HomeMy WebLinkAboutWPO201700047 Plan - E&S 2017-07-17CHARLOTTESVILLE, VIRGINIA EROSION AND SEDIMENT CONTROL PLAN (WP0201700047) BARTERBROOK PHASE 2 isy � 1 A 1:1k3 1 A t WX" N " Owl is ,11 3 k 49 L t, REGULATORY COMPLIANCE: Work shall be completed in accordance with the terms, conditions and requirements of all regulations and issued permits, including but not limited oto: 1. Virginia Department of Transportation Land Use Permit 2. Albemarle County WP0201700047 Erosion and Sediment Control Plan 3. Virginia Stormwater Management Program (VSMP) General VPDES Permit for Discharges of Stormwater from Construction Activities (Construction General Permit) — Not required. A. As identified in the Commonwealth of Virginia, Department of Environmental Quality, Water Division, Guidance Memo No. 15-2003, dated April 23, 2015, Postdevelopment Stormwater Management Implementation Guidance for Linear Utility Projects under the Virginia Stormwater Management Program Regulation, 9VAC25-870, this linemr utility installation project may be conducted without coverage under the Construction General Permit. Source: http://www.deq.virginia.gov/Portals/0/DEQ/Water/Guidancell5200J.polf B. Additionally, this linear utility installation project will not result in changes to the predevelopment runoff characteristics of the land surface; and, all pervious and impervious disturbed areas will be returned to their predevelopment condition upon completion of construction and final stabilization. PROJECT NUMBER 2017-02 QOM, 41 _7 i u INDEX OF DRAWINGS SHEET SHEET TITLE ESCP01 COVER SHEET ESCP02 SHEET LAYOUT, ABBREVIATIONS, LEGEND & GENERAL NOTES ESCP03 EROSION AND SEDIMENT CONTROL PLAN — NORTH BERKSHIRE ROAD ESCP04 EROSION AND SEDIMENT CONTROL PLAN — INGLEWOOD DRIVE ESCP05 EROSION AND SEDIMENT CONTROL PLAN — SOLOMON ROAD 4. Stormwater Pollution Prevention Plan (SWPPP) for the Barterbrook Phase? 2 • Refer to Section 2 of the SWPPP for a Water Main Replacement project. ' ' ESCP06 EROSION AND SEDIMENT CONTROL NOTES & DETAILS complete c 0 of Guidance Memo No. 15-2003, REDUCTION OF LEAD IN DRINKING WATER: The Contractor shall provide all materials (and certificates of compliance) in accordance with the 2011 Reduction of Lead in Drinking Water Act (S. 3874)„ except as amended by the Community Fire Safety Act of 2013 (H.R. 3588). Sources: http://www.gpo.govlfdsyslpkglPLAW-111 pub1380/pdf/PLAW-111 pub1380.pdf http://www.gpo.govlfdsyslpkglPLAW-113pub164/pdf/PLAW-113publ64.pdf LAYOUT, STAGING AND STORAGE AREAS: The layout, staging and storage of all materials and equipment will be locatesd on—site, and contained within the prescribed Limits of Silt Fence as shown orn the plans. I N T E R N A T 1 0 N A L 272 BENDIX ROAD, SUITE 400 VIItGI1VIA BEACH, VA 23452 PHONE: (757) 463-8770 FAX: (757) 463-0503 t . s t y 29 250 - \ 250 _ LOCATION MAP SCALE: 1 " = 500' JACK JOUETT MAGISTERIAL DISTRICT TAX MAP : 061K APRIL 2017 7__ APPROVED by the Albemarle County Community Development Department Date i y File, i.r.eawg��._ GENERAL NOTES: 1. Survey information is based on NAD 1983 Virginia South State Plane Coordinates for horizontal control, and on U.S. Geodetic Survey datum (NAVD88) for vertical control. Elevations are feet above mean sea level. 2. All materials and construction shall comply with the current edition of the General Water and Sewer Construction Specifications as adopted by the Albemarle County Service Authority, unless otherwise noted. 