HomeMy WebLinkAboutARB201800002 Application 2018-02-14TOTALLY COMMITTED.
December 28, 2017
Mr. Mark Graham, Director of Community Development
Albemarle County
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
RE: Tier II Personal Wireless Service Facilities (PWSF) Application
Parcel ID: 062A1-00-OK-00100 / Tax Map #62A1-OK-1 / GPIN: 492362913208
Address: 1225 Rio Road East, Charlottesville, VA 22901
Applicant: Shenandoah Mobile, LLC ("Shentel")
Shentel Site Name: 69202 Rio Road East
Dear Mr. Graham:
It was determined after the pre -application meeting we had with staff, on August 28, 2017, that only Tier II PWSF
approval would be required for the proposed project. On behalf of Shenandoah Mobile, LLC ("Shentel" or the
"Applicant") (successor in interest to Virginia PCS Alliance, L.C. d/b/a "NTELOS"), please accept the enclosed
Tier II PWSF application to construct and operate a 113 foot flush- mounted Tier H monopole telecommunications
facility on a 5.42 acre parcel located at 1225 Rio Road East, which is owned by Charlottesville Church of the
Brethren (the "Property"). Shentel is licensed by the Federal Communications Commission to provide wireless
communications services throughout Albemarle County (the "County"). This proposed facility is to fill a gap in
coverage in Shentel's existing network in this area.
The proposed 113 foot tower will only be 10 feet taller than the tallest reference tree within 25 feet in accordance
with Section 5.1.40(b)(10) of the Zoning Ordinance. The tower and associated ground equipment will be located
within a 20' x 20' fenced compound within a 30' x 30' lease area, sited behind the existing Church on the subject
Property. The Applicant is requesting to fence the compound area pursuant to Section 5.1.40(b)(5)(iii) at the
request of the Church given the lease area's location relative to the Church building and nearby residences, to
keep the public, especially children, out of the compound area for safety reasons. The details of the fence and
proposed landscaping requested by the Church, are shown on Sheet C-4 of the plans.
The rear portion of the Property (behind the Church) is wooded with mature trees and these trees will assist with
screening the tower and ground equipment from adjacent properties along Huntington Road and Wakefield Road.
The ground equipment will also be screened with a board on board wooden privacy fence painted Sherwin
Williams "Umbra SW4008" in accordance with Section 5.1.40(b)(1)(c) of the Zoning Ordinance. The tower will
be made of galvanized steel and painted Sherwin Williams "Umbra SW4008" to blend into the surrounding trees.
The facility will be unmanned and will be visited approximately once a month, on average, by technicians. The
facility will not be lit unless so required by the Federal Aviation Authority, and will not emit any odor, fumes or
glare. There will be a small light on the ground equipment cabinet for temporary maintenance use only. The noises
4435 Waterfront Drive + Suite 100 + Glen Allen, VA 23060 + 804-548-4079 + www.networkbuilding.com
emitted from the equipment on the ground will not be any louder than normal residential HVAC equipment..
Therefore, the impact on surrounding properties resulting from this beneficial passive use will be minimal.
The proposed tower will achieve the following:
• Improve Shentel's existing network by providing seamless coverage in the area;
• Support the latest wireless technologies (voice and data);
• Provide coverage to the following:
o Those living and working in adjacent and nearby residential neighborhoods;
o Those traveling on nearby roads (i.e. Rio Road East, Huntington Road, Wakefield Road and neighborhood
roads);
o Emergency personnel operating in the area.
The subject Property is zoned R-2 Residential R-2. In accordance with Section 14.2.1(13) of the Zoning
Ordinance, communication towers are permitted in the Residential R-2 District with the approval of a Tier II
PWSF application. Section 5.1.40 of the Zoning Ordinance regulates PWSF's. The submission requirements
listed in this section are highlighted in the attached application and checklist.
In accordance with Section 5.1.40 of the Albemarle County Zoning Ordinance, I have enclosed the following:
• Application for Personal Wireless Service Facility Application;
• Authorization to Submit Land Use Applications Letter (signed by the Property Owner);
• Deed and Plat;
• Authorization Letter (signed by Shentel);
• Photo Simulations (Camera Used: Nikon Coolpix L620);
• Pictures of Site (Camera Used: Samsung Galaxy S3);
• Color Sample of Proposed Monopole Tower (Umbra SW 4008);
• Sixteen (16) Copies of the Plan (11"xl7");
• Fee for Tier II Facility ($1,957.00, check #363833).
Thank you in advance for your consideration and please do not hesitate to contact me at (804) 475-8144 or
rIIetcher@nbcllc.com to further discuss any of the application materials. Thank you.
Sincerely,
Ryan etcher
Zoning Manager
(On Behalf of Shentel)
Enclosures
cc: Deborah Balser, Shentel
Valerie Long, Williams Mullen
Shana Sutton, NB+C, LLC
Roger Hughett, NB+C, LLC
4435 Waterfront Drive + Suite 100 + Glen Allen, VA 23060 + 804-548-4079 + www.networkbuilding.com
Application for PWSF
Application for
Personal Wireless Service Facility
0
IMPORTANT: Your application is considered INCOMPLETE until all of the information on the
Required Application Content Checklist on pages 2 thru 6 has been submitted and the appropriate fee has been submitted.
(See page 11 for the appropriate fees related to your application). Staff will assist you with these items.
PROJECT NAME: (how should we refer to this application?): t;hP_v4 < l@g207_ (Zia 1Zs+
PROPOSAL: ❑ Tier I Tier H ❑ Tier III ❑ Building Permit after Tier II or Tier III approval
COPIES REQUIRED: Two (2) Sixteen 1 Seventeen (17) Two (2)
EXISTING COMP PLAN LAND USE/DENSITY: Nee j ` s 2_ N&L rjens;
LOCATION/ADDRESS OF PROPERTY FOR SPECL4 , USE PERMITa lnla EA!
