HomeMy WebLinkAboutARB201700115 Staff Report 2017-11-27ARCHITECTURAL REVIEW BOARD STAFF REPORT
Project #/Name
ARB-2017-115: Sapon & Swisher Dental
Review Type
Major Amendment to Site Development Plan — First review
Parcel Identification
06100-00-00-024BO
Location
Northeast corner of Hydraulic Road and Whitewood Road
Zoned
Commercial (C1), Entrance Corridor (EC)
Owner/Applicant
Drs. Mark Sapon and Brad Swisher/Design Develop LLC (Kevin Schafer)
Magisterial District
Rio
Proposal
To demolish existing structure on a previously -developed parcel and construct a new building with a larger footprint
Context and Visibility
The proposed development lies east of Albemarle High School and Connect Church, at the intersection of Hydraulic
and Whitewood roads. The surrounding area is a mix of residential, office, and retail, with a shopping center (Republic
Business Center) to the south, across Whitewood Road; office space (Sachem Place) to the east; and a convenience
store (Hilltop Market) and Woodlane Apartments to the north. Situated on a corner lot, the development abuts
Hydraulic Road and will be visible from the EC.
ARB Meeting Date
December 4, 2017
Staff Contact
Heather McMahon
PROJECT HISTORY
DATE
APPLICATION
RESULT
9/16/2002
ARB-2002-89
Sign, administratively approved
4/9/2015
ARB-2015-39
Sign, administratively approved
12/4/2017
ARB-2017-115
Sapon & Swisher Dental, first review of a Major Site Amendment
This parcel was developed prior to the establishment of the Entrance Corridor. [Figure 1] Created in 1977, the site plan was revised in 1998 to its present
configuration of a building in the northwest corner surrounded by an L-shaped parking area. The site's single -story (14-feet high) building has served as
a restaurant for most of its existence. The ARB has reviewed applications pertaining to this parcel only twice previously, and both were staff -level
reviews of sign applications (Mario's Pizza in 2002 and Nude Fude in 2014). The Board will review the Sapon & Swisher Dental practice's proposal for
a Major Amendment to a Site Development Plan for the first time at the ARB meeting on December 4, 2017.
i I TMP Bt-74A /
\ V BABA 'VENTURES. INC.
D D. d474 599PL O �90,7t79674 D.B 7B0 P 2AT Il
�\ ♦ Woo I LOT 1 /
iE BLOCK E
IF JAM_
TCaSTUCCQ7 1
�O WrLL
Q'^t bq^^' • GRAY�1 y 5PE PO\ / I /!z
QOA°3 \J / / c 591.31 O Pe"LL ..1.
69,36 PANELm 159 D.65 i' V/uOp .O- \ 7-,Tt}9672 1
Jv?O'�S \♦ °' / 3911a �i 'ENCc J , Ac - -_ 51
Q_71Q. { o /_..`.••. s �pb •Ic
CC0 ehOk a �7T Bn 93 590.0 S
SIT 62A`� E02 / V A91 �C)f uY
• ♦ L / ' / I / I • �•'� PENCE
PPE. +
—` 5 1 G 64 / !
• 4 P 99 U y --_ 1 I Y
\ �
i
CONCRf iE l`-17!
PAT✓J S '4�. i� -/ 1MP 61W122, E7AL
SACHEM VILLAGE UNIT
9 OWNERS ASSOCIATION
\ \• ! I t��J \\ }—�_ 1. OB. 4481 P. 343
'1 I J'aq'o' 00. r 5906 D.B 1517 P. �42 P.-P.'A7H
p / 380 P_AT
,5B
J5 580 B]( D.B. 1469 P 439 PLAT
lL j D.B. 1131 P 349 PLAT
TMR 61-24� I \ j ._r�\ D.D. 11.7 P. 99 ?l AT
LOT 2 r""\ \ ° a I D.6. 1028 P. 120 PLAT
H i BLOCK E De sst 1. 356 Pt,A
1� D.9. BE6 447 PI AT
I a°o �, ,I DB. BI P 235 LAT
r•I♦\f ��__ 'e f t �\0.627 ACRES b, \
PHASE
COMMON AREA
SIG ASENENT
OB .0. P. ISO
�M \
\ 9a4j 0
\ \ Is - - _ - - _ — — �r I \
59
300.B OgESjEASFMEN
sTAr E ROUTE
Rpj�p
Figure 1: Existing Site Conditions at 2800 Hydraulic Road (TW61-24B)
2
PROPOSAL
The current proposal calls for the demolition of an existing, late 20t1i-century, frame and stucco building situated on the northwestern corner of the parcel
and the construction of a 5,065 square -foot dental clinic building in its place. The footprint of the proposed building would encompass that of the present
building as well as a concrete patio to the south of the current edifice; it would also expand westward, coming within 15 feet of the right-of-way
(Hydraulic Road), an Entrance Corridor. [Figure 2]
;•'�r� i 92.00.
