Loading...
HomeMy WebLinkAboutSUB200300140 Certified Engineer's Report Final Plat 2017-12-13 Z 03 tol90 COLLINS 800 E JEFFERSON CHARLOTTESVILLE VA 22902 434 293 3719 434 293 3719 www.collins-engineering.com December 13, 2017 Frank Pohl County Engineer Department of Community Development 401 McIntire Road, Room 227 Charlottesville, VA 22902 RE: Mountain Valley As-built Plan Certification Letter Dear Frank: Please allow this letter to serve as our formal certification that the roads within the Mountain Valley Subdivision have been constructed per the approved road plans and are complete and satisfactory. Early this year, VDOT completed the acceptance process for Ambrose Common Drive and accepted the roadway into the State System for Secondary Roads. This roadway acceptance was also approved by the Board of Supervisors this year, and currently, there is a two year VDOT Road maintenance bond on the roadway with VDOT. Attached to this letter are the revised As-built plans for the Mountain Valley Subdivision Development for the acceptance and bond release of the road. All roadway documentation, including stone and pavement inspection reports, compaction testing, and other structural information have been provided to the County and VDOT over the bond reduction and street acceptance process. Over the last year, the base pavement has been repaired and the final asphalt surface for the roadway has been placed. Other minor corrections and repairs have been made to the concrete drainage structures. All of these repairs and improvements have been reviewed and accepted by VDOT and Collins Engineering. Ambrose Common Drive is complete and ready for County release of the existing road bond. Please contact me if you have any questions or require any further information. Sinc rely, • Scott Collins 3 C. P'1(J. . W L//3/,7 yta' Y �'3Cs�eu`s