Loading...
HomeMy WebLinkAboutWPO201400099 Bond Estimates WPO VSMP 2017-08-15 Commonwealth Apartments WPO file number:WP0201400099 Erosion and Sediment Control Bond Estimate Item Item No.Unit Unit Cost Cost Number (instated) stablization(PS,TS) 0.96 acres $4.800.00 silt fence(SF) 80.0 ft $300.00 safety fence(SAF) 247.0 ft $1.23500 diversion(DD,FD.RWD) 218 ft $2,834.00 temporary slope drain(TSD) pipe length 0 tt pipe diameter 0 in $0.00 earthwork for trap/basin height of darn at toe 11 ft cut at high side 14 ft height of fill at face 0 ft cut at face 5 ft length of dam 45 ft length of cut 88 ft top width 3 ft width of cut 10 ft length of spillway 8 ft 013.00 $9,958.00 a width of spillway 5 ft 050.00 $115.00 structures fa basin riser height 0 ft ser diameter 0 in $000 barrel length 0 ft base plate or fdn 0 $200.00 $0 barrel diameter 0 01 $000 barrel collars 0 $200.00 $0 baffle length 0 ft $50.00 $0 silt fence net protection(IP) 17T. $000 stone Inlet protection(IP) 721 $200.00 outlet protection(OP) length 6 ft width 7.25 ft Ai 0'1' $195.75 channel(SCC.matted) length 0 ft width 0 ft $0,00 check dam depth in channel 0 ft channel width 0 ft IIII $0.00 $0.00 rom cstruc8entrance(CE) wash rack $2.000.00 $2,000.00 paved construction entrance $3.43.5500.00 42,0$0.00 00.00 40.00 np-rap,placed depth 0 ft length 00 ft width 0.0 $60.00 $000 survey and layout(prce per 0.1 mi.) acres 0.98 traps and bases 1 $980.00 mobilization $500.00 stream crossing(computed independently) $0.00 cost sum $25,117.75 contingency $2,511.78 Total $27,630 1/10/2017