HomeMy WebLinkAboutWPO201700032 Plan - Stormwater WPO VSMP 2017-04-18OWNER: 04500— 00— 00-111 CO J J FIRST GOLD LEAF LAND TRUST 1 r. P.O. BOX 5548 B(ISTT11 G GGINl'1TTT(M[ CHARLOTTESVILLE, VA 22905 EROSION & SEDIMENT CONTROL PLAN NARRATIVE 04500— 00— 00-11000 PHASE I EROSION & SEDIMENT CONTROL PLAN FIRST GOLD LEAF LAND TRUST , jjE e ,__ ;._ � ..�.f: P.O. BOX 5548 CHARLOTTESVILLE, VA 22905 APPLICANT SEVEN DEVELOPMENT STORMWATER MANAGEMENT NOTES & DETAILS 1900 ARLINGTON BLVD., SUITE A s CHARLOTTESVILLE, VA 22903 ENGINEER: COLLINS ENGINEERING z 200 GARRETT ST. SUITE K, CHARLOTTESVILLE, VA 22902 PPI TELEPHONE: (434)293-3719 TAX MAP NO.: 04500-00-00-11100 (D.B. 4659/ PG. 032) .. 04500-00-00-11000 (D.B. 4659/ PG. 032) AREA: 04500-00-00-111CO — 1.14 ACRES 04500-00-00-11000 — 3.82 ACRES ZONING: HIGHWAY COMMERCIAL & ENTRANCE CORRIDOR BUILDING HEIGHTS: MAXIMUM BUILDING HEIGHTS SHALL NOT EXCEED 65 FEET EXISTING/PROPOSED USE. EXISTING SITE VACANT ; ONE BAN PROPOSED 45,600 SF COMMERCIAL/RETAIL SUBDIVISION STREETS: CURB & GUTTER WA TERSHED: THIS SI TE IS NOT LOCA TED IN A RESERVOIR WA TERSHED. TOPO & SURVEY- TOPOGRAPHY PROVIDED BY LICENSED LAND SURVEYOR ROGER RAY & ASSOCIATES, FIELD VERIFIED IN SEPTEMBER 2016'. BOUNDARY PROVIDED BY LINCOLN SURVEYING. EXISTING VEGETATION: PREVIOUSLY CLEARED AREAS WITH A WOODED PERIMETER. CRITICAL SLOPES: CRITICAL SLOPE IMPACTS HAVE BEEN PREVIOUSL Y APPROVED WITH PHASE I DEVELOPMENT PLANS FOR NORTHTOWN CENTER, AND THE PREVIOUS GRADING AND SITE DISTURBANCE HAS IMPACTED THESE PREVIOUSLY APPROVED CRITICAL SLOPES. THERE ARE NO MANAGED OR PRESERVED SLOPES ON THIS PROJECT. FLOODPLAIN: THERE IS NO 100—YEAR FLOODPLAIN ON THIS SITE. RETAINING WALLS: NO PROPOSED RETAINING WALLS WITH THIS EARLY GRADING PERMIT PLAN. THE SITE DOES CONTAIN EXISTING RETAINING WALLS AS SHOWN ON THE PLANS. ADJACENT PROPERTY OWNERS: SEE EXISTING CONDITIONS, SHEET 2. PHASING: PHASE IIA — ONE (1) MIXED USE BUILDING & PARKING AREAS PHASE IIB — ONE (1) RETAIL BUILDING & PARKING AREAS PHASE //8 — (THIS PLAN) STORMWA TER MANAGEMENT FACILITY- EXISTING BIO—FILTER AND RAIN GARDEN SHALL ACCOMMODATE STORM WA TER MAAVAGEMENT REQUIREMENTS FOR THE PARCEL ADJACENT TO IROUTE 29. A STORMWA TER MANAGEMENT POND IS PROPOSED FOR WATER QUANTITY DETENTION FOR THE REAR PARCEL. WATER QUALITY FOR ACCOMM L SHALL BE CaDA TED THROUGH ON—SITE THIS PARCEL BUFFERS AND MI TIGA TION CREDITS. SEE STORMWA TER MANAGEMENT PLAN FOR ADDITIONAL DETAILS. 0 0 ki nUMMSM4. E112 EXI517NG II GANDER MOUNTAIN � y`-a`a I J J 1 1 r. r , B(ISTT11 G GGINl'1TTT(M[ ; EROSION & SEDIMENT CONTROL PLAN NARRATIVE 4 PHASE I EROSION & SEDIMENT CONTROL PLAN 5 , jjE e ,__ ;._ � ..�.f: 0 U �:F)RMATR MANAGEMENT PLAN 8 STORMWATER MANAGEMENT NOTES & DETAILS z s U EXI517NG II GANDER MOUNTAIN � y`-a`a SHEET LAYOUT SCALE: 1" = 100' 'yFi y �V '40q�TS O At l2O �O O,p�6',Qo co-) SITE �v VICINITY MAP SCALE: 1" = 21000' 'PIH 0 iULiOT, CT R. COLLINS� F� . No. 035791,x• Sheet List Table Sheet Number Sheet Title 1 COVER B(ISTT11 G GGINl'1TTT(M[ ; EROSION & SEDIMENT CONTROL PLAN NARRATIVE 4 PHASE I EROSION & SEDIMENT CONTROL PLAN 5 PHASE II EROSION & SEDIMENT CONTROL PLAN C Yl /lC T/1111 Ti"7QTi"OCr��rCTIT "��eLpIPT��[)ETA16F 0 U �:F)RMATR MANAGEMENT PLAN 8 STORMWATER MANAGEMENT NOTES & DETAILS z U z wca Uj PPI 0 �n-g- .. i" H LLJ CO n39 _LAR I6`Il H a- ; ONE BAN `L_::�x Y i r U) 1 � � -- _, , U.S, ROUTE ---29 - SEMI#NOLE-TRAIL.. VARIABLE WIDTH R/W' STATE HIGHWAY PRO,}ECT 6029-002-F19, RW202 — _ .. F z. SHEET LAYOUT SCALE: 1" = 100' 'yFi y �V '40q�TS O At l2O �O O,p�6',Qo co-) SITE �v VICINITY MAP SCALE: 1" = 21000' 'PIH 0 iULiOT, CT R. COLLINS� F� . No. 035791,x• Sheet List Table Sheet Number Sheet Title 1 COVER B(ISTT11 G GGINl'1TTT(M[ 3 EROSION & SEDIMENT CONTROL PLAN NARRATIVE 4 PHASE I EROSION & SEDIMENT CONTROL PLAN 5 PHASE II EROSION & SEDIMENT CONTROL PLAN C Yl /lC T/1111 Ti"7QTi"OCr��rCTIT "��eLpIPT��[)ETA16F 0 U �:F)RMATR MANAGEMENT PLAN 8 STORMWATER MANAGEMENT NOTES & DETAILS ROADS A TOTAL NUMBER OF SHEETS LEGEND EXISTING CULVERT ,,, . ,,, EARTH DITCH CUL VERT DRIVEWAY CULVERT DROP INLET & STRUCTURE NO. BENCH MARK CURB CURB & GUTTER — — — — — CLEARING LIMITS PROPOSED PA VEMENT as VDOT STANDARD STOP SIGN EC -3A DITCH — EXISTING CONTOUR DEPTH OF EC -3A DITCH PROPOSED CONTOUR EC -2 DITCH 240.55 PROPOSED SPOT ELEVATION TBC DENOTES TOP/BACK OF CURB DEPTH OF EC -2 DITCH TAB DENOTES TOP OF BOX APPROVED by the Albernarle, County cdmfflu tltv, Oa olapment Department eo o��sSl0NAL �� w z n n LU m M M � L9 Z Ul Z z w U) z J J 0 U O 0 U N Q X O 0 U 0 U O I 0 O 0 U O E 0 U C N 0 W o Q 0 L 0 W 7D a 0 O O a Q 1 0 ry 11) 0 �---! W 1—i >v a LU 0 0 U 0 0 T U I- z w U w _z CD z w Z z J J 0 C) 0 0 L F_ 0 0 Q LU U X U E 0 w 6 � U d LO a JOB NO. a� 092029 0 SCALE 0 AS NOTED SHEET NO. Q U) Q 0 z W 0 U 0 � z U z wca Uj Qz 0 H i" H LLJ CO w LU H a- U) n n LU m M M � L9 Z Ul Z z w U) z J J 0 U O 0 U N Q X O 0 U 0 U O I 0 O 0 U O E 0 U C N 0 W o Q 0 L 0 W 7D a 0 O O a Q 1 0 ry 11) 0 �---! W 1—i >v a LU 0 0 U 0 0 T U I- z w U w _z CD z w Z z J J 0 C) 0 0 L F_ 0 0 Q LU U X U E 0 w 6 � U d LO a JOB NO. a� 092029 0 SCALE 0 AS NOTED SHEET NO. Q U) Q 0 EROSION & SEDIMENT CONTROL MEASURES: STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. STRUCTURAL PRACTICES USED IN THIS SECTION CONSIST OF THE FOLLOWING. 3.01 SAFETY FENCE.• A PROTECTIVE BARRIER INSTALLED TO PREVENT ACCESS TO AN EROSION CONTROL MEASURE. TO PROHIBIT THE UNDESIRABLE USE OF AN EROSION CONTROL MEASURE BY THE PUBLIC. APPLICABLE TO ANY CONTROL MEASURE OR SERIES OF MEASURES WHICH CAN BE CONSIDERED UNSAFE BY VIRTUE OF POTENTIAL ACCESS BY THE PUBLIC. 