HomeMy WebLinkAboutSDP201700077 Approval - County 2018-01-25COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 January 25, 2018 Justin Shimp, P.E. Shimp Engineering, P.C. 201 E. Main Street Charlottesville, VA 22902 i ustinn, shims-enaineerina. com RE: SDP201700077 Greenmont Hopworks — Initial Site Plan - Action Letter Mr. Shimp: The Agent for the Board of Supervisors hereby grants administrative approval to the above referenced initial site plan. This approval shall be valid for a period of five (5) years from the date of this letter, provided that the developer submits a final site plan for all or a portion of the site within one (1) year after the date of this letter as provided in section 32.4.3.1 of Chapter 18 of the Code of the County of Albemarle, and thereafter diligently pursues approval of the final site plan. In accordance with Chapter 18 Section 32.4.2.8 Early or Mass Grading may be permitted after the following approvals are received: 1. Engineering approval of a VSMP plan meeting the requirements of Chapter 17 of the Code of the County of Albemarle. 2. Approval of all easements for facilities for stormwater management and drainage control. 3. Submittal of a tree conservation checklist with areas for tree preservation identified. The final site plan will not be considered to have been officially submitted until the following items are received: 1. A final site plan that satisfies all of the requirements of section 32.6 of Chapter 18 of the Code. 2. A fee of $1,613. Please submit 10 copies of the final plans to the Community Development Department. The assigned Lead Reviewer will then distribute the plans to all reviewing agencies. Once you receive the first set of comments on the final site plan, please work with each reviewer individually to satisfy their requirements. The Department of Community Development shall not accept submittal of the final site plan for signature until tentative approvals for the attached conditions from the following agencies/reviewers have been obtained: RRC 1VTemhers- Albemarle County Planning Services (Planner) — 3 copies (Cameron Langille, blanig�llegalbemarle.org) Albemarle County Engineering Services (Engineer) — 1 copy (Bobby Jocz, rjocz@albemarle.org) Albemarle County Information Services (E911) — 1 copy (Elise Kiewra, ekiewra e,albemarle.org) Albemarle County Building Inspections — 1 copy (Michael Dellinger, mdellin er e,albemarle.org) Albemarle County Fire & Rescue — 1 copy (Shawn Maddox, smaddox@albemarle.org) Rivanna Water and Sewer Authority — 1 copy (Victoria Fort, vforte,rivanna.org) Virginia Department of Transportation — 1 copy (Justin Deel, justin.deel@vdot.vir ig nia.gov) Virginia Department of Health — 1 copy (Alan Mazurowski, alan.mazurowski@vdh.vir ig.nia.gov) If you have any questions about these conditions or the submittal requirements please contact me at extension (434) 296-5832 ext. 3432 or blanig�llenalbemarle.org. Sincerely, Lt'ti' -� - Cameron Langille Senior Planner u County of Albemarle Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Memorandum To: Justin Shimp, P.E. (justin@shimp-en ing eering com) From: Cameron Langille, Senior Planner Division: Planning Date: January 25, 2018 Subject: SDP201700077 Greenmont Hopworks — Initial Site Plan The Planner/Engineer for the Current Development Division of the Albemarle County Department Community Development will recommend approval of the plan referred to above when the following items have been satisfactorily addressed. The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review. [Each comment is preceded by the applicable reference to the Albemarle County Code.] Albemarle County Planning Services (Planner) — Cameron Langille, blan ig llekalbemarle.org — Required changes: 1. [32.5.2 (a)] Please amend Sheet C2. The property label states the incorrect owner names and most recent instrument for property ownership. The instrument number is Deed Book 3929, pages 648-656. 2. [32.5.2 (a)] Please amend the Proposed Use and Zoning sections of the data table on Sheet C 1. The Special Use Permit (SP201700017) was approved by the Board of Supervisors on January 10, 2018. The approval date should be stated also. a. Please add the conditions approved with SP201700077 as an exhibit on the drawings. b. Please add the Concept Plan that was approved with SP201700077 as an exhibit on the drawings. 3. [32.5.2 (b)] Under "Proposed Use" on Sheet C1, please state "Commercial fruit or agricultural produce packing plant, Section 10.2.2.23 of the Zoning Ordinance. Approved January 10, 2018 (SP201700017)." 