10/13/2017 Reviewer:Adam Moore VDOT Review Status:No Objection Reviews Comments: Division: Date Completed:10/13/2017 Reviewer:Alexander Morrison ACSA Review Status:No Objection Reviews Comments: Division: Date Completed:10/16/2017 Reviewer:Johnathan Newberry CDD Planning Review Status:No Objection Reviews Comments: Division: Date Completed:10/31/2017 Reviewer:Emily Cox CDD Engineering Review Status:Approved Reviews Comments: Division: Date Completed:11/09/2017 Reviewer:Johnathan Newberry CDD Planning Review Status:Approved Reviews Comments: Division: Page:2 of 2 County of Albemarle Printed On:November 17, 2017 NOV' \rr1 p�ALp„ , t .-1" e„d� lav i rw♦«'J �F' 1 County of Albemarle Department of Community Development Memorandum To: JT Newberry From: Emily Cox Date: 24 Aug 2017 Rev. 1 Date: 05 Oct 2017 Subject: Old Trail Block 7 Ph1 -FSP (SDP201700050)Rev. 1 The final site plan for Old Trail Block 7 Ph. 1 has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. WPO Plan 201700044 must be approved before final site plan can be approved. Rev. 1: Comment still valid. 2. Road Plan SUB201700092 must be approved before final site plan can be approved. Rev. 1: Comment still valid. 3. VDOT approval is necessary before plan can be approved. Rev. 1: Comment still valid. 4. Provide sight distance profiles. Rev. 1: Sight distance profiles not shown on plan.If provided on the road plan,this comment is addressed. If not,please provide sight distance profiles. 5. Provide storm easement between structures Ex. 146 and 250. Rev. 1: Comment addressed. 6. Extend storm easements around structures 211B and 211A to ensure that removal/replacement/maintenance of these structures will be possible if necessary. Rev. 1: Comment addressed. 7. Provide handicap ramps along the sidewalk of Orion Lane at the entrances for Oldham Dr. L and Fennel Rd. Rev. 1: Comment addressed. 4. Extend sidewalk along entire length of Orion Ln. Rev. 1: The road improvements are shown with this site plan,therefore the sidewalk should be shown to the extent of the road improvements. County of Albemarle Department of Community Development Memorandum To: JT Newberry From: Emily Cox Date: 24 Aug 2017 Rev. 1 Date: 05 Oct 2017 Subject: Old Trail Block 7 Ph1 - FSP (SDP201700050) Rev. 1 The final site plan for Old Trail Block 7 Ph. 1 has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. WPO Plan 201700044 must be approved before final site plan can be approved. Rev. 1: Comment still valid. 2. Road Plan SUB201700092 must be approved before final site plan can be approved. Rev. 1: Comment still valid. 3. VDOT approval is necessary before plan can be approved. Rev. 1: Comment still valid. 4. Provide sight distance profiles. Rev. 1: Sight distance profiles not shown on plan. If provided on the road plan, this comment is addressed. If not, please provide sight distance profiles. 5. Provide storm easement between structures Ex. 146 and 250. Rev. 1: Comment addressed. 6. Extend storm easements around structures 211B and 211A to ensure that removal/replacement/maintenance of these structures will be possible if necessary. Rev. 1: Comment addressed. 7. Provide handicap ramps along the sidewalk of Orion Lane at the entrances for Oldham Dr. and Fennel Rd. Rev. 1: Comment addressed. 8. Extend sidewalk along entire length of Orion Ln. Rev. 1: The road improvements are shown with this site plan, therefore the sidewalk should be shown to the extent of the road improvements. PHONE(434)977-0205 ` INFO@ROUDABUSH.COM ROUDABUSH, GALE &ASSOCIATES, INC. LAND SURVEYING A PROFESSIONAL CORPORATION ENGINEERING Serving Virginia Since 1956 LAND PLANNING 914 MONTICELLO ROAD CHARLOTTESVILLE,VIRGINIA WILLIAM J.LEDBE I I ER,L.S. 22902 JIM L.TAGGART,P.E. BRIAN D.JAMISON,L.S. DAVIS A JORDAN,L.S. DAVID M.ROBINSON,P.E. KRISTOPHER C.WINTERS,L.S. AMMY M.GEORGE,L.A. September 25, 2017 Mr. J.T. Newberry, Senior Planner County of Albemarle Department of Community Development 401 McIntire Road, Rm. 227 Charlottesville, VA 22902-4596 RE: Old Trail Village, Block 7, Phase 1 (SDP2017-00050) Dear Mr. Newberry, I have reviewed your comments from July 6, 2017, below are the individual responses. Planning 1. There are 14 AR trees shown in bold on Sheet 5. Please update the calculation and plant list accordingly. The plan has been updated to show only the required street trees. Engineering 1. WPO plan 201700044 must be approved before the final site plan can be approved. Acknowledged. 