/' J,
iaFl7--Gh'� -
5,065 SQUARE FOOT
DENTAL CJNIC
FFE 592.00
12:1 RAMP (12 L°
W/ RAR$ IVP
91.96 III ,
9146 t
r- I
I V
9601C t
92,31 TIC 9'.105C EX
91.81 BC EX
9C.8' BC EX
91.C5 TIC / T1d1 -24
90.65 BC
JFX1 ' r LO
UB�OCK
XI TIN (2) - RISERS `-,
S .647 A`RL
MAX. Ns. T
LLLX41 CF
DIS' BA rf
_41
M.
�— —�—
N `�'�. - - —M )N log?o 41,5
Figure 2: Proposed Site Plan for 2800 Hydraulic Road (TMP61-24B)
_
k,9C 60 BC CX
LIMITS of
DIS7URBANC7TYP
19,885 S°) X
'••.+ M.ST1NIU I
's t � 1,' '•
90.60 BC DO L
x / 9 TIC
90.65 BC EX;
90.63 TC
90.13 BC 'Ek
90.71 TIC
90.21 BC (EX)
v\ /
97.96 TC '�• �� y/
90.46 BC (c)� sae ;1
3
The building's west elevation will face the EC, while the south and north elevations will be visible from various vantage points along the EC. With a
non -rectilinear footprint, acute angles, angled window bays, and material palette, the design is thoroughly modern. [Figure 3]
17 TALL BRUSHEDALUMINUMCHANNEL
LETTER SIGNAGE ON C CHANNEL CANOPY
PAINIED ?C) MATC,I ANODIZED ALUMINUM
STORM RONI
A j
D C B A
SOUTH ELEVATION (WHITEWOOD ROAD)
A3 118" = -0"
BOARD FORMED CAST IN PLAC.F
CONCRETE ADA RAMP
BRUSHED ALUMINLM CHANNEL
_=TTER SIGNAGL IN C(7RNICE BAND
— — — - — — — — — —. —. — —. —. — — —. —. — — — —
I
r.r
B A
WEST ELEVATION (HYDRAULIC ROAD)
A3 ',B 1•.0
Window gloss'n the Entrance Comdorsstlrwld nWel'he Icllowing cdtero: Viiide Lgh' transm1I(3 ;;:* i VI 1'
h"Irn 1rir--'rw An't Vma F��n1,-I].....rvw'VI RI ".1n 1crr 4Vn
Figure 3: South and West elevations ofproposed new building at 2800 Hydraulic Road (TMP61-24B)
MATERIAL KEY
LLIILR
SYMBOL
DESCRIPTION
A
'
EL DORADO LUROPEAN LEDOF
IN CO'IONWOOO
B
WE SHP. AP SID'NG FINISHED WITH DECKWISE IN OIL
C
Ell S SOING -AINTED BENJAMIN MOORE 2; I8-40'SEA _IFE
BRONZE ALUMINUM STOREFRONT SYS'LM
ANODIZED R GLAZING J 1CW-
Wish CLEAF COATING'
The proposal also includes additional landscaping to the site, most notably four large shade (River Birch) trees on the west property line, along the EC.
Very minor changes are proposed for the remainder of the site: the asphalt parking area will be repaved and re -striped; a dumpster pad and a shed in the
northeast corner of the parking area will be demolished; and a new dumpster pad and enclosure will replace the existing one slated for demolition.