3. Work shall be subject to inspection by Albemarle County Service Authority inspectors. The Contractor will be responsible for notifying the proper Service Authority officials at the start of the work. 4. The location of existing utilities are shown as approximate in Ilocation, and are based on utility designations performed under Miss Utility of Virginia Designer Ticket Nos. A621700832 and A621700840 (dated August 2016). In areas where existing water mains were not marked under the design ticket, GIS or existing record information was utilized to indicate the presence of and show approximate locations. The Contractor shall be responsible for the verificatlion of the location, size and depth of all existing utilities, both surface and subsurface. The Contractor shall immediately notify the Engineer of any discrepancies between the plans and observed field conditions. 5. CONTRACTOR SHALL BE AWARE THAT EXISTING UNDERGROUND UTILITIES MAY EXIST WITHIN THE WORK AREA, WHICH ARE NOT INDICATED ON THE PLANS AND/OR ARE UNMARKED IN THE FIELD. The Contractor shall exercise caution during excavations, and use due diligence to protect all utilities and structures from damage at all times. Damage to any existing utilities, structures, poles, guy wires, or other features shall be repaired by the Contractor to the original condition at no additional cost to the Owner. 6. The Contractor shall be responsible for notifying Miss Utility of Virginia (811 or 1-800-552-7001) sufficiently in advance of the start of construction, in accordance with Section 01500 of the Specifications. 7. All water mains shall have a minimum of three and one-half (3-1/2) feet of cover measured from the top of pipe, over the centerline of pipe. This includes all fire hydrant lines, service laterals and waterlines, etc. 8. All appurtenances (such as valves and valve boxes, hydrants, meter boxes, and meter vaults) are to be located outside of roadside ditches. 9. Contractor shall locate all existing water service lines and saniltary laterals that will be impacted by construction, and ensure all existing services are re -connected. Field adjustments shall be made for any new appurtenance (such as a bend or a valve) that may be found to be in conflict wilth existing conditions. 10. Upon completion of new water service installations, all existing water service lines, meters, setters and meter boxes shall be abandoned and/or removed in accordance with the details and project Specifications, unless rntherwise noted. 11. Elevations of all utilities are unknown unless indicated with an invert elevation. The Contractor shall confirm existing utility elevations sufficiently in advance of installing proposed water mains, and deflect the pipe vertically (as required) in order to provide minimum clearances of 18 inches for sanitary sewers/laterals and 12 inches for all other utilities, at no additional cost to the Owner. 12. Trenching for pipe installation shall be in accordance with Trench Detail shown on Sheet 8. Trench restoration for water main installations in pavement areas along public roads shall be in accordance with the VDOT Land Use Permit Asphalt Pavement Restoration Detail for Open Cut Utility Installations. 13. Pavement areas outside the areas of construction which are damaged as a result of hauling materials and equipment, shall be restored to the satisfaction of VDOT, at no additional cost to the Owner. 