3.02 CONSTRUCTION ENTRANCE. A STABILIZED PAVED CONSTRUCTION ENTRANCE WITH A WASH RACK LOCATED AT POINTS OF VEHICULAR INGRESS AND EGRESS ON A CONSTRUCTION SITE TO REDUCE THE AMOUNT OF MUD TRANSPORTED ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. CONSTRUCTION ENTRANCES SHALL BE INSTALLED AS SHOWN ON THE PLANS TO REDUCE THE AMOUNT SEDIMENT TRANSPORTED ONTO PUBLIC ROADWAYS 3.05 SILT FENCE A TEMPORARY SEDIMENT BARRIER CONSISTING OF A SYNTHETIC FILTER FABRIC STRETCHED ,ACROSS AND ATTACHED TO SUPPORTING POSTS AND ENTRENCHED, TO INTERCEPT AND DETAIN SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS DURING CONSTRUCTION OPERATIONS IN ORDER TO PREVENT SEDIMENT FROM LEAVING THE SITE AND TO DECREASE THE VELOCITY OF SHEET FLOWS AND LOW -TD -MODERATE LEVEL CHANNEL FLOWS THE SILT FENCE BARRIERS SHALL BE INSTALLED DOWN SLOPE OF AREAS WITH MINIMAL GRADES TO FILTER SEDIMENT LADEN RUNOFF FROM SHEET FLOW AS INDICATED. THEY SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND MAINTAINED IN ACCORDANCE WITH THE VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK (VESCH). 3.07 STORM DRAIN INLET PROTECTION. A SEDIMENT FILTER OR AN EXCAVATED IMPOUNDING AREA AROUND A STORM DRAIN DROP NNLET OR CURB INLET. TO PREVENT SEDIMENT FROM ENTERING STORM DRAINAGE SYSTEMS PRIOR TO PERMANENT STABILIZATION OF THE DISTURBED AREA. INLET PROTECTION APPLIES WHERE STORM fNT STABILIZATION OF THE CORRESPONDING DISTURBED DRAINAGE AREA. DRAIN INLETS ARE TO BE MADE OPERATIONAL BEFORE PERMANENT 3.09 TEMPORARY DIVERSION DIKE.• A TEMPORARY RIDGE OF COMPACTED SOIL CONSTRUCTED AT THE TOP OR BASE OF A SLOPING DISTURBED AREA. TO DIVERT STORM RUNOFF FROM UPSLOPE DRAINAGE AREAS A WAY FROM UNPROTECTED DISTURBED AREAS AND SLOPES TO ,A STABILIZED OUTLET. TO DIVERT SEDIMENT -LADEN RUNOFF FROM A DISTURBED AREA TO A SEDIMENT -TRAPPING FACILITY SUCH AS A SEDIMENT 7RAP OR SEDIMENT BASIN. USE WHEREVER STORMWATER RUNOFF MUST BE TEMPORARILY DIVERTED TO PROTECT DISTURBED AREAS AND SLOPES OR RETAIN SEDIMENT ON SITE DURING CONSTRUCTION. THESE STRUCTURES GENERALLY HAVE A LIFE EXPECTANCY OF 18 MONTHS OR LESS, WHICH CAN BE PROLONGED WITH PROPER MAINTENANCE. 3.12 DIVERSION. A CHANNEL CONSTRUCTED ACROSS A SLOPE WITH A SUPPORTING EARTHEN RIDGE ON THE LOWER SIDE TO REDUCE SLOPE LENGTH AND TO INTERCEPT AND DIVERT STORMWATER RUNOFF TO STABILIZED OUTLETS AT NON-EROSIVE VELOCITIES. APPLIES WHERE RUNOFF FROM AREAS OF HIGHER ELEVATION MAY DAMAGE PROPERTY, CAUSE EROSION, OR INTERFERE WITH THE ESTABLISHMENT OF VEGETATION ON LOWER AREAS, WHERE SURFACE AND/OR SHALLOW SUBSURFACE FLOW IS DAMAGING SLOPING UPLAND, AND WHERE THE SLOPE LENGTH NEEDS TO BE REDUCED TO M/NIMIZE SOIL LOSS. 3.13 TEMPORARY SEDIMENT TRAP. A TEMPORARY PONDING AREA FORMED BY CONSTRUC77NG AN EARTHEN EMBANKMENT WITH A STONE OUTLET. TO DETAIN SEDIMENT -LADEN RUNOFF FROM SMALL DISTURBED AREAS LONG ENOUGH TO ALLOW THE MAJORITY OF THE SEDIMENTTO SETTLE OUT. USE BELOW DISTURBED AREAS WHERE THE TOTAL CONTRIBUTING DRAINAGE AREA /S LESS THAN 3 ACRES, WHERE THE SEDIMENT TRAP WILL BE USED NO LONGER THAN 18 MONTHS, AND IT MAY BE CONSTRUCTED EITHER INDEPENDENTLY OR IN CONJUNCTION WITH A TEMPORARY DI VERSION DIKE. 3.14 TEMPORARY SEDIMENT BASIN: A TEMPORARY BARRIER OR DAM WITH A CONTROLLED STORMWATER RELEASE STRUCTURE FORMED BY CONSTRUCTING AN EMBANKMENT OF COMPACTED SOIL ACROSS A DRAINAGEWAY. TO DETAIL SEDIMENT -LADEN RUNOFF FROM DISTURBED AREAS IN "WET" AND `DRY" STORAGE LONG ENOUGH FOR THE MAJORITY OF THE SEDIMENT TO SETTLE OUT. APPLIES BELOW DISTURBED AREAS WHERE THE TOTAL CONTRIBUTING DRAINAGE AREA IS EQUAL TO OR GREATER THAN THREE ACRES. THERE MUST BE SUFFICIENT SPACE AND APPROPRIATE TOPOGRAPHY FOR THE CONSTRUCTION OF A TEMPORARY IMPOUNDMENT. 3.18 OUTLET PROTECTION: STRUCTURALLY LINED APRONS OR OTHER ACCEPTABLE ENERGY D/SSIPAT/NG DEVICES PLACED AT THE OUTLETS OF PIPES OR PAVED CHANNEL SECTIONS. TO PREVENT SCOUR AT STORMWATER OUTLETS, TO PROTECT THE OUTLET STRUCTURE, AND TO MINIMIZE THE POTEN77AL FOR DOWNSTREAM EROSION BY REDUCING THE VELOCITY AND ENERGY OF CONCENTRATED ST0RA4W4TER FLOWS APPLICABLE TO THE OUTLETS OF ALL PIPES AND ENGINEERED CHANNEL SECTIONS. 3.19 RIPRAP: A PERMANENT, EROSION -RESISTANT GROUND COVER OF LARGE, LOOSE, ANGULAR STONE WITH FILTER FABRIC OR GRANULAR UNDERLINING. TO PROTECT THE SOIL FROM THE EROSIVE FORCES OF CONCENTRATED RUNOFF, SLOW THE VELOCITY OF CONCENTRATED RUNOFF WHILE ENHANCING THE P07ENTIAL FOR INFIL TRA 770N, AND TO STABILIZE SLOPES WITH SEEPAGE PROBLEMS, AND/OR NON COHESIVE SOILS. USE WHEREVER SOIL AND WATER INTERFACE AND THE SOIL CONDITIONS, WA TER TURBULENCE AND VELOCITY, EXPECTED VEGETA 77VE COVER, ETC., ARE SUCH THA T THE SOIL MA Y ERODE UNDER THE DESIGN FLOW CONDITIONS 3.20 ROCK CHECK DAMS: SMALL TEMPORARY STONE DAMS CONSTRUCTED ACROSS A SWALE OR DRAINAGE DITCH. TO REDUCE THE VELOCITY OF CONCENTRATED STORMWATER FLOWS, THEREBY REDUCING EROSION OF THE SWALE OR DITCH. THIS PRACTICE ALSO TRAPS SEDIMENT GENERATED FROM ADJACENT AREAS OR THE DITCH ITSELF MAINLY BY PONDING OF THE STORMWATER RUNOFF. THIS PRAC77CE, UTILIZING A COMBINATION OF STONE SIZES, IS LIMITED TO USE IN SMALL OPEN CHANNELS WHICH DRAIN 10 ACRES OR LESS. 3.31 TEMPORARY SEEDING. THE ESTABLISHMENT OF A TEMPORARY VEGETATIVE COVER ON DISTURBED AREAS BY SEEDING WI7H APPROPRIATE RAPIDLY GROWING ANNUAL PLANTS TO REDUCE EROSION AND SEDIMENTATION BY STABILIZING DISTURBED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR A PERIOD OF MORE THAN 30 DAYS. TO REDUCE DAMAGE FROM SEDIMENT AND RUNOFF TO DOWNSTREAM OR OFF --SITE AREAS, AND TO PROVIDE PROTECTION TO BARE SOILS EXPOSED DURING CONSTRUCT/0N UNTIL PERMANENT VEGETATION OR OTHER EROSION CONTROL MEASURES CAN BE ESTABLISHED. 3.32 PERMANENT STABILIZATION: THE ESTABLISHMENT OF PERENNIAL VEGETATIVE COVER ON DISTURBED AREAS BY PLANTING, SEED. TO REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM DISTURBED AREAS. TO PERMANENTLY STABILIZE DISTURBED AREAS IN A MANNER THAT IS ECONOMICAL, ADAPTABLE TO SITE COND177ONS, AND ALLOWS SELECTION OF THE MOST APPROPRIATE PLANT MATERIALS TO IMPROVE WILDLIFE HABITAT. TO ENHANCE NATURAL BEAUTY. UPON COMPLETION OF CONS7RUC770N ACTIVITIES, ALL AREAS WILL RECEIVE A PERMANENT VEGETATIVE COVER. 