Loading...
HomeMy WebLinkAboutARB201700103 Review Comments Miscellaneous Submittal 2017-12-28COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 December 28, 2017 David L. Puckett 113 Fourth St., NE Charlottesville VA 22902 RE: ARB-2017-103: Afton Scientific Office Renovations Dear Mr. Puckett, I have reviewed your recent submittal (A.R.B. Submittal Package Afton Scientific Exterior Modification and Interior Fit Up of Office Space) plan submitted on 12/1/17 and I have the following comments, based on the ARB actions of November 6, 2017 and November 20, 2017. 1. Add a material/color schedule to sheet A200, with all materials keyed to the elevation drawings. Rev. 1: Comment not fully addressed. Address the following: • The materials shown in the Exterior Materials Schedule do not match the samples provided for the ARB meeting and review. Provide a sample for each material and its color. • The previous material palette provided included a sample of the Fiber Cement Panel System (Cembonit Adobe 946), the Metal Panel System (Centria 9957XL Silver) and the Aluminum Store Front (Clear Finish). There appears to have been a color and manufacturer for the Metal Panel System. Therefore, that information must also be included in the Exterial Materials Schedule on sheet A200. • Please note that the colors and materials previously submitted are those approved by the ARB. If a color has changed slightly approval of that similar color may be able to be accomplished by staff. However, if a color is not very similar to the one approved or a material has changed it will require ARB approval of the change. 2. Add the standard window glass note to the drawings: "Windows shall not be highly tinted or highly reflective. Visible Light Transmittance (VLT) shall not drop below 40%, and Visible Light Reflectance (VLR) shall not exceed 30%." Rev. 1: Comment Addressed. 3. Show the placement of the HVAC units in the plan. If the new location does not provide complete screening from the EC, add screening. Rev. 1: Comment Addressed. 4. Add the following note to the plan: "Visibility of proposed mechanical equipment from the Entrance Corridor shall be eliminated." Rev. 1: Comm ent._ci-i used. 5. Add a note to the plan that states, "No light fixtures are to be added or modified Nvith this plan." Rev. 6. Add a note to the plan that states, "All existing landscaping shall be protected. Any landscaping damaged during construction shall be replaced in kind." • NOTE: By request of the applicant, the Board reconsidered condition #6 at its meeting on Monday, November 20, 2017 and voted to approve the removal of the shrubs from the front of the building and to replace them with turf. Rev. 1: Comment not fully addressed. Revise the note to fix a typographical error. It should read "Shall' and not "hall'. 7. Revise the drawing index on the cover sheet to accurately reflect the submitted sheets. Rev. ?? Comment Addressed. 8. It is recommended that sheet A001 be revised to accurately represent the location of each building shown in the provided pictures. Rev. 1: Comment not fully addressed. It is recommended that sheet A001 be revised to not include the number "5" in two different locations. Remove the number "5" that is farther to the south. Additional Comments specified at bottom ARB comments letter: a. On sheet A002, add the following note to each of the three captions located below the photo simulations that show the proposed changes to the building: "The shrubs directly adjacent to the renovated building facades will be removed and replaced with turf. All other existing landscaping shall be protected. Any existing landscaping that is to remain and is damaged during construction shall be replaced in kind." Rev_ 1:Comment Addressed. b. If possible, revise the photo simulations to eliminate the existing shrubs located directly adjacent to the renovated building facades. Rev 1: C'om.-Fient Addressed. Please provide: 1. Two full sets of revised drawings that address the outstanding conditions noted above. Include updated revision dates on each drawing sheet. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staff s review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Paty Saternye Senior Planner cc: Afton Scientific Properties LLC 2020 Avon Ct Charlottesville VA 22902 File COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Paty Saternve DATE: PROJECT NAME: ARB2017-103 Afton Scientific Office Renovation Submittal Type Requiring Revisions () indicates submittal Code County Project Number # Copies Erosion & Sediment Control Plan (E&S Mitigation Plan MP Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, withprivate/public comparison (PRR) Private Road Request — Development Area (PRR-DA) Preliminary Site Plan SP Final Site Plan or amendment) (FSP) Final Plat FP Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP-CP Reduced Concept Plan (R-CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D-GWMP) Final Groundwater Management Plan (F-GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB2017-103 2 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB2017-103 2 Paty Satemye