14. The Contractor shall be responsible for maintaining access to fall properties; coordinating with all property owners to have pavement edges cleared of all vehicles, as required, in advance of pipe laying operations; and coordinating with all property owners for temporary access and temporary water service interruptions during re -connection. The Contractor may elect tto restrict parking on both sides of the road in order to maintain traffic at all times. 15. All flagging operations and appropriate temporary traffic contr(ol measures shall be installed and maintained in accordance with the Virginia Wc)rk Area Protection Manual, latest edition, subject to the approval of the VDOT Inspector. Anyone performing flagging operations must be certified, and possess a valid and verifiable certification card with them whenever they are performing flagging operations. Only persons completing approved Work Zone Traflfic Control training courses and possessing the appropriate valid and verifiable acccreditation card will be permitted to oversee temporary traffic control activities. 16. The Contractor shall be responsible for restoring all disturbed ureas to their original elevations, unless otherwise indicated on the drawings. 17. The Contractor shall be responsible for removing and placing Eexisting items, as required to facilitate water main construction, at no additional cost to the Owner. Such items include, but are not limited to: posts, bollards, fenices, railings, guardrails, mailboxes, signs, newspaper boxes, property pins, rmonuments, benchmarks, utility poles, guy wires, pedestals, cabinets, curbs„ gutters, driveways, paved flumes or other drainage structures, retaining walls, lancdscaping, sprinklers, etc. Any items damaged during removal or re-insVallation shall be replaced with materials of equal or better quality by the Contractor, at no additional cost to the Owner. '� . DESIGNED: WOW Service Auth*r'ity DRAWN: J LB CHECKED: RSQ N0. DATE GENERAL NOTES (continued): 18. The Contractor shall safeguard all existing and known property corners, monuments, and marks adjacent but not related to the Work and shall re-establish them if disturbed or destroyed, at no additional cost to the Owner. Any property corners disturbed must be re-established by a Land Surveyor, licensed in the Commonwealth of Virginia. 19. Based on information provided by Miss Utility of Virginia, utility service providers within the project areas may include, but may not be limited to: - Albemarle County Service Authority (ACSA26) Field Contact: Scott Krebelder, 434-531-0714, Ext. 146 In the event of damage call 434-531-0714, Ext. 146 - CenturyLink (CTL154) Field Contact: S&N, 804-608-5640 In the event of damage call 800-788-3600 - City of Charlottesville, Gas (CVL222) Field Contacts: Benchmark, 804-550-7740 In the event of damage call 434-970-3800 - City of Charlottesville, Water (CVL 333) Field Contacts: Benchmark, 804-550-7740 In the event of damage call 434-970-3800 - City of Charlottesville, Sewer (CVL444) Field Contacts: Benchmark, 804-550-7740 In the event of damage call 434-970-3800 - Comcast (CMC501) Field Contact: Cable Protection Services. 804-562-3861 In the event of damage call 800-441-6917, Option 1 - Dominion Virginia Power (DOM710) Field Contact: S&N, 804-608-5640 In the event of damage call 888-E667-3000 LEGEND EXISTING STRUCTURES 1=61-110VATMIM PROPOSED STRUCTURES SO�OMCN +� SHEET LAYOUT SCALE: NONE ADW Asphalt Driveway CSW Concrete Sidewalk UTH Utility Handhole cow Comcrete Driveway CA Concrete Apron SRW Stone Retaining Wall GDW Gravel Driveway SSW Brick Sidewalk CRW Concrete Retaining Walll c&c Curb and Gutter BRW Brick Retaining Wall cws Concrete Wheel Stop Ep Edge of Pavement TRW Timber Retaining Wall -C(DAIUR) «ANR� AV FM w G -w-w—w-w- ® -- r -- ------►-- �- m sG C.I.P. P.V.C. D.I.P. C.M.P. A.C.P. R.C.P. - — — — — — - Underground Gas Underground Gas (approx.,-K0— based on utility records) Ex. Asphalt Pavement Sign Mailbox Meter Box Sanitary Cleanout Fire Hydrant Utility Pole Woods or Tree Line Water Main Underground Water (approx., based on utility records) Water Meter Property Line or R/W Sanitary Sewer and Manhole Ex. Storm Sewer Overhead Utilities Mulched Landscape Area Cast Iron Pipe Polyvinyl Chloride Ductile Iron Pipe Corrugated Metal Pipe Asbestos Cement Pipe Reinforced Concrete Pipe Easement c� "� © E--w-w-w- -ii-w�-w-� FFM -" SF 1}' TP / Water Main Valve Fire Hydrant Blow—Off Assembly Reducer Water Meter Cut & Cap Ex. Wafter Main Existing Water Main (To Be Abandoned) Bale Barrier Silt Fence Inlet Protection Tree Protection Easement METER TABLE ADDRESS STREET NAME METER SIZE STRUCTURE TYPE 100 Inglewood Court 5/8—Inch Meter Standard Plastic Box 101 Inglewood Court 5/8—Inch Meter Standard Plastic Box 100 Inglewood Drive 5/8—Inch Meter Standard Plastic Box 1622 Inglewood Drive 5/8—Inch Meter Standard Plastic Box 1700 Inglewood Drive 5/8—Inch Meter Standard Plastic Box 1704 Inglewood Drive 5/8—Inch Meter Standard Plastic Box 1708 Inglewood Drive 5/8—Inch Meter Standard Plastic Box 1801 Inglewood Drive 5/8—Inch Meter Standard Plastic Box 1802 Inglewood Drive 5/8—Inch Meter Standard Plastic Box 1803 Inglewood Drive 5/8—Inch Meter Standard Plastic Box 1803—A Inglewood Drive 5/8—Inch Meter Standard Plastic Box 1804 Inglewood Drive 1—Inch Meter Standard Plastic Box 1805—A Inglewood Drive 1—Inch Meter Special Traffic Rated Box 1805—B Inglewood Drive 1—Inch Meter Special Traffic Rated Box 2321 Inglewood Drive 5/8—Inch Meter Standard Plastic Box 2401 Inglewood Drive Existing Meter To Remain N/A 1800 North Berkshire Road 1—Inch Meter Special Traffic Rated Box 1801 North Berkshire Road 5/8—Inch Meter Standard Plastic Box 2312 North Berkshire Road 5/8—Inch Meter Standard Plastic Box 2315 North Berkshire Road 5/8—Inch Meter Standard Plastic Box 2401—A North Berkshire Road 5/8—Inch Meter Special Traffic Rated Box 2401—B North Berkshire Road 5/8—Inch Meter Standard Plastic Box 2403—A North Berkshire Road 5/8—Inch Meter Special Traffic Rated Box 2403—B North Berkshire Road 5/8—Inch Meter Standard Plastic Box 2404 North Berkshire Road 1—Inch Meter Special Traffic Rated Box 2410 North Berkshire Road 2—Inch Compound Meter Meter Vault 2411 North Berkshire Road 5/8—Inch Meter Standard Plastic Box 2413 North Berkshire Road 5/8—Inch Meter Standard Plastic Box 2416 North Berkshire Road 5/8—Inch Meter Standard Plastic Box 1800 Solomon Road 5/8—Inch Meter Standard Plastic Box 1801 Solomon Road 5/8—Inch Meter Standard Plastic Box 1802 Solomon Road 5/8—Inch Meter Standard Plastic Box 1803 Solomon Road 1—Inch Meter Standard Plastic Box 1804 Solomon Road 5/8—Inch Meter Special Traffic Rated Box 2409 Solomon Road 1-1/2—Inch Meter Meter Vault 7 R. SCOTT QUAY tic. No. 024784 19/ 17 IUNAL FIM a V 272 BENDIX ROAD, SUITE 400 ."fichaelBakt4:*::4Lr VIRGINIA BEACH, VA 23452 PHONE: (757) 463-8770 FAX: (757) 463-0503 EROSION AND SEDIMENT CONTROL PLAN (WP0201700047) BARTERBROOK PHASE 2 WATER MAIN REPLACEMENT PROJECT (ACSA PROJECT NO. 2017-02) SHEET LAYOUT, ABBREVIATIONS, LEGEND & GENERAL NOTES \ 5 Prop. Fuel Storage s\ \ \ �� Area (See Note 3) \ 1 m Z fProp. Sanitary Waste EROSION AND SEDIMENT CONTROL PLAN — NORTH BERKSHIRE ROAD Scale: 1 "=25' r i Prop. Sanitary Waste Facility (See Note 2) r Prop. Wasite Disposal Area (See Note 2) r Proop. Concrete Washout Area (See Note 2) -- c> D �P�URi ..................... '/ GOO NO. I DATE NL R. SCOTT Q[UaST Lic. No. 024784 l7 J a4' I°I}' <<l vs/ONAL 272 BENDIX ROAD, SUITE 400 'Michael VIRGINIA BEACH, VA 23452 PHONE: (757) 463-8770 FAX: (757) 463-0503 NOTES: 1) This project does not involve stationary construction. All activities will progress along each affected street as pipe installations are completed. 