3.35 MULCHING: APPLICATION OF PLANT RESIDUES OR OTHER SUITABLE MATERIALS TO THE SOIL SURFACE. TO PREVENT EROSION BY PROTECTING THE SOIL SURFACE FROM RAINDROP IMPACT AND REDUCING THE VELOCITY OF OVERLAND FLOW. TO FOSTER THE GROWTH OF VEGETATION BY INCREASING AVAILABLE MOISTURE AND PROVIDING INSULATION AGAINST EXTREME NEAT AND COLD. AREAS WHICH HAVE BEEN PERMANENTLY SEEDED SHOULD BE MULCHED IMMEDIATELY FOLLOWING SEEDING. AREAS WHICH CANNOT BE SEEDED BECAUSE OF THE SEASON SHOULD BE MULCHED USING ORGANIC MULCH. MULCH MAY BE USED TOGETHER WITH PLAN77NGS OF TREES, SHRUBS, OR CERTAIN GROUND COVERS WHICH DO NOT PROVIDE ADEQUATE SOIL STABILIZATION BY THEMSELVES, CAN BE USED IN CONJUNCTION WITH TEMPORARY SEEDING. J.37 TREES SHRUBS. VINES & GROUND COVERS.- STABILIZING OVERS:STABILIZING DISTURBED AREAS BY ESTABLISHING VEGETATIVE COVER WITH TREES, SHRUBS, VINES, OR GROUND COVERS. TO AID IN STABILIZING SOIL IN AREAS WHERE VEGETATION OVER THAN TURF IS PREFERRED, TO PROVIDE FOOD AND SHIELTER FOR WILDLIFE WHERE WILDLIFE HABITAT IS DESIRABLE. APPLIES IN AREAS WHERE TURF ESTABLISHMENT IS DIFFICULT, ON STEEP OR IROCKY SLOPES WHERE MOWING IS NOT FEASIBLE, WHERE ORNAMENTALS ARE DESIRABLE FOR LANDSCAPING PURPOSES, AND WHERE WOODY PLANTS ARE DESIRABLE FOR SOIL CONSERVATION, OR TO ESTABLISH WILDLIFE HABITAT. 3.38 TREE PRESERVATION AND PROTECTION: PROTECTION OF DESIRABLE TREES FROM MECHANICAL OR OTHER INJURY DURING LAND DISTURBING AND CONSTRUCTION ACTIVITY. TO ENSURE THE SURVIVAL OF DESIRABLE TREES WHERE THEY WILL BE EFFEC7IVE FOR EROSION AND SEDIMENT CONTROL, WATERSHED PROTECTION, LANDSCAPE BEAUTIFICATION, DUST AND POLLUTION CONTROL, NOISE REDUCTION, SHADE AND OTHER ENVIRONMENTAL BENEFITS WHILE THE LAND IS BEING CONVERTED FROM FOREST TO URBAN -TYPE USES APPLIES IN TREE -INHABITED AREAS SUBJECT TO LAND DISTURBING ACTIVITIES. 3.39 DUST CONTROL: REDUCING SURFACE AND AIR MOVEMENT OF DUST DURING LAND DISTURBING, DEMOLITION AND CONSTRUCTION AC77W77ES. TO PREVENT SURFACE AND AIR MOVEMENT OF DUST FROM EXPOSED SOIL SURFACES AND REDUCE THE PRESENCE OF AIRBORNE SUBSTANCES WHICH MAY PRESENT HEALTH HAZARDS, TRAFFIC SAFETY PROBLEMS OR HARM ANIMAL OR PLANT LIFE DUST CONTROL ,MEASURES SHALL BE EMPLOYED TO PREVENT SURFACE AND AIR MOVEMENT OF DUST DURING CONSTRUCTION. MEASURES EMPLOYED SHALL BE IN ACCORDANCE WITH THE VESCH. EROSION CON TR0 L STB 0 ge P, V11 sT �&,%"F SB <MD a - -�--- .SF tltatst,W Rtyegr.tas CE F�El CD 3 il' FDop, - DV 01 0-- PS PS TO TO a M4Y t - Atig 31 German %i3:lei DC + DC TSD - SA RW P, - * VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK SPECIFICA77ON NUMBER STRA W BAIL BARRIER 3.04 TEMPORARY DIVERSION DIKE 3.09 TEMPORARY SEDIMENT TRAP 3.13 SEDIMENT BASIN 3.14 INLET PROTECTION 3.07 SILT FENCE 3.05 CONSTRUCTION ENTRANCE 3.02 CHECK DAM TEMPORARY FILL DIVERSION Dl VERSION PERMANENT SEEDING TOPSOILING CULVERT INLET PROTECTION DUST CONTROL TEMPORARY SLOPE DRAIN SAFETY FENCE 3.20 3.10 3.12 3.32 LEGEND ROADS - - --- -- -. � -- - -._. A SS 3.30-----2�---- 2 3.08 00 ) 240.5J5 J. 39 ._ - --- 3.15 3.01 TEMPORARY RIGHT -OF- WA Y 3.11 Dl VERSION EXISTING CULVERT CUL VERT DROP INLET & STRUCTURE NO. CURB CURB & GUTTER PROPOSED PA VEMENT EC -3A DITCH DEPTH OF EC -3A DITCH EC -2 DITCH DEPTH OF EC -2 DITCH EARTH DITCH DRIVEWAY CULVERT BENCH MARK CLEARING LIMITS VDOT STANDARD STOP SIGN EXISTING CONTOUR PROPOSED CONTOUR PROPOSED SPOT ELEVATION TBC DENOTES TOP/BACK OF CURB T/B DENOTES TOP OF BOX SEASONAL NURSE CROP FEBRUARY 16 THROUGH APRIL ANNUAL RYE MAY 1 THROUGH AUGUST 15 FOXTAIL MILLET AUGUST 16 THROUGH OCTOBER ANNUAL RYE NOVEMBER THROUGH FEBRUARY 15 WINTER RYE NOTES: 1. LIME AND FERTILIZER NEEDS SHALL BE DETERMINED BY SOIL TESTS AND APPLIED IN ACCORDANCE WITH VESCH STD. 3.32. 2. SEEDINGS TO BE MULCHED IMMEDIATELY UPON COMPLETION OF SEED APPLICATION, IN ACCORDANCE W/ VESCH STD 3.35. Ijn-c_'� PERMANENT SEEDING SCHEDULE EROSION CONTROL NOTES ES -1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. ES -2: THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR, TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. ES -3: ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. ES -4:A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES ES -5: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING BUT NOT LIMITED TO, OFF-SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. ES -6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. ES -7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING' ACTI VI TIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. ES -8. -DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED WATER FILTERING DEVICE. ES -9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDI,'ATELY. General construction notes for Erosion BIId. Sediluent Control Plans I. fl. , plan approving authority trtust be notific c9 one week. prior to the pre -construction conference, one week. prior to the. cc?mnte?ncenient Of land disturbing activity, attcl one week prior to the final Inspection. ' . All ero,sion and sediment control measures will be constructed and n1aintained according to OlikliII111111 stindau ds and, specifications of the Virginia Ercasiort and. `sediment Cyotttrol i-IandbR_xrk and Virginia Rg.4;ulltiorts VR 625.02-00 Erosion and Seditneut Control. Regulations. 3. All erosion anti sediment control measures are: to be placed prior to or as the first step in clears` n��. 41 A. copy of the approved erosionand sediment cxtn.trol lain shall t� maintained on (he. siw at } � pl 1� all urnes. 