Loading...
HomeMy WebLinkAboutSUB201600014 Review Comments Road Plan and Comps. 2016-08-08Short Review Comments Report for: SUB201600014 SubApplication Type: Old Trail Creekside III Phase III - Road Plan New Public Use Road Plan Date Completed:03/06/2016 Reviewer:John Anderson CDD Engineering Review Status:Requested Changes Reviews Comments:1. Provide/show VDOT end sections, culvert #2 profile, Sheet S-1. 2. Transfer construction note on approved sheet DP-2 for fill below inlets to Str. 116-Out profile, sheet S-1. 3. Consider/respond to VDOT review comments for sidewalk revision, drainage easement, culvert computations, etc., d. 23 Feb 2016. 4. Note: Reviewer will confirm with Planning whether Amendment to Approved SDP2012-00086 requires Site Plan action. Division: Date Completed:02/23/2016 Reviewer:Troy Austin VDOT Review Status:Requested Changes Reviews Comments: Division: Date Completed:02/14/2016 Reviewer:Robbie Gilmer Fire Rescue Review Status:No Objection Reviews Comments:no comments or objections Division: Date Completed:02/03/2016 Reviewer:Alexander Morrison ACSA Review Status:See Recommendations Reviews Comments:Text of Email, A. Morrison, ACSA, 2/3/2016 2:22 PM: "The ACSA has no comments on the plan, but will not be able to recommend approval until Old Trail Creek Side III Phase II utilities are dedicated to the ACSA. The applicant should contact Jeremy Lynn, PE (434-977-4511 ext. 114 or jlynn@serviceauthority.org) at the ACSA for more information on the dedication requirements. Let me know if you have any questions. Thank you. Alexander J. Morrison, P.E. Civil Engineer " Division: Date Completed:05/16/2016 Reviewer:John Anderson CDD Engineering Review Status:No Objection Reviews Comments:Revisions address prior (3/6/16) Engineering review comments –ref. CV: 1. Provide/show VDOT end sections, culvert #2 profile, Sheet S-1. (Rev. 1) Addressed. County accepts proposed end wall design. 2. Transfer construction note on approved sheet DP-2 for fill below inlets to Str. 116-Out profile, sheet S-1. (Rev. 1) Addressed. 3. Consider/respond to VDOT review comments for sidewalk revision, drainage easement, culvert computations, etc., d. 23 Feb 2016. (Rev. 1) Acknowledged. County has written VDOT /ACF&R requesting update to Agency comments on this ROAD Plan. (email: 5/16/2016 4:09 AM) 4. Note: Reviewer will confirm with Planning whether Amendment to Approved SDP2012-00086 requires Site Plan action. (Rev. 1) Addressed. Engineering has confirmed with Planning that Amendment to Approved SDP2012-00086 is not necessary. Division: Page:1 of 2 County of Albemarle Printed On:February 02, 2018 AM) 4. Note: Reviewer will confirm with Planning whether Amendment to Approved SDP2012-00086 requires Site Plan action. (Rev. 1) Addressed. Engineering has confirmed with Planning that Amendment to Approved SDP2012-00086 is not necessary. Date Completed:04/06/2016 Reviewer:Ellie Ray CDD Planning Review Status:See Recommendations Reviews Comments:Please make sure the relocated trees are within either the road right-of-way or the sidewalk/landscape easement. Division: Date Completed:04/01/2016 Reviewer:Joel DeNunzio VDOT Review Status:Requested Changes Reviews Comments: Division: Date Completed:04/16/2016 Reviewer:Robbie Gilmer Fire Rescue Review Status:No Objection Reviews Comments:Fire Rescue has no objections or comments to the plans. -R. Gilmer Division: Date Completed:05/18/2016 Reviewer:Alexander Morrison ACSA Review Status:No Objection Reviews Comments:A. Morris email (5/18/2016 12:38 PM): I have no comments and hereby recommend approval of the Road Plan Amendment. Division: Date Completed:07/23/2016 Reviewer:John Anderson CDD Engineering Review Status:Approved Reviews Comments:Please confirm ACSA Approval. Ref. 5/16/16 Engineering review (No objection). Please ref. email -7/23/2016 3:34 PM (County/JA to CE/FGM) janderson2 7/26/2016 5:15 AM ____________________update____________________janderson2 7/26/2016 7:13 AM ACSA Approval -email, 5/18/2016 1:08 PM, JA to FGM, Apologies, lost track Division: Date Completed:08/08/2016 Reviewer:Max Greene CDD Engineering Review Status:See Recommendations Reviews Comments:Road bonds were previouly posted with SUB201200086 road plan. No additions or alterations required for existing road bond. Division: Page:2 of 2 County of Albemarle Printed On:February 02, 2018 COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper, Virginia 22701 Charles A. Kilpatrick, P.E. Commissioner April 01, 2016 Mr. John Anderson County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SUB -2016-00014 Creekside III, Phase III Road Plan Amendment Dear Mr. Anderson: We have reviewed the Creekside III, Phase III Road Plan Amendment dated January 19, 2016 as submitted by Collins Engineering, and offer the following comments. 1. Previous comments: "Culvert computations should be provided for review. The following items should be addressed: a. Capacity b. Demonstrate that there is 18" of free board from the edge of shoulder/limits of travel way on Mill Stone Lane and Jarmans Gap Road. c. Tailwater depth d. Outlet velocity e. Determine the type of outlet protection required. See section 8.3.2.6 of the VDOT Drainage Manual. Refer to Chapter 8 of the VDOT Drainage manual for additional requirements and guidance. " 2. Previous comments: "Storm sewer, Inlet and HGL computations should also be provided for the revised sections of stormsewer. " 3. Please note curb ramps are required whenever sidewalks butt into side of curbs. 4. The drainage easement for the proposed 15" culvert should be labeled as a public drainage easement . If you need further information concerning this project please do not hesitate to contact me at 434-422- 9373. :Sincere#�', Joel DeNunzio, P.E. Resident Engineer VDOT Charlottesville Residency WE KEEP VIRGINIA MOVING COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper, Virginia 22701 Charles A. Kilpatrick, P.E. Commissioner February 23, 2016 Mr. John Anderson County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SUB -2016-00014 Creekside III, Phase III Road Plan Amendment Dear Mr. Anderson: We have reviewed the Creekside I11, Phase III Road Plan Amendment dated January I9, 2016 as submitted by Collins Engineering, and offer the following comments. 1. Culvert computations should be provided for review. The following items should be addressed: a. Capacity b. Demonstrate that there is 18" of free board from the edge of shoulderilimits of travel way on Mill Stone Lane and Jarmans Gap Road. c. TaiIwater depth d. Outlet velocity e. Determine the type of outlet protection required. See section 8.3.2.6 of the VDOT Drainage Manual. Refer to Chapter 8 of the VDOT Drainage manual for additional requirements and guidance. 2. A public drainage easement should be provided for the proposed 15" culvert. The previously submitted SUB -2015-00209 Old Trail, Creekside III, Phase IIID Final Plat should be updated accordingly. 3. Storm sewer, Inlet and HGL computations should also be provided for the revised sections of stormsewer. 4. The proposed CG -12's appear to direct pedestrians into Jarman Gap Road. They should be revised to direct pedestrians across Mill Stone Lane. 5. The curb at the intersection of Jarmans Gap Road and Mill Stone Lane should be pulled back and nosed down to accommodate a future curb connection. If additional information is needed concerning this project, please do not hesitate to contact me at (434)422-9782. Si�ly, Troy Austin, P.E. Area Land Use Engineer Culpeper District