HomeMy WebLinkAboutWPO201700026 Approval - Agencies WPO VSMP 2017-09-21COMMONWEALTH of VIRGINIA
DEPARTMENT OF ENVIRONMENTAL QUALITY
Street address: 629 East Main Street, Richmond, Virginia 23219
Molly Joseph Ward Mailing address: P.O. Box 1105, Richmond, Virginia 23218
Secretary of Natural Resources www.deq.virginia.gov
September 21, 2017
Craig Enterprises Inc dba Craig Builders
PO Box 6156
Charlottesville, VA 22906
will.craig@craigbuilders.net
RE: Coverage under the VPDES Construction General Permit (VAR10)
General Permit No. VARlOJ609
Out of Bounds Lots 31-38
Residential
Albemarle
Dear Permittee:
David K. Paylor
Director
804) 698-4000
1-800-592-5482
DEQ has reviewed your Registration Statement received on March 01, 2017 and determined that the
proposed land -disturbing activity is covered under the General VPDES Permit for Discharges of Stormwater from
Construction Activities (VAR10). The effective date of your coverage under this general permit is July 1, 2014 or
the date of this letter, whichever is later.
A copy of the general permit can be obtained from DEQ's webpage at the following location:
http://www.deg.virginia.gov/Portals/0/DEQ/Water/Publications/CGP2014.pdf.
The general permit contains the applicable Stormwater Pollution Prevention Plan (SWPPP) requirements and
other conditions of coverage. Please print the general permit and read it carefully as you will be responsible for
compliance with all permit conditions.
DEQ staff has determined that the proposed land -disturbing activity will discharge to a surface water identified
as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of the
general permit for (i) sediment or a sediment -related parameter or (ii) nutrients. Therefore, the following general
permit (Part 1.B.4) and SWPPP requirements (Part II.A.5) must be implemented for the land -disturbing activity:
Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after
final grade is reached on any portion of the site;
Nutrients (e.g., fertilizers) shall be applied in accordance with manufacturer's recommendations or an
approved nutrient management plan and shall not be applied during rainfall events;
Inspections shall be conducted at a frequency of (i) at least once every four (4) business days or (ii) at
least once every (5) business days and no later than 48 hours following a measurable storm event. In the
event that a measurable storm event occurs when there are more than 48 hours between business days,
the inspection shall be conducted on the next business day; and
Representative inspections used by utility line installation, pipeline construction, or other similar linear
construction activities shall inspect all outfalls.
The general permit will expire on June 30, 2019. The conditions of the general permit require that you submit
a new registration statement at least 90 days prior to that date if you wish to continue coverage under the general
permit, unless permission for a later date has been granted by the Board. Permission cannot be granted to
submit the registration statement after the expiration date of the general permit.
If you have any questions about this permit, please contact the DEQ Office of Stormwater Management at
Construction GP@deq.virg inia.gov.
Sincerely,
Frederick K. Cunningham, Director
Office of Water Permits
2