5• Prior to c:orrintencin- land disturbing activitiesin areas other than indicated on these plans w includin;fg, but not limited to, € ff-site borrow or waste areas), th.e contractor shall subrilit a supplementary €',rosioll control Than to the owDeFr for review and approval rov=al b y the plan 1� l Pp ) 1 approving authority.. Ci. The contractor is responsible for installation of any additional. erosion control measures raece=,ssary to pr ov ent f rasion and sedimentation Its detenuiraedl by the plait arpprovino authority - 7, All disturbed ateaas ,ire to drain. to approved sediment control ime asures at all tinges duritrg tand disturbit activities and during site development until finial stabilization, is acltie,,,,ed. 8. Durinodewatterin operations, water will be purnped into an anpprovcd. filtering ciev�icki... 9, 'the- contractor shall inspect all erosion control measures peric 4call.y and ;after: each runtoff- .roduc:ingratinfall event. Any rieCCssar rc aairs or eleanitl to maintain the effectiveness of I' �. � p p the erosion. control devices .stall be ittade. hilmediattely. 1(J. All fill material to be taken from art aapprovecl, designated bourovv area. It, AlI waste matedals shall be taken to at1 approved waste area. Earth fill shall be .inert materials only, lase of retests, stutu s.5 wood, rubbish, and othelr debris. 1 . Borrow or waste areas are to be reclaimed within 7 days of c:cmiple'tion per Zoning Ordinance Section 5,1.28. 13. t'`cll itiet`t material,; shall be transported in cornpliance with sec:(iorr 13-301 of the Code of Albeinaarl e. 141 Borrow, fill Or Nvlste activit involving industrial -type power equipment shall he limited to the hours of°7:00anl to t :00pm. 15. Borrow, fill or waste activity shall lx conducted in as safe manner than maintains lateral support, or order to tninitnize ar-y ltazacd to persons, pbvsjcal daantatoe to adjacetat land. and improvements, and damage to any public: street because is Slides, sinking, or colt{•tpse. 16. `I.'he developer shall reserve the right to install, n-taintain, renw)ve or convert to perrnacie nt stormwaater rnaanaa41,emen.t f t6litit s where applicable ea It licable all erosioin. control. measures required fay this p}alrt regatrdle ss. of the: s ale: of ally lot, unit buildin or othcl: portion of the: -property. 17. `Fecapor<arysta bilizat on sha ll be tetuporaLry seeding and Itaulcihin-.:lee-ding is to tat~ at '75 lbsAtcre, and its the niE.rilths of Septetllhe-n: to February to consiist at 50150 ttnx of Annual Ryegras;s and Cereal Wither Rye., or in March and April to coinsist of Annual Rye, or May throutnla August to consist of German :`Millet. Straw mulch is to be applied at 80111s/W(1sf. Atternativrers are. subject to approved by the Cortatya erosion control inspector. 18, Permanent Stabilization shall be time and l-eilili;rer, permarerrt seeding, and rnulch. Agricultural grade' linieistone shall be applied at illbs/1t100sf„ incorporated into the; top 4-6 inches of soil. Fertilizer shall be applied at I000lbslacre* and 1COUsist Of a 10--'fit:}-1.0 nutrient mix. Permanent seeding sbaall beapplied at 180lbs,°stere and c:onsiyt of 95%, Kentucky 31 or Tall }°R=scue clad tt k Perennial Ryerass or 1~ti eat:ur y Blue -crass. Straw mulch. i to be applied sift lit}lbsllQtlsf', Alternatives ,are subject to approvedh1y thy. County,erca icln control iris1 Lector. 14.1, Maitltenatnce: All r11e'.<asures are to be inspected weekly and After each rainfall. Any damage or colo0ging to structural measures is to be repair immediately!, , ,Silt traps are to lea cleaned whert 50% of the. wet Stora -e v oluine, is filled Withserdimetit. All seeded areas ;axe to be reseeded when necessary to achieve as good stand of grass. Siilt fend: and diversion dykes which are collecting sediment, to hall* their height., must be cle,aanted and repiire_d iris uediarte-4y, 0' All temporary erosion and seg}irr ent control measures are to be removed within iii days o final site stabilization, when measures are no lono'er needed, ,subject to approval by the County erasion central i Irspe ctor. 21, This Plan shall be: void if the owner toes not obtain as permit vwitltitt 'I year of the date of asection 17-204G.) lc1le't tt lae 21 Permanent veectation shall be itastalied can all denuded areas uvrithni nine (9) months atter the date the land disturbing activity= commenced, (Water Protewction Ordinarttce section 17- 207B) TABLE 3.31-A LIMING REQUIREMENTS FOR TEMPORARY SITES Recommetided Applic ttiora Fadi Test of Aorieulaaal Limestone below 4.2 3 eons per acre 4.2 to 5.2 2 tons per acre 5^ to 6 t ton per aere Source: 'ora. DSWC GENERAL SLOPE (3:1 OR LESS) KENTUCKY 31 FESCUE RED TOP GRASS SEASONAL NURSE CROP TOTAL LBS PER ACRE 128 LBS 2 LBS 20 LBS 150 LBS \V/ NO SCALE (STD. & SPEC. 3.32 OF VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK, 3RD ED.) TArl LE -IJ I.11 ACCEPTABLE ` EIVIPORARY SS EDING FIAN7 MAXE.RLii 4 °QL ICX RFFERE'NCF, FOR ALL RLGIO W R,,etc PCilnj )4y ...?D£sx ,$ (IGS Ysr Sept. 1 - Pett. 15 _RVQ n4ix of tltatst,W Rtyegr.tas (t.r iu,M mufti -f (LrP,P?.t 3 il' ryU , 1.t0 cem'at (Wfatted Rye $x.0.its:..�: 'x&. reK 16 . Apr- 0 Anrtujal R5Nc (G55 60 - 101D +at ""4?ti 4 gal..tt!1! 161.'.t1Q,Fm.ol) M4Y t - Atig 31 German %i3:lei :it) fk=nd wig . t lsour.e: Va. DSWC DESCRIPTION OF EROSION & SEDIMENT CONTROL MEASURES: - EROSION AND SEDIMENT CONTROL MEASURES.