Loading...
HomeMy WebLinkAboutWPO201700044 Review Comments WPO VSMP 2017-10-30Short Review Comments Report for: WPO201700044 SubApplication Type: Old Trail Village, Blk. 7, Ph. 1 - VESCP Stormwater Management/BMP Plan Erosion and Sediment Control Plan Date Completed:06/30/2017 Reviewer:Emily Cox CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:06/29/2017 Reviewer:Geoff Elsie CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:09/29/2017 Reviewer:Geoff Elsie CDD Engineering Review Status:Approved Reviews Comments: Division: Date Completed:10/17/2017 Reviewer:Emily Cox CDD Engineering Review Status:See Recommendations Reviews Comments:-Approved pending the posting of E&S bond and providing 2 additional copies of the plan and plat. Division: Date Completed:10/30/2017 Reviewer:Emily Cox CDD Engineering Review Status:Approved Reviews Comments:-Phase II will have to show compliance with master plan (overall drainage areas). -bond not posted yet. Division: Page:1 of 1 County of Albemarle Printed On:December 15, 2017 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project title: Old Trail Village, Block 7, Phase 1 - VSMP Project file number: WP0201700044 Plan preparer: Roudabush, Gale and Assoc. Ammy George[ageorge@roudabush.com] Owner or rep.: March Mountain Properties LLC. [No Email Provided] Plan received date: 6 Jun 2017 Date of comments: 29 June 2017 17 Oct 2017 — Rev. 1 Reviewers: Geoff Elsie - VESCP Emily Cox - VSMP County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is Approved pending the posting of the E&S bond and provision of 2 additional copies of the plan and SWPPP sheets. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Please provide a copy of the SWPPP, or the Registration Statement that shows that this property is part of the overall Old Trail Site. — {Rev. 1} Comments addressed B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. Please provide a copy of the PPP. — {Rev. 11 Comments Addressed C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is Approved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. Please provide a note explaining why SWM is not necessary with this plan, show that it complies with the overall master SWM Plan (or the WPO Plan, which included this site for SWM) - {Rev. 1} Comments Addressed. However, once fully developed (Phase 2?), a drainage map must be provided showing compliance with the master plan for the entire block. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. Engineering Review Comments Page 2 of 2 This plan is Approved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Construction Entrance must be paved, show paved Construction Entrance detail on page 6. Refer to Albemarle Design Standards Manual for detail. — {Rev. 11 Comments Addressed 2. Construction Entrance must have wash rack and drain to an approved sediment trapping device. — {Rev. 11 Comments Addressed The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptforins.asp?department--cdengmTo COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project title: Old Trail Village, Block 7, Phase 1 - VSMP Project file number: WP0201700044 Plan preparer: Roudabush, Gale and Assoc. Ammy George[ageorge@roudabush.com] Owner or rep.: March Mountain Properties LLC. [No Email Provided] Plan received date: 6 Jun 2017 Date of comments: 29 June 2017 Reviewers: Geoff Elsie County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Please provide a copy of the SWPPP, or the registration statement that shows that this property is part of the overall Old Trail site. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. Please provide a copy of the PPP. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. Please provide a note explaining why SWM is not necessary with this plan. Show that it complies with the overall master SWM Plan (or the WPO Plan which included this site for SWM). D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Construction Entrance must be paved, show paved Construction Entrance detail on page 6. Refer to Albemarle Design Standards Manual for detail. Engineering Review Comments Page 2 of 2 2. Construction Entrance must have wash rack and drain to an approved sediment trapping device. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptforins.asp?department--cdeng)Lypo File: E1_vsmp_review projectname.doc