Loading...
HomeMy WebLinkAboutSUB201700169 Review Comments 2017-11-08Short Review Comments Report for: SUB201700169 SubApplication Type: TRIPLETT/ATKINS/LAYMAN PROPERTY TMP 85-28 & 28A Boundary Line Adjustment Date Completed:10/30/2017 Reviewer:Tim Padalino CDD Planning Review Status:Requested Changes Reviews Comments:1. [Chapter 14, Section 14.302-(A)-10 and Chapter 18, Section 18.10.3.1]: Please revise to include the required information about the “right of further division of proposed lots.” a. Identify the existing development rights for Parcel 28 and Parcel 28A. b. Specify how those development rights are to be assigned to revised Parcel 28 and revised Parcel 28A. c. Add the note contained in Section 14.302-(A)-10. 2. [Chapter 14, Section 14.302-(B)-5]: Please revise zoning note on Sheet 1 of 2 to state Property Zoned RA Rural Areas, with Flood Hazard Overlay District located near Plank Road as shown on Sheet 2 of 2. 3. [Chapter 14, Section 14.302-(B)-7]: Please revise to include a note stating that Parcels 28 and 28A are located within the South Fork Rivanna Reservoir Water Supply Watershed. Division: Date Completed:11/03/2017 Reviewer:Tim Padalino CDD Planning Review Status:No Objection Reviews Comments: Division: Date Completed:11/08/2017 Reviewer:Tim Padalino CDD Planning Review Status:Approved Reviews Comments: Division: Page:1 of 1 County of Albemarle Printed On:February 01, 2018 Page 1 of 1 County of Albemarle Department of Community Development ________________________________________________________________________ Memorandum To: Thomas E. Shumate, Jr., LS – Tom Shumate Surveyor, Inc. (c/o tomjr@tomshumatesurveyor.com) From: Tim Padalino, AICP (tpadalino@albemarle.org) Division: Planning Date: October 30, 2017 Subject: SUB201700169 – “Boundary Adjustment and Composite Plat” (Triplett/Atkins/Lyman) The County will approve the plat referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) This review was completed using the sections listed under Section 14-208 of the Subdivision Ordinance. Staff has provided references to Chapter 14 (Subdivision Ordinance) and/or Chapter 18 (Zoning Ordinance) of the County Code preceding each comment. The County Code is kept up-to-date by the County Attorney’s office and may be found at www.albemarle.org/countycode. Planning: [Requirements]: 1. [Chapter 14, Section 14.302-(A)-10 and Chapter 18, Section 18.10.3.1]: Please revise to include the required information about the “right of further division of proposed lots.” a. Identify the existing development rights for Parcel 28 and Parcel 28A. b. Specify how those development rights are to be assigned to revised Parcel 28 and revised Parcel 28A. c. Add the note contained in Section 14.302-(A)-10. 2. [Chapter 14, Section 14.302-(B)-5]: Please revise zoning note on Sheet 1 of 2 to state Property Zoned RA Rural Areas, with Flood Hazard Overlay District located near Plank Road as shown on Sheet 2 of 2. 3. [Chapter 14, Section 14.302-(B)-7]: Please revise to include a note stating that Parcels 28 and 28A are located within the South Fork Rivanna Reservoir Water Supply Watershed. Please note that, in accord with the provisions of Section 14-229(B) of Chapter 14, if the subdivider fails to submit a revised plat to address all of the requirements within six (6) months after the date of this letter, then the application shall be deemed voluntarily withdrawn. Please contact Tim Padalino at 434-296-5832, ext. 3088 or tpadalino@albemarle.org for further information about any of the comments above. Thank you.