• IT IS ANTICIPATED TO USE CONSTRUCTION ENTRANCES, DIVERSION DIKES, EXISTING SEDIMENT BASINS, AND SILT FENCES WILL BE INSTALLED TO CONTROL SURFACE DRAINAGE. TEMPORARY SEEDING WILL BE USED IMMEDIATELY FOLLOWING ALL LAND DISTURBANCE ACTIVITIES TEMPORARY STOCKPILE AREAS WILL BE MAINTAINED FROM TOPSOIL THAT WILL BE STRIPPED FROM AREAS TO BE GRADED AND STORED FOR LATER SPREADING. STOCKPILE LOCATIONS SHALL BE ON SITE AND SHALL BE STABILIZED WITH A TEMPORARY VEGETATIVE COVER. PERMANENT SEEDING WILL BE PERFORMED FOR ALL AREAS WHICH WILL NO LONGER BE EXCAVATED AND WHERE CONSTRUCTION ACTI VI TIES HAVE CEASED. PERMANENT SEEDING SHALL ALSO BE PERFORMED FOR ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR A YEAR OR MORE. SELECTION OF SEED MIXTURE WILL DEPEND ON THE TIME OF YEAR APPLIED. TEMPORARY SEEDING WILL BE PERFORMED FOR ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE THAN SEVEN DAYS THESE AREAS SHALL BE SEEDED WITH FAST GERMINA TING VEGETA TION IMMEDIA TEL Y FOLLOWING GRADING OF THOSE AREAS SELECTION OF SEED MIXTURE WILL DEPEND ON THE TIME OF YEAR APPLIED. CONSTRUCTION ENTRAN E.• C A STABILIZED PAVED CONSTRUCTION ENTRANCE WITH A WASH RACK LOCATED AT POINTS OF VEHICULAR INGRESS AND EGRESS ON A CONSTRUCTION SITE. TO REDUCE THE AMOUNT OF MUD TRANSPORTED ONTO PAVED PUBLIC ROADS BY MOTOR RUNOFF. OR VEHICLES RU . C CONSTRUCTION ENTRANCES SHALL BE INSTALLED AS SHOWN ON THE PLANS TO REDUCE THE AMOUNT SEDIMENT TRANSPORTED ONTO PUBLIC ROADWAYS. SIL T FENCE.• A TEMPORARY SEDIMENT BARRIER CONSISTING OF A SYNTHETIC FILTER FABRIC STRETCHED ACROSS AND ATTACHED TO SUPPORTING POSTS AND ENTRENCHED. TO INTERCEPT AND DETAIN SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS DURING CONSTRUCTION OPERATION'S IN ORDER TO PREVENT SEDIMENT FROM LEAVING THE SITE. TO DECREASE THE VELOCITY OF SHEET FLOWS AND LOW -TO -MODERATE LEVEL CHANNEL FLOWS. THE SILT FENCE BARRIERS SHALL BE INSTALLED DOWN SLOPE OF AREAS WITH MINIMAL GRADES TO FILTER SEDIMENT LADEN RUIVOFF FROM SHEET FLOW AS INDICATED. THEY SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND MAINTAINED IN ACCORDANCE WITH 77 -IE VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK (VESCH). PERMANENT STABILIZATION: THE ESTABLISHMENT OF PERENNIAL VEGETATIVE COVER ON DISTURBED AREAS BY PLANTING SEED. TO REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM DISTURBED AREAS. TO PERMANENTLY STABILIZE DISTURBED AREAS IN A MANNER THAT IS ECONOMICAL, ADAPTABLE TO SITE CONDITIONS, AND ALLOWS SELECTION OF THE MOST APPROPRIATE PLANT MATERIALS TO IMPROVE WILDLIFE HABITAT. TO ENHANCE NATURAL BEAUTY. UPON COMPLETION OF CONSTRUCTION ACTIVITIES, ALL AREAS WILL RECEIVE A PERMANENT VEGETATIVE COVER. TEMPORARY SEEDING: THE ESTABLISHMENT OF A TEMPORARY VEGETATIVE COVER ON DISTURBED AREAS BY SEEDING WITH APPROPRIATE RAPIDLY GROWING ANNUAL PLANTS TO REDUCE EROSION AND SEDIMENTATION BY STABILIZING DISTURBED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR A PERIOD OF MORE THAN 30 DAYS. TO REDUCE DAMAGE FROM SEDIMENT AND RUNOFF TO DOWNSTREAM OR OFF-SITE AREAS, AND TO PROVIDE PROTECT70N TO BARE SOILS EXPOSED DURING CONSTRUCTION UNTIL PERMANENT VEGETAT70N OR OTHER EROSION CONTROL MEASURES CAN BE ESTABLISHED. DUST CONTROL: REDUCING SURFACE AND AIR MOVEMENT OF DUST DURING LAND DISTURBING, DEMOL177ON AND CONSTRUCTION ACTI VI TIES. TO PREVENT SURFACE AND AIR MOVEMENT OF DUST FROM EXPOSED SOIL SURFACES AND REDUCE THE PRESENCE OF AIRBORNE SUBSTANCES WHICH MAY PRESENT HEALTH HAZARDS TRAFFIC SAFETY PROBLEMS OR HARM ANIMAL OR PLANT LIFE DUST CONTROL MEASURES SHALL BE EMPLOYED TO PREVENT SURFACE AND AIR MOVEMENT OF DUST DURING CONSTRUCTION. MEASURES EMPLOYED SHALL BE IN ACCORDANCE WITH THE IVESCH. 7EMPORARY DIVERSION DIKE: A RIDGE OF COMPACTED SOIL CONSTRUCTED AT THE TOP OR BASE OF A SLOPING DISTURBED AREA WHICH DIVERTS OFF-SITE RUNOFF AWAY FROM UNPR07ECTED SLOPES AND TO A STABILIZED OUTLET, OR TO DIVERT SEDIMENT -LADEN RUNOFF TO A SEDIMENT TRAPPING STRUCTURE. MAXIMUM EFFECTIVE LIVE 1S 18 MONTHS. ROCK CHECK DAMS: SMALL, TEMPORARY STONE DAMS CONSTRUCTED ACROSS A DRAINAGE DITCH TO REDUCE THE VELOCITY OF CONCENTRATED FLOWS, REDUCING EROSION OF THE SWALE OR DITCH. LIMITED TO USE IN SMALL OPEN CHANNELS WHICH DRAIN 10 ACRES OR LESS, • SHOULD NOT BE USED )IN LIVE STREAMS. STORM DRAIN INLET PROTECTION: THE INSTALLATION OF VARIOUS KINDS OF SEDIMENT TRAPPING MEASURES AROUND DROP INILETS OR CURB INLET STRUCTURES PRIOR TO PERMANENT STABILIZATION OF THE DISTURBED AREA; LIMITED TO DRAINAGE AREAS NOT EXCEEDING ONE ACRE, AND NOT INTENDED TO CONTROL LARGE, CONCENTRATED STORMWATER FLOWS TEMPORARY SEDIMENT TRAP: A SMALL PONDING AREA, FORMED BY CONSTRUCTING AN EARTHEN EMBANKMENT WITH A STONE OUTLET ACROSS A DRAINAGE SWALE, TO DETAIN SEDIMENT -LADEN RUNOFF FROM SMALL DISTURBED AREAS FOR ENOUGH 77ME TO ALLOW MOST TO THE SUSPENDED SOLIDS TO SETTLE OUT. MAXIMUM EFFECTIVE LIFE IS 18 MONTHS. TEMPORARY SEDIMENT BASIN: A TEMPORARY BARRIER OR DAM WITH CONTROLLED STORMWATER RELEASE STRUCTURES WHICH IS FORMED BY CONSTRUCTING AN EMBANKMENT OF COMPACTED SOIL ACROSS A DRAINAGEWAY. IT IS USED TO DETAIN SEDIMENT -LADEN RUNOFF FROM DRAINAGE AREAS 3 ACRES OR GREATER FOR ENOUGH TIME TO ALLOW MOST OF THE SUSPENDED SOLIDS TO SETTLE OUT. IT CAN BE CONSTRUCTED ONLY WHERE THERE IS SUFFICIENT SPACE AND APPROPRIATE TOPOGRAPHY MAXIMUM EFFECTIVE LIFE IS 18 MONTHS UNLESS DESIGNED AS A PERMANENT POND BY A QUALIFIED PROFESSIONAL. OUTLET PROTECTION: THE INSTALLATION OF RIPRAP CHANNEL SECTIONS AND/OR STILLING BASINS BELOW STORM DRAIN OUTLETS TO REDUCE EROSION AND UNDER-CUTTNG FROM SCOURING AT OUTLETS AND TO REDUCE FLOW VELOCITIES BEFORE STORMWATER ENTERS RECEIVING CHANNELS BELOW THESE OUTLETS CULVERT INLET PROTECTION: A SEDIMENT FILTER LOCATED AT THE INLET TO STORM SEWER CULVERTS WHICH PREVENTS SEDIMENT FROM ENTERING, ACCUMULA77NG IN AND BEING TRANSFERRED BY THE CULVERT. IT ALSO PROVIDES EROSION CONTROL AT CULVERTS DURING THE PHASE OF A PROJECT WHERE ELEVATIONS AND DRAINAGE PATTERNS ARE CHANGING, CAUSING ORIGINAL CONTROL MEASURES TO BE INEFFECTIVE. SAFETY FENCE: A PROTECTIVE BARRIER INSTALLED TO PROHIBIT UNDESIRABLE USE OF AN EROSION CON7R(OL MEASURE. PERMANENT STABIL IZA TION: PERMANENT SEEDING WILL BE APPLIED TO ALL DISTURBED AREAS AS PER THE PERMANENT STABILIZATION