2. Road Plan SUB201700092 must be approved before the final site plan can be approved. Acknowledged. 3. VDOT approval is necessary before plan can be approved. Acknowledged. 4. Provide sight distance profiles. Sight Distance Profiles have been added to the Orion Lane profile. 5. Provide storm easement between structures Ex. 146 and 250. A storm sewer easement has been provided for the pipe between Ex. 146 and 250. 6. Extend storm easement around structure 211B and 211A to ensure that removal/replacement/ maintenance of these structures will be possible if necessary. The storm sewer easement around 211A and 211B has been extended around the storm inlet. OTV Block 7, Phase 1 SDP2017-00030 1 `-rie 7. Provide handicap ramps along the sidewalk of Orion Lane at the entrances for Oldham Drive and Fennel Road. Handicap ramps have been added at the intersections of Orion Lane/Oldham Drive and Orion Lane/Fennel Road. 8. Extend sidewalk along entire length of Orion Lane. The sidewalk along the northern side of Orion Lane will be designed and constructed with the Block 6 site plan. If you have any questions or comments, please feel free to contact me. Sinc ely, y orge OTV Block 7, Phase 1 SDP2017-00030 2 County of Albemarle Department of Community Development Memorandum To: JT Newberry From: Emily Cox Date: 24 Aug 2017 Subject: Old Trail Block 7 Ph1 - FSP (SDP201700050) The final site plan for Old Trail Block 7 Ph. 1 has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. WPO Plan 201700044 must be approved before final site plan can be approved. 2. Road Plan SUB201700092 must be approved before final site plan can be approved. 3. VDOT approval is necessary before plan can be approved. 4. Provide sight distance profiles. 5. Provide storm easement between structures Ex. 146 and 250. 6. Extend storm easements around structures 211B and 211A to ensure that removal/replacement/maintenance of these structures will be possible if necessary. 7. Provide handicap ramps along the sidewalk of Orion Lane at the entrances for Oldham Dr. and Fennel Rd. 8. Extend sidewalk along entire length of Orion Ln. Johnathan Newberry From: Johnathan Newberry Sent: Thursday,July 20, 2017 3:27 PM To: Emily Cox Subject: Planning Application Review for SUB201700092 Old Trail Village BIk.7 Phase 1 - Road Plans. Sorry for the delay. The Review for the following application has been completed: Application Number= SUB201700092 Reviewer =Johnathan Newberry Review Status = Requested Changes Completed Date =07/20/2017 1. There are 14 trees shown in bold on Sheet 5. Please update the calculation and plant list accordingly. 2. Sheet 1 of the Initial Site Plan shows 35,430 SF of impervious area and 12,660 SF of turf area, whereas the Road Plan shows 28,195 SF of impervious area and 5,650 SF of turf area. The plans appear to propose identical development. Can you clarify which amounts are correct? This email was sent from County View Production. 1 Nwe *IS Johnathan Newberry From: Johnathan Newberry Sent: Friday, October 13, 2017 1:18 PM To: 'Ammy George' Cc: Emily Cox; Bill Ledbetter Subject: RE: Block 7, Old Trail - SDP201700050 Attachments: SDP201700050 Old Trail Block 7 Phl_engineering_FSP_Revl.pdf Hi Ammy, Justin Deel at VDOT will be providing comments on the final site plan. I will forward them as soon as they are received. Thank you for addressing the previous landscaping comment from Planning. I've attached comments from Engineering. I'm providing an additional Planning comment to support Engineering comment#8 regarding the sidewalk adjacent to Block 6. 