Loading...
HomeMy WebLinkAboutARB201700094 Action Letter 2018-01-12COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 January 12, 2018 Scott Collins Collins Engineering 200 Garrett Street, Ste K Charlottesville, VA 22902 RE: ARB-2017-94: Avinity Estates II Initial Site Plan - Initial Site Development Plan Mr. Collins, At its meeting on Monday, January 8, 2018 the Albemarle County Architectural Review Board, by a vote of 5:0 voted to forward the following recommendations on the above -noted Initial Site Development Plan to the agent for the Site Review Committee: • Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5) and recommended conditions of initial plan approval: 1. Prior to initial plan approval revise the plan as follows: a) Revise the shape of the SWMF pond to be more naturalistic. b) Relocate the access road to the west side of the SWMF and show it consistently throughout the site plan set. c) Show the power line easement on the plans. Show utilities and associated easements on the landscape plan. d) Create a denser, more naturalistic vegetative cover along the EC frontage to screen the SWMF from the EC and integrate it into the surroundings. Provide a quantity of large shade trees along the EC frontage equivalent to 35' on center, 3.5" caliper at planting. Add small trees and shrubs layered among the large trees. Increase planting area (open space) to accommodate this planting free of utilities and easements. e) Make the width of the landscape buffer consistent throughout the site plan set. f) Provide landscaping consistent with the application plan, free of utilities and easements. g) Show the fence and trees that are proposed along Pebble Drive. h) Revise the site configuration to minimize or screen the retaining walls. i) Show the existing trees that will remain along the EC frontage. j) Revise the geometry of the roadways to reduce visibility of pavement from the corridor. k) Revise the layout of the residential units to more fully meet the guidelines and improve their relationship to the EC. 2. A Certificate of Appropriateness is required prior to final site plan approval. • Regarding recommendations on the plan as it relates to the guidelines: None. • Regarding the final plan submittal: 1. A Certificate of Appropriateness is required prior to final site plan approval. 2. Submit all architectural elevations for the single-family attached houses and a materials palette for all proposed buildings for review. 3. Add the standard window glass note to the architectural drawings, Visible light transmittance (VLT) shall not drop below 40%. Visible light reflectance (VLR) shall not exceed 30%. Provide manufacturer's specifications for the window glass. 4. Show proposed loading, service, refuse, and storage areas as well as mechanical equipment on the site plan set. If mechanical equipment is roof -mounted, provide roof plans. Show how the visibility of equipment will be eliminated from the EC. 5. Add the standard mechanical equipment note to the site plan set and architectural drawings, Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 6. Submit a lighting plan with photometric values for all free-standing and wall -mounted lights as well as a lighting schedule and cut sheets for review. 7. Revise the shape of the SWMF pond to be more naturalistic. 8. Relocate the access road to the west side of the SWMF and show it consistently throughout the site plan set. 9. Show the power line easement on the plans. Show utilities and associated easements on the landscape plan. 10. Create a denser, more naturalistic vegetative cover along the EC frontage to screen the SWMF from the EC and integrate it into the surroundings. Provide a quantity of large shade trees along the EC frontage equivalent to 35' on center, 3.5" caliper at planting. Add small trees and shrubs layered among the large trees. Increase planting area (open space) to accommodate this planting free of utilities and easements. 11. Make the width of the landscape buffer consistent throughout the site plan set. 12. Provide landscaping consistent with the application plan, free of utilities and easements. 13. Show the fence and trees that are proposed along Pebble Drive. 14. Revise the site configuration to minimize or screen the retaining walls. 15. Show the existing trees that will remain along the EC frontage. 16. Revise the geometry of the roadways to reduce visibility of pavement from the corridor. 17. Revise the layout of the residential units to more fully meet the guidelines and improve their relationship to the EC. 18. Revise the spacing of street trees on interior streets within the development to 40' o.c. 19. Rectify the plant schedule to reflect the requirement that all shrubs measure 24" in height at planting. 20. Provide perimeter and interior parking lot trees at the clubhouse parking lot, 2 V2" caliper at planting 21. Show on the plan that the tree buffers on the north and east parcel boundary lines are planted within a 10' landscaping easement maintained by the HOA. 22. Provide additional information on the screening to be installed on the Kappa Sigma property. 23. Add the standard plant health note to the landscape plan, All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. 24. Indicate on the plan the proposed material and color for the retaining wall and submit a sample for review. Regarding conditions to be satisfied prior to issuance of a grading permit: 1. Revise the shape of the SWMF pond to be more naturalistic. 2. Relocate the access road to the west side of the SWMF and show it consistently throughout the site plan set. 3. Show the power line easement on the plans. Show utilities and associated easements on the landscape plan. 4. Create a denser, more naturalistic vegetative cover along the EC frontage to screen the SWMF from the EC and integrate it into the surroundings. Provide a quantity of large shade trees along the EC frontage equivalent to 35' on center, 3.5" caliper at planting. Add small trees and shrubs layered among the large trees. Increase planting area (open space) to accommodate this planting free of utilities and easements. 5. Make the width of the landscape buffer consistent throughout the site plan set. 6. Provide landscaping consistent with the application plan, free of utilities and easements. You may submit your application for continued ARB review at your earliest convenience. Application forms, checklists and schedules are available on-line at www.albemarle.org/ARB. Please be certain that your ARB submittal addresses the above -noted issues. If you have any questions concerning any of the above, please feel free to contact me. Sincerely, 1�4- PX/A/— Heather McMahon Senior Planner cc: Riverbend Development 455 Second Street SE, Ste 400 Charlottesville, VA 22902 Avon Properties PO Box 1467 Charlottesville, VA 22902