OF THIS EROSION & SEDIMENT CONTROL NARRATIVE. AFTER CONSTRUCTION IS COMPLETED, ALL DISTURBED AREAS OF 7HE SITE WILL BE LIIMED, FERTILIZED, AND SEEDED AS PER CURRENT VDOT STANDARDS. THIS SHALL CONSIST OF THE FOLLOWING: TOP SOIL - 2" DEPTH LIME - 2 TONS/ACRE FERTILIZER - 600 LBS/ACRE OF 15-30-15 SEED - ERNST 5311 CONSERVA 77ON SEED MIX - ERNMX-114 (45 LBS/ACRE PENNLA I WN CREEPING RED FESCUE, 37.5 LBS/ACRE ARGILS KENTUCKY BLUEGRASS, 37.5 LBS/ACIRE PARK KENTUCKY BLUEGRASS, 15 LBS/ACRE ANNUAL RYEGRASS & 15 LBS/ACRE PLEASURE PERENNIAL AFTER THESE AREAS ARE STABILIZED THEY WILL BE MOWED AND MAINTAINED ON A REGULAR BASIS. MAINTENANCE. IN GENERAL, ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAINFALL. SPECIFIC ATTENTION WILL BE GIVEN TO THE FOLLOWING ITEMS A. SEDIMENT BASINS AND/OR TRAPS WILL BE CLEANED AND MAINTAINED IN ACCORDANCE WITH THE VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK. B. ALL GRAVEL OUTLETS WILL BE CHECKED REGULARLY FOR SEDIMENT BUILDUP THAT WILL PREVENT PROPER DRAINAGE. IF THE GRAVEL IS CLOGGED BY SEDIMENT, THE GRAVEL WILL BE REMOVED AND CLEANED, OR IT WILL BE REPLACED. C. ALL SILT FENCE BARRIERS WILL BE CHECKED REGULARLY FOR UNDERMINING OR DETERIORATION OF THE FABRIC AND REPAIRED AS REQUIRED. SEDIMENT SHALL BE REMOVED WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHED HALF WAY TO THE TOP OF THE BARRIER. D. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND RESEEDED AS NEEDED. EROSION CONTROL NOTES & NARRATIVE PURPOSE THE PURPOSE OF THIS LAND DISTURBING ACTIVITY IS TO GRADE THE NORTHTOWN PHASE IIB SITE FOR FUTURE DEVELOPMENT. THE TOTAL AREA TO BE DISTURBED WITH THIS PHASE OF DEVELOPMENT IS 3.78 ACRES. EXISTING SITE CONDITIONS. THIS SITE CONSISTS OF AN OPEN GRASS FIELD WITH APPROXIMATE HALF OF THE SIDE LIGHTLY WOODED, SLOPING DOWNWARD TO THE NORTH. THE SITE IS LOCATED TO THE EAST OF ROUTE 29 AND DRAINS TO AN EXISTING CREEK ON-SITE. ADJA CEN T AREAS.• THIS SITE IS BORDERED TO THE EAST BY THE EXISTING GANDER MOUNTAIN SHOPPING CENTER. TO THE SOUTH AND EAST EXISTS SINGLE-FAMILY HOMES AND A RETAIL AREA. NORTHTOWN PHASE ! EXISTS TO THE NORTH. OFFSITE LAND DISTURBANCE ALL OTHER LAND DISTURBANCE IS TO OCCUR WITHIN THE LIMITS OF DISTURBANCE AS SHOWN. CRITICAL AREAS: CARE SHALL BE TAKEN TO PREVENT CONSTRUCTION RUNOFF FROM ENTERING THE EXISTING CREEK ON SI TE. SOILS: SOILS MAP IS INCORPORATED INTO THE EROSION CONTROL PLANS WITH SOILS DATA INCLUDED WITH THIS NARRA T! VE. SEQUENCE OF CONSTRUCTION: 1. NOTIFY ALBEMARLE COUNTY TO SCHEDULE A PRE -CONSTRUCTION MEETING AS REQUIRED. 2. NO EROSION CONTROL MEASURES MAY BE REMOVED DURING THE CONSTRUCTION PROCESS WITHOUT THE APPROVAL FROM THE INSPECTOR ON THE PROJECT. 3. INSTALL THE PAVED CONSTRUCTION ENTRANCES WITH WASH AREAS AS SHOWN ON THE PLANS CONSTRUCTION ENTRANCES TO BE INSTALLED WHERE CONSTRUCTION VEHICLE ROUTES INTERSECT PAVED PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY (VEHICULAR) TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTING TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. 4. INSTALL THE INITIAL CONSTRUCTION MEASURES AS SHOWN ON THE EROSION CONTROL SHEET. THIS INCLUDES SILT FENCE, DIVERSION DIKES, AND A SEDIMENT BASIN. MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP WITH ANY LAND DISTURBANCE ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 5. IN ADDITION TO ENSURING THAT THE PAVED CONSTRUCTION ENTRANCE IS INSTALLED, INSTALL ANY REMAINING EROSION CONTROL ITEMS AS SHOWN ON THE EROSION CONTROL PLAN. 6. ONCE ALL THE PHASE I EROSION CONTROL ITEMS HAVE BEEN INSTALLED AS SHOWN ON THE EROSION CONTROL PHASE I PLAN AND THE INSPECTOR HAS APPROVED THE EROSION CONTROL MEASURES, THE CONTRACTOR CAN BEGIN GRADING OPERATIONS. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES, AND DIVERSIONS IMMEDIA TEL Y AFTER INSTALLATION. Z AFTER ALL PHASE I ESC MEASURES ARE INSTALLED, THE CONTRACTOR CAN INSTALL THE CONSTRUCTION MEASURES AS SHOWN ON THE PHASE l! EROSION CONTROL PLAN SHEETS. MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP WITH ANY LAND DISTURBANCE ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 8. THE CONTRACTOR SHALL THEN INSTALL THE UTILITIES, RETAINING WALLS, CURB/GUTTER AND PPAVEMENT INLET PROTECTION SHALL BE INSPECTED AFTER EACH RAINFALL EVENT AND REPAIRS SHALL BE MADE AS NEEDED. IF THE STONE FILTER BECOMES CLOGGED WITH SEDIMENT SO THAT !T NO LONGER ADEQUATELY PERFORMS ITS FUNCTION, THE STONE MUST BE PULLED AWAY AND CLEANED AND/OR REPLACED. 9. ONCE PHASE 11 OF CONSTRUCTION IS COMPLETE, THE S17E IS STABILIZED AND THE INSPECTOR HAS GIVEN APPROVAL, THE CONTRACTOR CAN REMOVE THE EROSION & SEDIMENT CONTROL MEASURES, INCLUSIVE OF THE APPROVED AND EXISTING SEDIMENT BASINS. NO ITEM SHALL BE REMOVED UNLESS THE UPSTREAM AREAS ARE STABILIZED AND THE INSPECTOR GIVES PERMISSION. 10. MAINTAIN ALL EROSION CONTROL MEASURES AS SPECIFIED IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, REMOVING ONLY WHEN APPROVED BY THE LOCAL PROGRAM ADMINISTRATOR IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. 11. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS 07HERMSE AUTHORIZED BY THE LOCAL PROGRAM ADMINIS7RATOR. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESUL77NG FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMEN TA TION. SOIL DESCRIPTION 34C - GLENELG LOAM -77 TO 157 SLOPES, FINE -LOAMY. THIS VERY DEEP, WELL DRAINED SOIL IS FOUND IN CROP FIELDS. RUNOFF CLASS RANGES FROM LOW ON LEVEL SLOEPS TO VERY HIGH ON STEEP OR VERY STEEP SLOPES. 