HomeMy WebLinkAboutSDP201700069 Application Final Site Plan and Comps. 2017-11-17 Albemarle County Community Development Department
i)` 401 hlelntireP /dCharlottesville.VA229D2 4596
m
Voice:sod 296-5832 Fax:(434)972-4126
4 - 41 Planning Application
PARCEL I OWNER INFORMATION
TMP 07600-00-00-04601 Owner(s): MOUNTAINWOOD PROPERTIES, L.L.C.
Application* S P2OI 700069
PROPERTY INFORMATION
Legal Description IAcREAGE PARCEL Y
Magisterial Dist. Samuel Miller Land Use Primary Forest l .i
Current AFD !Not in AjF District Current Zoning Primary R15 Residential
APPLICATION INFORMATION
Street Address Entered By
!Keith Bradsha
Application Type Site Development Plans 11/27/2017
Project Brookdale Final
Received Date 11/27/17 Received Date Final Submittal Date 11/27/17 Total Fees 1613
Closing File Date Submittal Date Final Total Paid 1613
Revision Number
Comments
D �
Legal Ad
1 �
‘ii_j)4
Tc\iut,e
SUB APPLICATION(s)
Type Sub Applicatio Comment
Final Plat' ;,11/27/17
APPLICANT /CONTACT INFORMATION
ContactType , Address CityState Zip Phone PhoneCell
3w MOUNTAIN 0@D PROPERRTIES LLC. 300 WEST F EMASON NORFOLK-VA 22901
.d.opicant WILLIAM N PARK CIO BROOKDALE 1821 AVON ST SUITE 200 pCHARLOTTESVILL 22902 4349792900
Signature of Contractor or Authorized Agent Date
plication for
Initial Site Plan or Final Site Plan or Site Plan Exception i n ® ,,.
�.
Project Name: Brookdale G
Tax map and parcel(s): 07600-00-00-0401 zoning: R-15
Contact(who should we contact about this project) William N. Park do Brookdale Partners, LP
Street Address 1821 Avon Street Suite 200
City Charlottesville State VA Zip Code 22902
Phone Number 434-979-2900 Email wparlc@pinnacleconstructionva.com
Owner of Record Mountainwood Properties. LLC
Street Address 300 West Freemason Street
City Norfolk State VA Zip Code 23510
go-
Phone Number 75 7- ( 27' 1 /O V EmailV(j , eSQ ` I e. p(IZtt ef,CC'/14
Applicant Brookdale Partners LP,a Virginia Limited Partnership
Street Address 1821 Avon Street Suite 200
City Charlottesville State VA Zip Code 22902
Phone Number 434-979-2900 Email wpark@pinnacleconstructionva.com
Type of Development
Ul Residential U Non-residential
Type of unit(s): multi-family ❑ Commercial
#of building(s): 4 apt buildings and clubhouse U Industrial
o Quasi-Public
Sq.ft.of building(s): 37,769 Sq.ft.of building(s):
#of units per building: 28 or 12
Acreage of site:
Total#of units: 96
Acreage in open space:
Resulting density: 16.68 units per score Acreage in roads:
Acreage of site: 5.766
Average gallons of water used per day:
Acreage in open space:
Acreage in roads: 0.241
Average'gallons'of water used per day: 14,400
FOR OFFICE USE ONLY SDP# /14-4
�� _ ,
Fee Amount$lLP 13 Date Paid II 2O/lBy who? u 7 LA/.? Receipt#1/111.3 oat �!2 7 By:
County of Albemarle
Department of Community Development
401 McIntire Road Charlottesville,VA 22902 Voice: (434)296-5832 Fax: (434)972-4126
REVISED 11/02/2015 Page 1 of 2
Intended use or justification for request:
Comments/Attachments:
FEES
SITE DEVELOPMENT PLAN SITE PLAN EXCEPTION
Initial Site Nan Final Site Plan Exception to drawing of site
plan under section 323.5(a)
Approved No ,
Preapplication plan Preapplication plan
❑ $752 plus$16/dwelling U $1,290 plus$16/dwelling ® $1613 ❑ $1,613
unit and/or$0.016 per unit and/or$0.016 per '
square foot of square foot of
nonresidential structure nonresidential structure
$ $
16 folded copies of the plan d of copies required for submittal will be noted with 8 folded copies of the plan
plus an additional 6 copies if within an Entrance Corridor your initial approval letter. Copies of the plan should
be folded and in blue or black ink.Also provide 1
reduced copy of the plan no larger than 11 by 17 in.
❑ The initial site plan has a parking structure. U The final site plan has a parking --
❑ Included are architectural elevations,drawings, structure.
photographs or other visual materials showing any ❑ Included are revised architectural elevations,
parking structure proposed on the site and surrounding drawings,phdtographs or other visual
structures and land uses. materials submitted with the initial site plan.
The elevations shall be part of the approved
final site plan.
GROUNDWATER ASSESSMENT
(Required for all non-residential site plans not serviced by public water)
U If the plans show a use using less than 2,000 gallons/day(average) Tier 3 Groundwater Review=$548
U If the plans show a use using greater than 2,000 gallons/day(average) Tier 4 Groundwater Review=$1,183
❑ Special Exception=$457
Notices required by Section 32.4.2.1(f)
Preparing and mailing or delivering up to fifty(50)notices=$215.00 plus the actual cost of first lass postage.
Preparing and mailing or delivering,per notice more than fifty(50)=$1.08 plus the actual cost of first lass postage.
Owner/Applicant Must Read and Sign
This site plan as submitted contains all of the information required by Section 32.5(Initial Site Plan)or Section 32.6(Final Site Plan)of
Chapter 18 of the Code of the County of Albemarle. I understand that plans which lack information required by said sections shall be
deemed incomplete and shall be denied by the agent within ten(10)days of submittal as provided in Section 32.4.2.1 or Section 32.4.3.1
of Chapter 18 of the Code as the case may be.By signing this application I am consenting to written comments,letters and or notifications
regarding this application being . • .-. . me or my designated contact via fax and or email. This consent does not preclude such
written communication fro . . being .= t via first class mail.
For Final `' s 0. :To of my knowledge.I have complied with Section 32.43.1(a)of Chapter 18 of the Code.
n _/
Sig :' . 6•• • , .ntract Purchaser,Agent Date
William N. Park, Manager fro Contract Purchaser 434-979-2900 ! ' --
Print Name Daytime phone nu
j� ���/ ,014c• " i 11/02/2015 Page 2 of 2
f�
Final Side Development Plan
Checklist
Project Name: Brookdale
Firm: Hamrick Engineering, P. C.
This checklist must be completed,signed and submitted with the application. The information contained in this
checklist reflects the contents of the Section 32 of Chapter 18 of the Code of the County of Albemarle also known as
the Site Plan Ordinance as of January 1,2013. The applicant is responsible for insuring that no revisions to the
Ordinance have occurred since preparation of this document.
This final site plan has:
621 an initial site plan that was approved for the development and it remains valid; SDP-2017 - 0 0 0 3
® satisfied all of the requirements of section 32.6 below;and
® satisfied all of the conditions delineated in the letter provided under section 32.4.2.5(c)required to be satisfied prior to
submitting the final site plan.
® Authorized preparer.
❑ The plan,and any amendments to a plan,is prepared and sealed,signed and dated by one of the following
❑ An architect licensed to practice in the Commonwealth of Virginia.
4 A professional engineer licensed to practice in the Commonwealth of Virginia.
❑ A land surveyor licensed to practice in the Commonwealth of Virginia.
❑ A certified landscape architect licensed to practice in the Commonwealth of Virginia.
® Number of copies when first submitted.
® Provide the number of copies as directed in the Initial Site Plan approval letter
® One(1)reduced copy of the plan no larger than eleven(11)by seventeen(17)inches in size.
O Scale and size.
❑ The plan is prepared to the scale of one(1)inch equals twenty(20)feet or larger,or to another scale approved by
the agent in a particular case.
❑ Other scale approved -one(1)inch equals ( )feet,by
® No sheet exceeds forty-two(42)inches by thirty-six(36)inches in size.
O The plan IS prepared on one(1)sheet.OR
❑ The plan IS prepared on more than one(1)sheet and match lines clearly indicate where the several sheets join.
O The top of each sheet is approximately
Ga North or
❑ East
O Dimensions.
The plan is dimensioned to at least the following standards for accuracy:
O Boundary,setback and zoning lines:Within one one-hundredth(0.01)of a foot.
O Existing contours:Within one-half(1/2)of the contour interval required in section 32.6.2(c).
O Proposed contours:Within one(1)foot horizontally and vertically.
O Spot elevations:Within one-tenth(0.10)of a foot.
O Existing critical structures including utilities and other topographic features:Within two(2) feet,
provided that for critical structures,which include,but are not limited to,gas lines,other utilities,pipes,
conduits,walls and buildings to be preserved,within one-tenth(0.10)of a foot.
O Proposed structures,roads,parking lots and other improvements:Within one one-hundredth(0.01)of a
foot.
REVISED 06/10/2015 Page 1 of 4
`i Albema /ounty-Final Site Plan Checklist
Site Plan Ordinance Section 32.6-Contents of final site plan
In addition to containing all of the information required to be on an initial site plan, as provided in section 32.5, a final
site plan shall contain the following:
® Demonstrate compliance with chapter.Specific written schedules or notes as necessary to demonstrate that the
requirements of this chapter are satisfied.
® Proposed grading.
® Proposed grading(up to twenty[20]percent slope,maximum two[2]foot contours;over twenty[20]
percent slope,maximum five [5]foot contours).
® Water and sewer facilities.