1. [Section 32.7.2.3] Please extend the sidewalk adjacent to Block 6 for the full-length that Orion Lane is shown. The previous comment response letter indicated that the "northern side of Orion Lane will be designed and constructed with the Block 6 site plan." However, the Block 6 final site plan labels Orion Lane as "designed and constructed by others." Still, regardless of any conflicting information shown between these two site plans, sidewalks need to be shown to the extent that any road section is being approved. A subsequent road and site plan may alter what has previously been approved, but it is our responsibility to ensure that sidewalks are required in the case the future development doesn't happen (or just doesn't happen as originally planned). Thanks, .I.T. Newberry Senior I iannP1 County of Albemarle, Planning 1)1Visiun 434-296-5832, e'st. 3270 From:Johnathan Newberry Sent:Wednesday, September 27, 2017 4:48 PM To:Ammy George<AGeorge@roudabush.com> Cc: Emily Cox<ecox@albemarle.org> Subject: RE: Block 7,Old Trail Thanks, Ammy. I can confirm they've been received and are in the queue for distribution. From:Ammy George [mailto:AGeorge@roudabush.com] Sent:Wednesday, September 27, 2017 11:05 AM To:Johnathan Newberry<inewberry@albemarle.org> Cc: Emily Cox<ecox@albemarle.org> Subject: RE: Block 7,Old Trail 1 4.110 Good morning JT, Emily Cox let me know that I did not send enough copies of the Road and Site Plan to you the other day. I will be dropping the additional copies off later today. 4/u`u 1 George From:Johnathan Newberry [mailto:jnewberry@albemarle.org] Sent:Tuesday,September 26, 2017 12:27 PM To:Ammy George<AGeorge@roudabush.com> Subject: RE: Block 7,Old Trail Okay,great.Thank you. From:Ammy George [mailto:AGeorge@roudabush.com] Sent:Tuesday,September 26,2017 7:30 AM To:Johnathan Newberry<inewberry@albemarle.org> Subject: RE: Block 7,Old Trail Good morning JT, I did submit to ACSA separately. As for VDOT,we did receive comments from them on the Road Plans. I believe we talked through their comments and they were okay with the revisions. But they of course will let you know. Thanks! Avct.vuJ George From:Johnathan Newberry [mailto:jnewberry@albemarle.org] Sent: Monday,September 25, 2017 4:58 PM To:Ammy George<AGeorge@roudabush.com> Subject: RE: Block 7,Old Trail Hi Ammy, I received the revised plans and have transmitted a copy to Engineering. Did you transmit a copy to ACSA separately? Also, do you have any comments from VDOT? I have not received anything from them. Thanks, .l.T. NON-l)P1Iv 4Pi►i(►r I laii11(9 (1011110 of Albemarle, Planning I)iv inion -134-296-58:12, ext. 3‘,270 From: Bill Ledbetter [mailto:BLedbetter@roudabush.com] Sent: Monday,September 25, 2017 8:00 AM 2 * is/ To:Johnathan Newberry<jnewberry@albemarle.org> Subject: RE: Block 7,Old Trail Thanks JT Bill Ledbetter Roudabush, Gale and Associates 914 Monticello Road Charlottesville, Virginia 22902 434-977-0205 office 540-649-0190 cell 434-296-5220 fax www.Roudabush.com From: Johnathan Newberry [mailto:jnewberry@albemarle.orq] Sent: Sunday, September 24, 2017 5:06 PM To: Ammy George Cc: Bill Ledbetter Subject: RE: Block 7, Old Trail Hi Ammy, Thanks for providing that road information. My only comment on the final site plan relates to the landscaping. I provided the same comment on the road plans. • There are 14 AR trees shown in bold on Sheet 5. Please update the calculation and plant list accordingly. Thanks, .I.T. Newberry Senior Planner Comity of Allwina •le, Planning Division 434-296-5832, ext. 3270 From:Ammy George [mailto:AGeorge@roudabush.com] Sent:Thursday,September 21, 2017 11:36 AM To: Bill Ledbetter<BLedbetter@roudabush.com>;Johnathan Newberry<jnewberry@albemarle.org> Subject: RE: Block 7,Old Trail Good morning JT, I have attached a copy of the plan and typical section for Orion Lane. There is a transition in the proposed Orion Lane, it is from the existing side of Orion Lane which has parking on both sides of the road to the proposed side of Orion Lane has parking on one side. /4vitvuj George 3 401 From: Bill Ledbetter Sent:Thursday, September 21, 2017 11:24 AM To:Johnathan Newberry<jnewberry@albemarle.org>; Ammy George<AGeorge@roudabush.com> Subject: Re: Block 7,Old Trail Ammy Email JT a PDF of the block 6 road plan showing the full width road section thru 6 Thanks, Bill Ledbetter Roudabush, Gale and Associates On Sep 21, 2017,at 11:21 AM,Johnathan Newberry<jnewberry@albemarle.org>wrote: Hey Bill, I was speaking with Dave yesterday about the future of Block 6 following our discussion about the open space. I'm trying to get Ammy comments on the Block 7 final site plan and I'm a little concerned about the way Orion Lane is pinching down as it progresses into Block 6. Can you tell me anything more about that? Is that intentional? Is it temporary? The Application Plan identifies it as a "B Street" (Commercial Side Street)with parking on both sides, although there is a note that states VDOT and the Eng. Dept. can approve a lesser standard. It's just that the level of activity that Dave and I discussed doesn't seem to match up with the standard shown here adjacent to Block 6.Any info you have would be helpful. Thanks! 