TAX MAP PARCEL(s): J - lQ- ®Km O U Oo
ZONINGDISTRICT: RZ VL--i V4.%
# OF ACRES TO BE COVERED BY SPECIAL USE PERMIT (if a portion it must be delineated on a plat): W IA.
Is this an amendment to an existing Special Use Permit? If Yes provide that SP Number.
❑ YES O
Are you submitting a Special Exception to modify or waive certain requirements with this application?
❑ YES P"NO
If YES, provide the modifications:
Does the owner of this property own (or have any ownership interest in) any abutting property?
RYES Q'NO
If YES, please list those tax map and parcel numbers: 0(9t- ®O < OK d 007-CO
Applicant (whom should we contact about this project): S �0bik( "stile e I)C`A �%a F*k1ner) N , 1"
Street Address
44 1�tLknt®r+ PfiN/C_g SSA Im
City GIeyl NlIpm —State V P@ Zip Code Z30400
Phone Number �M—LA-15 �- ak4L 4
Email 41p_6? nbck C
Owner of Record c harlo weSV 4 �� Onwr i4 0�
Street Address 122S R%'® 9,_Q0,d Eac i
City CInay 6-welb4 @ k State V Zip Code Z2-9 ® 0
Phone Number ` M_ 9 ®,q`" 02 9 B
Email yll� �� ��r V�4 �° o0h, -
Contractor (Building Permits and Tier I only)
Street Address
City
Phone Number
Email
Work Value $
Code
FOR OFFICE USE ONLY Application # SIGN # (if an SP)
Fee Amount $ Date Paid By who? Receipt # Ck# by:
ZONING ORDINANCE SECTION
County of Albemarle Department of Community Development
401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126
www.albemarle.org
REVISED 12/7/2017 Page 1 of 11
Personal Wireless Service Facility Application
Tiers
I
II
M
Application Requirements & Checklist
Instructions: an X" in Application Type indicates requirements.
Use thear right cohimn to con firm requirements are met.
form, by the owner, the
X
X
X
1. Application form and signatures. A completed application signed parcel
parcel owner's agent or the contract purchaser, and the proposed facility's owner. If the owner's
agent signs the application, he shall also submit written evidence of the existence and scope of the
agency. If the contract purchaser signs the application, he shall also submit the owner's written
consent to the application.
2. Plat or survey of the parcel. A recorded plat or recorded boundary survey of the parcel on which the
X
X
X
[v}'
facility will be located, provided, if neither a recorded plat nor boundary survey exists, a copy of the
legal description of the parcel and the Albemarle County Circuit Court deed book and page number.
3. Ownership. The identity of the owner of the parcel and, if the owner is other than a real person, the
X
X
X
®°
complete legal name of the entity, a description of the type of entity, and written documentation that
the person signing on behalf of the entity is authorized to do so.
4. Plans and supporting drawings, calculations, and documentation. Except where the facility will be
located entirely within an eligible support structure or an existing building, a scaled plan and a
scaled elevation view and other supporting drawings, calculations, and other documentation required
by the agent, signed and sealed by an appropriate licensed professional. The plans and supporting
drawings, calculations, and documentation shall show:
(a) Existing and proposed improvements. The location and dimensions of all existing and proposed
X
X
X
Rr
improvements on the parcel including access roads and structures, the location and dimensions
of significant natural features, and the maximum height above ground of the facility (also
identified in height above sea level).
(b) Elevation and coordinates. The benchmarks and datum used for elevations shall coincide with
X
X
X
the State Plane VA South US Survey Feet based on the North American Datum of 1983 (NAD
83), and the benchmarks shall be acceptable to the county engineer.
(c) Design. The design of the facility, including the specific type of support structure and the
X
X
X
®'
design, type, location, size, height, and configuration of all existing and proposed antennas and
other equipment.
(d) Color. Identification of each paint color on the facility, by manufacturer color name and color
X
X
X
number. A paint chip or sample shall be provided for each color.
(e) Topography. Except where the facility would be attached to an eligible support structure or an
X
X
existing building, the topography within two thousand (2,000) feet of the proposed facility, in
contour intervals not to exceed ten (10) feet for all lands within Albemarle County and, in
contour intervals shown on United States Geological Survey topographic survey maps or the
best topographic data available, for lands not within Albemarle County.
(1) Trees. The caliper and species of all trees where the dripline is located within fifty (50) feet of
X
X
X
the facility. The height, caliper, and species of any tree that the applicant is relying on to
provide screening of the monopole or tower. The height, caliper and species of the reference
tree. The caliper and species of all trees that will be adversely impacted or removed during
installation or maintenance of the facility shall be noted, regardless of their distances to the
facility.
(g) Setbacks, parking, fencing, and landscaping. All existing and proposed setbacks, parking,
X
X
X
fencing, and landscaping.
(h) Location of accessways. The location of all existing vehicular accessways and the location and
X
X
X
design of all proposed vehicular accessways.
(i) Location of certain structures and district boundaries. Except where the facility would be
X
X
X
`9
attached to an eligible support structure or an existing building, residential and commercial
structures- and residential and rural areas district boundaries.
REVISED 12/7/2017 Page 2 of 11
Yersonai wireless bervice raculry
Appuca
(j) Proximity to airports. If the proposed monopole or tower will be taller than one hundred fifty
X
X
(150) feet, the proximity of the facility to commercial and private airports.
5. Photographs. Photographs of the location of the proposed monopole or tower shall be provided that
X
X
include, for applications for Tier 11 facilities, the reference tree, and for applications for Tier III
facilities, the area within fifty (50) feet of the proposed monopole or tower. These photographs shall
include reference points to enable the lease area, the vehicular access, the trees that will remain, and
the trees that will be removed, to be identified. In addition, photographs, where possible, or
perspective drawings of the facility site and all existing facilities within two hundred (200) feet of the
site, if any, and the area surrounding the site.