® Detailed plans for proposed water and sewer facilities,including all pipe sizes,types and grades;
® proposed connections to existing or proposed central water supplies and central sewage systems;
• location and dimensions of proposed easements and whether they are to be publicly or privately
maintained;
® profiles and cross sections of all water and sewer lines including clearance where lines cross;
® all water main locations and sizes;valves and fire hydrant locations;
• all sewer appurtenances by type and number;
® the station on the plan to conform to the station shown on the profile and indicate the top and invert
elevation of each structure.
® Drainage and grading plans.
® Detailed construction drainage and grading plans:
® Profiles of all ditches and channels whether proposed or existing,showing existing and
proposed grades,and invert of ditches,cross pipes or utilities;typical channel cross
sections for new construction;and actual cross sections for-existing channels intended
to remain;
® Profiles of all storm sewer systems showing existing and proposed grades;
® Plan view of all drainage systems with all structures,pipes and channels numbered or
lettered on the plan and profile views.Show sufficient dimensions and bench marks to
allow field stake out of all proposed work from the boundary lines;
• A drainage summary table for culverts,storm sewer and channels as described in the
following example:
Structure Description Length Invert Invert Slope Remarks
Number In Out
1 42"RCP 50' 24.50 424.00 100.00% Provide
Class III 2,EW
2 DI-3B L=8 26.00 432.00 - IS-1
Top
3 PG-2A 400' 420.00 400.00 5.00% D=12"
4 Grade 200' 420.00 415.00 2.50% D=18"
Swale
® A legend showing all symbols and abbreviations used on the plan;
® General notes,typical sections,and details of all items not covered by Virginia
Department of Transportation standard drawings;and
® Flood plain limits for the one hundred(100)year storm for all watercourses with an
upstream drainage area of fifty(50)acres or more provided that the county engineer
may waive this requirement for drainage areas of less than one hundred(100)acres
upon determining that the information is unnecessary for review of the proposed
development.
REVISED 06/10/2015 Page 2 of 4
So/ Albemarlrnty-Final Site Plan Checklist
® Street sections.
❑ Typical street sections together with specific street sections where street cut or fill is five(5)feet or
greater;
® centerline curve data;
® radius of curb returns or edge of pavement;
® location,type and size of proposed ingress to and egress from the site together with culvert size;
® symmetrical transition of pavement at intersection with existing street;
® the edge of street surface or face of curb for full length of proposed street;
® when proposed streets intersect with or adjoin existing streets or travelways,both edges of existing
pavement or travelway together with curb and gutter indicated for a minimum of one hundred(100)
feet or the length of connection,whichever is the greater distance.
® Public facilities and utilities.
® All public facilities,utility and drainage easements outside the right-of-way of public streets,provided
that new easements may be generally shown and accurately dedicated by separate plat.
® All water and sewer facilities to be dedicated to public use and the easements for those facilities and
shall be identified by a statement that the facilities are to be dedicated to the Albemarle County Service
Authority.
® Signature panel.
® Signature panel for signature by each member of the site review committee.
® Parking and loading areas.
® For all parking and loading areas,indicate the
size,
angle of stalls,
6d width of aisles and specific number of spaces required and provided,and
method of computation.Indicate type of surfacing for all paved or gravel areas.
® Landscape plan.
® A landscape plan that complies with section 32.7.9
® Outdoor lighting.
® Outdoor lighting information including
a photometric plan with
location,description,and photograph or diagram of each type of outdoor luminaire.
® Recreational facilities.
® Specifications for recreational facilities.
In addition to the items required by the ordinance,Albemarle County Engineer,the Virginia
Department of Transportation,the Albemarle County Service Authority,and the Thomas Jefferson
Health District require these items on plans submitted for final site plan approval. Plans will not be
rejected if these items are not present,but they are required for approval. These items are provided in
an effort to communicate all final site plan comments.
® 1.Reference the benchmarks used for surveys. (Albemarle County Engineering Policy)
® 2.Indicate the available sight distance for entrances and left turn lanes. (Albemarle County Engineering Policy)
® 3.Label the maximum height of all retaining walls. (Albemarle County Engineering Policy)
❑ 4.Provide copies of off-site easements,or letters of intent to grant them from off-site property owners.
(Albemarle County Engineering Policy)
REVISED 06/10/2015 Page 3 of 4
+1411 Albemar� ,>unty-Final Site Plan Checklist
❑ 5.Show and label stream buffer limits. (Water Protection Ordinance,WPO) `!�
® 6.Indicate the deed book and page reference for all existing utility easements located on the property.
(Albemarle County Service Authority)
O 7.Tier 3-Draft or Final Groundwater Management Plan(WPO Section 17-403)
❑ 8.Tier 4—Aquifer testing work plan(WPO Section 17-403)
Read and Sign
In represen• :the abov- -ferenced ubmitting this plan for final approval,I hereby sate that,to the best of my knowledge,the attached plan
contains al ' inn. 'I n re. ' . I y thi•checklist.
• lfi7/.2-of7
Si: .ture o I er,Contract Purchaser,Agent Date
William N. Park, Manager fro Contract Purchase! 434-979-2900
Print Name Daytime phone number of Signatory
REVISED 06/10/2015 Page 4 of 4