3.T. Newberry Senior Planner County of Albemarle, Planning I)ivision 434-296-5832, eat. 3270 4 of COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 July 6, 2017 Bill Ledbetter Roudabush Gale&Associates, Inc. 914 Monticello Road Charlottesville,VA 22902 BLedbetter@roudabush.com RE: SDP201700030 Old Trail Village Block 7,Phase I—Initial Site Plan Dear Mr. Ledbetter: The Site Review Committee has reviewed the development proposal referenced above. Initial comments from the following divisions of the Department of Community Development and other agencies, as applicable,are attached: Albemarle County Planning Services(Planner) Albemarle County Engineering Services(Engineer)(attached) Albemarle County Information Services(E911)(attached) Albemarle County Building Inspections Albemarle County Department of Fire Rescue Albemarle County Service Authority Virginia Department of Transportation(attached) Comments reflect information available at the time the proposal was reviewed and should not be considered final. However,the Site Review Committee has attempted to identify all issues that are required to be resolved prior to final approval. The applicant should work with each of the reviewers individually to address the comments provided. Once all of the comments have been addressed,the Lead Reviewer will request copies for final signature by each reviewer. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, a.4. J.T.Newberry Senior Planner CC: March Mountain Properties 800 East Jefferson Street • Charlottesville,VA 22902 411100 111101) Albemage County Planning Services(Planner)—J.T.Newberry,jnewberry n,albemarle.org—Requested changes. A. Section 4.12.16/p.10 of COD—Please confirm that each driveway is a minimum of 18 feet wide.The / driveway for Lots 5, 11,and 14 appear to be only 16 feet wide. ✓2. Section 32.5.2(a)—On Sheet 1,please remove the reference to critical slopes.Under Zoning,please note this site also lies with the Steep Slopes(Managed)and Entrance Corridor overlay districts. Section 32.5.2(a)—On Sheet 1,please clarify the information shown for Project Area and Area Summaries.The area shown for Project Area is 0.78 acres and then the Total under Area Summary is 1.11 acres. Should these two numbers match? Section 32.5.2(a)—On Sheet 1,please specify this site lies within the South Fork Rivanna Reservoir water supply watershed. [General Comment]—On Sheet 6,the cross-section for Orion Lane shows a 6 foot parking lane. Please delineate these parking spaces on Sheet 3. 06. Section 32.5.2(p)—Sheet 5 shows 14 street trees in bold,but the planting schedule only shows 12 trees. Please only show the required trees in bold and confirm that the correct quantity of trees is included in the planting schedule. ►/j [General Comment]—Other blocks proposing residential uses in Old Trail have used the same table to track the provision of affordable housing units over time. Please copy and update this table from the last approved site plan at the time of final site plan submission. As of right now,the latest table is from the final site plan for Blocks 10, 16, 17,and 18 (SDP201600006). Albemarle County Engineering Services(Engineer)—Emily Cox,ecoxgn,albemarle.org—See attached. Albemarle County Department of Fire Rescue—Robbie Gilmer,rgilmer@albemarle.org—Requested changes. 1. Show no parking signs on one side of Orion Lane. 2. Increase radii to 25 feet at the intersection of Alley A and Alley B. Albemarle County Information Services(E911)—Elise Kiewra,ekiewraga,albemarle.org—See attached. Albemarle County Building Inspections,Michael Dellinger,mdellinger(aialbemarle.org —No objection. ACSA—Alex Morrison,amorrison(a)serviceauthority.org—See recommendation. 