HomeMy WebLinkAboutSP201700031 Review Comments Special Use Permit 2018-01-31COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
January 31, 2018
Ms. Jini Bitzer
Ms. Judy McMullen
340 Greenbrier Drive, Suite C
Charlottesville, VA 22902
RE: SP201700031 The Rack
Dear Ms. Bitzer and Ms. McMullen:
Staff has reviewed your initial submittal for SP201700031 to add pool tables to a restaurant at 340
Greenbrier Drive.
Planning Comments (Elaine Echols)
Consistency with the Comprehensive Plan
Comments on conformity with the Comprehensive Plan will be provided to the Planning Commission
and Board of Supervisors as part of the staff report when this proposal goes to public hearing or a
worksession.
Land Use:
• This project is designated for Office/R&D/Flex/Light Industrial, which allows professional office;
research and development, design, testing of prototypes; manufacturing, assembly, and packaging;
commercial and residential are secondary uses (no maximum density) in the PL29 Master Plan. It
was determined at your preapplication meeting that this use could be considered a secondary use.
Zoning Comments (Rebecca Ragsdale)
• Parking -- Based on the recreation parking calculation of 1 space/125 square feet of usable rec area,
there is adequate parking for regular operation of The Rack on this site. However, given that The
Rack is expected to host tournaments, I need more information on the expected number of
attendees to determine parking and recommend parking strategies for tournament days. The
applicants mentioned in the community meeting that shared parking with the abutting property
under common ownership (TMP 061WO-01-OA-009AO) would provide tournament day overflow
parking needs. Zoning will still need to have information on expected # of attendees for
tournaments at The Rack as well as review businesses and required parking on TMP 061WO-01-OA-
009AO to determine if a shared parking agreement can be approved under Section 4.12.10 and
4.12.08 of the ordinance.
1
• Noise - Since the applicants do not propose music other than a juke box, staff does not have
concerns about noise.
Building Official (Michael Dellinger)
• (If the Board approves the special use permit) Plans will need to be drawn by a registered design
professional, as the proposed use appears to be a change of use of the CO to an Assembly use.
Grease trap maybe needed if including a restaurant. May need sprinkler system if not already
installed.
Police — to be forwarded
Virginia Department of Transportation Comments — to be forwarded
Additional Planning Comments
The NMD zoning designation anticipated a mixture of uses in this building. This proposed restaurant
with pool tables appears to be consistent and compatible with the nearby uses. Staff recommends that
you resubmit information requested by Zoning, according to the resubmittal schedule. After review,
staff will develop potential conditions for the special use permit for consideration by the Planning
Commission at their public hearing if they recommend approval to the Board of Supervisors.
Action after Receipt of Comments
After you have read this letter, please take one of the actions identified on "Action after Receipt of
Comment Letter" which is attached. Staff recommends that you provide a resubmittal prior to asking for
your Planning Commission public hearing.
Resubmittal
If you choose to resubmit, please use the attached form. There is no fee for the first resubmittal. See
resubmittal schedule is for resubmittal dates
Notification and Advertisement Fees
When this project is ready to be scheduled for the Planning Commission's public hearing, a fee of $474
must be paid to cover costs for legal advertisements. The Board of Supervisors public hearing fee of
$259 can be paid with the Planning Commission's public hearing fee or later. If you wish to provide a
single payment, the total is $733.
Feel free to contact me if you wish to meet or need additional information. I can be reached at
eechols@albemarle.org or 434-296-5832, ext. 3252.
Sincerely,
Elaine K. Echols, FAICP
Chief of Planning
Planning Division
Enc: Action after receipt of comment letter
Resubmittal form
DEPARTMENT OF COMMUNITY DEVELOPMENT
ACTION AFTER RECEIPT OF COMMENT LETTER
Within 30 days of the date of this letter, please do one of the following:
(1) Resubmit in response to review comments
(2) Request indefinite deferral
(3) Request that your Planning Commission public hearing date be set
(4) Withdraw your application
(1) Resubmittal in Response to Review Comments
If you plan to resubmit within 30 days, make sure that the resubmittal is on or before a
resubmittal date as published in the project review schedule. The full resubmittal schedule may
be found at www.albemarle.org in the "forms" section at the Community Development page.
Be sure to include the resubmittal form on the last page of your comment letter with your
submittal.
The application fee which you paid covers staff review of the initial submittal and one
resubmittal. Each subsequent resubmittal requires an additional fee. (See attached Fee
Schedule.)
(2) Request Indefinite Deferral
If you plan to resubmit after 30 days from the date of the comment letter, you need to request
an indefinite deferral. Please provide a written request and state your justification for
requesting the deferral. (Indefinite deferral means that you intend to resubmit/request a
public hearing be set with the Planning Commission after the 30 day period.)
(3) Request Planning Commission Public Hearing Date be Set
At this time, you may schedule a public hearing with the Planning Commission. However, we
do not advise that you go directly to public hearing if staff has identified issues in need of
resolution that can be addressed with a resubmittal.
After outstanding issues have been resolved and/or when you are ready to request a public
hearing, staff will set your public hearing date for the Planning Commission in accordance with
the Planning Commission's published schedule and as mutually agreed by you and the County.
The staff report and recommendation will be based on the latest information provided by you
with your initial submittal or resubmittal. Please remember that all resubmittals must be made
on or before a resubmittal date.
By no later than twenty-one (21) days before the Planning Commission's public hearing, a
newspaper advertisement fee and an adjoining owner notification fee must be paid. (See
attached Fee Schedule.) Your comment letter will contain the actual fees you need to pay.
Payment for an additional newspaper advertisement is also required twenty-two (22) days prior
to the Board of Supervisors public hearing.
Please be advised that, once a public hearing has been advertised, only one deferral prior to the
Planning Commission's public hearing will be allowed during the life of the application. The
only exception to this rule will be extraordinary circumstances, such as a major change in the
project proposal by the applicant or more issues identified by staff that have not previously
been brought to the applicant's attention. As always, an applicant may request deferral at the
Planning Commission meeting.
(4) Withdraw Your Application
If at any time you wish to withdraw your application, please provide your request in writing.
Failure to Respond
If we have not received a response from you within 30 days, we will contact you again. At that
time, you will be given 10 days to do one of the following: a) request withdrawal of your
application, b) request deferral of your application to a specific Planning Commission date as
mutually agreed to with staff, or c) request indefinite deferral and state your justification for
requesting the deferral. If none of these choices is made within 10 days, staff will schedule
your application for a public hearing based on the information provided with your original
submittal or the latest submittal staff received on a resubmittal date.
Fee Payment
Fees paid in cash or by check must be paid at the Community Development Intake
Counter. Make checks payable to the County of Albemarle. Do not send checks directly to the
Review Coordinator. Fees may also be paid by credit card using the secure online payment
system, accessed at
http://www.albemarle.org/department.asp?department=cdd&relpage=21685. IF YOU PAY BY
CREDIT CARD, PLEASE EMAIL THE REVIEW PLANNER. THANKS.
21