Loading...
HomeMy WebLinkAboutWPO201500038 Certified Engineer's Report 2017-06-02TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. David James Civil Engineer I County of Albemarle 401 McIntire Rd Charlottesville, VA 22902 608 Preston Avenue P 434.295.5624 Suite 200 F 434.295.8317 Charlottesville, VA 22903 www.timmons.com Re: As -Build Certification Letter - Dunlora V (SUB2016-75) Dear Mr. James, This letter is to certify to Albemarle County that the Road Plan As -Built drawings prepared by Timmons Group dated April 7, 2017 based on a survey performed on February 17, 2017 for the referenced project have been reviewed, are true and accurate and are in substantial conformance to the approved plans. Asphalt Placement reports by Froehling & Robertson, Inc. have been reviewed, and are in substantial conformance to the specification provided in the approved plans. We have also reviewed the Utility As -Built plans submitted to Albemarle County Service Authority on April 7, 2017, and the utility installation depicted are in substantial conformance with the approved plans. Additionally, we hereby certify to the placement of proposed underground stormwater management facilities referred to as "SWM A" and "SWM B" on the approved plans. Through review of the WPO As -Built Plan prepared by Timmons Group submitted on May 26, 2017 based on a survey performed on February 17, 2017 and by site visit inspections, it has been determined that the facilities as installed are in substantial conformance with the approved plans. A video camera inspection was performed on the facilities on May 16, 2017 by Momentum Earthworks. We have reviewed the inspection video report and the installation is in substantial conformance with the approved plans. Sincerely, Clint Shifflett, P.E. �•1444444444000000LT H /0/ • 00 la�O� �/ V CLINT W. S IFFLETT >� Z �0 Lic. No. 54.180 1211-7 ��=(pc�, 000000*, 1 CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES iofI