4
ANALYSIS
REF #
GUIDELINE CURRENT ISSUE RECOMMENDATION
GENERAL GUIDELINES
Purpose
1
The goal of the regulation of the design of development within
This thoroughly modern building
See below.
the designated Entrance Corridors is to insure that new
does not reflect the traditional
development within the corridors reflects the traditional
architecture of the area either in
architecture of the area. Therefore, it is the purpose of ARB
materiality or form, but it does reflect
review and of these Guidelines, that proposed development
contemporary design vocabularies
within the designated Entrance Corridors reflect elements of
implemented in this region and
design characteristic of the significant historical landmarks,
beyond. The only characteristic that
buildings, and structures of the Charlottesville and Albemarle
might be construed as traditional is
area, and to promote orderly and attractive development
the scale: at a single story (14 feet
within these corridors. Applicants should note that replication
high), it retains the height of the
of historic structures is neither required nor desired.
extant building (although a tower on
the southwest corner extends 17 feet
2
Visitors to the significant historical sites in the Charlottesville
and Albemarle area experience these sites as ensembles of
high) while reflecting the one- and
buildings, land, and vegetation. In order to accomplish the
two-story developments in the
integration of buildings, land, and vegetation characteristic of
vicinity.
these sites, the Guidelines require attention to four primary
factors: compatibility with significant historic sites in the area;
the character of the Entrance Corridor; site development and
layout; and landscaping.
SPECIFIC GUIDELINES
Structure design
9
Building forms and features, including roofs, windows, doors,
The proposed materials (stone veneer,
Revise the building design to
materials, colors and textures should be compatible with the
EIFS, Ipe siding, and anodized
further relate to traditional
forms and features of the significant historic buildings in the
aluminum storefront fenestration),
architecture.
area, exemplified by (but not limited to) the buildings
color palette (black, greys, taupe, and
described in Appendix A [of the design guidelines]. The
reddish -brown), forms (non-
standard of compatibility can be met through scale, materials,
rectilinear footprint, acute angles,
and forms which may be embodied in architecture which is
projecting angular windows), and
contemporary as well as traditional. The replication of
massing are in keeping with trends in
important historic sites in Albemarle County is not the
contemporary architectural design,
objective of these guidelines.
but are not reflective of traditional
architecture in the region. While the
use of wood and stone are references
to traditional building materials, the
horizontality of the El Dorado
European Ledge is not a local
aesthetic nor is the Ipe native.
The massing is broken down by three
projecting, angular corner "towers"
that add relief to the north, west, and
south elevations in particular (they
are seen in profile from the east
elevation as well); the southwest
corner tower rises three feet above the
parapet (17 feet high from grade).
Each elevation of the main block is
punctuated by "bump -out" windows
with angular projections that are
distinctly contemporary in design.
The form, materials and general
character of the bump -out windows as
set against the blank EIFS backdrop
of wall do not contribute to a
cohesive whole and are not
compatible with traditional
architecture although they do create a
rhythm and marche.
10
Buildings should relate to their site and the surrounding
The building relates to its context in
None.
context of buildings.
its scale and in the west elevation's
parallel orientation to the street. The
11
The overall design of buildings should have human scale.
Scale should be integral to the building and site design.
west side of the building has been set
within its 10' minimum and 30'
12
Architecture proposed within the Entrance Corridor should
use forms, shapes, scale, and materials to create a cohesive
maximum setback lines from the EC.
whole.
Existing parking is relegated from the
EC, albeit visible.
13
Any appearance of "blankness" resulting from building design
Potential blankness is resolved by
Add landscaping at the west
should be relieved using design detail or vegetation, or both.
copious fenestration, projecting
end of the north elevation to
corner towers, and landscaping. The
relieve the blankness of the
north elevation is the least adorned,
EIFS elevation.
with a boxed bed of three
lantanaphyllum viburnum (shrubs).
The perspective renderings show a
flowering dogwood or a similar
ornamental on the north side of the
building which is not shown in the
landscape plans.
14
Arcades, colonnades, or other architectural connecting devices
No architectural connecting devices
None.
should be used to unify groups of buildings within a
are proposed.
development.
15
Trademark buildings and related features should be modified
Although this is not an example of
None.
to meet the requirements of the Guidelines.
corporate trademark architecture, the
overall aesthetic (including the
projecting window forms and the
modernist landscaping plan and plant
panels) has been seen before,
including on recent projects like
North Point, a residential
development on Route 29.
16
Window glass in the Entrance Corridors should not be highly
Note is provided on A3 and A4 of the
None.
tinted or highly reflective. Window glass in the Entrance
architectural drawings.
Corridors should meet the following criteria: Visible light
transmittance (VLT) shall not drop below 4001o. Visible light
reflectance (VLR) shall not exceed 30%. Specifications on the
proposed window glass should be submitted with the
application for final review.
GENERAL GUIDELINES
Compatibility with significant histofic sites / Compatibility with the character of the Entrance Corridor
3
New structures and substantial additions to existing structures
The building does not reference
See comments above.
should respect the traditions of the architecture of historically
traditional architecture of the region.
significant buildings in the Charlottesville and Albemarle
The scale of the building reflects the
area. Photographs of historic buildings in the area, as well as
one- and two-story late 20"-century
drawings of architectural features, which provide important
buildings in the vicinity, however.
examples of this tradition are contained in Appendix A.
4
The examples contained in Appendix A should be used as a
guide for building design: the standard of compatibility with
the area's historic structures is not intended to impose a rigid
design solution for new development. Replication of the
design of the important historic sites in the area is neither
intended nor desired. The Guideline's standard of
compatibility can be met through building scale, materials,
and forms which may be embodied in architecture which is
contemporary as well as traditional. The Guidelines allow
individuality in design to accommodate varying tastes as well
as special functional requirements.
5
It is also an important objective of the Guidelines to establish
a pattern of compatible architectural characteristics throughout
the Entrance Corridor in order to achieve unity and coherence.
Building designs should demonstrate sensitivity to other
nearby structures within the Entrance Corridor. Where a
designated corridor is substantially developed, these
Guidelines require striking a careful balance between
harmonizing new development with the existing character of
the corridor and achieving compatibility with the significant
historic sites in the area.
Site development and layout
6
Site development should be sensitive to the existing natural
The previously -developed site has
None.
landscape and should contribute to the creation of an
been cleared, graded, and largely
organized development plan. This may be accomplished, to
paved. The terrain is relatively flat,
the extent practical, by preserving the trees and rolling terrain
with a slight decrease in slope from
typical of the area; planting new trees along streets and
west to east (from 593 feet on the
pedestrian ways and choosing species that reflect native forest
west property line to 590 feet on the
elements; insuring that any grading will blend into the
east property line). No additional
surrounding topography thereby creating a continuous
grading is proposed.
landscape; preserving, to the extent practical, existing
significant river and stream valleys which may be located on
A stand of trees on the east property
the site and integrating these features into the design of
line will remain, while additional
surrounding development; and limiting the building mass and
trees and shrubs will be added to the
height to a scale that does not overpower the natural settings
site. Only four trees over the whole
of the site, or the Entrance Corridor.
site are slated for removal, including
a large willow on the EC frontage; its
removal is to accommodate the
planting of four new street trees.
Landscaping
7
The requirements of the Guidelines regarding landscaping are
The planting program is minimal,
Correct the plant schedule to
intended to reflect the landscaping characteristic of many of
homogenous, and repetitive; the
correspond with the number
the area's significant historic sites which is characterized by
applicant describes the repetitive
of plants shown on the
large shade trees and lawns. Landscaping should promote
forms as a unifying design motif. It
landscape plan (C 105 of the
visual order within the Entrance Corridor and help to integrate
has been the ARB practice, however,
site plan set).
buildings into the existing environment of the corridor.
to encourage that the number of
proposed plants for any one species is
Reduce and limit the number
8
Continuity within the Entrance Corridor should be obtained by
planting different types of plant materials that share similar
limited to 25% of the total for that
of proposed plants for any
characteristics. Such common elements allow for more
plant type in order to ensure the site's
one species to 25% of the
flexibility in the design of structures because common
overall plant health and survival. The
total for that plant type by
landscape features will help to harmonize the appearance of
proposed amount of River Birch (BN)
adding more variety.
development as seen from the street upon which the Corridor
is greater than 25% the total tree
is centered.
count; the proposed amount of
Sweetspire (IV) is greater than 25%
the total shrub count; and both
proposed ornamental grasses are over
25% the total ornamental grass count.
