Loading...
HomeMy WebLinkAboutSDP201700075 Approval - County 2018-02-02COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 February 2, 2018 Scott Collins Collins Engineering 200 Garret Street, Suite K Charlottesville, VA 22902 RE: SDP2017-75 Glenbrook at Foothills — Initial Site Development Plan SUB2017-205 Glenbrook at Foothills — Preliminary Subdivision Plat Mr. Collins: The Agent for the Board of Supervisors hereby grants administrative approval to the above referenced site plan and subdivision plat. This approval shall be valid for a period of five (5) years from the date of this letter, provided that the developer submits a final site plan for all or a portion of the site within one (1) year after the date of this letter as provided in section 32.4.3.1 of Chapter 18 of the Code of the County of Albemarle, and thereafter diligently pursues approval of the final site plan. In accordance with Chapter 18 Section 32.4.2.8 Early or Mass Grading may be permitted after the following approvals are received: 1. Engineering approval of a VSMP plan meeting the requirements of Chapter 17 of the Code of the County of Albemarle. 2. Submittal of a tree conservation checklist with areas for tree preservation identified. The final site plan will not be considered to have been officially submitted until the following items are received: 1. A final site plan that satisfies all of the requirements of section 32.6 of Chapter 18 of the Code. 2. Applicable fee outlined in the application The final plat will not be considered to have been officially submitted until the following items are received: 1. A final plat that satisfies all of the requirements of section 14-303 and sections 14-304 through 14-318 of the Code, and the conditions attached to this letter. 2. Applicable fee outlined in the application. Please submit 8 copies of the final plans to the Community Development Department. The assigned Lead Reviewer will then distribute the plans to all reviewing agencies (for ACSA, please submit 3 copies of construction plans directly to them, as stated in their comments). Once you receive the first set of comments on the final site plan, please work with each reviewer individually to satisfy their requirements. The Department of Community Development shall not accept submittal of the final site plan or plat for signature until tentative approvals for the attached conditions from the following agencies/reviewers have been obtained: SRC MPmhPrt- Albemarle County Planning Services (Planner) - 2 copies [Rachel Falkenstein, rfalkenstein@albemarle.org] Albemarle County Engineering Services - 1 copy [Matt Wentland, mwentland@albemarle.org] Albemarle County Information Services (E911)- 1 copy [Elise Kiewra ekiewra@albemarle.org] Albemarle County Planning Services (ARB)- 1 copy [Margaret Maliszewski, mmaliszewski@albemarle.org] Albemarle County Building Inspections-1 copy [Michael Dellinger mdellinger@albemarle.org] Albemarle County Department of Fire Rescue- 1 copy [Shawn Maddox, smaddox@albemarle.org] Albemarle County Service Authority — 3 copies submitted directly to ACSA [Richard Nelson, rnelson@serviceauthority.org] Virginia Department of Transportation- 1 copy [Adam Moore, Adam.Moore@vdot.virginia.gov] Recommendations/Advisory Comments: Rivanna Water and Sewer Authority- 1 copy [Victoria Fort, vfort@rivanna.org ] If you have any questions about these conditions or the submittal requirements please feel free to contact me at (434) 296-5832 x3272, rfalkenstein@albemarle.org. Sincerely, 0 W-� Rachel Falkenstein Senior Planner Albemarle County Planning Services (Planner) Rachel Falkenstein, rfalkensteingalbemarle.org Requested changes: 1. [32.5.2(a) & 14-302(a)] Clarify which lot lines are already existing and those that are proposed with this development. 2. [32.5.2(a) & 14-302(a)] More clearly distinguish between lots proposed with this development and those shown on previous applications. 3. [32.5.2(a) & 14-302(a)] The lot and road layout shown for adjacent phases of Foothill Crossing to the west do not appear to match previously approved phases of this development. Consider submitting a more comprehensive initial site plan and/or preliminary plat showing all future phases planned for this development. 4. [ZMA2016-05] Please revise plans so that no more than 2 phases are proposed. 5. [32.5.2(i) & 14-302(a)] Is the "existing greenway and trail system" shown on sheet 2 an existing easement? If so, provide deed book and page number and list easement owner. 6. [32.5.2(n)] Provide more detail about proposed recreational facilities on site, specifically the tot lot equipment. Show gazebo detail/dimensions on final site plan. 7. [14-302(a)] Provide dimensions and acreage of all proposed lots. 8. [14-302(a)] There is no need to show further division rights. 9. [14-302(a)] On the coversheet, correct the "Proposed Zoning" note to read "Existing Zoning." 