September 19, 2014
Anvince Land Trust LLC
255 Ipswich Place
Charlottesville,VA 22901
RE: Coverage under the 2014 VPDES Construction General Permit(VAR10)
General Permit No,VAR10F182
Albrecht Place
Private-Commercial
Dear Permittee:
DEQ has reviewed your Registration Statement received on June 19, 2014 and determined that the proposed
land-disturbing activity is covered under the General VPDES Permit for Discharges of Stormwater from
Construction Activities(VAR10). The effective date of your coverage under this general permit is the date of this
letter.
A copy of the general permit can be obtained from DEQ's webpage at the following location:
htto://wNvw,deo.Virttihla.goWPortalsiO/DEQANater/PublicatlonsfCGP2014.odf,
The general permit contains the applicable Stormwater Pollution Prevention Plan (SWPPP) requirements and
other conditions of coverage. Please print the general permit and read it carefully as you will be responsible for
compliance with all permit conditions.
The general permit requires that you update your SWPPP to incorporate the chances that the Deoartment
made for this permit reissuance. Please update the SWPPP as soon as possible but no later than sixty(60)days
from the date of this letter.
DEQ staff has determined that the proposed land-disturbing activitywill discharge to a surface water identified
as impaired or for which a TMDL.wasteload allocation has been established and approved prior to the term of the
general permit for(i)sediment or a sediment-related parameter or(ii) nutrients, Therefore, the following general
permit(Part IBA)and SWPPP requirements(Part II,A.5)must be implemented for the land-disturbing activity:
• Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7)days after
final grade is reached on any portion of the site;
• Nutrients (e.g., fertilizers) shall be applied in accordance with manufacturer's recommendations or an
approved nutrient management plan and shall not be applied during rainfall events;
• Inspections shall be conducted at a frequency of(i) at least once every four(4) business days or(ii) at
least once every(5)business days and no later than 48 hours following a measurable storm event In the
event that a measurable storm event occurs when there are more than 48 hours between business days,
the inspection shall be conducted on the next business day;and
• Representative inspections used by utility line installation, pipeline construction, or other similar linear
construction activities shall inspect all outfalls.
Nese Nod
Page 2 of 2
General Permit No.VAR10F182
Albrecht Place
The general permit will expire on June 30, 2019. The conditions of the general permit require that you
submit a new registration statement at least 90 days prior to that date if you wish to continue coverage under the
general permit, unless permission for a later date has been granted by the Board. Permission cannot be granted
to submit the registration statement after the expiration date of the general permit.
If you have any questions about this permit, please contact the DEQ Office of Stormwater Management at
ConstructionGP(a).deu.viroinia.gov.
Sincerely,
Aszefte
./...? / . /- ",. .
i
Frederick K.Cunningham, Director
Office of Water Permits