The number of plants in the plant
schedule and those illustrated on
C 105 of the site plan set do not
correlate: 4 BNs were counted (6
listed); 36 (or 40?) FG counted (30
listed); 126 IV counted (122 listed);
320 MC counted (279 listed); 320 PV
counted (279 listed). In addition, 4
possible FG are not called out on the
southwest side of the entrance to the
building. Note also that the HV
(common witch hazel) is sometimes
considered a deciduous shrub and
sometimes considered a small tree.
Accessory structures and equipment
17
Accessory structures and equipment should be integrated into
An existing refuse area on the north
Clarify on Existing
the overall plan of development and shall, to the extent
property line, east of the building,
Conditions sheet (C 102) of
possible, be compatible with the building designs used on the
will be demolished and a new
the site plan set if the wooden
site.
dumpster pad with Ipe siding
enclosure will be built in its place.
rail fence on northern
property line is to be
18
The following should be located to eliminate visibility from the
Entrance Corridor street. If, after appropriate siting, these
The enclosure's siding is coordinated
demolished.
features will still have a negative visual impact on the Entrance
with the building materials (bump -out
Corridor street, screening should be provided to eliminate
windows). A shed in the northeast
visibility.
corner of the parking area will be
a. Loading areas,
demolished and not replaced.
b. Service areas,
c. Refuse areas,
Loading and service areas are not
d. Storage areas,
marked on the site plan set. An
e. Mechanical equipment,
existing wooden rail on the northeast
f. Above -ground utilities, and
corner (northern property line)
g. Chain link fence, barbed wire, razor wire, and similar
appears to remain on the "Proposed
security fencing devices.
Project Site Plan" (sheet 10 of the
architectural drawings) but does not
appear on the "Existing Conditions"
(sheet C 102) of the site plan set. A
wooden fence on the neighboring
parcel to the east (eastern property
line) will remain.
No ground -mounted mechanical
equipment is illustrated on the site
plan set; the architectural drawings,
however, include a roof plan (A2)
that illustrates two HVAC units will
be placed in the center of the flat roof
within a recess that will have a 3.25-
foot tall parapet around it. As
illustrated, the units will not be
visible from the EC.
A traffic light and a traffic control
box stand at the corner of the
intersection and are to remain.
19
Screening devices should be compatible with the design of the
Vegetation is used as accent rather
None
buildings and surrounding natural vegetation and may consist
than screening. No walls or fencing
of. a. Walls, b. Plantings, and c. Fencing.
are proposed.
20
Surface runoff structures and detention ponds should be
Previous development included
None.
designed to fit into the natural topography to avoid the need for
stormwater drainage, and no new
screening. When visible from the Entrance Corridor street,
surface runoff structures or detention
these features must be fully integrated into the landscape. They
ponds are proposed in this scope of
should not have the appearance of engineered features.
work.
I
21
The following note should be added to the site plan and the
Note provided on Al and A2 of the
None.
architectural plan: "Visibility of all mechanical equipment
architectural drawings.
from the Entrance Corridor shall be eliminated."
Lighting
A lighting plan was submitted for
Provide a complete lighting
staff review past deadline and could
plan that includes all
not be reviewed in advance of this
proposed freestanding and
staff report.
wall -mounted lights with the
final site plan.
Landscaping
32
Landscaping along the frontage of Entrance Corridor streets
Four large shades (River Birches) are
Intersperse ornamentals
should include the following:
proposed for the EC frontage (west
among the large shade trees
a. Large shade trees should be planted parallel to the Entrance
side of the property). They are listed
on the EC frontage.
Corridor Street. Such trees should be at least 3'/2 inches caliper
as 3.5" caliper in the plant schedule.
(measured 6 inches above the ground) and should be of a plant
They span from 35' to 38' on center
Update the Existing
species common to the area. Such trees should be located at
(o.c.). The southernmost birch will
Conditions sheet (C 102)
least every 35 feet on center.
replace a very large willow on the
within the site plan set to
b. Flowering ornamental trees of a species common to the area
southwest corner of the site. The
show which trees in the
should be interspersed among the trees required by the
proposed trees on the west side of the
northeast corner will be
preceding paragraph. The ornamental trees need not alternate
property seem to conflict with several
removed for poor health.
one for one with the large shade trees. They may be planted
underground and overhead utilities; if
among the large shade trees in a less regular spacing pattern.
new trees cannot be planted because
Clarify the sign easement
c. In situations where appropriate, a three or four board fence
of utilities, the willow should remain.
area delineated on the
or low stone wall, typical of the area, should align the frontage
Existing Conditions sheet
of the Entrance Corridor street.