1. Water and Sewer Construction Plan Review will be required at the final site plan stage. Submit 3 copies of the final site plan along with water and sewer data sheets to the ACSA,Attn:Jeremy Lynn, PE,to begin the review. 2. RWSA Wastewater Capacity Certification will be required at the final site plan stage. Virginia Department of Transportation—Adam Moore,Adam.Mooregvdot.virginia.gov—See attached. Olims01 ''41%0104 rizocs,, „ft. COUNTY OF ALBEMARLE Department of Community Development 401 Mclntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 July 6,2017 Bill Ledbetter Roudabush Gale&Associates, Inc. 914 Monticello Road Charlottesville, VA 22902 BLedbetter@roudabush.com RE: SDP201700030 Old Trail Village Block 7,Phase I—Initial Site Plan Dear Mr. Ledbetter: The Site Review Committee has reviewed the development proposal referenced above. Initial comments from the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Planning Services (Planner) Albemarle County Engineering Services (Engineer)(attached) Albemarle County Information Services (E911)(attached) Albemarle County Building Inspections Albemarle County Department of Fire Rescue Albemarle County Service Authority Virginia Department of Transportation(attached) Comments reflect information available at the time the proposal was reviewed and should not be considered final. However,the Site Review Committee has attempted to identify all issues that are required to be resolved prior to final approval. The applicant should work with each of the reviewers individually to address the comments provided. Once all of the comments have been addressed, the Lead Reviewer will request copies for final signature by each reviewer. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, J.T.Newberry Senior Planner CC: March Mountain Properties 800 East Jefferson Street Charlottesville,VA 22902 kind 114114 Albemarle County Planning Services(Planner)—J.T.Newberry,jnewberry@albemarle.org_—Requested changes. 1. Section 4.12.16/p.10 of COD—Please confirm that each driveway is a minimum of 18 feet wide. The driveway for Lots 5, 11, and 14 appear to be only 16 feet wide. 2. Section 32.5.2(a)—On Sheet 1,please remove the reference to critical slopes.Under Zoning,please note this site also lies with the Steep Slopes(Managed)and Entrance Corridor overlay districts. 3. Section 32.5.2(a)—On Sheet 1,please clarify the information shown for Project Area and Area Summaries.The area shown for Project Area is 0.78 acres and then the Total under Area Summary is 1.11 acres. Should these two numbers match? 4. Section 32.5.2(a)—On Sheet 1,please specify this site lies within the South Fork Rivanna Reservoir water supply watershed. 5. [General Comment]—On Sheet 6,the cross-section for Orion Lane shows a 6 foot parking lane. Please delineate these parking spaces on Sheet 3. 6. Section 32.5.2(p)—Sheet 5 shows 14 street trees in bold,but the planting schedule only shows 12 trees.Please only show the required trees in bold and confirm that the correct quantity of trees is included in the planting schedule. 7. [General Comment]—Other blocks proposing residential uses in Old Trail have used the same table to track the provision of affordable housing units over time. Please copy and update this table from the last approved site plan at the time of final site plan submission. As of right now,the latest table is from the final site plan for Blocks 10, 16, 17, and 18(SDP201600006). Albemarle County Engineering Services(Engineer)—Emily Cox, ecox@,albemarle.org—See attached. Albemarle County Department of Fire Rescue—Robbie Gilmer,rgilmer(a4albemarle.org—Requested changes. 1. Show no parking signs on one side of Orion Lane. 2. Increase radii to 25 feet at the intersection of Alley A and Alley B. Albemarle County Information Services(E911)—Elise Kiewra, ekiewra@albemarle.org—See attached. Albemarle County Building Inspections, Michael Dellinger,mdellinger(c4albemarle.org —No objection. ACSA—Alex Morrison, amorrison@serviceauthority.org—See recommendation. 1. Water and Sewer Construction Plan Review will be required at the final site plan stage. Submit 3 copies of the final site plan along with water and sewer data sheets to the ACSA,Attn: Jeremy Lynn, PE,to begin the review. 