2) Locations for concrete washout, vehicle fueling, sanitary waste facilities and waste disposal areas shall be modified by the site operator as required and/or as corrective measures are warranted. 3) Stationary equipment fueling will occur based on equipment placement. Fuel container storage shall be modified by the site operator as required and/'or as corrective measures are warranted. EROSION AND SEDIMENT CONTROL PLAN (WP0201700047) BARTERBROOK PHASE 2 WATER MAIN REPLACEMENT PROJECT (ACSA PROJECT NO. 2017-02) EROSION AND SEDIMENT CONTROL PLAN NORTH BERKSHIRE ROAD Prop, Fuel Storage / ' / /"/ / ��� //�, / Area (See Note 3) s l/ /// J II X // Prop. Waste Disposal Grave) Area See Note 2 G Zz N(DATUR ) Prop. Sanitary Waste Facility (See Note 2) I I i/ I I I Prop. Concrete Washout Area (See Note 2) I 1 I Curb Cut _ /t 6Xj''-- Illi —" ,6�r � ��'� I � -- � _ �✓ rJ I �an Prop. Sanitary Waste / - Facility (See Note 2) O I Prop. Waste Disposal / Area (See Note 2) EROSION AND SEDIMENT CONTROL PLAN - INGLEWOOD DRIVE Scale: 1 "=25' O / Z �Ao ew am NO. I DATE I �,TTx o f EROSION AND SEDIMENT CONTROL PLAN (WP0201700047) P� 272 BENDIX ROAD, SUITE 400 BARTERBROOK PHASE 2 WATER MAIN REPLACEMENT PROJECT S ® VIRGINIA BEACH VA 23452 (ACSA PROJECT NO. 2017-02) C K SCOT -T OBST > �. No, 0241784PHONE: (757) 463-8770 0041 0411' 9' l7 FAX: (757) 463-0503 EROSION AND SEDIMENT CONTROL PLAN INGLEWOOD DRIVE 510 -"�W � D TUR) _ W — O s� _U �J i Prop. Concrete Washout Area (See Note 2) I 1 I Curb Cut _ /t 6Xj''-- Illi —" ,6�r � ��'� I � -- � _ �✓ rJ I �an Prop. Sanitary Waste / - Facility (See Note 2) O I Prop. Waste Disposal / Area (See Note 2) EROSION AND SEDIMENT CONTROL PLAN - INGLEWOOD DRIVE Scale: 1 "=25' O / Z �Ao ew am NO. I DATE I �,TTx o f EROSION AND SEDIMENT CONTROL PLAN (WP0201700047) P� 272 BENDIX ROAD, SUITE 400 BARTERBROOK PHASE 2 WATER MAIN REPLACEMENT PROJECT S ® VIRGINIA BEACH VA 23452 (ACSA PROJECT NO. 2017-02) C K SCOT -T OBST > �. No, 0241784PHONE: (757) 463-8770 0041 0411' 9' l7 FAX: (757) 463-0503 EROSION AND SEDIMENT CONTROL PLAN INGLEWOOD DRIVE I I II Q I = z Q IL I J LJ -- vv DA T u R) �F' _ — = - - 112 CMI{ i til' J! �` -- 12 CN _ - _ - - - - - _ 1 E, - _ ( �� 7 --_ X. n c --- ---- r G = - — �� �� Ex, As malt A���r j -� DA bV l — n.YTi iPl u �� i "' '\` _ � � V • 1 UGI JIVI V G - �-� ti C71 IV, / EY OrC 1, r \. CrQV�� ' �C t .. \ O f rE t Sys o�� I -. , ���i� ��air X SF Area (See Note 3) L� (Dg10q �rr Diejtyj r II G(DATUR) G(DATUR) G(DATUR) G(D RG(DATU G(DATUR) G(DATUR) ✓ico Dltc CD I ` I E DESIGNED: WOW c eServi th r*t ._ DRAWN: J LB a..; CHECKED: RSQ N0. DATE EROSION AND SEDIMENT CONTROL PLAN - SOLOMON ROAD Scale: 1 "=25' F �A31f op, C • SV- J �M`i� V � R. SCOTT QU)AST J tic. No. 024784 �o^a4�1g1� l-7 F J'/0NAV 0 Prop. Concrete Washout / Area (See Note 2) 6 C 7 Prop. Waste Disposal Area (See Note 2) 272 BENDIX ROAD, SUITE 400 Michael ®r °' VIRGINIA BEACH, VA 23452 PHONE: (757) 463-8770 FAX: (757) 463-0503 NOTES: 1) This project does not involve stationary construction. All activities will progress along each affected street as pipe installations are completed. 