No flowering ornamentals are
(C 102) within the site plan.
d. An area of sufficient width to accommodate the foregoing
proposed between the birch trees. No
plantings and fencing should be reserved parallel to the
four -board fence or low stone wall is
Revise the landscape plan to
Entrance Corridor street, and exclusive of road right-of-way
proposed, except for a stone -veneer
verify that the proposed trees
and utility easements.
monument sign ("wall") at the
on the west side of the
southwest corner of the site. The sign
property will not conflict
is not being reviewed with this
with existing utilities. Ensure
proposal and the location on the site
that the proposed
plan is for information only; it will
development meets the
not be approved until a separate sign
landscape guidelines.
application is submitted and
reviewed. A sign easement area is
shown on C 102; clarification of its
limits and nature is needed.
33 Landscaping along interior roads:
a. Large trees should be planted parallel to all interior roads.
Such trees should be at least 2% inches caliper (measured six
inches above the ground) and should be of a plant species
common to the area. Such trees should be located at least
every 40 feet on center.
34 Landscaping along interior pedestrian ways:
a. Medium trees should be planted parallel to all interior
pedestrian ways. Such trees should be at least 2% inches
caliper (measured six inches above the ground) and should be
of a species common to the area. Such trees should be located
at least every 25 feet on center.
35 Landscaping of parking areas:
a. Large trees should align the perimeter of parking areas,
The planting area along the EC
frontage ranges from 10'-15', a
sufficient swath for the proposed
landscaping plan; however, the four
proposed trees (especially the middle
two) seem to conflict with one
overhead and two underground
utilities. The expansion of the
building to fill its lot without meeting
the landscape guidelines suggests that
the site is being overdeveloped.
The table on C 105 (landscape plan)
of the site plan set states that there is
"no adequate room for planting"
[large shade trees] along Whitewood
Road. A gas easement is shown that
extends 15' into the property.
Preferably, planting area should be
increased to provide the required
landscaping. At a minimum, the 5'
landscape buffer along the south edge
of the site might hold smaller
ornamental trees as well as shrubs.
Currently, mixed grass panels (24"
high) are proposed. One existing
willow tree on the site's southeast
entrance from Whitewood Road will
remain. Additional interior parking
lot trees might help offset the lack of
perimeter trees.
One small shade (Trident Maple) is
proposed for the southeast corner of
the building. The sidewalks around
the building are lined with shrubs and
ornamental grasses, but no trees.
The existing trees on the eastern
perimeter of the parking area will
Revise the planting plan to
increase planting area on the
south side of the site to
accommodate large shade
trees, 40' on center. At the
ARB's discretion, alternative
plantings could include
ornamental trees and/or larger
shrubs on the Whitewood
Road frontage, supplemented
with additional interior
parking lot trees.
Provide medium shade trees
to all interior pedestrian ways
on the east elevation and at
the entrance.
Provide three trees on the
interior of the parking area.
located 40 feet on center. Trees should be planted in the
remain; there is one existing canopy
interior of parking areas at the rate of one tree for every 10
tree on the south edge of the
parking spaces provided and should be evenly distributed
property/parking area; and two
throughout the interior of the parking area.
proposed birches on the EC frontage
b. Trees required by the preceding paragraph should measure
are also on the parking area's west
2% inches caliper (measured six inches above the ground);
perimeter. However, there are no
should be evenly spaced; and should be of a species common
proposed trees intended for perimeter
to the area. Such trees should be planted in planters or
parking, and one interior tree (the
medians sufficiently large to maintain the health of the tree
Trident Maple) within the parking lot.
and shall be protected by curbing.
For 33 parking spaces, three shade
c. Shrubs should be provided as necessary to minimize the
trees are required.
parking area's impact on Entrance Corridor streets. Shrubs
should measure 24 inches in height.
