HomeMy WebLinkAboutWPO201400099 Bond Estimates WPO VSMP 2017-08-15 Commonwealth Apartments
WPO file number:WP0201400099
Erosion and Sediment Control Bond Estimate
Item Item No.Unit Unit Cost Cost
Number
(instated)
stablization(PS,TS) 0.96 acres $4.800.00
silt fence(SF) 80.0 ft $300.00
safety fence(SAF) 247.0 ft $1.23500
diversion(DD,FD.RWD) 218 ft $2,834.00
temporary slope drain(TSD) pipe length 0 tt pipe diameter 0 in $0.00
earthwork for trap/basin
height of darn at toe 11 ft cut at high side 14 ft
height of fill at face 0 ft cut at face 5 ft
length of dam 45 ft length of cut 88 ft
top width 3 ft width of cut 10 ft
length of spillway 8 ft 013.00 $9,958.00
a width of spillway 5 ft 050.00 $115.00
structures fa basin
riser height 0 ft
ser diameter 0 in $000
barrel length 0 ft base plate or fdn 0 $200.00 $0
barrel diameter 0 01 $000
barrel collars 0 $200.00 $0
baffle length 0 ft $50.00 $0
silt fence net protection(IP) 17T.
$000
stone Inlet protection(IP) 721
$200.00
outlet protection(OP) length 6 ft width 7.25 ft Ai 0'1' $195.75
channel(SCC.matted) length 0 ft width 0 ft $0,00
check dam depth in channel 0 ft channel width 0 ft IIII $0.00 $0.00
rom
cstruc8entrance(CE)
wash rack $2.000.00 $2,000.00
paved construction entrance $3.43.5500.00 42,0$0.00
00.00 40.00
np-rap,placed depth 0 ft length 00 ft
width 0.0 $60.00 $000
survey and layout(prce per 0.1 mi.) acres 0.98 traps and bases 1
$980.00
mobilization
$500.00
stream crossing(computed independently) $0.00
cost sum $25,117.75
contingency $2,511.78
Total $27,630
1/10/2017