6. Balloon tests. For any proposed monopole or tower, photographs taken of a balloon test, which shall
be conducted, if requested by the agent, as follows:
(a) Scheduling. The applicant shall contact the agent within ten (10) days after the date the
X
X
application was submitted to schedule a date and time when the balloon test will be conducted.
The test shall be conducted within forty (40) days after the date the application was submitted,
and the applicant shall provide the agent with at least seven (7) days prior notice; provided that
this deadline may be extended due to inclement weather or by the agreement of the applicant
and the agent.
(b) Marking key boundaries and locations. Prior to the balloon test, the locations of the access
X
X
road, the lease area, the tower site, the reference tree, and the tallest tree within twenty five (25)
feet of the proposed monopole shall be surveyed and staked or flagged in the field.
(c) Balloon height. The test shall consist of raising one or more balloons from the facility site to a
X
X
height equal to the proposed facility.
(d) Balloon color or material. The balloons shall be of a color or material that provides maximum
X
X
visibility.
(e) Photographing balloon test. The photographs of the balloon test shall be taken from the nearest
X
X
residence and from appropriate locations on abutting properties, along each publicly used road
from which the balloon is visible, and other properties and locations as deemed appropriate by
the agent. The applicant shall identify the camera type, film size, and focal length of the lens for
each photograph.
7. Additions of antennas. If antennas are proposed to be added to an eligible support structure or an
X
X
X
existing building, all existing antennas and other equipment on the structure, building, or facility, as
well as all ground equipment, shall be identified by owner, type, and size. The method(s) by which
the antennas will be attached to the mounting structure shall be depicted.
8. Site under conservation or open space easement. If the proposed facility would be located on lands
X
X
Er
subject to a conservation easement or an open space easement, a copy of the recorded deed of
easement and the express written consent of all easement holders to the proposed facility.
9. Photographic simulations. At the request of the agent, photographic simulations of the proposed
X
X
facility.
12. Special exception. If the proposed facility does not comply with any provision of section 5.1.40, the
X
X
X
applicant shall request a special exception in writing as part of the application. The request shall
identify which regulation in section 5.1.40 for the special exception is requested and a justification
for the special exception.
ion
REVISED 12/7/2017 Page 3 of 11
Personal Wireless Service Facility Application
Development Requirements & Checklist
I
II
III
Instructions: an 'X" in Application Type indicates requirements.
Use the ar right column to confirm requirements are met.
1. General design. The facility shall be designed, installed, and maintained as follows:
(a) Guy wires. Guy wires are prohibited. X
X
X
(b) Outdoor lighting. Outdoor lighting for the facility shall be permitted only during maintenance periods; X
X
X
regardless of the lumens emitted, each outdoor luminaire shall be fully shielded as required by section
4.17; provided that these restrictions shall not apply to any outdoor lighting required by federal law.
(c) Ground equipment. Any ground equipment shelter not located within an eligible support structure or
an existing building shall be screened from all lot lines either by terrain, existing structures, existing X
X
X
vegetation, or by added vegetation approved by the agent.
(d) Whip antenna. A whip antenna less than six (6) inches in diameter may exceed the height of the
facility, the eligible support structure, or the existing building. X
X
X
g
(e) Grounding rod. A grounding rod, whose height shall not exceed two (2) feet and whose width shall
not exceed one (1) inch in diameter at the base and tapering to a point, may be installed at the top of X
X
X
the facility_, the eligible support structure, or the existing building.
2. Antennas and associated equipment. Antennas and associated equipment that are not entirely within a
X
X
X
®'
proposed facility, an eligible support structure, or an existing building shall be subject to the following:
(a) Number of arrays. The total munber of arrays of antennas shall not exceed three (3). All types of
X
X
X
antennas and dishes, regardless of their use, shall be counted toward the limit of three arrays.
(b) Size. Each antenna proposed under the pending application shall not exceed the size shown on the
X
X
X
application, which size shall not exceed one thousand four hundred (1400) square inches.
(c) Projection. No antenna shall project from the facility, structure or building beyond the minimum
required by the mounting equipment, and in no case shall the closest point on the back of the antenna
X
X
X
be more than twelve (12) inches from the facility, structure, or building; and in no case shall the
farthest point of the back of the antenna be more than eighteen (18) inches from the facility, structure,
or building, and
X
X
X
(d) Color. Each antenna and associated equipment shall be a color that matches the facility, structure, or
building.
3. Tree conservation plan; content. Before the building official issues a building permit for the facility, the
X
X
X
applicant shall submit a tree conservation plan prepared by a certified arborist. The plan shall be submitted
to the agent for review and approval to ensure that all applicable requirements have been satisfied. The plan
shall specify tree protection methods and procedures, identify all existing trees to be removed on the parcel
for the installation, operation and maintenance of the facility, and identify all dead and dying trees that are
recommended to be removed. In approving the plan, the agent may identify additional trees or lands up to
two hundred (200) feet from the lease area to be included in the plan.
4. Creation of slopes steeper than 2: 1. No slopes associated with the installation of the facility and its
X
X
X
P'
accessory uses shall be created that are steeper than 2:1 unless retaining walls, revetments, or other
stabilization measures acceptable to the county engineer are employed.
5. Ground equipment shelter, -fencing. Any ground equipment shelter not located within an existing building
X
X
X
Rr
shall be fenced only with the approval of the agent upon finding that the fence: (i) would protect the facility
from trespass in areas of high volumes of vehicular or pedestrian traffic or, in the rural areas, to protect the
facility from livestock or wildlife; (ii) would not be detrimental to the character of the area; and (iii) would
not be detrimental to the public health, safety or general welfare.