2. RWSA Wastewater Capacity Certification will be required at the final site plan stage. Virginia Department of Transportation—Adam Moore,Adam.Moore@,vdot.virginia.gov—See attached. 141104 ftiO4 of AJ. kir Mian A County of Albemarle Department of Community Development Memorandum To: JT Newberry From: Emily Cox Date: 21 Jun 2017 Subject: Old Trail Block 7 Ph1 -ISP(SDP201700030) The initial site plan for Old Trail Block 7 Ph. 1 has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. WPO Plan must be submitted and approved before final site plan can be approved. 2. Road Plan must be submitted and approved before final site plan can be approved. 3. Please add the approved Master SWM Plan#to the note on the cover sheet (WPO20160009). 4. Ensure that all critical slopes are shown and labeled on the plan. 5. VDOT entrance permit will be required for Orion Lane. Please designate the type of entrances. iiN4 County of Albemarle j Department of Community Development 401 McIntire Road, North WingTt- . Charlottesville,Virginia 22902 PLAN REVIEW COMMENTS - E911 APPLICATION#: SDP201700030 TMP: 055E0-01-00-000A1 DATE: 6/19/2017 FROM: Elise Kiewra - : • n. . -�:�• - • • :gr. • �c,Aa• •"ervices (GDS) -70 . • '• -PI. I- • . • •s I.4, ,, ,, _;�.�• -1 ex .'5030 • g.s Comments for road names are below: 1. "Private Road A" will need to be a continuation of FENNEL RD 2. "Alley A" does not need a road name as it appears no houses will be addressed off of it 3. "Alley B" will also be FENNEL RD as it appears that the road will curve around and connect back to Orion Ln Please let me know if you have any questions. Thanks. 0101 ' W• • rte �� v : COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper Vag:r o 22701 Charles A. Kilpatrick, P.E. Commissioner June 16, 2017 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: J.T. Newberry Re: OId Trail Village Block 7 Phase 1 — Initial Site Plan SDP-2017-00030 Review#1 Dear Mr. Newberry: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Roudabush, Gale, & Associates, dated 8 May 2017, and offers the following comments: 1. It is our understanding that Orion Lane will be a private street; please confirm this on the plans by labeling all streets public or private. If it is to be a public street, the entrances must show conformance with the VDOT Road Design Manual Appendices B(1) and F, as well as any other applicable standards, regulations or other requirements, in which case comments can be provided. 2. Please demonstrate that existing drainage structures being tied-in to are adequate for the developed site. Please provide two copies of the revised plan along with a comment response letter. If further information is desired, please contact Justin Deel at 434-422-9894. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434)422-9399 for information pertaining to this process. Sincerely, Caw. Q.. igezitc„ Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING PHONE(434)977-0205 FAX(434)296-5220 INFO@ROUDABUSH.COM ROUDABUSH, GALE &ASSOCIATES, INC. LAND SURVEYING A PROFESSIONAL CORPORATION Serving Virginia Since 1956 ENGINEERING LAND PLANNING 914 MONTICELLO ROAD CHARLOTTESVILLE,VIRGINIA 22902 WILLIAM J.LEDBETTER,L.S. BRIAN D.JAMISON,L.S. JIM L.TAGGART,P.E. DAVIS A JORDAN,L.S. DAVID M.ROBINSON,P.E. KRISTOPHER C.WINTERS,L.S. AMMY M.GEORGE,L.A. August 7, 2017 Mr. J.T. Newberry, Senior Planner County of Albemarle Department of Community Development 401 McIntire Road, Rm. 227 Charlottesville, VA 22902-4596 RE: Old Trail Village, Block 7, Phase 1 (SDP2017-00030) Dear Mr. Newberry, I have reviewed your comments from July 6, 2017, below are the individual responses. Planning 1. Please confirm that each driveway is a minimum of 18 feet wide. The driveways for Lots 1, 7, and 10 appear to be only 16 feet wide The driveway widths for Lots 1, 7 and 10 have been revised to be 18' wide. 2. On Sheet 1, remove the reference to critical slope. Under Zoning, please note this site also lies within the Steep Slope (Managed) and Entrance Corridor overlay districts. The Zoning Information has been updated to reflect that the project area is located within the Steep Slope (Managed) and Entrance Corridor overlay districts. 