4. [32.5.2 (b)] Please amend the Parking Schedule on Sheet C1. The "Required Parking" calculation does not clearly identify which standard/use from Section 4.12.6 of the Zoning Ordinance is being applied. Furthermore, the Parking Schedule does not state the calculation that was used to determine how many customer spaces are required (i.e. 1 customer space per sq. ft. of gross floor area). Was the "Production, processing, testing, repairing, or servicing materials, goods or products" standard applied to this project? If so, please amend the use type listed under Parking Schedule on Sheet C1. 5. [32.5.2 (b)] No loading spaces are included in the Parking Schedule on Sheet C1. This site will be required to install loading spaces in accordance with Section 4.12.13 (c) of the Zoning Ordinance. Please add the calculation to Sheet C 1 on the final site plan. 6. [32.5.2 (d)] The final site plan will need to show all proposed grading associated with the project. Please see Engineering comments below regarding submittal and approval of a Water Protection Ordinance (WPO) plan. 7. [32.5.2 (f)] Please label the 100' WPO stream buffer on Sheets C2 and C3. The buffer coincides with the location of the wooded areas to remain, as shown on the approved Concept Plan for SP201700077. 8. [32.5.2 (k)] Please show the location of all proposed sewer and drainage easements. Label as "proposed" with a size/width measurement. State whether the easement is public or private. 9. [32.5.2 (1)] Please show the location of all proposed utility easements. Label as "proposed" with a size/width measurement. State whether the easement is public or private. 10. [32.5.2 (n)] Please show all proposed loading areas on the final site plan. 11. [32.5.2 (n)] No trash containers or dumpster pads are shown on Sheet C3. This site will require a dumpster pad in accordance with Section 4.12.13 (e) of the Zoning Ordinance. Dumpster pads must comply with the design standards stated in Section 4.12.19 of the Zoning Ordinance. 12. [32.5.2 (n)] The perpendicular parking spaces shown on Sheet C3 do not meet the minimum 9' width required by Section 4.12.16 (c) of the Zoning Ordinance. The spaces must be 9' x 18' when adjacent to a 24' vehicle travelway. Please amend the parking layout and design as necessary. 13. [32.5.2 (n)] The site plan does not show any/label any sidewalks inside of the development. All sidewalk and pedestrian access improvements must be shown, labeled, and dimensioned. This includes handicap ramps leading from all proposed sidewalks within and adjacent to the parking area. 14. [32.5.2 (p)] The final site plan must include a landscape plan as required by Section 32.7.9 of the Zoning Ordinance. This includes the following sections: a. [32.7.9.5] Please show the required landscaping along the existing public street and include calculation for the number of required trees. State the proposed species and caliper/height at time of installation. b. [32.7.9.6] Please demonstrate that at least 5% of the parking area and vehicular circulation area will be landscaped. Identify proposed landscaping materials, include caliper/height at time of installation. c. [32.7.9.8] Please demonstrate that an overall tree canopy of at least 10% of the site area will be installed. Identify proposed landscaping materials, include caliper/height at time of installation. 15. [32.5.2 (n) and 32.7.31 The site plan shows gravel as the surface material for most of the parking area and internal vehicle travel ways. Additional details of the gravel will be required on the final site plan and is subject to final approval by the County Engineer. 16. [32.5.2 (n) and 4.171 The final site plan will need to include a lighting plan showing all proposed outdoor lighting locations, lummaire types, heights, footcandle measurements inside of the property and along all proposed property lines, and include manufacturer specifications demonstrating compliance with full -cutoff standards in accordance with Section 4.17 of the Zoning Ordinance. 17. [General Comment] Prior to final site plan approval, a separate easement plat application must be submitted, reviewed, and approved for all proposed easements associate with the development. Please contact Cameron Langille at the Department of Community Development at blanig�lle@albemarle.org or 296-5832 ext. 3432 for further information. Comments From Other Reviewers: Albemarle County Engineering Services (Engineer) — Bobby Jocz, rjoczna,albemarle.org — Requested Changes: 1. WPO plan approval required prior to final site plan approval. 2. Show/identify limits of WPO buffer at south end of property. 