REVISED 12/7/2017 Page 4 of 11
Personal Wireless Service Facility Application
Development Requirements & Checklist
I
II
III
Instructions: an 'X" in Application Type indicates requirements.
Use thefar right column to con rm requirements are met.
6. Screening and siting to minimize visibility. The site shall provide adequate opportunities for screening and
X X Rr
the facility shall be sited to minimize its visibility from adjacent parcels and streets, regardless of their
distance from the facility. The facility also shall be sited to minimize its visibility from any entrance
corridor overlay district, state scenic river, national park, or national forest, regardless of whether the site is
adjacent to the district, river, park or forest. If the facility would be located on lands subject to a
conservation easement or an open space easement, or adjacent to a conservation easement or open space
easement, the facility shall be sited so that it is not visible from any resources specifically identified for
protection in the deed of easement.
7. Open space plan resources. The facility shall not adversely impact resources identified in the natural
X
X
[�
resources chapter of the county's comprehensive plan and the parks and green systems chapters in any coup
master plan.
8. Horizontal separation of multiple facilities. The facility shall not be located so that it and three (3) or more
X
existing or approved personal wireless service facilities would be within an area comprised of a circle
centered anywhere on the ground having a radius of two hundred (200) feet.
9. Diameter of monopole. The maximum base diameter of the monopole shall be thirty (30) inches and the
X
maximum diameter at the top of the monopole shall be eighteen (18) inches.
10. Height of monopole. The top of the monopole, measured in elevation above mean sea level, shall not be
X
more than ten (10) feet taller than the tallest tree within twenty-five (25) feet of the monopole, and shall
include any base, foundation or grading that raises the monopole above the pre-existing natural ground
elevation.
11. Color of monopole, antennas, and equipment. Each monopole shall be a dark brown natural or painted
X
X
wood color that blends into the surrounding trees. The antennas, supporting brackets, and all other
equipment attached to the monopole shall be a color that closely matches that of the monopole. The
ground equipment, the ground equipment shelter, and the concrete pad shall also be a color that closely
matches that of the monopole, provided that the ground equipment and the concrete pad need not closely
match the color of the monopole if they are enclosed within a ground equipment shelter or within or
behind an approved structure, facade or fencing that: (i) is a color that closely matches that of the
monopole; (ii) is consistent with the character of the area; and (iii) makes the ground equipment, ground
equipment shelter, and the concrete pad invisible at any time of year from any other parcel or a public or
private street.
12. Placement of cables, wiring, and similar attachments. Each wood or concrete monopole shall be
X
constructed so that all cables, wiring, and similar attachments that run vertically from the ground
equipment to the antennas are placed on the monopole to face the interior of the site and away from public
view, as determined by the agent. Metal monopoles shall be constructed so that vertical cables, wiring,
and similar attachments are contained within the monopole's structure.
13. Special use permit conditions. All conditions of approval of a special use permit.
X
❑
REVISED 12/7/2017 Page 5 of 11
Personal Wireless Service Facility Application
Applicability of other Development Requirements Type of
in this Chapter & Checklist Application
Instructions: an `X" in Application Type indicates requirements. I II Hi
Use the ar right column to confirm requirements are met.
2. Vehicular access. Vehicular access to the facility site or tower site shall be subject to the requirements of X X X
section 4.2 and shall not be exempt under section 4.2.6(c).
Setbacks. Notwithstanding section 4.10.3.1(b), the agent may authorize a facility to be located closer in X X X
distance than the height of the tower or other mounting structure to any lot line if the applicant obtains an
easement or other recordable document showing agreement between the lot owners, acceptable to the
county attorney as to addressing development on the part of the abutting parcel sharing the common lot line
that is within the monopole or tower's fall zone. If the right-of-way for a public street is within the fall zone,
the Virginia Department of Transportation shall be included in the staff review, in lieu of recording an
easement or other document.
Type of A plication
I
II
1n
Performance Standards, Requirements & Checklists
Please check those that apply to acknowledge these requirements
1. Building permit application; submitting certiftcation of monopole height and revised plans. The following
X
[
shall be submitted with the building permit application: (i) certification by a registered surveyor stating the
height of the reference tree that is used to determine the permissible height of the monopole; and (ii) a final
revised set of plans for the construction of the facility. The agent shall review the surveyor's certificate and
the plans to ensure that all applicable requirements have been satisfied.
Work Value S
2. Tree conservation plan; compliance, amendment. The installation, operation, and maintenance of the
X
X
X
Fier
facility shall be conducted in accordance with the tree conservation plan. The applicant shall not remove
existing trees within the lease area or within one hundred (100) feet in all directions surrounding the lease
area of any part of the facility except for those trees identified on the plan to be removed for the
installation, operation, and maintenance of the facility and dead and dying trees. Before the applicant
removes any tree not designated for removal on the approved plan, the applicant shall submit and obtain
approval of an amended plan. The agent may approve the amended plan if the proposed tree removal will
not adversely affect the visibility of the facility from any location off of the parcel. The agent may impose
reasonable conditions to ensure that the purposes of this paragraph are achieved.
3. Completion of installation, submitting certifications of compliance. Within thirty (30) days after
X
X
X
completion of the installation of the facility, the applicant shall provide to the agent prior to issuance of a
certificate of occupancy: (i) certification by a registered surveyor stating the height of the tower or
monopole, measured both in feet above ground level and in elevation above mean sea level, using the
benchmarks or reference datum identified in the application; and (ii) certification stating that the lightning
rod's height does not exceed two (2) feet above the top of the tower or monopole and its width does not
exceed a diameter of one (1) inch.
4. Discontinuance of use; notice thereof- removal; surety. Within thirty (30) days after a tower or monopole's
X
X
X
use for personal wireless service or any service facilitated by transmission equipment is discontinued, the
owner of the facility shall notify the zoning administrator in writing that the facility's use has discontinued.
