SWM Bond Inspection
Project title:
Charlottesville Catholic School - VSMP
Project file number:
WP020150004
Plan preparer:
Collins Engineering [adam@collins-engineering.com]
Owner or rep.:
Catholic Diocese of Richmond [f.murphy@cvillecatholic.org]
Date Received:
29 November 2017
Date of comments:
28 December 2017
Adam,
We reviewed the stormwater management as -built plan and completed a field inspection. This
plan is rejected. Another fee will be required for the next submittal review.
After this review, we have the following comments:
1. See attached Construction Record Drawings (As -built) for VSMP requirements. Ensure everything
is provided.
2. Provide photographs of biofilter installation to certify the correct depths were constructed.
3. Forebay does not appear to be 4ft. deep. Please verify and provide certification.
4. As -built says 10' wide level embankment for access to spillway, however, this area only measures
approximately 6'.
5. As -built says 20' wide grass -lined emergency spillway, however, this area only measure 12'.
6. There is severe erosion at the top of the rip -rap after the emergency spillway. Please correct.
7. Replace all dead plants.
8. A plant appears to have washed away from the dam between the forebay and the bioretention
basin. Please fix erosion & re -plant.
9. There appears to be 1.5 to 2 feet of ponding in some of the bioretention area. This should only be
a maximum of 1 foot.
10. There did not appear to be a 3" layer of shredded hardwood mulch as outlined in the approved
plans.
If you have any questions or concerns, please contact me either by email (ecox@albemarle.org) or by
phone at 434-296-5832.
Sincerely,
Emily Cox, P.E.
Civil Engineer II