HomeMy WebLinkAboutWPO201700018 Permit 2014-09-05 tff'
COMMONWEALTH of VIRGINIA
DEPARTMENT OF ENVIRONMENTAL QUALITY
Street address:629 East Main Street,Richmond,Virginia 23219
Molly Joseph Ward Mailing address:P.O.Box 1105,Richmond,Virginia 23218 " David K.Paylor
Secretary of Natural Resources www.deq.virginia.gov Director
(804)698-4020
1-800-592-5482
September 5, 2014
Ryan Homes
1885 Seminole Trl
Charlottesville,VA 22901
RE: Coverage under the 2014 VPDES Construction General Permit(VAR10)
General Permit No. VAR107194
Briarwood Townhouses
Private- Residential-Attached Townhouses
Dear Permittee:
DEQ has reviewed your Registration Statement received on May 20, 2014 and determined that the proposed
land-disturbing activity is covered under the General VPDES Permit for Discharges of Stormwater from
Construction Activities (VAR10). The effective date of your coverage under this general permit is the date of this
letter.
A copy of the general permit can be obtained from DEQ's webpage at the following location:
http://www.dea.virainia.gov/Portals/0/DEQNVater/Publications/CGP2014.pdf.
The general permit contains the applicable Stormwater Pollution Prevention Plan (SWPPP) requirements and
other conditions of coverage. Please print the general permit and read it carefully as you will be responsible for
compliance with all permit conditions.
The general permit requires that you update your SWPPP to incorporate the changes that the Department
made for this permit reissuance. Please update the SWPPP as soon as possible but no later than sixty (60) days
from the date of this letter.
DEQ staff has determined that the proposed land-disturbing activity will discharge to a surface water identified
as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of the
general permit for(i) sediment or a sediment-related parameter or (ii) nutrients. Therefore, the following general
permit(Part l.B.4)and SWPPP requirements(Part II.A.5)must be implemented for the land-disturbing activity:
•
• Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after
final grade is reached on any portion of the site;
• Nutrients (e.g., fertilizers) shall be applied in accordance with manufacturer's recommendations or an
approved nutrient management plan and shall not be applied during rainfall events;
• Inspections shall be conducted at a frequency of (i) at least once every four (4) business days or (ii) at
least once every(5) business days and no later than 48 hours following a measurable storm event. In the
event that a measurable storm event occurs when there are more than 48 hours between business days,
the inspection shall be conducted on the next business day; and
• Representative inspections used by utility line installation, pipeline construction, or other similar linear
construction activities shall inspect all outfalls.
Page 2 of 2
General Permit No. VAR107194
Briarwood Townhouses
The general permit will expire on June 30, 2019. The conditions of the general permit require that you
submit a new registration statement at least 90 days prior to that date if you wish to continue coverage under the
general permit, unless permission for a later date has been granted by the Board. Permission cannot be granted
to submit the registration statement after the expiration date of the general permit.
If you have any questions about this permit, please contact the DEQ Office of Stormwater Management at
Construction G P Adeq.virgi n ia.q ov.
Sincerely,'
,i0404
9,44eze.
Frederick K Cunningham, Director
Office of Water Permits
,45c A
Request for Pre-construction Meeting and Grading Permit
from Albemarle County �fttf:
4�Roin
Approved Plan Number: WPO-
Approved Plan Name:
(Plans must be approved prior to a pre-construction meeting.)
Bond approved date:
(Bonds must be approved and posted prior to a pre-construction meeting or permit.)
Responsible Land Disturber:
Print Name:
State Certification Number:
Address
City State Zip
Daytime Phone( ) E-mail
Primary Contractor:
Print Name
Address
City State Zip
Daytime Phone( ) E-mail
Permit Issuance and First Year Maintenance Fees: (Request must include payment)
Total acres proposed to be disturbed is contained on the approved plan and application:
VSMP:
Acres to be disturbed Fee Due at Grading Permit
Less than 1 0
1 and less than 5 $594.00
5 and less than 10 $74 .
10 and less than 50 $990.00
50 and less than 100 $1,342.00
100 and more $2,112.00
For plans exempt from VSMP,VESCP fees were paid with the application.
7/1/14,Revised: 8/29/14 Page 1 of 3
Person(s)to attend the Pre-construction Meeting:
Names(type or print) Firm Contact Number or email
The second part of the application fee is required to be paid with this request. This fee amount is;
FOR OFFICE USE ONLY Permit Issued Date
By who?
7/1/14,Revised: 8/29/14 Page 2 of 3
Information for Permit applicants;
9-Month Permanent Stabilization Deadline:
Code Sec. 17-808 Duty to stabilize denuded areas with permanent vegetation within nine months after
commencing land disturbing activity
A. When permanent vegetation required.The owner shall install on all denuded areas on the site within nine(9)
months after the date the land disturbing activity commenced,except for areas that the administrator
determines are necessary parts of the construction that are subject to an active building permit and areas where
erosion is prevented by a non-erosive surface,including,but not limited to,the following surfaces: (i)
roadways and sidewalks covered by gravel,asphalt pavement,or concrete;(ii)trails or paths covered by
gravel,stone dust,or mulch; (iii)buildings and other permanent structures;and such other surfaces that the
administrator determines would adequately provide a permanent barrier to erosion.
(see code 17-808 for information about possible extensions)
Notice to Comply and Permit Revoked for Overdue Fees
Late fees will incur interest,and enforcement actions per code section 17-210.
(1) Owners with late payments of fees required by 17-207C6 will be issued a Notice to Comply(NTC). The notice
gives 7 days to make payments.
(2) At the end of the NTC time period,the permit will be revoked,and a Stop Work Order will be issued for
working without a current permit.
Disturbed Area Reductions
Acreage for the purpose of fee computations will be the entire permitted acreage. This is the disturbed acreage on
approved plans. If fees are to be reduced,an application for plan amendment must be made,and areas reduced by
changes in limits of disturbance and appropriate plan changes. Such amendments must be approved prior to the fee
due date. Amendments to remove disturbed areas can only be approved when such areas are completely stabilized and
all erosion control measures(including traps and basins)removed.
Refunds
The County does not have a refund program. Fees will not be refunded based on completion within the year. Fees will
not be pro-rated at payment,other than the first year VSMP fee as indicated in code section 17-2098.
Re-inspection Fees
Re-Inspection Fees will be charged for inspections following a Notice to Comply or a Stop Work Order. Fees are$250
per inspection,or as given in code sections 17-207 and 17-208.
7/1/14,Revised: 8/29/14 Page 3 of 3