The facility and any transmission equipment shall be disassembled and removed from the facility site
within ninety (90) days after the date its use for personal wireless service or any service facilitated by
transmission equipment is discontinued. If the agent determines at any time that surety is required to
guarantee that the facility will be removed as required, the agent may require that the parcel owner or the
owner of the facility submit a certified check, a bond with surety, or a letter of credit, in an amount
sufficient for, and conditioned upon, the removal of the facility. The type and form of the surety guarantee
shall be to the satisfaction of the agent and the county attorney. In determining whether surety should be
required, the agent shall consider the following: (i) whether there is a change in technology that makes it
likely that the monopole or tower will be unnecessary in the near future; (ii) the permittee fails to comply
with applicable regulations or conditions; (iii) the permittee fails to timely remove another monopole or
tower within the county; and iv whenever otherwise deemed necessary by the agent.
REVISED 12/7/2017 Page 6 of 11
Personal Wireless Service Facility Application
Criteria for Special Exception to modify or waive requirements
If an applicant proposes to submit less information than required or request a modification or waiver of any design criteria the request for
modification or waiver must be received at the time the application is filed or the application shall be deemed incomplete. In requesting a
modification or waiver the applicant shall provide information to allow the Board of Supervisors to find:
1. That complying with the provisions of the Zoning Ordinance would not forward the purposes of the Zoning Ordinance or
otherwise serve the public health, safety, or welfare or;
2. That a modified regulation would satisfy the purposes of the Zoning Ordinance to at least an equivalent degree as the specified
requirement.
Definitions associated with Personal Wireless Service Facilities
Antenna array: An orderly arrangement of antennas mounted at the same height on a tower or other structure and intended to transmit a
signal providing coverage over a specific area for a single provider of personal wireless services.
Avoidance area: An area having significant resources where the initial siting of personal wireless service facilities could result in adverse
impacts as follows: (i) any ridge area where a personal wireless service facility would be skylighted; (ii) a parcel within an agricultural
and forestal district; (iii) a parcel within a historic district; (iv) any location in which the proposed personal wireless service facility and
three (3) or more existing or approved personal wireless service facilities would be within an area comprised of a circle centered
anywhere on the ground having a radius of two hundred (200) feet; or (v) any location within two hundred (200) feet of any state scenic
highway or by -way.
Base station: A structure or equipment at a fixed location that enables Federal Communications Commission -licensed or authorized
wireless communications between user equipment and a communications network.
1. Services to which the term applies. The term includes, but is not limited to, equipment associated with wireless communications
services such as private, broadcast, and public safety services, as well as unlicensed wireless services and fixed wireless services
such as microwave backhaul.
2. Equipment to which the term applies and does not apply. The term includes, but is not limited to, radio transceivers, antennas,
coaxial, or fiber optic cable, regular and backup power supplies, and comparable equipment, regardless of technological
configuration, including distributed antenna systems and small -cell networks. The term does not include any equipment
associated with a tower.
3. Structures to which the term applies and does not apply. The term includes any structure, other than a tower, that, at the time the
relevant application is filed with the county, supports or houses equipment described in paragraphs (1) and (2) of this definition
that has been reviewed and approved under section 5.1.40 or the applicable zoning process in effect prior to October 13, 2004.
The term does not include: (i) a tower as defined in this section; and (h) any structure that, at the time the relevant application is
filed with the county under section 5.1,40, does not support or house equipment described in paragraphs (1) and (2) of this
definition. ,
Collocation: The mounting or installation of transmission equipment on an eligible support structure for the purpose of transmitting
and/or receiving radio frequency signals for communications proposes.
Collocation, exempt: A collocation that would not result in a substantial change in the physical dimensions of an eligible support
structure.
Concealment elements of the eligible support structure: Any condition of approval, including any applicable requirement of section 5.1.40
in effect at the time of approval, established and imposed on the personal wireless service facility as a concealment technique and which
includes conditions or regulations pertaining to antenna size, color of the structure and all equipment, antenna mounting techniques,
including the requirement that antennas be flush mounted, maximum tower diameters at the base and top, limitations on tower height
relative to a reference tree, screening by trees including the restrictions on removing trees that are screening the tower, siting towers so
that they are not skylighted, requirements as to how cables should be located on a tower, and the size, location, design, and screening for
ground based equipment.
Eligible support structure: Any tower or base station, provided that it is existing at the time the relevant application is filed with the
County.
Existing building: As used in section 5.1.40 and any definitions pertaining to personal wireless service facilities, a building that was
lawfully constructed or established and complies with the minimum applicable bulk, height, setback, floor area, and other structure
requirements of the district in which the building is located.
REVISED 12/7/2017 Page 7 of 11
Personal Wireless Service Facility Application
Existing structure: As used in section 5.1.40 a structure, other than a flagpole or an existing tower, that was lawfully constructed or
established and complies with the minimum applicable bulk, height, setback, floor area or other structure requirements of the district in
which the structure is located.
Existing tower or existing base station: As referred to in the definition of "eligible support structure," a constructed tower or base station
that has been reviewed and approved under the applicable zoning process, provided that a tower that has not been reviewed and approved
because it was not required to be reviewed when it was built, but was lawfully constructed, is existing for purposes of this definition.
Fall zone: A zone on the surface of the ground that is a circle whose center is the proposed or standing personal wireless service facility
or small wind turbine (the "facility or turbine"), where the radius is measured from the outer surface of the facility's or turbine's pole or
other vertical structure immediately above its foundation, and where the radius is: (i) for facilities, equal to the height of the facility; and
(ii) for turbines, equal to the height of the turbine plus a distance of twenty (20) feet.
Mobile personal wireless service facility: A portable self-contained personal wireless service facility site that can be moved to a location
and set up to provide personal wireless services on a temporary or emergency basis.
