HomeMy WebLinkAboutWPO201400003 Application Final Site Plan and Comps. 2014-01-21 ,,, Albemarle Cbtinty *tale Community Development Department
401 McIntire Road Charlottesville,VA 22902-4596
:s Planning Application Voice:(434)296-5832 Fax:(434)972-4126
PARCEL/ OWNER INFORMATION
TMP 03100-00-00-021A0 Owner(s):
Application # WP0201400003 4F LLC
PROPERTY INFORMATION
Legal Description ACREAGE
Magisterial Dist. Rio Land Use Primary Industrial
Current AFD Not in A/F District Current Zoning Primary Light Industry
APPLICATION INFORMATION
Street Address 411 REAS FORD RD EARLYSVILLE, 22936 Entered By
Application Type Water Protection Ordinances Judy Martin
01/21/2014
Project Earlysville Business Park
Received Date 01/15/14 Received Date Final ( I Submittal Date 01/21/14 Total Fees 180
Closing File Date Submittal Date Final Total Paid 180
Revision Number
Comments
as
Legal Ad Y- - - — —_, r
Per zoning Ordinance
SUB APPLICATION(s)
r Type Sub Appiicati
Stormweter liana entellnit BMP Plate
(APPLICANT/ CONTACT INFORMATION
ContactType Name
Ow ner/ Iceri q 4F Ltd r g t 2885 EARL VIL O_ !� a LYSVI E r Ph0 Ph0
__ E „YSYT�. 22�,� na neCell
PrimaryContactyV DONALD FOSTER W. 2885 EARLYSVILLE ROAD EARLYSVILLE,VA 22936 434973907
General Contractor BRAD BOOKER, BBX CORP. P.O. BOX 7506 CHARLOTTESVILL 22906 4345315548
Plan Preparer BRIAN P. SMITH CIVIL ENG.INC. 4835 THREE CHOPT ROAD TROY,VA. 22974 4342963644
Signature of Contractor or Authorized Agent Date
NS
`"Application for Review of „`"'" .,,_
• Erosion & Sediment Control Plan & Stormwater Management/BMP Plan & .' -}
Stream Buffer Mitigation Plan
❑ Erosion& Sediment Control Plan 0 Stormwater Management/BMP Plan 0 Stream Buffer Mitigation Plan
❑ E&S Plan Amendment XJ SWM Plan Amendment
(Previous Plan# ) (Previous Plan# 2006-00039 )
❑ E&S Plan with Variance 0 Request for Exception
#of Variances 0 SWM Plan Resubmittal
❑ E&S Plan Resubmittal WPO Application#
WPO Application#
Submit 2 copies each of applicable plans/narrative/computations
*When a WPO plan is reviewed,but not approved,and a response to comments is not received within 6 months from the date of
county comments,the application will be deemed withdrawn.
Project Name: Earlysville Business Park
03100-00-00-021 A0
Tax map and parcel: tl:1100-0f)-fl0-(191r)0 Zoning: Light Industry
Amount of Land Disturbance: 1.37 Acres
Location of property(landmarks,intersections,or other): Travel on Rt. 660 one mile south of Rt. 743. EBP is located on the south
.0- • 1- •.• I • 1 •1 I • - ,1' 1" • ••_ •'1'1• 1- : •- •1• 1- -1• • I ' ).
Contact Person(Who should we call/write concerning this project?): Donald Foster
Address 2885 Earlysville Road City Earlysville State VA Zip 22936
Daytime Phone(434) 973-9079 Fax#( ) E-mail
Owner of Record Same as above
Address City State Zip
Daytime Phone( ) Fax#( ) E-mail
Contractor Brad Booker, 1 BBX C k.P.
Address T 1 b, .16O)c 5.15 co City C !Vgt,.G- State I Zip Z 2-(10(o
Daytime Phone(434) 531-5548 Fax#( ) E_mail bradbbx@earthlink.net
Plan Preparer Brian P. Smith Civil Engineering, Inc.
Address 4835 Three Chopt Road City Troy state VA Zip 22974
Daytime Phone(434) 296-3644 Fax#( ) E-mail bpspe@embarqmail.com
Owner/Applicant Must Read and Sign
By signinl this application as owner,I hereby certify that all requirements of the approved Erosion Control Plan,Stormwater
Manage nt/BMP Plan,and/or Mitigation Plan will be complied with and I have the authority to authorize the land disturbing activities and
develo, nt n e subje ,roperty. I hereby grant the County of Albemarle the right to enter upon the property as required to ensure
comp e i 7 as , .Ian.
�V January, 15,2014
Signature of Owner,Contract Purchaser Date
Donald Foster 434.973.9079
Print Name Daytime phone number of Signatory
FOR OFFICE USE ONLY WPO# AVIk-3
Fee Amount$ I TO.00 Date Paid 11 ic))Lj By who? y > L La Receipt# q Lino I Ck# y(pots By:
Revised November 14,2011 Page 1 of 3
•
Slue
EROSION CONTROL PLAN: (SUBMIT 2 COPIES)
Land disturbing activity pertaining to single family dwelling unit:
1. Plan Review $150 per review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
2 Permit and First Year Inspection Fees $150
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
3. Annual Permit Renewal and Inspection Fees $150
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
4. Each reinspection $150
(REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
Land disturbing activity pertaining to non-exempt agricultural land:
5. Plan Review $150 per review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
6. Permit and First Year Inspection Fees $150
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
7. Annual Permit Renewal and Inspection Fees $150
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
8. Each reinspection $150
(REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
All other land disturbing activity:
9. Plan Review,Disturbed Area Less Than One Acre $150 per review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
10. Permit and First Year Inspection Fees,Disturbed Area Less Than One Acre $200
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
11. Annual Permit Renewal and Inspection Fees,Disturbed Area Less Than One Acre $200
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
12. Plan Review,Disturbed Area One Acre or Larger $300 per review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
13. Permit and First Year Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
14. Annual Permit Renewal and Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
15. Each reinspection $250
(REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
16. Amendment to Approved Plan $180/per plan review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
17. Variances $150/per request
(TO BE PAID AT TIME OF APPLICATION)
18. SUBTOTAL EROSION CONTROL PLAN $
Revised November 14,2011 Page 2 of 3
STORMWATER MANAGEMENT/BMP PLAN &MITIGATION PLAN: (SUBMIT 2 COPIES)
19. Stormwater Management/BMP Plan... $300/per plan review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
20. Major Amendment of Plan $180/per plan review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
21. Request for exception $240
(TO BE PAID AT TIME OF APPLICATION)
22.Request for development in a stream buffer or for reduction or modification of stream
buffer and mitigation plan(if not part of another document)—Single family dwelling unit
or accessory structure $85
(TO BE PAID AT TIME OF APPLICATION)
23. Each inspection or reinspection $60
(INSPECTION/REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
24. Mitigation Plan $150
(TO BE PAID AT TIME OF APPLICATION)
25. SUBTOTAL SWM/BMP PLAN $ 180.00
TOTAL APPLICATION FEE: (Add lines 18 and 25) $ 180.00
THE OWNER SHALL BE RESPONSIBLE FOR ALL REINSPECTION AND/OR ANNUAL RENEWAL
FEES WHICH MAY BE CHARGED TO THIS PROJECT.
r,`'` Revised November 14,2011 Page 3 of 3