Loading...
HomeMy WebLinkAboutWPO201700062 Checklist - Project Closeout (Administrative) WPO VSMP 2017-08-11 WATER PROTECTION (REVIEW) FILE CLOSEOUT AT TIME OF ENGINEERING APPROVAL/DENIAL IMAGING CENTER INSTRUCTIONS CHECKLIST The Lead Engineer is to complete this form within 30 days of final action of WPO plan; place the completed form in the WPO folder and forward to the Imaging Center for digital closeout into LaserFiche. Once items have been placed in LaserFiche,Imaging Center staff will fo rward back to the Engineering Department. WPO# 'D11.-014, PROJECT TITLE 41 —� 1 GG FULL NAME OF ENGINEER: � C��� FINAL ACTION DATE: � T 11-7� CountyView — 111 Limits of Disturbance Area(Ac)updated SP! Status/Status Date updated Hardcopy— File Folder Closeout: All items listed should be placed in project folder,in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file, place an"N/A" next to the check box. The Lead Reviewer/Engineer has the discretion to include any item deemed necessary to provide clarity to the file, please indicate that item on the"Other" lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format,can be saved to LaserFiche.Please provide the digital location (path/name)of the document in the space provided. ® Application(signature copy) ❑ Scan ❑ Saved location IVr Approved E&S Plan and/or SWM Plan and/or SWPPP(stamped"Approved") ❑ Scan ❑ Saved location ❑ Approved Mitigation Plan(stamped"Approved") ❑ Scan ❑ Saved location ❑ SWM Maintenance Agreement(executed and recorded) ❑ Scan ❑ Saved location ❑ SWM Deed/Easement Plat(recorded) ❑ Scan ❑ Saved location ❑ Nutrient Credit Agreement ❑ Scan ❑ Saved location ❑ Calculations stamped"Approved" ❑ Scan ❑ Saved location ❑ Bond Estimate ❑ Scan ❑ Saved location ❑ ACOE/ACSA/VDOT Approval Letter(s) ❑ Scan Saved location 6-11 Other(Please explain) CIN Al ❑ Scan ❑ Sad location ❑ At the Engineer's discretion, copies of unapproved plans/plats may be placed in the file if they lend clarity to the review at a later date. If such plans are included, they should be clearly marked as unapproved and contain a note clarifying why it was included. ❑ Scan ❑ Saved location