3. On Sheet 1,please clarify the information shown for Project Area and Area Summaries. The area shown for Project Area is 0.78 acres then the Total under Area Summary is 1.11 acres. Should these two numbers match? I have double-checked the area calculations and the 1.12 acres is correct and now shows up under the Project Area and Area Summary. 4. On Sheet 1, please specify this site lies within the South Fork Rivanna Reservoir water supply watershed. The note regarding the public water supply watershed has been updated to name the South Fork Rivanna Reservoir. 5. On Sheet 6, the cross section for Orion Lane shows a 6-foot parking lane. Please delineate these parking spaces. In the previous plan set, the parking lane had been left off of Orion Lane. Now, Orion Lane has been updated so that it reflects the Typical Section shown on Sheet 6. The parking spaces are now shown on the plan. OTV Block 7, Phase 1 SDP2017-00030 1 Stile 6. Sheet 5 shows 14 street trees in bold, but the planting schedule only shows 12 trees. Please only show the required trees in bold and confirm that the correct quantity of trees is included in the planting schedule. The line weights for the existing trees has been adjusted so that they contrast more with the trees that will need to be relocated. We will be relocating several trees that conflict with the entrance locations and a water meter location. 7. Other blocks proposing residential uses in Old Trail have used the same table to track the provision of affordable housing unit types over time. Please copy and update this table from the last approved site plan at the time of final site plan submission. As of right now, the latest table is from the final site plan for Blocks 10, 16, 17 and 18 (SDP2016-00006). The updated Development Chart has been added to Sheet 6. Engineering 1. WPO plan must be submitted and approved before the final site plan can be approved. Acknowledged. 2. Road Plan must be submitted and approved before the final site plan can be approved. Acknowledged. 3. Please add the approved Master SWM Plan#to the note on the Cover Sheet (WPO201600009). The approved SWM Master Plan application number has been added to the Cover Sheet. 4. Ensure all critical slopes are shown and labeled on the plan. The Managed Steep Slope areas from GIS have been added to the plans. 5. VDOT entrances permit will be required for Orion Lane. Please designate the type of entrances. The VDOT entrance types have been added to the plan. Fire & Rescue 1. Show no parking signs on one side of Orion Lane. "No Parking" signs have been added to one side of Orion Lane. 2. Increase radii to 25' at the intersection of Alley A and Alley B. The radii at the intersection of Greenwell Lane(Alley A) and Oldham Drive (Alley B) have been revised to be 25'. E911 1. "Private Road A" will need to be a continuation of Fennel Road. Acknowledged. Private Road "A" has been relabeled as Fennel Road. 2. "Alley A" does not need a road name as it appears no houses will be addressed off of it. OTV Block 7, Phase 1 SDP2017-00030 2 I 3 "Alley A" has been renamed to Greenwell Lane, a name that was reserved for Old Trail. 3. "Alley B" will also be Fennel Road, as it appears that the road will curve around and connect back to Orion Lane. I have renamed "Alley B" as Oldham Drive for two reasons; 1) since it will be intersecting with the extension of Fennel Road in the future and 2) it is a similar situation to Fennel Road/Private Road "A", a continuation of Oldham Drive. VDOT 1. It is our understanding that Orion Lane will be a private street; please confirm this on the plan by labeling all streets public or private. If this is a public street, the entrances must show conformance with the VDOT Road Design Manual Appendices B(1) and F, as well as any other applicable standards, regulations or other requirements, in which case comments can be provided. Orion Lane will be a Public Street. The roads have been relabeled to clarify if they are public or private. 2. Please demonstrate that the existing drainage structure being tied-in to are adequate for the developed site. The downstream drainage calculations have been provided for your review in this plan set. If you have any questions or comments, please feel free to contact me. Sincerel , y G orae OTV Block 7, Phase 1 SDP2017-00030 3