3. Parking spaces must be 9x18 where a 24' travelway exists. Albemarle County Information Services (E911) — Elise Kiewra, ekiewra@albemarle.org — No Objection Albemarle County Building Inspections — Michael Dellinger, mdellinger@albemarle.org — No Objection Albemarle County Planning Services (Architectural Review Board) — Margaret Maliszewski, mmaliszewskina,albemarle.org —No Objection: 1. Only a portion of this site falls within the Entrance Corridor overlay district. The proposed development in that area is not expected to be visible from the EC. Consequently, ARB review is not required. Albemarle County Department of Fire Rescue — Shawn Maddox, smaddox@albemarle.org — Requested Changes: 1. A knox box will be required. Please make a note on the plans that it is required and that location can be coordinated with the fire marshal's office. 2. Please show proposed travel lanes around the site. While the site appears to provide adequate emergency access it does not indicate if there will be outside storage or other obstructions. Emergency apparatus access must be provided and shall be at least 20' of unobstructed travel width. Albemarle County Service Authority —Richard Nelson, rnelsonnserviceauthority.org — No Objection: 1. The Greenmont Hopworks project area is not in the ACSA jurisdictional area. There are no comments. Rivanna Water and Sewer Authority — Victoria Fort, vfortnrivanna.org, 434-977-2970, ext. 205 — Comments not yet received from RWSA. Any comments or approvals will be forwarded to the applicant upon receipt. Virginia Department of Transportation —Justin Deel, justin.deelkvdot.vir ig nia.gov —Requested Changes, see attached. Thomas Jefferson Health District — Alan Mazurowski, alan.mazurowskikvdh.vir ig.nia.gov — Approved, see attached recommendation. Charles A. Kilpatrick, P.E. Commissioner COMMONWEALTH of VIRGIN.IA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper Virginia 22701 January 11, 2018 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Scott Clark Re: Greenmont Hopworks Processing Facility — Initial Site Plan SDP-2017-00077 Review #1 Dear Mr. Clark: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Shimp Engineering, dated 4 December 2017, and offers the following comments: 1. Provide dimensions between proposed entrance and any other commercial entrances or intersections. Will the existing entrances to the parcel remain? It appears those entrances do not meet spacing requirements. Note that the minimum entrance spacing for a 55 mph Collector road is 445 feet. 2. The required intersection sight distance is 695 feet; this plans show 495 feet. Profiles are also required. Sight distance easements are required where the sight line is not within the ROW. 3. The minimum commercial entrance width is 30 feet. 4. Note that the final site plan must show conformance with the VDOT Road Design Manual Appendices B(1) and F, as well as any other applicable standards, regulations or other requirements. Please provide two copies of the revised plan along with a comment response letter. If further information is desired, please contact Justin Deel at 434-422-9894. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, // Od'a (bl, `/t- ffG Z Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING COMMONWEALTH of VIRGINIA In Cooperation with the Thomas Jefferson Health District ALBEMANN COUNTY TTESVIRA) FLUVANNA COUNTY (PALMVRA) State Department of Health GREENE COUNTY (STANARDSVILLE) 1138 Rose Hill Drive LOUISA COUNTV(LOUISA) Phone (434) 972-6219 P O. Box 7546 NELSON COUNTY (LOVINGSTON) Fax (434) 972-4310 Charlottesville, Virginia 22906 January 11, 2018 Cameron Langille, Senior Planner Albemarle County Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Greenmont Hopworks Initial Site Plan SDP2017- 77 Mr. Langille: As requested, I've reviewed the Initial Site Plan, dated December 4, 2017, for the proposed development, referenced above, and offer the following comments with regard to water & sewer: Water: I recommend chlorinating the existing well and testing for coliform bacteria prior to use and annually thereafter. If a total of at least 25 individuals (employees, customers, etc.) per day are to use the well water, the well will need to be regulated as a waterworks by the Office of Drinking Water (540-463-7136). Sewage: It appears the property has been investigated and an area identified for the location of a drainfield, however, our office has not yet received, or approved, the plans. Until plans for a Sewage Disposal System permit are approved, this area may be subject to change. Recommendation: Approval Conditions: Owner obtains sewage disposal system permit for the area indicated as "Approx. Drainfield Location" If there are any questions or you wish to discuss, please give me a call, 434-972-4306. Sincerely, Alan Mazurowski Environmental Health Supervisor Thomas Jefferson Health District alan.mazurowskikvdh.vir ig�nia.gov