Loading...
HomeMy WebLinkAboutWPO201300050 Bond 2015-08-27 • p...49- . ,4-- OFA /As) Date Received:: r Fee Paid: Received by: . 1 iqi Intake: Forty -r oMaagementAnalyst r Pal /V1/ZAO/5 )4______ .4113.170 • BOND INSPECTION REQUEST APPROVED PLAN#WPO-201300050 610 7 Pee/41H • PROJECT NAME: Western Albemarle High School SWM Improvements • (As listed on the approved plan) • This is to request that an inspection be performed by the County. Where fees are assessed,a fee is required for each inspection. Please check the inspections requested. ® VSMP/VESCP Erosion Control,Stormwater Management and/or Mitigation per Water Protection Ordinance section 17-207&208 $250 ❑ Subdivision(roads,drainage,etc.)per Subdivision.Ordinance section 14-435 and 14-438; $250 ❑ Water&Sewer per Subdivision Ordinance section 14-435 $250 O Site Development Performance bond(Incomplete Site Work&Landscape Maintenance) $280 TOTAL FEES N/A Inspections for the purposes of bond reduction or release will require a separate fee for each bond. Submit requests to: Department of Community Development,401 McIntire Road,North Wing,Charlottesville, VA 22902,Attention:Management Analyst=Phone 434=296=5832;Fax 434=972-4126. All roads and - - - - — - stormwater facilities will require construction record drawings,inspection reports,and completion processes through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and county's published procedures.A minimum 20%of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds,if landscape installation is part of the bonded incomplete site work,a request for reduction should only be made once all site work is complete. The revised estimate should be sent to; EMAIL: fpohl©albemarle.org OR REGULAR MAIL ADDRESS: ',1:' :.;,•1/4.0“,c4 V 7 Signature of Owner/Developer Fralik-F1'otSi(.)JR\J t, 08/27/15 Print Name Date Revised 7/15/2014,7/20/2015 Mark Hopkins From: Todd Shifflett Sent: Thursday, September 03, 2015 9:59 AM To: Mark Hopkins Subject: BIR; WPO201300050-Western Albemarle High School SWM Improvements Attachments: im3512CurDev@albemarle.org_20150903_224653_0468_f91 daed400d4.pdf Mark, Attached is a Bond Inspection Request for the above project. There is no DEQ coverage. Please determine if this project can be closed out and provide release forms to me. Thank You, Todd 1 Internal Use Only �� L 0 ‘ J Date Received:` 4 n Fee Paid: �''CC�� Received by: area tt to_f_( /7:4-/Ze Intake: Forw to M gement Analyst BOND INSPECTION REQUEST APPROVED PLAN#WPO-201300050 (Ai° .71042 ibe rr) PROJECT NAME: Western Albemarle High School SWM Improvements (As listed on the approved plan) This is to request that an inspection be performed by the County. Where fees are assessed, a fee is required for each inspection. Please check the inspections requested. IR1 VSMP/VESCP Erosion Control,Stormwater Management and/or Mitigation per Water Protection Ordinance section 17-207&208 $250 ❑ Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435 and 14-438; $250 ❑ Water& Sewer per Subdivision Ordinance section 14-435 $250 ❑ Site Development Performance bond(Incomplete Site Work&Landscape Maintenance) $280 TOTAL FEES N/A Inspections for the purposes of bond reduction or release will require a separate fee for each bond. Submit requests to: Department of Community Development,401 McIntire Road,North Wing,Charlottesville, VA 22902,Attention: Management Analyst-Phone 434-296-5832;Fax 434-972-4126. All roads and stormwater facilities will require construction record drawings, inspection reports,and completion processes through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and county's published procedures.A minimum 20%of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds,if landscape installation is part of the bonded incomplete site work,a request for reduction should only be made once all site work is complete. The revised estimate should be sent to; EMAIL: fpohl@albemarle.org OR REGULAR MAIL ADDRESS: 7y.1/4...A.4,4/4. V etae Signature of Owner/Developer Frank falil' ; j =;'.. -1; 08/27/15 Print Name Date Revised 7/15/2014,7/20/2015