34D - GLENELG LOAM -157 TO 257 SLOPES, FINE -LOAMY. THIS VERY DEEP, WELL DRAINED SOIL IS FOUND IN CROP FIELDS. RUNOFF CLASS RANGES FROM LOW ON LEVEL SLOEPS TO VERY HIGH ON STEEP OR VERY STEEP SLOPES TEMPORARY SEEDING: ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR EXTENDED PERIODS OF TIME SHALL BE SEEDED WITH FAST GERMINATING TEMPORARY VEGETATION IMMEDIATELY FOLLOWING GRADING. SELECTION OF THE SEED MIXTURE WILL DEPEND ON THE TIME OF YEAR AND WILL BE APPLIED TO DISTURBED ARES THAT WILL NOT BE BROUGHT TO FINAL GRADE WITHIN 30 DAYS. PLANTS SHOULD BE SELECTED APPROPRIATE TO THE SEASON AND SITE CONDITIONS FROM TABLES 3.31B AND 3.31C. NOTE THAT TABLE 3.31B PRESENTS PLANTS WHICH CAN BE USED WI THOU T EXTENSIVE EVALUATION OF SITE CONDITIONS; TABLE 3.31 C PRESENTS MORE IN-DEPTH INFORMATION ON THE PLANT MATERIALS TO CONTROL EROSION ON BARE SOIL SURFACES, PLANTS MUST BE ABLE TO GERMINA TE AND GROW. SEEDBED PREPARA TION IS ESSENTIAL. AN EVALUATION SHOULD BE CONDUCTED TO DETERMINE IF LIME IS NECESSARY FOR TEMPORARY SEEDING. TABLE 3.31A MAY BE USED TO DETERMINE THE ACTUAL NEED ALONG WITH SUGGESTED APPLICATION RATES FERTILIZER SHALL BE APPLIED AS 600 LBS/ACRE OF 10-20-10 (14 LBS/1, 000 SQ. FT.) OR EQUIVALENT NUTRIENTS. LIME AND FERTILIZER SHALL BE INCORPORATED INTO THE TOP 2 TO 4 INCHES OF THE SOIL IF POSSIBLE IF THE AREA HAS BEEN RECENTLY LOOSENED OR DISTURBED, NO FURTHER ROUGHENING IS REQUIRED. WHEN THE AREA IS COMPACTED, CRUSTED, OR HARDENED, THE SOIL SHALL BE LOOSENED BY DISCING, RAKING, HARROWING, OR OTHER ACCEPTABLE MEANS. TRACKING WITH BULLDOZER CLEATS IS MOST EFFECTIVE ON SANDY SOILS THIS PRACTICE OFTEN CAUSES UNDUE COMPACTION OF THE SOIL SURFACE, ESPECIALLY IN CLAYEY SOILS, AND DOES NOT AID PLANT GROWTH AS EFFECTI VEL Y AS OTHER METHODS OF SURFACE ROUGHENING. SEED SHALL BE EVENLY APPLIED WITH A BROADCAST SEEDER, DRILL, CUL TIPACKER SEEDER OR HYDROSEEDER. SMALL GRAINS SHALL BE PLANTED NO MORE THAN 1� INCHES DEEP. SMALL SEEDS, SUCH AS KENTUCKY BLUEGRASS, SHOULD BE PLANTED NO MORE THAN 4 INCH DEEP. OTHER GRASSES AND LEGUMES SHOULD BE PLANTED FROM 4 INCH TO � DEEP. SEEDINGS MADE IN FALL FOR WINTER COVER AND DURING HOT AND DRY SUMMER MONTHS SHALL BE MULCHED ACCORDING TO MULCHING, STD. & SPEC. 3.35, EXCEPT THAT HYDROMULCHES (FIBER MULCH) WILL NOT BE CONSIDERED ADEQUATE. STRAW MULCH SHOULD BE USED DURING THESE PERIODS. AREAS WHICH FAIL TO ESTABLISH VEGETATIVE COVER ADEQUATE TO PREVENT RILL EROSION WILL BE RE -SEEDED AS SOON AS SUCH AREAS ARE IDENTIFIED. STORMWA TER RUN-OFF CONSIDERATIONS: STORMWATER MANAGEMENT.• THE STORMWATER RUNOFF FROM THIS PROJECT DRAINS TEMPORARILY TO THE SEDIMENT BASIN. THE SEDIMENT BASIN WILL BE CONVERTED TO A PERMANENT STORMWATER MANAGEMENT FACILITY AFTER THE DEVELOPMENT OF THE NORTHTOWN PHASE !IB SITE ACH 0 /- � / We . � �_O 2 �i r_� o SCQTT R. CQLLINSZ U Lic. No. 03579111h1. t -' SSIONAL E�C1 CLI Li w Z 0 r 0 � � � � � � � 1'0__ � � � � � � � 1'3__�: Z TMP 45C -1-P-12 NOTES: N/F BRUMBAUGH % TMP 45C -1 -P -T0 TMC' 45C -1-P-11 1. THERE IS 0.12 AC. OF TREE CLEARING ASSOCIATED WITH ZONE: R2 N/F DOLZER N/F BANCROFT THIS PROJECT. THE TOTAL LIMITS OF DISTURBANCE IS 3.78 AC. TMP 45C -1-P43 ZONE: R2 ZONE: R2 USE: SFD TMP 45C -1-P-9 No., 2. CONTRACTOR TO NOTE AND FLAG LOCATION OF FLOOD N/F HAM USE: SFD USE: SFD Z 0 N E.- R2 PLAIN AND WETLANDS. FILLING OR CONSTRUCTION ACTIVITY N/F EMSWILER #2923 t DB 1005 PG 344 SCOT OLLINS, #2925 ZONE: R2 #2927 0 USE: SFD MAY NOT OCCUR WITHIN THE LIMITS OF THE FLOODPLAIN. U Lie. o. 035791,��, USE: FD DB 1630 PG 654 DB 1006 PG 681 #2921 N CONSTRUCTION ACTIVITY WITHIN THE STREAM BUFFER SHALL #2929 DB 1038 PG 42 BE LIMITED TO THE SANITARY SEWER INSTALLATION & k ofl DB 2107 PG 115 [—jREE PROTECTION FENCE SEDIMENT BASIN OUTFALL. NO OTHER ACTIVITY IS ALLOWED IONAL d Z fl� W W CD SCALE 1 11=401 SHED NO 4 in GRAVEL CURB RV SEDIMENT F IL TER amwiFiLdFi - RUNOFF WATFR 5f, MME"T CONORETE OfXm SPE=IC AMICATION IMP" 1AFSH Ffrffffll 'ATFR Ir GURO INLET THIS METHOD OF W PROTECTION :18 APPLICADU AT CURB INLETS W_HEI:B PONDINT'O IN FRO]qT (IF THE STRUCTOU L13 -NOT UKELY TOCAUP9F INCONVENIENCE OR DAtdAQE TO ADJACENT STRUCURES AND T NPRMCTEO Al�W-a� 4 GJUWJRL RfiALL 3Z VlJW #& 1357 OR 5 COAME AGGREGATE sounc; Va.. Dswc um Plaw 107.6 3,07 �. ! {' TMP 45C -1-P-12 TIMP 45C -1-P-10 TMP 45C -1-P®11 N/F BRUMBAUGH N/F DOLZER N/F BANCROFT ZONE: R2 TRAD A rrl A 0 Nonalmill- R/F LM6VVILER ZONE: R2 USE: SFD #2929 DB 2107 PG 115 EXISTING TREELIKE (TYP.) TEMPORARY CONSTRUCTION EASEMENT FOR FUTURE STREAM RESTORATION WORK ........ .. A D1 UAL k-, BENCHMARK' _,:EXISTING 24" RCP BARREL, 21.8 LF S.E.'CORNER OF CONCRETE INV. IN=424.70, INV. OUT=421.90 SLAB AT PROPANE TANK ' A, ELEVATION 424.27 v EXISTING OUTLET PROTECTION*7--< f; TIE-IN PROPOSED 18" RCP B) TO EXISTING 48" RCP J EXISTING 20'ACSA UTILITY EASEMENT W/ WIRE D.B. 1724, PG. 42 SYPPOR V!, PROPOSED SAFETY ZONE: R2 USE: SFD #2925 DB 1006 PG 681 XI/ PROPOSED WALL - SEE SITE PLAN USE: SFD #2923 DB 1005 PG 3441, -TREE PROTECTION FENCE N/F HAMILTON ZONE: R2 USE: SFD #2921 DB 1038 PG 42 IMITS OF DISTURBANCE (TYP.) "H 0 SCOTT R. COLLINSZ U Lic. No. 035791 Lu yt L�. uujW0 Lij c� m u 0- • 0 092029 .60 co (n SCALE 1 =40' Mffuzliawkqle� KOR SEC TION A-9. TYPIC A -L GR_ALPH1C'_-kL DET'AMS fill 7 min �-Qjk off trryb-4' bel(yN quitable SdI w rw�k TYPICAL HOMOGENF-CUS EMBANKMENT jp.r; — Moe Gullet F -Cor m filt-F Perforuted' arm . s 6rs "'—FuundaUo,.q drain FOUNDATION DRAIN d MR 10 or gvd M 'z�lr,unuftiufl flitef CHIMINE yr DRAIN Trarniban 1511 "-, Elanket. drain SLANKET DRA Rod< or rp'wd d f din TFQM"QMcirt fihm- M DRAIN Scuy�ce -,SCS-Enf Fb�efd kkfflmij,,V Figmne _k4a.Honiogeneom -Embamkinenis w/Seepage C-oufrols DETENTION BASIN NOTE: CONTRACTOR SHALL GRADE/ INSTALL A COMPLETE CLAY LINING, OR INSTALL A RUBBER MEMBRANE, COVERING 100% OF THE BASIN TO PREVENT INFILTRATION. CLAY LINING OR RUBBER MEMBRANE TO EXTEND FROM THE EMERGENCY SPILLWAY CREST ELEVATION TO THE BOTTOM OF THE FACILITY ON ALL SIDES. DETENTION BASIN DETAIL SCALE: 1 "=30' 4. t; / PROp'OS'ED,O S�PACE,ESMT (TYR) , J DETENTION BASIN Basin Dim A0imt Elevation Volume