Loading...
HomeMy WebLinkAboutSUB201700199 Review Comments Road Plan and Comps. 2018-01-11Charles A. Kilpatrick, P.P. Commissioner COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper. VirgNa 22701 January 4, 2018 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Matt Wentland, P.E. Re: Foothill Crossing Connector Road -- Road Plan SUB-2017-00199 Review #1 Dear Mr. Wentland: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, dated 13 November 2017, and offers the following comments: 1. Include the attached VDOT General and Traffic Control Notes on the plans. 2. Provide the design speed for Eastern Avenue. 3. Plans for the proposed pedestrian tunnel and box culvert must be approved by the Culpeper District Structure & Bridge Section prior to road plan approval. A Geotechnical report is required, including borings at each end wall. Borings must be performed in accordance with Chapter 3 of the VDOT Manual of Instructions (MOI). 4. Plans for the proposed box culvert must be approved by the Culpeper District Drainage Section; comments will be forwarded once they are received. 5. Provide turn lane warrants for the proposed intersection at STA 29+75. 6. Show intersection sight distance lines on plans and provide profiles. Verify that the proposed grading will not obstruct the sight lines at Eastern Avenue and Park Ridge Drive. 7. The typical section, to include the sidewalks, should remain consistent. Note that sidewalks that are adjacent to the back of the curb must be 8' in width. 8. Is the size of the box culvert to be used for the proposed pedestrian tunnel (5'x7') sufficient for the intended use of the trail? 9. Specify and provide details for the culvert and tunnel endwalls. 10. The minimum turn lane taper is 200' for design speeds of 35 mph or higher. Does the proposed turn lane warrant a 300' storage lane? 11. Provide dimensions for the left turn lane transition taper. 12. Provide horizontal curve radii. 13. Underdrains must be tied in to drainage structures; show this in plan view. 14. Are no guardrails warranted for the slopes around the pedestrian tunnel and box culvert? Please provide that analysis. Note that this will be evaluated under the new MASH standards. 15. Show stop signs on Park Ridge Drive. VirginiaDOT.org WE KEEP VIRGINIA MOVING January 4, 2018 Matt Wentland, P.E. Page 2 16. Pavement Design: a. Provide a note stating that actual pavement designs should be based on CBR values of the actual subgrade material- b. SM-9.5A, the maximum lift thickness is 1.5" with the maximum number of lifts being 1. Additional lifts must be placed 1 year apart, per Appendix III of the 2014 VDOT Pavement Design Guide. This should be clearly noted. 17. Roadway & Pipe Profile Notes: a. Note 1 should reference 2016 VDOT Road & Bridge Specification Section 232 for specification for the use of RCP and HDPE pipe materials. Reference and provide VDOT Road & Bridge Standard PB-1. b. Note 2, please clarify "predominantly of soil" and change 2007 to 2016. c. Note 3 should say that fill material shall be compacted to 95% of the soil's maximum dry density as determined by ASTM D698. Please provide a copy of the revised plan along with a comment response letter. If further information is desired, please contact Justin DeeI at 434-422-9894. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Oka, �' 1 UIcav Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING