HomeMy WebLinkAboutSUB201400047 Bond Road Plan and Comps. 2016-09-26 Dm.1.2r<ened' fij 4::: _4.7 Fre Pad:i ' ^te s, ok •.1/ -,&,,,
) tkeict (-712bitio 0,
'.::,74 11111:
Intike, t-nntard lana meal kital,.$1
4$11ligi /1.44,44..1-
1
vr '10.
BOND INSPECTION REQUEST
•PC---."
APPROVED PLAN # 30/-.) 710/V CCOh--
--
PROJECT NAME: Stonewater Subdivision Minor Road Plan Amendment
(As listed on the sppro‘cd plan)
This is to request that an inspection be performed by the County. Where fees are assessed, a fee is required for
each inspection. Please check the inspections requested.
0 VSMP/VESCP Erosion Control Stormwater Management and/or Mitigation per
Water Protection Ordinance section 17-207 & 208 S250
fit /q(9 E Subdivision (roads, drainage, etc.)per Subdivision Ordinance section 14-435 and 14-438; 5269
0 Water& Sewer per Subdivision Ordinance section 14-435 $269
0 Site Development Performance bond (Incomplete Site Work & Landscape Maintenance) $301
3 /00iiik.et/(2,/a4-1 TOTAL FEES $269
Inspections for the purposes of bond reduction or release w' require a separate fee for each bond.
Submit requests to: Department of Community Deselopment, 401 McIntire Road,North Wing, Charlottesville,
VA 22902, Attention: Management Analyst - Phone 434-296-5832; Fax 434-972-4126. All roads and
storrnwater facilities will require construction record drawings, inspection reports, and completion processes
through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection
documentation per the state requirements and county's published procedures. A minimum 20%of the original
posting is held until acceptance of all bonded improvements For Site Development Performance bonds, if
landscape installation is part of the bonded incomplete site 11ork. a request for reduction should only be made
once all site work is complete.
lite revised estimate should h, -.ern 1, ,
EMAIL: charlotte IP huntercraigcompany.com
OR REGULAR MAIL P.O. ox 5509 ADDRESS.
Charlottesville, VA 22905
4E) ikDdtOCIA
151'. - -:::-.---- -'
a
Signature of ONIneriDc—k-54er
Hunter E. Craig9/16/17
Print Name Date
p0 (3 t,•_. c s- 09
z_2 V) I
Re*Lied'7i5/21114,7)'20/2015, I I .if'2015
County of Albemarle �~ ��g� 1 /[l� � � 7
Department ofCommuoty [k,el(`pnrep/
PH:(434)2A6'503% DateVn
—qJ4 )^r~—
__
1 RECEIVED FR( N� ^ _ -/ tl\ sac
,,_
Zz,)--a-
AMOUNT . ' 41 hor�^- 5/
� 510 /
*sr
/ _-
. �4 _�/
��- �� _ 300__ 3 � / ��
For� _____ cash __
_________ .' / .rd �t_� .__ __'
=- '
MPV
By _ _ .` ^ 2,A10___ _ -- -_-_-__ __- __ �, �__ '.�N
- �- __'_—_ _ _ ___-___- _ _
CASH ONLY IF ALL C^ec^Los **SECURITY FEATURES USTED ON SACK INDICATE NO TAIRPERING OR COPYING
RIO ROAD HOLDINGS, LLC
P 0 BOX 5509 VIRGINIA NATIONAL BANK
CHARLOTTESVILLE,VA 22902 1473
tCHARLOTTESVILLE,VA 22905
i9/19/16
_i 269 00
., ORDER OF COUNTY OF ALBEMARLE
Two Hundred Sixty-Nine and 00/100*".**
COUNTY OF ALBEMARLE
401 MCINTIRE ROAD
411
so
' STONEVVATER BOND INSPECTION
°
RIO ROAD HOLDINGS,LLC 1473
COUNTY OF ALBEMARLE 9/18/16
Date Type Reference Original Amt Balance Due Discount Payment
9/15/16 Bill 091516 269 00 269 00 269 00
Check Amount 269 00
Cash VNB STONEWATER BOND INSPECTION 269 00
66147 Internal Use Only �f r ! ' I
Date Received: S1)21 l l Fee Paid: G.cO .0 0 S.( lAS:/,,
s"j'��.- Y
Received by: D� .'„ 't
Q ^' glum ,
Intake: Forward to Management Analyst �•y
BOND ESTIMATE REQUEST
APPROVED PROJECT PLAN TITLE:(Title on the approve plan from which the estimate will be prepared.)
J11)tit t o+e( T'0410n y j
All parcels in the project, including any off-site work if easements are not provided, and current owners. Use a
separate sheet if more owners are required. Owner and tax map information must be correct,and plans must be
approved prior to bond estimates being prepared.
TAX MAPs/PARCELs: U(Q642-61 OWNER'S NAME: _ 0// I „0,_, L,
UQl 2t 4L-64 b0
SIGNATURE:
IG TORE: date:
TAX MAPs/PARCELs: OWNER'S NAME: (0 KD/♦ wj I L
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
The requested estimates are;
I rosion&Sediment Control per Water Protection Ordinance section 17-207
❑ Stormwater Management per Water Protection Ordinance section 17-306
H Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435;
&Water&Sewer per Subdivision Ordinance section 14-435;$250 fee required
The estimate must,�be sent to theowner. Please provide contact information.
IAA(AA((U n �
t l�'� e.+zvCrejei �tip/ . et)ri�l
OR REGULAR MAIL ADDRESS: t l
.P°eta riLtilk
1,0,4 IL Poi Ravi
a,xavE
Revised 11/1/2011 ('eC1C jMl� LQml1'tn1 "�y
� w. V dal'", COWI1412(I L