2) Locations for concrete washout, vehicle fueling, sanitary waste facilities and waste disposal areas shall be modified by the site operator as required and/or as corrective measures are warranted. 3) Stationary equipment fueling will occur based on equipment placement. Fuel container storage shall be modified by the site operator as required and/or as corrective measures are warranted. EROSION AND SEDIMENT CONTROL PLAN (WP0201700047) BARTERBROOK PHASE 2 WATER MAIN REPLACEMENT PROJECT (ACSA PROJECT NO. 2017-02) EROSION AND SEDIMENT CONTROL PLAN SOLOMON ROAD 1. The Contractor shall be required to provide erosion and sediment control measures during all phases of the work. All erosion and sediment control measures shall be in accordance with Section 02370 of the Specifications. 2. Unless otherwise indicated, all vegetative and structural erosion and sediment control practices shall be constructed and maintained according to minimum Standards and Specifications of the Virginia Erosion and Sediment Control Handbook, latest edition applicable Erosion and Sediment Control Technical Bulletins, and the Albemarle County Design Standards Manual, latest edition_. 3. The Contractor shall apply permanent or temporary soil stabilization to all disturbed areas within 7 days after final grade is established on any portion of the site. Soil stabilization must also be applied to disturbed areas, which may not be at final grade, but which will remain undisturbed for longer than 14 days. Permanent stabilization s hall be applied to areas that are to be left dormant for more than one (1) year. Soil stabilization measures shall include (but not limited to) vegetative establishment, mulching, anld the early application of gravel base material on areas to be paved. 4. All erosion and sediment control measures shall be placed prior to, or as the first step in construction. 5. All erosion and sediment control measures shall be inspected daily by the Site Superintendent or his representative, and after each runoff producing rainfall event. Any necessary repairs to maintain the effectiveness of the erosion control devices and cleanup of sedimentation are the responsibility of Albemarle County Service Authiority's Contractor and shall be made by the close of the working day. 6. Sediment shall be removed from paved areas on a daily basis. 7. Stock piles of soil and other erodible materials shall be stabilized or protected with sediment trapping measures. The Contractor is responsible for the ternporary protection and permanent stabilization for stockpiles onsite as well as for materials transported from the project site. 8. The Contractor shall monitor and take precautions to control dust, including (but not limited to) use of water, mulch and control of construction site traffic. g. It is Albemarle County Service Authority's Contractor's responsibility to cllean streets of mud and dust and take whatever measures necessary to insure that the streets are kept in a clean and dust free condition at all times. 10. Effluent from dewatering operations shall be filtered or passed (or both) through an approved sediment trapping device, and discharged in a manner that does not adversely affect adjacent properties, wetlands, waterways, or the storm drainage :system. 