HomeMy WebLinkAboutSUB201700199 Review Comments Road Plan and Comps. 2018-01-12COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
Road and Drainage Plan Review
Project title:
Foothill Crossing Connector Road
Project file number:
SUB-2017-00199
Plan preparer:
Collins Engineering [scott@collins-engineering.com]
Owner or rep.:
Foothill Crossing, Inc.
Plan received date:
16 November 2017
Date of comments:
11 January 2018
Reviewers:
Matt Wentland
Scott,
We have reviewed the plans and have the following comments:
Engineering
1. The WPO submittal will need to be approved prior to road plan approval.
Planning — Rachel Falkenstein
1. Proffer 3 requires a greenway trail be constructed, as shown on the application plan, to a
Class-B standard prior to the loth CO. Staff recommends the trail be shown on this road
plan and constructed with the connector road. Please show trail dimensions and details.
Show width and location of (future) greenway easement.
2. Proffer 3 also requires the installation of the greenway trail shall not preclude the future
conversion, by others, to a Class -A trail. The trail tunnel should be dimensioned to fit a
future Class -A trail. Please also provide more legible culvert details for the trail tunnel.
Fire Rescue — Shawn Maddox
No hydrants are shown on this portion of the connector road. It appears that hydrant spacing will
exceed the 500' requirement.
Comments have not yet been received from the ACSA. E911 had no objection and VDOT comments were
emailed on 1/4/18.
File: SUB201700199 Foothill Crossing Connector Road Review Comments 01-11-18.doc