Loading...
HomeMy WebLinkAboutSUB201700183 Review Comments Easement Plat 2017-12-15Short Review Comments Report for: SUB201700183 SubApplication Type: MONSCANE CENTER Easement Plat Date Completed:12/07/2017 Reviewer:Alexander Morrison ACSA Review Status:No Objection Reviews Comments: Division: Date Completed:11/17/2017 Reviewer:Tim Padalino CDD Planning Review Status:No Objection Reviews Comments:No objection; County will approve plat, pending review and approval by ACSA. Review comment letter (dated 11/17/2017) available in Laserfiche. Division: Date Completed:11/08/2017 Reviewer:Matthew Wentland CDD Engineering Review Status:No Objection Reviews Comments: Division: Date Completed:11/21/2017 Reviewer:Alexander Morrison ACSA Review Status:Requested Changes Reviews Comments:• V1: Revise note 10 so the ACSA water and sewer easement are dedicated to the ACSA and not to public use. • V1: Add a note that the ACSA water and sewer easements are to be centered on the as-built location. • V2: Revise WE12 to 10’ (it does not need to extend to the building, just 5’ past the water meter location). • V2: Increase the width of the fire hydrant easement at WE10 so it extends 10’ off all sides of the fire hydrant. • V2: Extend SE6 to the property line along the existing sewer alignment. Division: Date Completed:11/15/2017 Reviewer:Adam Moore VDOT Review Status:No Objection Reviews Comments:No objection / generally acceptable per review of plat dated 10/16/2017. A VDOT Land Use Permit will be required prior to any work within the right-of-way. Division: Date Completed:12/15/2017 Reviewer:Tim Padalino CDD Planning Review Status:Approved Reviews Comments: Division: Page:1 of 1 County of Albemarle Printed On:February 01, 2018 Page 1 of 1 County of Albemarle Department of Community Development ________________________________________________________________________ Memorandum To: Steve Dancey – Dominion Engineering (sdancey@dominioneng.com) From: Tim Padalino, AICP (tpadalino@albemarle.org) Division: Planning Date: November 17, 2017 Subject: SUB201700183 – Monscane Center Easement Plat Community Development staff have reviewed the above-referenced plat, and there are no objections from Planning or Engineering. Therefore, the County will approve the plat pending review and approval of the Albemarle County Service Authority (ACSA). If ACSA identifies any required revisions to the plat, the County will approve the plat after any such items are satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) This review was completed using the sections listed under Section 14-208.2 of the Subdivision Ordinance. Staff has provided references to the County Code preceding each comment. The Code is kept up -to-date by the County Attorney’s office and may be found at www.albemarle.org/countycode. Planning:  No Objection (11/17/2017) Engineering: (Matthew Wentland / mwentland@albemarle.org)  No Objection (11/8/2017) Albemarle County Service Authority (ACSA): (Alex Morrison / amorrison@serviceauthority.org)  A copy of the plat (dated 10/16/2017) was transmitted to ACSA on 11/6/2017. To date, County staff have not received a response; ACSA has been asked to provide written review comments by 11/21/2017. Staff will forward ACSA review comments and/or approval(s) upon receipt. VDOT: (Adam Moore / adam.moore@vdot.virginia.gov)  No Objection (11/14/2017) – please see attached comment letter. In accord with the provisions of Section 14-229(B) of Chapter 14, if the subdivider fails to submit a revised plat to address all of the requirements within six (6) months after the date of this letter, then the application shall be deemed voluntarily withdrawn. Please contact Tim Padalino at 434-296-5832, ext. 3088 or tpadalino@albemarle.org for further infor mation about any of the comments above, or to otherwise discuss SUB201700183. Thank you.