Loading...
HomeMy WebLinkAboutSDP201700069 Correspondence Final Site Plan and Comps. 2018-02-12 Christopher Perez From: William Park <wpark@pinnacleconstructionva.com> Sent: Monday, February 12, 2018 10:46 AM To: Christopher Perez; 'Brasil Hamrick' Cc: Ron White; Lisa Green; Rebecca Ragsdale; Mark Graham; Bill Fritz; Betty Groth Subject: RE: SDP2017-69 Brookdale—Final Site Plan Chris— We will be down this morning to pick it up. Thanks to you and the staff for the priority review and we look forward to bringing another affordable housing development to the area. Regards, Wm. William N. Park Pinnacle Construction & Devel. Corp. From:Christopher Perez [mailto:cperez@albemarle.org] Sent: Monday, February 12, 2018 10:41 AM To:William Park<wpark@pinnacleconstructionva.com>; 'Brasil Hamrick'<bwheng@verizon.net> Cc: Ron White<rwhite2@albemarle.org>; Lisa Green<Igreen2@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org>; Mark Graham<mgraham@albemarle.org>; Bill Fritz<BFRITZ@albemarle.org> Subject:SDP2017-69 Brookdale—Final Site Plan Mr. Park& Mr. Hamrick, SDP2017-69 Brookdale—Final Site Plan The above ref final site plan has been approved. Please come by the office and pick up your copy of the approved final site plan. Ron White, I am including you on this email because of the affordable housing element to the plan and your continued involvement with it. Please act accordingly. Christopher P. Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 1 same Christopher Perez From: Ron White Sent: Monday, February 12, 2018 10:46 AM To: Christopher Perez Subject: RE: SDP2017-69 Brookdale— Final Site Plan Thanks, called William and he is sending someone down to pick it up. Row 20.ite eitee6o 0 434-V6-5839 From:Christopher Perez Sent: Monday, February 12, 2018 10:41 AM To:William Park<wpark@pinnacleconstructionva.com>; 'Brasil Hamrick'<bwheng@verizon.net> Cc: Ron White<rwhite2@albemarle.org>; Lisa Green<Igreen2@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org>; Mark Graham<mgraham@albemarle.org>; Bill Fritz<BFRITZ@albemarle.org> Subject:SDP2017-69 Brookdale—Final Site Plan Mr. Park&Mr. Hamrick, SDP2017-69 Brookdale—Final Site Plan The above ref final site plan has been approved. Please come by the office and pick up your copy of the approved final site plan. Ron White, I am including you on this email because of the affordable housing element to the plan and your continued involvement with it. Please act accordingly. Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 1 Christopher Perez From: Christopher Perez Sent: Monday, February 12, 2018 10:41 AM To: William Park; 'Brasil Hamrick' Cc: Ron White; Lisa Green; Rebecca Ragsdale; Mark Graham; Bill Fritz Subject: SDP2017-69 Brookdale— Final Site Plan Mr. Park&Mr. Hamrick, SDP2017-69 Brookdale—Final Site Plan The above ref final site plan has been approved. Please come by the office and pick up your copy of the approved final site plan. Ron White, I am including you on this email because of the affordable housing element to the plan and your continued involvement with it. Please act accordingly. Christopher P. Perez Senior Planner Department of Community Development l County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 1 -w Christopher Perez From: Christopher Perez Sent: Monday, February 12, 2018 10:48 AM To: 'Richard Nelson';Alex Morrison Cc: Mark Graham Subject: RE: SDP2017-69 Brookdale—Final Site Plan Richard, RE: SDP2017-69 Brookdale—Final Site Plan In this specific circumstance,we do not need or request your signature, as we just took an action on it with your tentative email approval.This is not the norm and typically never happens; however,this was an extenuating circumstance with a compressed time frame. Typically,once we receive tentative approvals we allow all signers 10 days time to come into the office and sign the plans. Regardless,thanks for moving so fast on this so we could take an action within the compressed time frame. Christopher P. Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From: Richard Nelson [mailto:rnelson@serviceauthority.org] Sent: Monday, February 12, 2018 9:52 AM To:Christopher Perez<cperez@albemarle.org>; Mark Graham<mgraham@albemarle.org> Cc:Alex Morrison<amorrison@serviceauthority.org> Subject: RE:SDP2017-69 Brookdale—Final Site Plan Chris, I received all internal signatures and can recommend approval. I will be at the County office later today to sign. Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434)977-4511 From:Christopher Perez [mailto:cperez@albemarle.org] Sent: Monday, February 12, 2018 9:31 AM To: Mark Graham <mgraham@albemarle.org> Cc: Richard Nelson<rnelson@serviceauthority.org>; Bill Fritz<BFRITZ@albemarle.org> Subject: RE:SDP2017-69 Brookdale—Final Site Plan Mark, 1 (id 1114 RE: SDP2017-69 Brookdale—Final Site Plan I just got off the phone with Richard (ACSA); they do not have any changes required to the final site plan prior to approval. They are currently working on internal signatures for their internal action but they have no changes required to the final site plan. We now have all tentative approvals from all agencies. Thus,under the circumstances I believe we should pull the trigger and take an action of approval on this final site plan. Based on the time constraints I presume you will take action on the site plan in place of all SRC reviewers' signatures. Downstairs in the cubbyhole are 3 copies of the plans. Typically, we require 4 copies for action;however,this is all the clean copies that remain from the last review. But 3 is enough: (1) for the file, (1) for the applicant, and(1) for inspections who typically get 2 copies. Christopher P. Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From: Richard Nelson [mailto:rnelson@serviceauthority.org] Sent: Friday, February 09,2018 10:01 AM To:Christopher Perez<cperez@albemarle.org> Cc: Mark Graham<mgraham@albemarle.org>;Alex Morrison<amorrison@serviceauthority.org> Subject:SDP2017-69 Brookdale—Final Site Plan Chris, I am currently working on getting internal signatures for SDP2017-69 Brookdale—Final Site Plan. Granted, initial water and sewer comments were submitted to Hamrick Engineering December 5, 2017, and recently received the revised plans February 5, 2018. I will do my best to try and get everything wrapped up by Monday. Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434)977-4511 2 Christopher Perez From: Richard Nelson <rnelson@serviceauthority.org> Sent: Monday, February 12, 2018 9:52 AM To: Christopher Perez; Mark Graham Cc: Alex Morrison Subject: RE: SDP2017-69 Brookdale—Final Site Plan Chris, I received all internal signatures and can recommend approval. I will be at the County office later today to sign. Thanks, Richard Nelson Civil Engineer , , Albemarle County Service Authority 168 Spotnap Road I Charlottesville, Virginia 22911 (434)977-4511 From:Christopher Perez [mailto:cperez@albemarle.org] Sent: Monday, February 12, 2018 9:31 AM To: Mark Graham<mgraham@albemarle.org> Cc: Richard Nelson<rnelson@serviceauthority.org>; Bill Fritz<BFRITZ@albemarle.org> Subject: RE:SDP2017-69 Brookdale—Final Site Plan Mark, RE: SDP2017-69 Brookdale—Final Site Plan I just got off the phone with Richard (ACSA); they do not have any changes required to the final site plan prior to approval. They are currently working on internal signatures for their internal action but they have no changes required to the final site plan. We now have all tentative approvals from all agencies. Thus, under the circumstances I believe we should pull the trigger and take an action of approval on this final site plan. Based on the time constraints I presume you will take action on the site plan in place of all SRC reviewers' signatures. Downstairs in the cubbyhole are 3 copies of the plans. Typically, we require 4 copies for action; however, this is all the clean copies that remain from the last review. But 3 is enough: (1) for the file, (1) for the applicant, and(1) for inspections who typically get 2 copies. Christopher P. Perez Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext. 3443 From: Richard Nelson [mailto:rnelson@serviceauthority.org] Sent: Friday, February 09,2018 10:01 AM To:Christopher Perez<cperez@albemarle.org> Cc: Mark Graham<mgraham@albemarle.org>;Alex Morrison<amorrison@serviceauthority.org> Subject:SDP2017-69 Brookdale—Final Site Plan 1 44110 Chris, vipoi I am currently working on getting internal signatures for SDP2017-69 Brookdale—Final Site Plan. Granted, initial water and sewer comments were submitted to Hamrick Engineering December 5, 2017,and recently received the revised plans February 5, 2018. I will do my best to try and get everything wrapped up by Monday. Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434)977-4511 2 Application Number Project Name TMP CurrentStaYrs 'SOP201700069 i Brookdale Final 07600000Cc46C1 lir zer Re•.ie.