Personal wireless services: Commercial mobile services, unlicensed wireless services, common carrier wireless exchange access services,
as those services are defined by federal law and, for the purposes of this chapter, unlicensed wireless broadband internet access services.
Personal wireless service facility: A facility for the provision of personal wireless services, which may be composed of antennas, cables,
wiring, supporting brackets and other structural equipment, grounding rods, transmission equipment, one or more ground equipment
shelters, and a self-supporting monopole or tower.
Reference tree: A tree designated for determining the top height of a treetop facility's monopole mounting structure. This may either be
the tallest tree within twenty five (25) feet of the proposed monopole or a shorter tree that has been strategically identified for screening
and camouflaging purposes. (Added 10-13-04)
Replacement: As used in section 5.1.40 and any definitions pertaining to personal wireless service facilities, the replacement of
transmission equipment of the same or lesser size in the same location as the equipment being replaced on an eligible support structure.
Replacement, exempt: A replacement that would not result in a substantial change in the physical dimensions of the eligible support
structure.
Ridge area: All land within one hundred (100) vertical feet of, and including, the ridgeline and peaks of a mountain or chain of
mountains, as identified on a ridge area map approved by the board of supervisors.
Ridgeline: The uppermost line created by connecting the peaks of a mountain or chain of mountains, and from which land declines in
elevation on at least two (2) sides, as identified on a ridge area map approved by the board of supervisors.
Skylight: Locating a personal wireless service facility in such a way that the sky is the backdrop of any portion of the facility. Skylight has
the same meaning as "skylining," as that term is used in the wireless policy.
Substantial change: A modification to an eligible support structure that meets one or more of the following criteria:
Increase in height. For towers other than towers in the public rights -of -way, the modification increases the height of the tower by
more than ten percent (10%) or by the height of one additional antenna array with separation from the nearest existing antenna
not to exceed twenty (20) feet, whichever is greater; for other eligible support structures, the modification increases the height of
the structure by more than ten percent (10%) or more than ten (10) feet, whichever is greater. Changes in height shall be
measured from the original support structure in cases where deployments are or will be separated horizontally, such as on
buildings' rooftops; in other circumstances, changes in height should be measured from the dimensions of the tower or base
station, inclusive of originally approved appurtenances and any modifications that were approved prior to February 22, 2012.
Increase in width. For towers other than towers in the public rights -of -way, the modification involves adding an appurtenance to
the body of the tower that would protrude from the edge of the tower more than twenty (20) feet, or more than the width of the
tower structure at the level of the appurtenance, whichever is greater; for other eligible support structures, the modification
involves adding an appurtenance to the body of the structure that would protrude from the edge of the structure by more than six
(6) feet.
REVISED 12/7/2017 Page 8 of 11
Personal Wireless Service Facility Application
3. Excessive equipment cabinets. For any eligible support structure, the modification involves installation of more than the standard
number of new equipment cabinets for the technology involved, but not to exceed four (4) cabinets; or, for towers in the public
rights -of -way and base stations, the modification involves installation of any new equipment cabinets on the ground if there are
no pre-existing ground cabinets associated with the structure, or else involves installation of ground cabinets that are more than
ten percent (10%) larger in height or overall volume than any other ground cabinets associated with the structure.
4. Expands tower site. The modification entails any excavation or deployment outside the current site.
5. Defeats concealment elements. The modification would defeat the concealment elements of the eligible support structure.
6. Does not comply with conditions of approval. The modification does not comply with conditions associated with the siting
approval of the construction or modification of the eligible support structure or base station equipment; provided that this
limitation does not apply to any modification that is noncompliant only in a manner that would not exceed the thresholds
identified in paragraphs (1) through (4) of this definition.
Tier I personal wireless service facility or Tier I facility: A personal wireless service facility that: (i) is located entirely within an existing
building but which may include a self-contained ground equipment shelter not exceeding one hundred fifty (150) square feet that is not
within the building or a whip antenna that satisfies the requirements of subsection 5.1.40(b)(1)(d); (ii) consists of one or more antennas,
other than a microwave dish, attached to an existing structure, together with associated personal wireless service equipment; (iii) is
located within or camouflaged by an addition to an existing structure determined by the agent to be in character with the structure and the
surrounding district; or Lv) is the replacement of a wooden monopole with a metal monopole that does not exceed the maximum
dimensions permitted under subsection 5.1.40(b)(9).
Tier 17personal wireless service facility or Tier Hfacility: A personal wireless service facility that is a treetop facility not located within
an avoidance area.
Tier III personal wireless service facility or Tier III facility: A personal wireless service facility that is neither a Tier I nor a Tier II
facility, including a facility that was not approved by the commission or the board of supervisors as a Tier II facility.
Tower: As referred to in -the definition of "eligible support structure" and "existing tower or base station," any structure built for the sole
or primary purpose of supporting any Federal Communications Commission licensed or authorized antennas and their associated
facilities, including structures that are constructed for wireless communications services including, but not limited to, private, broadcast,
and public safety services, as well as unlicensed wireless services and fixed wireless services such as microwave backhaul, and the
associated tower site.
Tower site: As referred to in the definitions of "substantial change" and "tower" and as used in section 5.1.40, for towers other than
towers in the public rights -of -way, the current boundaries of the leased or owned property surrounding the tower and any access or utility
easements currently related to the site, and, for other eligible support structures, further restricted to that area in proximity to the structure
and to other transmission equipment already deployed on the ground.
Transmission equipment: As used in section 5.1.40, equipment that facilitates transmission for any Federal Communications Commission
licensed or authorized wireless communication service, including, but not limited to, radio transceivers, antennas, coaxial or fiber-optic
cable, and regular and backup power supply. The term includes equipment associated with wireless communications services, including,
but not limited to, private, broadcast, and public safety services, as well as unlicensed wireless services and fixed wireless services such as
microwave backhaul.
