HomeMy WebLinkAboutWPO201700081 Approval - County 2018-02-06COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP Permit Plan Review
Project title: Brookdale
Project file number: WP0201700081
Plan preparer:
Brasil Hamrick (bwheng@verizon.net)
Owner or rep.:
Brookdale Partners, LP (William Park)
Plan received date:
14 December 2017
(Rev. 1)
5 February 2018
Date of comments:
8 January 2018
(Rev. 1)
6 February 2018
Reviewer:
Matt Wentland
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is approved. The
rationale is given in the comments below. The VSMP application content requirements can be
found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. The SWPPP will need to be updated with the ESC, SWM, and PPP sheets. This can be done once
the plans are ready to be approved. (Rev. 1) Comment addressed.
2. The Certification will need to be signed. (Rev. 1) Comment addressed.
3. Provide two additional copies of the SWPPP. (Rev. 1) Comment addressed.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. The PPP exhibit will need to be included in the SWPPP. (Rev. 1) Comment addressed.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is approved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-403.
1. The 4.80 lbs of nutrient credits will need to be purchased before a grading permit is issued. Please
contact Ana Kilmer before purchasing the credits. (Rev. 1) Response noted (now 5.11 lbs).
2. Any Forest and Open Space used in the VRRM worksheet should be labelled as 'SWM Forest and
Open Space' (since the pond is in this easement also, `and SWM Facility Easement' can be added).
The following note will need to be placed on both the VSMP plan and the Easement Plat:
"The SWM Forest and Open Space Easement is subject to the guidance set forth by DEQ in the
Virginia Stormwater Management Program. The areas will remain undisturbed in a natural,
Engineering Review Comments
Page 2 of 3
vegetated state, except for activities as approved by the local program authority, such as forest
management, control of invasive species, replanting and revegetating, passive recreation (e.g.,
trails), and limited bush hogging to maintain desired vegetative community (but no more than four
times a year)." (Rev. 1) Comment addressed, open space has been removed.
3. The SWM Maintenance Agreement and the Forest and Open Space Plat and Deed will need to be
approved and the project will need to be bonded prior to issuing a grading permit. (Rev. 1)
Response noted.
4. Provide a maintenance schedule for the pond. (Rev. 1) Comment addressed.
5. Provide spot elevations in the bottom of the pond to ensure positive drainage. Engineering would
also prefer a maximum side slope in the pond of 3:1. (Rev. 1) Comment addressed.
6. All storm pipes and channels carrying water through the site from off-site or VDOT ROW will
need to be in an easement. (Design Manual). (Rev. 1) Comment addressed.
7. Provide two copies of the stormwater management calculations separate from the SWPPP. (Rev.
1) Comment addressed.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is approved, and the reasons are provided in the comments below. The erosion control
plan content requirements can be found in County Code section 17-402.
On all slopes steeper than 3:1, specify a low -maintenance, non -grass groundcover which will not
require mowing (Design Manual). (Rev. 1) Comment addressed.
Any areas shown in a SWM Forest and Open Space Easement that are disturbed during
construction will need to be restored per DEQ BMP Specification No. 4, Soil Compost
Amendment. (Rev. 1) Comment addressed, open space has been removed.
Additional ESC measures may be requested by the Inspector during construction. (Rev. 1)
Comment addressed.
The VSMP permit application and all plans may be resubmitted for approval when all comments have
been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package
with a completed application form.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to
discuss this review.
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will
prepare estimates and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms, which will need to be completed by the owner
and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need
to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to
obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded.
The County's Management Analyst or other staff will prepare the forms and check for ownership and
signature information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
Engineering Review Comments
Page 3 of 3
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference.
Applicants will need to complete the request for a pre -construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction
conference will be scheduled with the County inspector. At the pre -construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;
http://www.albemarle.org/deptfonns.asp?dppartment=cden,gwpo
File: WPO201700081 Brookdale rev Approved 02-uo-its.aoc