HomeMy WebLinkAboutWPO201700031 Bond Estimates WPO VSMP 2017-11-07 Project Name:UVA Foundation Indoor Golf Facility WPO file number:WPO201700019 Erosion and Sediment Control Bond Estimate Item Item No.Unit Unit Cost Cost Number (installed) Ott fence(F1 TS) c 55.0$0.00 $21470.00 sift fence(SF) ft� 85.00 $26.479.00 safety fence(SAF) ft $5.00 $50,512.00 diversion(DD,FD,RWD) ft $13.00 511,436.10 temporary slope drain(TSD) pipe length -ft pipe diameter _in $0.00 $000 earthwork for trap/basin h ht at length of dam at toe ■ft lengthhighot .ft height of fill at face ft cut at face ft len th of darn ft of cu[ ft top w dth ft width of cut ft is o ve transition) 12 sr (area below transition) 92 sf (total width of dam) 4 ft (rota'wdtn of cut) 37 ft (height below transition) Oft depth below transit;or 3 f[ (area below transition) 0 sf (area above transition) 485 sf (total fill volume) 3.0 cy !foul fill volume) 307.6 cy length of spillwayft (TOA&CY estimate) 309 cy $13.00 $4,017.00 width of spillway -ft (spillway stone tons) 0 tons $50.00 $0.00 structures for basin riser height ft riser diameter in $o00 $000 barrel length ft base plate or fdn MIIIII $200.00 $0 barrel diameter in ..ice) $000 $0.00 barrel collars $200.00 $0 baffle length .ft $50.00 $0 stoneprotection inletprotection(IP) II. CO 00.00 inlet nlet protection(IP) $200.00 $1,200.00 outlet protector(OP) length ft width ft Slams() $5,400.00 channel(SCC,matted) length ft widthIll ft $0.00 conk tlam depth In channel ft channel width ft . $0.00 0 00 construction entrance(CE) $2,500.00 $$0.00 wash rack 52,000.00 $0.00 53,5 paved construction entrance 00.00 53,500.00 rip-rap,placed depth Ellift length ft width 0 tons $60.00 $000 survey and layout(price per 0.1 mi.) acres IMMIN traps and basins ® $2,600.00 mobilization $2500.00 stream crossing(computed independently) $0.00 cost sum $12864410'. contingency $12,664.41 Total $141,510_; 111712017 Project Name:UVA Foundation Indoor Golf Facility WPO file number: WPO-201700019 Stormwater Management Plan Bond Estimate Item Item No Unit Unit Cost Cos Number (installed) permanent diversion or ditch ft $13.00 $000 standard manhole frame top(not inlet) ea $500.00 $1,500.00 drop inlet or gratea $3,50000 s2800000 manhole structure(per R.rise) fl $450.00 $0 00 pipe,rcp,cmp(15 to 48") in II ES-1,2 fl W EC-1 fl $3500 $1259500 pipe,rcp,cmp(15 to 48") in d ES-1,2 EC-1 ft $40.00 $6,300 00 pipe,rcp,cmp(15 to 48") Intl ES-1,2 EC-1 ft $7500 $14,175.00 aggregate base or drainage stone in d ft L 0,0 ton $3500 $0.00 earthwork for trap/basin height of dam at toe ft cut at high i9h side ft height of fill at face ft cut at face ft length of dam ft length of cut ft top width ft width of cut ft (area above transalon( 12 sf (area below transition) 92 sf (total width of dam) 4 ft (total width of cut) 37 ft (height below transition 0 ft (depth below transition 3 ft (area below transelon) 0 sf (area above transition) 46.5 sf ,total hli volume, 36 cy (total fill volume) 307.8 cy length of spillwayft (TOAL CV estimate) 309 cy $13.00 $4,017.00 width of spillway -It (spillway stone tons) 0 tons $50 00 $0 00 structures for basin riser height ft riser diameter In nisei unit price) $0 00 $0 00 ft barrel length Line plat tan IE. $200.00 $0 barrel diameter in (barrel unit price) $0 00 $0.00 barrel collars 5200.00 50 baffle length ft $50.00 $0 - trees $27500 $935000 shrubs $5000 $000 seedlings $500 $0.00 underdrain(LE) fta $5.00 $38500 biafiller soil mix(CV) cY $4500 $7335.00 trash rack/anti vortex devices ft S1.500 00 $0.00 maintenance access road(LF) ft $50 00 $000 rip-rap,placed depth 1111 ft length _ft width (tons) 375 $60.00 $2,250.00 survey and layout(price per 0.1 mi.) acres basins MIN $2,100.00 mobilization $2,500.00 as-built drawings(per facility) 1.1 ea $2,00000 52,000.00 materials testing(per facility) $200000 $2,000.00 compaction testing(per dam) ea $300000 $0.00 manufactured facilities(attach manufacturers or contractors price as a base) $000 cost slim $94,507.00 contingency 59,450 70 Total $103,960 11/7)2017