11. The Contractor is responsible for installation and maintenance of any additional control measures necessary to prevent erosion and sedimentation as required based on field conditions or as determined necessary by the Albemarle County Service Authority Inspector, and at no additional cost. 12. Temporary erosion and sediment control measures shall not be removed until all disturbed areas upstream of them are stabilized. After stabilization is complete, with the approval of the Albemarle County Service Authority Inspector, all measures shall be removed within 30 days. Trapped sediment shall be spread and seeded. 13. Erosion and sediment controls may only be removed after areas above them have been stabilized and with the approval of the Albemarle County Service Authority Inspector. 14. The Contractor is responsible for providing an individual holding a Responsible Land Disturber Certificate per Albemarle County requirements, who will be responsible for compliance with carrying out the land disturbing activity on this project. co 48" HIGH DENSITY ORANGE — POLYETHYLENE SAFETY FENCE 66" LONG METAL T -POST STAKE DRIVEN 18" BELOW GROUND SURFACE P� 12 �� F� S� PS Q\3\\ SP PSE M X' 0 co' O`�`QN c GROUND SURFACE WIRE OR ZIP TIES TO SECURE SAI,FETY FENCE TO METAL POST (TYP.) NOT TO SCALE METAL FENCE POST`. OR 4x4 POSTS PLASTIC TREE JCE TP TREE PROTECTION NOT TO SCALE 15" 1 'x2" WOODEN STAKE, 2 PER BALE ENTRENCHED STRAW BALE FILTEREDRUNOFF 18 �I 12" III' SOIL COMPACTED TO PREVENT PIPING SEDIMENT -LADEN RUNOFF THIS DETAIL INCORPORATED FOR REFERENCE ONLY: STRAW BALE BARRIERS MAY BE USED AS AN ADDITIONAL MEANS OF INTERCEPTING AND DETAINING SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS, WHICH MAY BE SUBJECT TO SHEET AND RILL EROSION. UNDER NO CIRCUMSTANCES SHOULD THEY BE CONSTRUCTED IN LIVE STREAMS OR IN SWALES WHERE THERE IS A POSSIBILITY OF WASHOUT. STB STRAW BALE BAR R I E R NOT TO SCALE 1. SET POSTS AND EXCAVATE A 4" X 2. STAPLE WIRE FENCING TO 4" TRENCH UPSLOPE ALONG THE LINE THE POSTS. OF POSTS. / MESH SPACING 6" MAX. 6' MAX 12 1/2 GAUGE MIN. 4" �� r STEEL OR WOOD POST -IMBED 3' 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. FILTER GROUND LINE 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. TEMPORARY SILT FENCING NOT TO SCALE 2 x 4" WOOD FRAME DROP INLET PERSPECTIVE VIEWS STAKE II - 1 ill'MIN, ELEVATION OF STAKE AND DETAIL A FABRIC ORIENTATION SPECIFIC APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE THE INLET DRAINS A RELATIVELY FLAT AREA (SLOPE NO GREATEER THAN 5%) WHERE THE INLET SHEET OR OVERLAND FLOWS (NOT EXCEEDING 1 C.F.S.) ARE TYPICAL. THE METHOD SHALL NCOT APPLY TO INLETS RECEIVING CONCENTRATED FLOWS, SUCH I AS IN STREET OR HIGHWAY MEDIANS. SILT FENCE DROP INLET PROTECTIION 272 BENDIX ROAD, SUITE 400 .r �r VIRGINIA BEACH, VA 23452 PHONE: (757) 463-8770 FAX: (757) 463-0503 FLOW ** VDOT #3, #357, #5, #56 OR #5 - COARSE AGGREGATE TO REPLACE SILT FENCE IN "HORSESHOE" WHEN HIGH VELOCITY OF FLOW IS EXPECTED 1.0' 1.5' 2.5' ,,L -ASS I RIPRAP OPTIONAL STONE COMBINATION ** -rnr nr rii i FLOW -ILL `DISTANCE IS 6' MINIMUM IF FLOW IS TOWARD EMBANKMENT SILT FENCE CULVERT INLET PROTECTION AME _., 7 ER EXCESS ORNERS INLET PROTECTION I P NOT TO SCALE GRAVEL FILTER*—�-12" RUNOFF WATER SEDIMENT—� VIII, CONCRETE GUTTER WIRE MESH FILTERED WATER 4 e• 1110 ° 12" CURB INLET SPECIFIC APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE PONDING IN FRONT OF THE STRUCTURE IS NOT LIKELY TO CAUSE INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED AREAS. * GRAVEL SHALL BE VDOT #3, #357 OR 5 COARSE AGGREGATE. STORM DRAIN INLET PROTECTION EROSION AND SEDIMENT CONTROL PLAN (WP0201700047) [BARTERBROOK PHASE 2 WATER MAIN REPLACEMENT PROJECT (ACSA PROJECT NO. 2017-02) EROSION AND SEDIMENT CONTROL NOTES & DETAILS