•. Record 1 i. r r • Planning • X Application 1 Application 2 Fees 1 Inspections Reviews , Planning Documents Erosion Control Erosion Control Letter Code Compliance Acti,, I REVIEWS Selected Application Number SDP201100069 II Add Planning Review Entered By/Date Christopher Perez 1.11130/2017 Review Coordinator Site Inspector Date Assigned F= Commit Review Data Chnstcpher Perez Adam Moore Final Site Plan and Comps. VDOT Requested Cham._ ._ _- 1 '21/17 1 L'05,13 Reviewer Submittal Type Division Status Gate Recei:e°. Date Due Date C• •at Elise Kiera Final Site Plan and Comps. COD E911 Requested Changes , w • 17 ` 2/i , Alexander Morrison Final Site Plan and Comps =' Requested Changes 11/30/17 12/21/17 01/17/18 l j1„,... - Mmchael Dellinger Final Site Plan and Comps. COD Inspections No Objection ' i 17 Matthen..V.entland Final Site Plan and Comps. CDD Engineering Requested Changes 11/30( 17 OFFrAnnillirrntli ..e `' a. Maddox Final Site Plan and Comps. Fire Rescue No Objection ,, i Adam Moore Final Site Plan and Comps. ',DOT Requested Changes 11/30/17 11 9 Christopher Perez Final Site Plan and Comps. CDD Planning Requested Changes 11/30/17 12/21/17 01/08/18 G•a: I latther.tientland Final Site Plan and Comps. CDD Engineering Na Objection 0207'13 02/09/18 02/07/18 /DVT ,l'"dam Moore Final Site Plan and Comps. VDOT Approved 02/06/18 02/09/18 02/08/18 /� 9 Alexander Morrison Final Site Plan and Camps. ACSA Na Objection 02106/18 02/09/18 02/12/18 f Christopher Perez Final Site Plan and Comps. COD Planning No Objection 02/06/18 02/09/18 02/07/18 6q 0/( Elise Kiea.ra Final Site Plan and Comps. CDD Egli Na Objection 02'05'13 02,109/18 02107/18 .. I Christopher Perez From: Christopher Perez Sent: Wednesday, February 07, 2018 10:06 AM To: Mark Graham Cc: 'Bedsaul,Willis C. (VDOT)'; Matthew Wentland; Richard Nelson;Alex Morrison Subject: SDP2017-69 Brookdale— Final Site Plan Mark, SDP2017-69 Brookdale—Final Site Plan I just completed my review of the above ref project. I have no outstanding review comments. Tentative Approvals Received *E911 just approved the revisions. *The Building Official previously approved it. *Fire and Rescue's Shawn Maddox previously approved it. *Planning—I have no outstanding comments. Prior to site plan approval we need 3 remaining SRC reviewers to provide reviews/tentative approvals: VDOT, ACSA, and Engineering. ✓1 ;DOT—Willis is reviewing it as this email goes out. Pending a review/tentative approval. 2 ACSA's initial comments I never received; rather,they ACSA sent them directly to the applicant. I spoke to ichard Nelson(the new"Alex" for ACSA)and he understands the time line and hopes to get something to us by Friday at the latest. engineering,Matthew Wentland just approved the VSMP, so I doubt the final site plan has anything remaining but I am awaiting him comments as well. I will not be in the office on Friday(2-9-18), to assure that this plan has the possibility of being approved by you I am placing 2 hard copies of the plan downstairs in the cubbyhole for you to make the final call. Feb 12th(Monday) is the day this project turns into a pumpkin and it needs to be signed/approved otherwise it loses funding and dies.IF and once you sign/approve the plan, you need to let Ron White (County's Chief of Housing), William Park(owner/developer), Brasil Hamrick(Engineer)know of its approval. I am also CCing the various reviewers to this email so they know to CC or send you the comments/tentative approvals for you to take appropriate action. I requested all reviewers provide comments/tentative approvals to you by Friday 2-9-18. Christopher P. Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 1 Christopher Perez From: Mark Graham Sent: Tuesday, February 06, 2018 3:39 PM To: Christopher Perez; Bedsaul, Willis C. (VDOT); 'Moore, Adam PE (VDOT)'; Deel, Justin (VDOT) Subject: RE: Brookdale Thanks for following up on this. The project has high visibility with the Board. Mark B Graham, P.E. Director of Community Development Albemarle County,Virginia From:Christopher Perez Sent:Tuesday, February 06, 2018 3:25 PM To: Bedsaul,Willis C. (VDOT)<Willis.Bedsaul@VDOT.Virginia.gov>; 'Moore,Adam PE (VDOT)' <Adam.Moore@vdot.virginia.gov>; Deel,Justin (VDOT)<Justin.Deel@vdot.virginia.gov> Cc: Mark Graham<mgraham@albemarle.org> Subject: RE: Brookdale Willis, SDP2017-69 Brookdale—Final Site Plan The applicant had submitted PDF copies of the site plan on 2-1-18, today the full sized hard copies were submitted, two copies of this plan are in your mailbox here at the County along with the transmittal sheet. This priority project needs County approval no later than Feb 13th or they lose large amounts of funding. As such I am requesting all comments no later than 2-10-18 from all remaining SRC reviewers. Please review to assure VDOT's minor comments have been addressed and provide an approval or your review comments via email. I am CCing Mark Graham to this communication be this project is living at that level. Thanks for your help Christopher P. Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From: Brasil Hamrick [mailto:bwheng@verizon.net] Sent:Thursday, February 01, 2018 11:38 AM To: 'Moore,Adam PE (VDOT)' <Adam.Moore@vdot.virginia.gov>; Christopher Perez<cperez@albemarle.org> Cc: 'William Park'<wpark@pinnacleconstructionva.com> Subject: Brookdale Adam: 1 **we Ntio0 Attached you will find a resubmittal letter and the affected sheets. Hard copies of the plans will be given to Chris today. Please advise if you have any questions. Thanks Brasil 2 11.00 %0160 COUNTY OF ALBEMARLE Department Community Development 1,4,11:7*._• Planning Services Division x ;�;,; 401 McIntire Road North Wing• Charlottesville,Virginia 22902-4596 �� Phone: (434)296-5823 • Fax: (434)972-4035 Transmittal From: Christopher Perez Date: 02/07/18 To: 0 0 0 0 Matt Wentland-Engineering 0 0 0 0 0 JOB#/FILE NAME:SDP-2017-69 Brookdale-Final Site Plan We are sending you the following items: ® Attached or ❑ Under separate cover ❑ Copy of Letter ❑ Prints ❑ Plans ❑ Plats ❑ Specifications ❑ Other #of Date Description Copies 1 2/6/18 final site plan These are transmitted as checked below: ® For review and comments ® For approval ❑ Other Remarks: Please review these small resubmitals for VDOT. Comments are due in City View or email by: 2/10/18 Signature: Christopher Perez rv/ Christopher Perez From: Matthew Wentland Sent: Tuesday, February 06, 2018 1:18 PM To: Brasil Hamrick Cc: 'Willia is •- hristopher Perez Subject: crookdale VSMP Attachments: WPO201700081 Brookda evl Approved 02-06-18.pdf .rasil, The Brookdale VSMP plans have been approved! Thanks, Matt Wentland, P.E. Civil Engineer ll 1 Christopher Perez From: Mark Graham Sent: Friday, February 02, 2018 1:05 PM To: Bill Fritz; Christopher Perez Subject: FW: Brookdale Attachments: Planning Letter2.pdf; BD SHEETC.001 PLOTTED 01-29-18.pdf; BD SHEETC.002 PLOTTED 01-29-18.pdf; BD SHEETC.005 PLOTTED 01-29-18.pdf; BD SHEETC.012 PLOTTED 01-29-18.pdf; BD SHEETC.014 PLOTTED 01-29-18.pdf FYI, Mark B Graham, P.E. Director of Community Development Albemarle County,Virginia • From: Ron White Sent: Friday, February 02, • 11:34 AM To: M. - • 1 t�albemarle.org> S. 'jest: FW: Broo dale -______ _ FYI if interested but main thing is need for site approval by '/12. THANKS b, Ofj q-__-__.% 434-2 -. 83S From:William Park [mailto:wpark@pinnacleconstructionva.com] Sent: Friday, February 02,2018 10:53 AM To: Ron White<rwhite2@albemarle.org> Subject: FW: Brookdale Ron— Ju t an FYI that the resubmission is complete. I didn't see any issues. VHDA needs final site plan ap,Aroval by 2 2. Everyone has been very good to work with. You might want to keep Mark in the loop. Thanks .gain for your assistance. Wm. William N. Park ,`,_.,� Pinnacle Construction & Dev . _---- From: Brasil Hamrick [mailto:bwheng@verizon.net] Sent:Thursday, February 1, 2018 11:33 AM To:cperez@albemarle.org Cc:William Park<wpark@pinnacleconstructionva.com> Subject: Brookdale Chris: 1 Attached you will find the final site plan resubmission letter. In addition the five (5) affected sheets are attached electronically. Hard copies of the plan will be delivered to your office today. Please advise if you have any questions. Thanks Brasil 2 s Brookdale Partners LP 1821 Avon St. Suite 200 Charlottesville VA 22902 434-979-2900 Albemarle County Service Authority 168 Spotnap Road Charlottesville, VA 22902 February 2, 2018 Re: Encroaching into the Authority's Water/Sewer Easement Brookdale Tax Map 07600-00-00-046C1 Gentlemen: I respectfully request permission to construct a fence that will encroach within the existing ACSA easement. The proposed fence will be 6 foot wooden fence between the parking lot and the existing Villas at Southern Ridge. The fence would cross the ACSA easement in two places. The fence location is shown on the site plan submitted to the County of Albemarle planning department [SDP201700069]. This work is planned Brookdale, Tax Map 07600-00-00-046C1. In exchange for this permission, I relieve the Albemarle County Service Authority from any responsibility for repairing or replacing this fence should it be damaged by the Authority's forces during maintenance of the public utility. BROOKDALE PART - by: BROOKDAL- C, its G: eral Partner by: �TO A ND, L.L.C., its Manager illiam N. Park, its Manager The foregoing instrument was acknowledged before me this day of February 2018, by William N. Park. • My commission expires: f(/ /X24 ,,� ;%l'. 1/ / Notr ry I IC 01'H F '7j7j�i � 46NWF:**#90 S. REGISTRATION NO. 35755$ F. ;MY COMM.EXPIRES,: • 11/30/2021 igRoitt. 1�veN,`*$ Sole *ftwri Christopher Perez From: Richard Nelson <rnelson@serviceauthority.org> Sent: Friday, February 02, 2018 11:33 AM To: Alex Morrison; Brasil Hamrick Cc: Christopher Perez Subject: RE: Brookdale Attachments: BROOKDALE ENCROACHMENT FORM.docx Brasil, ACSA has agreed to allow the fence construction in Brookdale,with the condition of completion and submission of the attached encroachment form before final approval. Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434)977-4511 From:Alexander Morrison Sent: Monday,January 29, 2018 2:27 PM To: Brasil Hamrick<bwheng@verizon.net> Cc: 'Christopher Perez'<cperez@albemarle.org>; Richard Nelson<rnelson@serviceauthority.org> Subject: RE: Brookdale Brasil, Thank you. We are reviewing your submittal and will let you know ASAP. Alexander J. Morrison, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville,Virginia 22911 (0)434-977-4511 Ext. 116 (C)434-981-5577 (F)434-979-0698 From: Brasil Hamrick [mailto:bwheng@verizon.net] Sent: Monday,January 29, 2018 2:09 PM To:Alexander Morrison<amorrison@serviceauthority.org> Cc: 'Christopher Perez'<cperez@albemarle.org> Subject: RE: Brookdale Alex: 1 (400 11011114 Attached is a landscape plan showing the proposed fence. I believe this is what Chris needs.The fence shown in red crosses the ACSA sanitary sewer easement in two places. Once near existing manhole number CNTRYGRN-1-5 and once near CNTRYGRN-1-3. In both locations a double swing gate, with 6-foot leafs, providing a 12-foot pass thru space has been shown. In all other locations the proposed fence does not encroach into the easement shown in yellow. The field located sanitary sewer is green. Please advise. Thanks Brasil From: Alexander Morrison [mailto:amorrison@serviceauthority.orq] Sent: Friday, January 26, 2018 3:11 PM To: Brasil Hamrick Cc: 'Christopher Perez'; Richard Nelson; Jeremy Lynn Subject: RE: Brookdale Brasil, Thank you for sending. I will review this information with our department and try to let you know something next week. Alexander J. Morrison,P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville,Virginia 22911 (0)434-977-4511 Ext. 116 (C)434-981-5577 (F)434-979-0698 From: Brasil Hamrick [mailto:bwheng@verizon.net] Sent: Friday,January 26,2018 2:54 PM To:Alexander Morrison<amorrison@ serviceauthoritv.org> Cc: 'Christopher Perez' <cperez@albemarle.org> Subject: Brookdale Alex: Tried to reach you by phone maybe this will help clarify our inquiry. Please see the attached landscape plan excerpt from the Brookdale plan set.To satisfy County screening ordinance we have to provide a 6' high wooden fence between the parking lot and the existing Villas @ Southern Ridge development.The fence would cross the ACSA sewer easement in 2 different places.We would place gates at those locations and would understand if the fence had to be removed for future upgrades, repairs or maintenance it would be done so at the owners expense. Please advise if that is acceptable. Thanks Brasil 2 Christopher Perez From: Brasil Hamrick <bwheng@verizon.net> Sent: Friday, February 02, 2018 3:20 PM To: Richard Nelson; Alex Morrison Cc: Christopher Perez; 'William Park'; 'Betty Groth' Subject: RE: Brookdale Attachments: Brookdale Fence Encroachment.pdf Richard: Attached you will find the signed encroachment agreement. Please advise if you need anything else regarding this matter. Thanks Brasil From: Richard Nelson [mailto:rnelson@serviceauthority.org] Sent: Friday, February 02, 2018 11:33 AM To: Alexander Morrison; Brasil Hamrick Cc: 'Christopher Perez' Subject: RE: Brookdale Brasil, ACSA has agreed to allow the fence construction in Brookdale,with the condition of completion and submission of the attached encroachment form before final approval. Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434)977-4511 From:Alexander Morrison Sent: Monday,January 29, 2018 2:27 PM To: Brasil Hamrick<bwheng@verizon.net> Cc: 'Christopher Perez' <cperez@albemarle.org>; Richard Nelson<rnelson@serviceauthority.org> Subject: RE: Brookdale Brasil, Thank you.We are reviewing your submittal and will let you know ASAP. Alexander J. Morrison,P.E. Senior Civil Engineer 1 c 410 Albemarle County Service Authority 168 Spotnap Road Charlottesville,Virginia 22911 (0)434-977-4511 Ext. 116 (C)434-981-5577 (F)434-979-0698 From: Brasil Hamrick[mailto:bwhengPverizon.net] Sent: Monday,January 29,2018 2:09 PM To:Alexander Morrison<amorrison@serviceauthority.org> Cc: 'Christopher Perez'<cperez@albemarle.org> Subject: RE: Brookdale Alex: Attached is a landscape plan showing the proposed fence. I believe this is what Chris needs.The fence shown in red crosses the ACSA sanitary sewer easement in two places. Once near existing manhole number CNTRYGRN-1-5 and once near CNTRYGRN-1-3. In both locations a double swing gate, with 6-foot leafs, providing a 12-foot pass thru space has been shown. In all other locations the proposed fence does not encroach into the easement shown in yellow. The field located sanitary sewer is green. Please advise. Thanks Brasil From: Alexander Morrison [mailto:amorrison@serviceauthoritv.orq] Sent: Friday, January 26, 2018 3:11 PM To: Brasil Hamrick Cc: 'Christopher Perez'; Richard Nelson; Jeremy Lynn Subject: RE: Brookdale Brasil, Thank you for sending. I will review this information with our department and try to let you know something next week. Alexander J. Morrison,P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville,Virginia 22911 (0)434-977-4511 Ext. 116 (C)434-981-5577 (F)434-979-0698 From: Brasil Hamrick [mailto:bwheng@verizon.net] Sent: Friday,January 26, 2018 2:54 PM To:Alexander Morrison<amorrison@serviceauthority.org> Cc: 'Christopher Perez'<cperez@albemarle.org> Subject: Brookdale Alex: 2 *440 Tried to reach you by phone maybe this will help clarify our inquiry. Please see the attached landscape plan excerpt from the Brookdale plan set.To satisfy County screening ordinance we have to provide a 6' high wooden fence between the parking lot and the existing Villas @ Southern Ridge development.The fence would cross the ACSA sewer easement in 2 different places. We would place gates at those locations and would understand if the fence had to be removed for future upgrades, repairs or maintenance it would be done so at the owners expense. Please advise if that is acceptable. Thanks Brasil 3 Christopher Perez From: Betty Groth <bgroth@pinnacleconstructionva.com> Sent: Thursday, February 01, 2018 11:28 AM To: Christopher Perez Cc: William Park; 'Brasil Hamrick'; PC Brookdale Subject: RE: SUB2018-16 Brookdale—right of way dedication plat Attachments: BD Brookdale ROW Dedication Owner exec 201801_31.pdf Chris, attached is a scanned copy of the ROW dedication plat signed by the owners. We will drop off 2 originals for County signature later today. Please let me know when it's ready for pickup for recordation. Thanks, Betty Groth Director of Legal&HR Pinnacle Construction&Development Corp. Park Properties Management Co LLC 1821 Avon Street,Ext.Suite 200 Charlottesville,VA 22902 Tel:434-979-2900 Ext.112 I Fax:434-979-0001 email:bgroth@pinnacleconstructionva.com From: William Park Sent: Friday, January 26, 2018 12:32 PM To: Betty Groth Subject: FW: SUB2018-16 Brookdale— right of way dedication plat William N. Park Pinnacle Construction & Devel. Corp. From:Christopher Perez [mailto:cperezPalbemarle.org] Sent: Friday,January 26, 2018 12:21 PM To:William Park<wpark@pinnacleconstructionva.com>; Brasil Hamrick<bwheng@verizon.net> Subject:SUB2018-16 Brookdale—right of way dedication plat Brasil/ William, SUB2018-16 Brookdale—right of way dedication plat is ready for approval. Please have the owners sign and notarize the plat and submit 1 or 2 copies maximum for County approval. Thanks Christopher P.Perez I Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road Charlottesville,VA 22902 434.296.5832 ext. 3443 1 (110 Nifir From:Christopher Perez Sent:Thursday,January 25, 2018 3:45 PM To:Sherry Short<SSHORT@albemarle.org> Cc: David Benish<DBENISH@albemarle.org>;wpark@pinnacleconstructionva.com Subject: RE: RE: Refund for SUB2017-202 Brookdale- Final Subdivision Plat Sherry, The applicant's name is William N. Park 434-979-2900 The check information is attached in the scanned doc. From: Christopher Perez Sent:Thursday,January 25, 2018 3:19 PM To: David Benish<DBENISH@albemarle.org>;Sherry Short<SSHORT@albemarle.org> Subject: RE: Refund for SUB2017-202 Brookdale- Final Subdivision Plat David/Sherry, RE: Refund for SUB2017-202 Brookdale- Final Subdivision Plat As previously discussed, the applicant submitted the incorrect application and paid the wrong fee. Thus, we are doing a refund on SUB2017-202 Brookdale- Final Subdivision Plat. I have already withdrawn the file. They have already followed staff's guidance and submitted the correct fee and the correct application type: "Special Lot". Please process a full refund of$1,075 for SUB2017-202. Thanks Christopher P.Perez I Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road 1 Charlottesville,VA 22902 434.296.5832 ext. 3443 2 Soo Christopher Perez From: Brasil Hamrick <bwheng@verizon.net> Sent: Monday,January 29, 2018 4:21 PM To: Christopher Perez Subject: Brookdale Recreation Attachments: REC NOTE.pdf; Rec Letter.pdf Chris: In addressing your recreation comments please look at the attachment.The note portion now appears on the front cover with all the other project information.The passive recreation area behind the buildings, if acceptable,will be hatched on the landscape plan.There is a very flat area 15-foot wide behind buildings 100, 200, and 300 that could be used to flip a frisbee or outdoor yoga or meditation or whatever floats your boat. Does this work? If so I will revise the recreation substitution letter and place it on the plans. Not sure what I was thinking with the 3-acres listed in the letter.That is the total green space of the property after development. Thanks Brasil HE HAM RICK ENGINEERING, P.C. Engineers • Surveyors • Land Planners November 30, 2017 Mr. Christopher P. Perez Senior Planner County of Albemarle 401 McIntire Road Charlottesville, VA 22902 RE: Recreational Amenity Substitutions for Brookdale Dear Mr. Perez: The purpose of this letter is to request substitutions for the required recreational facilities for the development entitled Brookdale. The reason for the request is safety concerns with swing sets and springer animals. In addition the basketball court does not match up with the majority of the targeted demographic of this development and can become a nosie nuisance for those not using the facility. Specifically, the developer would like to provide substitute facilities for the requirement of two (2) tot lots and a half court basketball court. One tot lot and the half court basketball court would be substituted by the fitness center, yoga/stretch area, community room, and setting porch within the clubhouse along with the passive recreational opportunities within the 3-acre green space of the development. The equipment within the second tot lot would be substituted with the attached modular play facility. Your consideration of this request is appreciated. If you should have any questions, or need additional information, please contact me at your earliest convenience. Sincerely, ., • 4) � Brasil W. Hamrick, Jr., P.E. Cc: William Park 156 Laurel Hill Road (Rt.612 E.),Verona,VA 24482 • (540) 248-7407 • Fax(540) 248-7408 'Itiof `toe 71 m m c) c) 7) 7) m m -1 -1 O O cyi Z z D > X r r — > D co m xi Cr T T . Il m Am N 0 0 J J 0 Z7 (r m m I 0 0 --1 o m 0 —Iry OC = O co u) O u O CO O_I = m nN < m r- Dco mo m p0 O _1mm 0 � x m -1 G') ODD D � op 77) m x7 IImz m m m e m Z O 3D D0 NII z DI M O 2 II Tp w - z z It O ` '_ O 0 0 Z N0 _1 0 o D Cn ?i O p m D II D • Cn m m CA zp C) = � 0 P1 C p m = V) (A II w30 0 O 0 in ;coCPO• C D O F ' (n(n N(n C) TITI • ' ax - Z D 0 r 0 O O 0 ZJ N) O O N 0 0 O N (/) X 0 7) CD m WO _, � > 0 NO m Cn D C,a D p u) ii W Christopher Perez From: Brasil Hamrick <bwheng@verizon.net> Sent: Thursday, February 01, 2018 11:33 AM To: Christopher Perez Cc: 'William Park' Subject: Brookdale Attachments: Planning Letter2.pdf; BD SHEETC.001 PLOTTED 01-29-18.pdf; BD SHEETC.002 PLOTTED 01-29-18.pdf; BD SHEETC.005 PLOTTED 01-29-18.pdf; BD SHEETC.012 PLOTTED 01-29-18.pdf; BD SHEETC.014 PLOTTED 01-29-18.pdf Chris: Attached you will find the final site plan resubmission letter. In addition the five (5) affected sheets are attached electronically. Hard copies of the plan will be delivered to your office today. Please advise if you have any questions. Thanks Brasil I'`rr/ Christopher Perez From: Bill Fritz Sent: Wednesday,January 10, 2018 10:52 AM To: Matthew Wentland Cc: Christopher Perez Subject: RE: Brookdale Retaining Walls The height limit of the wall cannot be changed except by the issuance of a variance by the Board of Zoning Appeals. If the wall is part of the building it can exceed the 6 foot height limit. As soon as that wall leaves the building it is no longer part of the building and is subject to the height limit. Attachment to the building does not make the wall part of the building. From: Matthew Wentland