Treetop facility: A personal wireless service facility consisting of a self-supporting monopole having a single shaft of wood, metal or
concrete no more than ten (10) feet taller than the crown of the tallest tree within twenty-five (25) feet of the monopole, measured above
sea level (ASL), and includes associated antennas, mounting structures, an equipment cabinet and other essential personal wireless service
equipment_
REVISED 12/7/2017 Page 9 of 11
Personal wireless Service Facility Application
'PIER I, II, and III Building Permit & or Site Plan APPLICATIONS
If this is a Tier I application requiring a building permit, the permit becomes null and void if work or construction authorized is not
commenced within 6 months, or if construction or work is suspended or abandoned for a period of 6 months at any time after work is
commenced.
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume
to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of
construction.
By signing this application, the owner and/or their agent hereby grant employees of the Albemarle County Community Development &
Real Estate Departments the right to enter and inspect the subject property Monday through Friday between the hours of 8:00 a.m. and
5:00 pm., holidays excepted.
By signing this application I certify that the information provided on this application and on supporting documents is correct and accurate
to the best of my knowledge. I also consent and understand that providing incorrect and inaccurate information about the nature of this
application renders this application incomplete and it shall have be deemed to have not been officially submitted.
Please check which applies: V I certify that I am the agent for C har p�10 V Chu f& C4 Af e 1f4 who is the Owner, and I am
authorized to submit this application on behalf of the Owner under the agency.
❑ I am neither the Owner nor the Owner's agent. I certify that written notice of this application, by providing a copy of this
application, will be mailed to the Owner at the following address:
within 10 days of today's date as required by Virginia Code § 15.2-2204(H). I understand that, if I do not provide the notice to the Owner
as provided herein, the building permit application and every other subsequent approval, permit or certificate related thereto could be
determined to be void.
❑ I certify that I am the owner.
Signature of Owner, Contractor, or Authorized Agent Date
ELECTRONIC RECORDS STATEMENT: Albemarle County is creating and using electronic records and electronic signatures as
allowed by the Uniform Electronic Transactions Act (Virginia Code § 59.1-479 et. Seq.). As an applicant to the Building Permit process,
you may consent to receive, or have online access to, electronic records and receive and create records having electronic signatures related
to Building Permits, Correspondence, Inspection Tickets and Certificates of Occupancy (the Building Permit transactions).
Initials of Owner, Contractor or Authorized Agent
Date
Your agreement to conduct Building Permit transactions by electronic means does not prevent you from refusing to conduct other
transactions by electronic means.
TIER III Special Use Permit APPLICATIONS
I hereby certify that I own the subject property, or have the legal power to act on behalf of the owner in filing this application.
I also certify that the information provided on this application and accompanying information is accurate, true, and correct to
the best of my knowledge. By signing this application I am consenting to written comments, letters and or notifications
regarding this application being provided to me or my designated contact via fax and or email. This consent does not
preclude such written communication from also being sent via first class mail.
Signature of Owner/Agent
Print Name
Date
Daytime phone number of Signatory
REVISED 12/7/2017 Page 10 of 11
Personal Wireless Service Facility Application
Required FEES to be paid at time of application:
What tvne ofPersonal Wireless Service Facilitv are you applvintr for?
❑
Tier I Facility
$113.60
Tier II Facilities — Site Plan
$1,957
❑
Tier III Facilities — Special Use Permit
$2,150
❑
Amend existing Special Use Permit
$1,075
®
Special Exception
$457
❑
Notification Requirement for Tier II and Tier III for up to 50 notices
$215
❑
Notification Requirement for Tier II and Tier III for each notice over 50 notices*
$1.08 plus the cost of
postage
❑
Published notice cost for Tier III Facilities **
Cost is based on a cost
note from the publisher.
❑
Building Permit after Tier II or Tier III approval
$113.60
*This fee is not collected at the time of initial submittal. This fee, if an}; will be calculated by staff and the applicant will be notified
of the fee amount and the deadline forpayment. If the fee is not submitted by the deadline the applicant shall be deemed incomplete.
**To be paid after staff review for public notice:
Most applications for a Special Use Permit require at least one public hearing by the Planning Commission and one public
hearing by the Board of Supervisors. Virginia State Code requires that notice for public hearings be made by publishing a legal
advertisement in the newspaper and by mailing letters to adjacent property owners. Therefore, at least two fees for public notice
are required before a Special Use Permit may be heard by the Board of Supervisors.
The total fee for public notice will be provided to the applicant after the final cost is determined and must be paid before the
application is heard by a public body. Staff gjtimates the total cost of legal advertisement and adjacent owner notification to be
between $350 and $450 per hearing. This estimate reflects the average cost ofpublic notice fees for Special Use Permit
applications, but the cost of certain applications may be higher.
Other FEES that may apply:
➢
Deferral of scheduled public hearing at applicant's request
$194
Resubmittal fees for Tier III Facilities
➢
First resubmission
FREE
➢
Each additional resubmission (To BE PAID WHEN TEE RESUBMISSION IS MADE TO INTAKE STAFF)
$1,075
➢
Each additional resubmission of an amendment to an existing SP (To BE PAID WHEN THE RESUBMISSION
IS MADE TO INTAKE STAFF)
$ 53 8
REVISED 12/7/2017 Page 11 of 11
AUTHORIZATION
TO SUBMIT LAND
USE APPLICATIONS
AUTHORIZATION To
SUBMIT La1vD USE APPLICATIONS
The Charlottesville Church of the Brethren is the owner of Albemarle County tax map
parcel number 062A 1-OO-OK-00100, having an address of 1225 Rio Road E
Charlottesville. Virginia 22901. As Owner/Trustees of the property, I hereby authorize
Shefltel, Shenandoah Personal Communications, LLC, NB+C Engineering Services,
Williams Mullen, and its representatives and/or affiliates thereof, including but not
limited to, Deborah Balser of Shentel, Drew Patterson of NB+C, and Valerie W. Long of
Williams Mullen, to submit land use applications on my behalf and to serve as agent in
such capacity. Such land use applications may include Personal Wireless Service Facility
applications, site plan applications, special use permit applications, Architectural Review
Board applications, building permits and similar applications involving the property
referenced above.