The proposed site plan offers four
additional parking spaces than are
required; at least two spaces could be
devoted to interior tree beds.
36
Landscaping of buildings and other structures:
Ornamental grasses, shrubs, and
Add landscaping at the west
a. Trees or other vegetation should be planted along the front
groundcover are proposed around all
end of the north elevation to
of long buildings as necessary to soften the appearance of
elevations of the proposed building.
relieve the blankness of the
exterior walls. The spacing, size, and type of such trees or
All shrubs and ornamental grasses are
EIFS elevation.
vegetation should be determined by the length, height, and
24" high at planting according to the
blankness of such walls.
plant schedule on C 105 of the site
b. Shrubs should be used to integrate the site, buildings, and
plan set.
other structures; dumpsters, accessory buildings and
structures; "drive thru" windows; service areas; and signs.
Shrubs should measure at least 24 inches in height.
37
Plant species: a. Plant species required should be as approved
All species proposed are included on
None.
by the Staff based upon but not limited to the Generic
the referenced plant lists.
Landscape Plan Recommended Species List and Native Plants
for Virginia Landscapes (Appendix D).
38
Plant health: The following note should be added to the
The note is not provided on the
Add standard plant health
landscape plan: "All site plantings of trees and shrubs shall be
landscape plan (C 105) of the site plan
note to the landscape plan
allowed to reach, and be maintained at, mature height; the
set. It has been provided on the
(C 105) of the site plan set.
topping of trees is prohibited. Shrubs and trees shall be
"proposed landscape plan" and
pruned minimally and only to support the overall health of the
"pedestrian planting plan" within the
plant."
submitted architectural drawings set.
Site Development and layout
Development pattern
13
39
The relationship of buildings and other structures to the
The site was previously developed
Revise the landscape plan to
Entrance Corridor street and to other development within the
and illustrates an organized pattern of
verify that the proposed trees
corridor should be as follows:
pedestrian paths (sidewalks) and
on the west side of the
a. An organized pattern of roads, service lanes, bike paths, and
interior roads.
property will not conflict
pedestrian walks should guide the layout of the site.
with existing utilities. Ensure
b. In general, buildings fronting the Entrance Corridor street
The new building is oriented parallel
that the proposed
should be parallel to the street. Building groupings should be
to the EC and is located specifically
development meets the
arranged to parallel the Entrance Corridor street.
to engage the street. However, the
landscape guidelines.
c. Provisions should be made for connections to adjacent
expansion limits ability to provide
pedestrian and vehicular circulation systems.
required frontage planting outside of
d. Open spaces should be tied into surrounding areas to
easements.
provide continuity within the Entrance Corridor.
e. If significant natural features exist on the site (including
The public sidewalks on the west and
creek valleys, steep slopes, significant trees or rock
south edges of the site are not being
outcroppings), to the extent practical, then such natural
altered.
features should be reflected in the site layout. If the provisions
of Section 32.5.6.n of the Albemarle County Zoning
No significant features or views exist
Ordinance apply, then improvements required by that section
on this previously developed site.
should be located so as to maximize the use of existing
features in screening such improvements from Entrance
Corridor streets.
f. The placement of structures on the site should respect
existing views and vistas on and around the site.
Site Grading
40
Site grading should maintain the basic relationship of the site to
The site was graded as per previous
Show adequate tree
surrounding conditions by limiting the use of retaining walls and
approvals.
protection fencing on the site
by shaping the terrain through the use of smooth, rounded land
plan set.
forms that blend with the existing terrain. Steep cut or fill
Although the site plan set calls out
sections are generally unacceptable. Proposed contours on the
various existing trees that will
grading plan shall be rounded with a ten foot minimum radius
remain, adequate tree protection
where they meet the adjacent condition. Final grading should
fencing is not shown on the site plan
achieve a natural, rather than engineered, appearance. Retaining
set.
walls 6 feet in height and taller, when necessary, shall be
terraced and planted to blend with the landscape.
No new stormwater facilities are
proposed.
41
No grading, trenching, or tunneling should occur within the drip
line of any trees or other existing features designated for
preservation in the final Certificate of Appropriateness.
Adequate tree protection fencing should be shown on, and
14
coordinated throughout, the grading, landscaping and erosion
and sediment control plans.