n Contour 17.4 (ft) ELEVATION (cf) Areas (sf) 450.5 1,607 0 452 2,527 3,075 454 3,852 9,407 456 5,288 18,509 458 5,743 29,537 PROPOSED VDOT #3 C' AGGREGATE OUTLET PRC w/ GEOTEXTILE FILTER UNDERLAYMENT (2' DEE 465 StormRaxlll Ad 4T, 114K�ri WX_ s. f:ki 12", GONQ;�E`Fk N4ANHOLE STANDARD 60 INCH RACK SHOWN. DIMENSIONS IN INCHES PLAN Hpp�E P-�� "'u, :7 , P1 X,5TIr- 5), ?tnOo 1C SLIMIFIINE"' INC - StarrnliaxTIA Round Series for Imusde-Manho.1-e Par NO 1 Dim A0imt M 0� Mr'n 10 n RS�2 17.4 _ 1 14 0- ELEVATION 727 -ZZ 1, 9 458 0o __ FLUS 4QX 36 - --------- RS -48 1 27 Y 54 48 5 7 i;&w 271%j . ...... )A Y, I 664 613 SHALL BE USED Plastic- Solutions, Inc. CbNTRAC - PC) B.A,4386, Wnchest&, VA 22604 EXISTI I NG Wer, VA 72603 877) 8°7xasx x ,W) f4A PROW ELEVATION 727 -ZZ 1, 9 FIM 0+50 1+00 1+50 1+75 PROPOSED TOP OF DAM ELEV. = 458.00' ,ADJACENT EX. TOP OF WALL= 456.8') ISOMETRIC CONCRETE STRUCTURE DIMENSIONS INSIDE STRUCTURE DIMENSION OUTSIDE STRUCTURE DIMENSION AVAILABLE OPTIONS CROSS BRACINO FOR OVERHANO HOPE ANTI -VORTEX PLATE DATE- DRAWil BY: APPS 5Y: PROPOSED 40' WIDE GRASS LINED EMERGENCY SF`jj,LOA , V , � -) CREST ELEVATION7f4Sj.ob' " �4' (TOP OF DAM ELEV. 5h: '& CONTRACTOR SHALL INSTALL THE BASIN & ITS EMBANKMENT IN ACCORDANCE w/ THE DETAILS & NOTES SHOWN ON THIS PLAN. CONTRACTOR SHALL HAVE A GEOTECHINICAL ENGINEER CONFIRM THE CONSTRUCTION SPECIFICATIONS ARE MET DURING CONSTRUCTION TO ENSURE THE EXISTING RETAINING WALL IS NOT ADVERSELY IMPACTED. PROPOSED 24" CL. III RCP STANDPIPE WITH TRASHRACK SHALL SERVE AS THE RISER STRUCTURE. RISER RIM ELEV.=455.66'. RISER TO HAVE A 05" LOW -FLOW ORIFICE ATTHE LOW POINT OF THE BASIN (INV. 450.50') & FOUR (4) 06" MID -FLOW ORIFICES (INV. 454.25'). ORIFICES TO HAVE TRASHRACKS. —EXISTING ENDWALL & ARMORED RIPRAP CHANNEL PROTECTION TO REMAIN DETENTION BASIN SECTIONJ PROPOSED BASIN SPILLWAY SIDE SLOPES SHALL BE 4:1 OR FLATTER TO PROVIDE A SMOOTH VEHICULAR TRANSITION ALONG THE ACCESS ROAD & TO PROTECT THE GRASS LINED SPILLWAY. 460 k 460 455 455 450 450 ISTHNGX E)'�_ URRUE IT (PCST-CONSTRUCTION) GRADE 445 1 1 i 1 1 445 440 1 1 440 435 435 EXISTING/ S-- ORIGINAL L RADE 6T1O)(PRE-CDNSTRU- 430 430 99 co 425 w LU M co LO _j _j 00 Uj wM ocr) 04 C� co (D Iii LL 0+50 0+75 PROFILE SCALES 111=5, (V) DETEN 1"=50'(H) TION BASIN SPILLWAY NH 0 FSCOTT'R. COLLINS'� U Lic. No. 035791.11 - U) z _j _j 0 0 Q) U) 0 V) x O c C) C 0 0 c 0 0 0 0 0 U Q 0 _c Uj U) 0 0 0 12 Uj < < 0 > o LIJ Uj (D < Uj < cc) 0 Uj < 0 CL c E LLJ ryo 0 F— Li Lj.j V) 0 :7 U _j _j 0 0 0 F- 0 x 0 zUj _j b Uj rn Uj LU :3 0 w U 0 0- _0 -0 JOB NO. (D 092029 S C ALE AS SHOWN c SHEET NO. Q) 8 U) Q) CbNTRAC - -OR SHALL RAISE THE EXISTI I NG CONC. RISER STANDOIPE TOA ELEVATION 458 0o __ FLUS :4AJWTH THE TOP 0: DAM. -A VDOT__'__ STP. MH -i TDP SHALL, BEINST L LLEDONTHE 460 RISER AND IT SHALL BE USED AMH/ACCESS 460 !WITH THzPROPO5ED_QE_ 'L V� LOPMENT PR,1PO' PROPOSED POSED RADE RAID ---------- EXISTINF/ ----- CURRENT ---------- ;POST-CPNSTRU�TION) I v Q RADE 455 )ARSE— TECTION ------ - ------- - ------- ...... --------- V 'ABRIC P MIN.) 450 450 FLOOR7 i ELEV.:: 450.501 10PREVE!,41 FLOT TION THE RISER -Bi 6E AND BARREL CO NECTION SHALL BE- E - " FI FIRMLY 445 18" MLY EM BEDDED THICK LONCRE " INTO AIREINFOR E FOUNDATION THAT ED 445 JS S'x5',IAND IS B JRIED BELOW THE BOTTQM OF TH -- BASIN C RADING. PROPOSE l51' CL. III CP 8AR EL TO ,CONNEc INTO EXISTING RISER 440 STRUCTURE. t PROPOSED 16.00'13ARREL 11 440 ______1NV. 1,NF-4-4i2.00-&,,�1,NY--QUT-=445-.5j)!--- EASTING/ ORIGINAL �E-CON STRUCTIbN) ------------- - - -------- ------- - ----- _ G R A D E 435--435 EXISTING 48" RISER --------------- ----------- ------ x 430 430 C6NTRACTIOR SHALL ENSURETHE STR6CTURALi INTEGRITY OF T HE RISER, BARREL & CON RETE WALL AND PV AKE ANY N NECESSARY I ------ - -- --- 425 425 NV 424.7: ----------- --- _._...EXI.S_T1NG _0_24 CON(- PIPE \/4 420 INV. 421. 9' 2 10' >>_ w LU co co co 00'a) C) _j _j W LU co co 4WR (D (D LU LL_ 0+50 1+00 1+50 1+75 PROPOSED TOP OF DAM ELEV. = 458.00' ,ADJACENT EX. TOP OF WALL= 456.8') ISOMETRIC CONCRETE STRUCTURE DIMENSIONS INSIDE STRUCTURE DIMENSION OUTSIDE STRUCTURE DIMENSION AVAILABLE OPTIONS CROSS BRACINO FOR OVERHANO HOPE ANTI -VORTEX PLATE DATE- DRAWil BY: APPS 5Y: PROPOSED 40' WIDE GRASS LINED EMERGENCY SF`jj,LOA , V , � -) CREST ELEVATION7f4Sj.ob' " �4' (TOP OF DAM ELEV. 5h: '& CONTRACTOR SHALL INSTALL THE BASIN & ITS EMBANKMENT IN ACCORDANCE w/ THE DETAILS & NOTES SHOWN ON THIS PLAN. CONTRACTOR SHALL HAVE A GEOTECHINICAL ENGINEER CONFIRM THE CONSTRUCTION SPECIFICATIONS ARE MET DURING CONSTRUCTION TO ENSURE THE EXISTING RETAINING WALL IS NOT ADVERSELY IMPACTED. PROPOSED 24" CL. III RCP STANDPIPE WITH TRASHRACK SHALL SERVE AS THE RISER STRUCTURE. RISER RIM ELEV.=455.66'. RISER TO HAVE A 05" LOW -FLOW ORIFICE ATTHE LOW POINT OF THE BASIN (INV. 450.50') & FOUR (4) 06" MID -FLOW ORIFICES (INV. 454.25'). ORIFICES TO HAVE TRASHRACKS. —EXISTING ENDWALL & ARMORED RIPRAP CHANNEL PROTECTION TO REMAIN DETENTION BASIN SECTIONJ PROPOSED BASIN SPILLWAY SIDE SLOPES SHALL BE 4:1 OR FLATTER TO PROVIDE A SMOOTH VEHICULAR TRANSITION ALONG THE ACCESS ROAD & TO PROTECT THE GRASS LINED SPILLWAY. 460 k 460 455 455 450 450 ISTHNGX E)'�_ URRUE IT (PCST-CONSTRUCTION) GRADE 445 1 1 i 1 1 445 440 1 1 440 435 435 EXISTING/ S-- ORIGINAL L RADE 6T1O)(PRE-CDNSTRU- 430 430 99 co 425 w LU M co LO _j _j 00 Uj wM ocr) 04 C� co (D Iii LL 0+50 0+75 PROFILE SCALES 111=5, (V) DETEN 1"=50'(H) TION BASIN SPILLWAY NH 0 FSCOTT'R. COLLINS'� U Lic. No. 035791.11 - U) z _j _j 0 0 Q) U) 0 V) x O c C) C 0 0 c 0 0 0 0 0 U Q 0 _c Uj U) 0 0 0 12 Uj < < 0 > o LIJ Uj (D < Uj < cc) 0 Uj < 0 CL c E LLJ ryo 0 F— Li Lj.j V) 0 :7 U _j _j 0 0 0 F- 0 x 0 zUj _j b Uj rn Uj LU :3 0 w U 0 0- _0 -0 JOB NO. (D 092029 S C ALE AS SHOWN c SHEET NO. Q) 8 U) Q)