HomeMy WebLinkAboutSUB200300140 Certified Engineer's Report Final Plat 2017-12-13 Z 03 tol90
COLLINS 800 E JEFFERSON CHARLOTTESVILLE VA 22902
434 293 3719 434 293 3719
www.collins-engineering.com
December 13, 2017
Frank Pohl
County Engineer
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, VA 22902
RE: Mountain Valley As-built Plan Certification Letter
Dear Frank:
Please allow this letter to serve as our formal certification that the roads within the
Mountain Valley Subdivision have been constructed per the approved road plans and are
complete and satisfactory. Early this year, VDOT completed the acceptance process for
Ambrose Common Drive and accepted the roadway into the State System for Secondary
Roads. This roadway acceptance was also approved by the Board of Supervisors this
year, and currently, there is a two year VDOT Road maintenance bond on the roadway
with VDOT.
Attached to this letter are the revised As-built plans for the Mountain Valley Subdivision
Development for the acceptance and bond release of the road. All roadway
documentation, including stone and pavement inspection reports, compaction testing, and
other structural information have been provided to the County and VDOT over the bond
reduction and street acceptance process. Over the last year, the base pavement has been
repaired and the final asphalt surface for the roadway has been placed. Other minor
corrections and repairs have been made to the concrete drainage structures. All of these
repairs and improvements have been reviewed and accepted by VDOT and Collins
Engineering.
Ambrose Common Drive is complete and ready for County release of the existing road
bond.
Please contact me if you have any questions or require any further information.
Sinc rely,
•
Scott Collins
3 C. P'1(J. .
W L//3/,7
yta'
Y �'3Cs�eu`s