42
Areas designated for preservation in the final Certificate of
Appropriateness should be clearly delineated and protected on
the site prior to any grading activity on the site. This
protection should remain in place until completion of the
development of the site.
43
Preservation areas should be protected from storage or
movement of heavy equipment within this area.
44
Natural drainage patterns (or to the extent required, new
drainage patterns) should be incorporated into the finished site
to the extent possible.
SUMMARY OF RECOMMENDATIONS
Staff recommends the following as the primary points of discussion:
1. The need to vary plant species or limiting any one plant species to 25% the total plant count versus a design intention of homogeneity and
minimalism.
Staff offers the following comments on the proposal:
1. Revise the building design to further relate to traditional architecture.
2. Add landscaping at the west end of the north elevation to relieve the blankness of the EIFS elevation.
3. Correct the plant schedule to correspond with the number of plants shown on the landscape plan (C 105 of the site plan set).
4. Reduce and limit the number of proposed plants for any one species to 25% of the total for that plant type by adding more variety.
5. Clarify on Existing Conditions sheet (C 102) of the site plan set if the wooden rail fence on northern property line is to be demolished.
6. Provide a complete lighting plan that includes all proposed freestanding and wall -mounted lights with the final site plan.
7. Intersperse ornamentals among the large shade trees on the EC frontage.
8. Update the Existing Conditions sheet (C 102) within the site plan set to show which trees in the northeast corner will be removed for poor health.
9. Clarify the sign easement area delineated on the Existing Conditions sheet (C 102) within the site plan.
10. Revise the landscape plan to verify that the proposed trees on the west side of the property will not conflict with existing utilities. Ensure that the
proposed development meets the landscape guidelines.
11. Revise the planting plan to increase planting area on the south side of the site to accommodate large shade trees, 40' on center. At the ARB's
discretion, alternative plantings could include ornamental trees and/or larger shrubs on the Whitewood Road frontage, supplemented with additional
interior parking lot trees.
12. Provide medium shade trees to all interior pedestrian ways on the east elevation and at the entrance.
13. Provide three trees on the interior of the parking area.
15
14. Add standard plant health note to the landscape plan (C 105) of the site plan set: All site plantings of trees and shrubs shall be allowed to reach, and
be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall
health of the plant.
15. Show adequate tree protection fencing on the site plan set.
TABLE A
This report is based on the following submittal items:
Sheet #
Drawing Name
Drawing Date/Revision Date
C100
Cover Sheet
10/23/17
C 102
Existing Conditions
10/23/17
C103
Layout Plan
10/23/17
C104
Grading & Utility Plan
10/23/17
C105
Landscape Plan
10/23/17
C106
Site Details
10/23/17
Al
First Floor Plan
10/23/17
A2
Roof Plan
10/23/17
A3
South / West Elevations
10/23/17
A4
North / East Elevations
10/23/17
1
Cover
10/23/17
3
Table of Contents
10/23/17
5
Project Description
10/23/17
6
Vicinity Map
10/23/17
7
Context Photos
10/23/17
8
Existing Site Conditions
10/23/17
9
Building Form Development
10/23/17
10
Proposed Project Site Plan
10/23/17
11
Southbound on Hydraulic Rd. Entrance Corridor
10/23/17
12
Northbound on Hydraulic Rd. Entrance Corridor
10/23/17
13
South Elevation from Interior Parking Lot
10/23/17
14
South Elevation from Parking Lot Entrance
10/23/17
15
Aerial Above Hydraulic Rd.
10/23/17
IN
16
Courtyard Perspective
10/23/17
17
Pedestrian Perspective
10/23/17
18
Pedestrian Perspective
10/23/17
19
Pedestrian Perspective
10/23/17
20
Pedestrian Perspective
10/23/17
21
Pedestrian Perspective
10/23/17
22
Proposed Landscape Plan
10/23/17
23
Pedestrian Planting Plan
10/23/17
24
Plantings — Ornamental Grasses
10/23/17
25
Plantings — Trees
10/23/17
26
Plantings — Shrubs
10/23/17
27
Plantings — Grasses and Groundcover
10/23/17
28
Proposed Sign Wall
10/23/17
29
Exterior Finishes
10/23/17
17