10. [14-302(a)(8)] Provide acreage and clearly show new lot lines for all residue parcels. 11. [14-302(a)(11)] List instrument creating property for all existing parcels and easements. 12. [14-302(b)(10)] Include stream buffer note as required by this section. 13. [14-401] There are double frontage lots shown on Park Ridge Drive. These are prohibited, but you may request a special exception from this requirement. 14. [14-303] Include statement that: "The platting or dedication of the following described land [insert a correct description of the land subdivided] is with the free consent and in accordance with the desire of the undersigned owners, proprietors and trustees, if any." 15. [14-303] Show the exterior boundary lines of the property with bearings in degrees, minutes and seconds. Curvilinear data shall include radius, central angle, arc length, and tangent distance. 16. [14-303] Show the location and material of all permanent reference monuments. Show bearing and distance tie between not less than two permanent monuments on the exterior boundary of the property. Show at least four control points, evenly distributed across the property and located at survey property corners. 17. [14-303] Include signature panels for each owner and for the agent or his designee, under the statement of consent. 18. [14-303] Include notary panels. 19. [14-409] Extend the width of Park Ridge Ave right of way to the northern property line to provide future access for adjacent parcels to the north. 20. [Proffer 6] Provide the affordable housing tally on the final plat. 21. [ZMA 2016-05] Fifty percent of the units are required to be single family units. Provide a tally showing how many are proposed with each phase and the percentage of total. 22. [ZMA2016-05] Provide screening for lots 113 to 116 from Eastern Avenue, in the landscaping plan. 23. [32.7.9] Correct the detail that overlaps with the text, underneath. 24. [32.7.9] Show the tree canopy requirements and calculations. 25. [32.7.9] Indicate the number and type of street trees, per road segment. 26. [32.7.2.3] Extend sidewalks at the end of Sunders Hill Drive to connect to Eastern Ave. Comments From Other Reviewers: Albemarle County Engineering Services (Engineer) Matthew Wentland, mwentlan&ji)albemarle. org Requested Changes: An approved and bonded WPO submittal will be required before Final Plat approval. Any stream buffer disturbances will require a mitigation plan. An approved and bonded (or built and accepted by VDOT) Road Plan submittal will be required before Final Plat approval. Albemarle County Information Services (E911) Elise Kiewra, ekiewragalbemarle. org No Objections Albemarle County Building Inspections (Inspections) Michael Dellinger, mdellin er e,albemarle. org No Objections Albemarle County Water and Service Authority (ACSA) Richard Nelson, rnelson e serviceauthori ..org No objections (see attached checklist) Virginia Department of Transportation (VDOT) Justin Deel, Justin. Deelkvdot.vireinia.gov Requested Changes: 1. Show design speed for all proposed and existing roads that appear on the plans. 2. Why have crosswalks on Park Ridge Drive been removed? Previous comments on the road plan only asked for the removal of the mid -block crossing. Please see our 17 November 2017 road plan review letter. How will the proposed on street parking be marked? It appears as though parking may interfere with intersection sight distance lines; those areas should be signed no parking. Albemarle County Service Authobrity TO: Rachel Falkenstein FROM: Richard Nelson DATE: 12/29/17 RE: Site Plan Technical Review for: SDP201700075, SUB201700205 Glenbrook at Foothills The below checked items apply to this site. 1. This site plan is within the Authority's jurisdictional area for: ✓ A. Water and sewer B. Water only C. Water only to existing structure D. Limited service ✓ 2. An 8 inch water line is located approximately (on site) distant. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. ✓ 4. A 8 inch sewer line is located approximately (on site) distant. 5. An Industrial Waste Ordinance survey form must be completed. ✓ 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8. and plans have been received and approved. 9. No plans are required. 10. Final and plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may/may not be signed. ✓ 12. RWSA approval for water and/or sewer connections. 13. City of Charlottesville approval for sewer. Comments: Water and Sewer utilities have been approved under road plan, approved 6/1/2017, last revised 11/6/2017. Final site plan and subdivision plat will be reviewed to ensure utilities are depicted properly. As part of the water and sewer utility approval, we obtained RWSA approval for water and sewer connections. 168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977-4511 • Fax (434) 979-0698 www.serviceauthority.org