Sent:Wednesday,January 10, 2018 7:24 AM To: Bill Fritz<BFRITZ@albemarle.org> Cc:Christopher Perez<cperez@albemarle.org> Subject: FW: Brookdale Retaining Walls Bill, I think I already know the answer, but I wanted to get your input on this. Thanks From: Brasil Hamrick [mailto:bwheng@verizon.net] Sent:Tuesday,January 09,2018 4:00 PM To: Matthew Wentland <mwentland@albemarle.org>; Frank Pohl<fpohl@albemarle.org> Cc: 'Betty Groth'<bgroth@pinnacleconstructionva.com>; 'William Park'<wpark@pinnacleconstructionva.com> Subject: Brookdale Retaining Walls Matt: In regards to your site plan comment number 6 please look at the attached plan.The retaining walls are shown in green and the managed steep slopes are shown in red. The retaining wall around the parking lot at building 300 is just barely within the edge of the steep slope area. Of the total length of the wall only 63-feet touches the steep slope area. I assume this County ordinance provision was born out of the aesthetic concern of having a tall wall visible from a street. This wall will not be visible from a public street. Given that only a portion is just within the steep slope area I propose planting a double staggered row of evergreen trees in front of the 63-foot length. Please advise if you can make this work with your ordinance. Please advise. In regards to the retaining wall in front of building 400 I hope we can classify this wall as an integral part of the building. I know the wall does not touch the building but it was designed because of building and is as integral to the buildings function as the water and sewer connection.The County really pushed for the addition of this building and the wall cannot be seen from the street. For all practical purposes the only people that will see the wall are the residence of the front units of the building.The wall at the northwest corner of the building is about 15-feet tall.This would require a three wall system and would result in relocating the building. Please advise. Thanks 1 Christopher Perez From: Matthew Wentland Sent: Wednesday, January 10, 2018 11:20 AM To: Brasil Hamrick; Frank Pohl; Christopher Perez Cc: 'Betty Groth'; 'William Park' Subject: RE: Brookdale Retaining Walls Brasil, I double-checked with Bill Fritz, and the walls will have to follow the managed slope requirements.The visibility of the wall isn't what determined the ordinance wall height, it was the stability of the slope. For the integral to the building part, the wall would have to be part of the building (like it's exterior wall). It looks like the only way to change the wall height would be to request a variance from the Board of Zoning Appeals (which I've been told would probably not be granted and is not a quick process). Thanks, Matt From: Brasil Hamrick [mailto:bwheng@verizon.net] Sent:Tuesday,January 09, 2018 4:00 PM To: Matthew Wentland<mwentland@albemarle.org>; Frank Pohl<fpohl@albemarle.org> Cc: 'Betty Groth'<bgroth@pinnacleconstructionva.com>; 'William Park'<wpark@pinnacleconstructionva.com> Subject: Brookdale Retaining Walls Matt: In regards to your site plan comment number 6 please look at the attached plan.The retaining walls are shown in green and the managed steep slopes are shown in red. The retaining wall around the parking lot at building 300 is just barely within the edge of the steep slope area. Of the total length of the wall only 63-feet touches the steep slope area. I assume this County ordinance provision was born out of the aesthetic concern of having a tall wall visible from a street. This wall will not be visible from a public street. Given that only a portion is just within the steep slope area I propose planting a double staggered row of evergreen trees in front of the 63-foot length. Please advise if you can make this work with your ordinance. Please advise. In regards to the retaining wall in front of building 400 I hope we can classify this wall as an integral part of the building. I know the wall does not touch the building but it was designed because of building and is as integral to the buildings function as the water and sewer connection.The County really pushed for the addition of this building and the wall cannot be seen from the street. For all practical purposes the only people that will see the wall are the residence of the front units of the building.The wall at the northwest corner of the building is about 15-feet tall.This would require a three wall system and would result in relocating the building. Please advise. Thanks Brasil 1