Loading...
HomeMy WebLinkAboutWPO201600067 Bond Estimates 2017-12-21Project Name: Broderick May Property WPO file number: WP0201600067 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed stabf tim (PS, TS) 0.9 acres $5,000,00 $4,500.00 sift fence (SF) 575.0 It $5,00 $2,875.00 safety fence (S.4F) 0.0 It $5,00 $0.00 diversion (DD, FD, RVJD) 255 It $13,00 $3,315.00 temporary slope drain (TSD) pipe length -ft pipe diameter 0 in $0,00 $0.00 earthwork for trap/basin ha ht of tlam al toe 9 fl cut at highale 3.5 ft heof fill ft cut ot face ft m length of dam ft length of cut ft top vidth ft vndth of cut ft (area above transition) 17.5 at (area belay transition) 48 at (total vndlh of dam) 7 ft (total vndlh of cut) 31 ft (height belay transition) 1 ft (depth below transilior 1.5 ft (area below transition) 2.5 sf (area above transition) 21 at (total fill volume) 29.6 cy (total fill volume) 63.9 cy length of spillway _fl (TO -CV estimate) 74 cy $13.00 $962.00 Width of spilhvay ft (spillway stone tons) 5.2 tau $50.00 $260.00 structures for basin riser height fl rise r dlamoterin"-- -' -ce) $0.00 $0.00 barrel length ft base plate or fdn $200.00 $0 barrel diameters Sao Oo $2,310.00 barrel collars 0 $200.00 $0 baffle length 0 It $50.00 $0 sift fence inlet protection (IP) $100.00 $0.00 stone inlet protection (IP) $200.00 $0.00 outlet protection (OP) length 12 ft width 9 ft $486.00 $486.00 channel (SCC, matted) length 715 ft width 3 It $2,788.50 check dam depth in channel 1 ft channel witlth 3 It $67.50 $406 00 construction entrance(CE) , $2,500.00 $2,500.00 wash rack $2,000.00 $0.00 paved construction entrance $3,500.00 $0.00 rip rap, placed depth ft length 0.0 It width $fi0.00 $0.00 surrey and layout (price par 0.1 mi.) acres traps and basins ]r $950.00 mobilaa ion $2,500.00 stream crossing (computed independently) $5,000.00 cost sum $28,851.10 contingency $2,885.15 Total $31,740 12/21/2017 Approximate Earthwork computations for sed Assumes all cut and fill slopes are 2:1 for simplicty Cut at High Side h2 Height of Fill at Face h1 w Width of Cut Fill area above transition = h1(2h1) + h1(w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2-h1, area = (width *height)/2 - height x height Length of Cut Top I-w transitic h1 Cut at Fa liment traps and basins Width m point Height of Dam at Toe h2 ice Volume = Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Length of Fill for Dam (approximately)