WITNESS the following signature(s):
Property owner name:
Property owner signature: y --
Date: Z&2 Sl/ (4rl�A 0 g �1o
c �� r l l e
Property owner name: P 4--1&j
Property owner signature:
Date: � 2 �S-01
T
32669139 I.DOC
>-I . , . �,
.,
i'
,;
__
Page 1 of 5-
008 768
THIS DEED made this 15th day of June, 1994, by and
between DISTRICT BOARD OF THE SHENANDOAH DISTRICT OF THE CHURCH
OF THE BRETHREN, INCORPORATED, a non -stock Virginia corporation,
Grantor, and THE CHARLOTTESVILLE CHURCH OF THE BRETHREN, Grantee,
whose address is 1225 E. Rio Road, Charlottesville, Virginia .I
22901,
W I T N E S S E T H:
That for and in consideration of the sum of TEN AND
NO/100 DOLLARS ($10.00) and other good and valuable
consideration, the Grantor does hereby GRANT and CONVEY unto the
Grantee those certain lots or parcels of land, with the
improvements thereon and appurtenances thereto, situated in the
County of Albemarle, Virginia, currently known as 1225 East Rio
Road, shown as Lot 1 containing 5.121 acres, more or less, and
Lot 2 containing 0.600 acre, more or less, of Block K, Section 7,
Northfields Subdivision, on a plat by B. Aubrey Huffman &
Associates, Ltd., dated March 26, 1991, and recorded in the
Clerk's Office of the Circuit Court of the County of Albemarle,
Virginia, in Deed Book 1153, page 331. The major portion of the
above described property is the same property that was conveyed
to the Grantor by a deed of The Board Of Administration Of The
Church Of The Brethren For The Eastern District of Virginia,
Incorporated, by deed dated February 19, 1968, recorded in the
Clerk's Office of the Circuit Court of Albemarle County,
Virginia, in Deed Book 441, page 20. The conveyance of this
parcel by the Grantor is with General Warranty of Title and
English Covenants of Title.
Book: 1416 Page: 396 FileNumber:1994-00008768 Seq: 1
Page 2 of 3
s
A small portion of the property herein conveyed, .2987
acres, more or less, was heretofore conveyed directly to the
Grantee herein by deed of Charles Wm. Hurt dated October 22,
1975, recorded in said Clerk's Office in Deed Book 583, page 126,
so that title to said .2987 acres is already vested in the
Grantee. The Grantor herein conveys its interest, if any, in
said .2987 acre to the Grantee with Special Warranty of Title
only.
The property herein conveyed is subject to the
following restriction hereby imposed:
If this property ever ceases to be used to aid in
teaching and disseminating the gospel of Jesus Christ
according to the beliefs, practices and doctrines of
the Church of the Brethren as set forth and promulgated
from time to time by Annual Conference, or if the
congregation has been closed or the property abandoned,
the district conference may, upon recommendation of the
district board, assert title to the property and have
the same vested in the district board, in trust, for
the district.
That before a legal title to the property can be
conveyed, consent of the district board must first be
secured, and the deed of conveyance must have affixed
thereto the signatures and acknowledgements of its
executive officers.
The property hereby conveyed is also subject to any and
all easements, restrictions, reservations and conditions
contained in duly recorded deeds, plats and other instruments
constituting constructive notice in the chain of title to the
above described property, or which may be disclosed by a physical
examination of the property, and which have not expired by a time
limitation contained therein or have not otherwise become
ineffective, and to any lien inchoate or otherwise, for real
estate taxes or assessments, not yet due and payable.
Book: 1416 Page: 396 FileNumber: 1994-00008768 Seq:2
Page 3 of 5
This conveyance was authorized by resolution of the
District Board of the Grantor held on June 14, 1994, and the
Chairman of the Board and the Secretary of the Board were
directed to make this conveyance.
This deed is exempt from taxation pursuant to Section 58.1-
811 A2 of the Code of Virginia, 1950, as amended.
IN WITNESS WHEREOF, the Grantor has caused this
instrument to be executed on its behalf by its Chairman of the
Board and its Secretary of the Board.
DISTRICT BOARD OF THE
SHENANDOAH DISTRICT OF THE
CHURCH OF TR BRETHREN,
INC D
By I�
J. G ick, Chairman of
th District Board of the
Shenandoah District of the
Church of the Brethren,
Incorporated
y- (L. , � , q.&
JarOVL Miller, S cretary
of Lt&e District Board of
the Shenandoah District of
the Church of the Brethren,
Incorporated
STATE OF VIRGINIA
CITY/COUNTY OF RoCk1t1(,HAM
��� The foregoing deed was acknowledged before me this
...d_�— day of Tiipr , 1994, by J. D. Glick, Chairman
of the District Board of the Shenandoah District of the Church of
Book: 1416 Page: 396 FileNumber:1994-00008768 Seq: 3
Page 4 of 5
C) L)
the Brethren, Incorporated.
My commission expires: Agasf 3L 194,l
�ar1n R (. Ad I
Notary Public as
r ,q" A. 2--'v�5
STATE OF VIRGINIA
CITY/COUNTY OF ?Ky 9186H&Ll
The foregoing deed was acknowledged before me this
1 day of 1994, by James E. Miller,
Secretary of the District Board of the Shenandoah District of the
Church of the Brethren, Incorporated.
My commission expires: jqrrsF 3L 199q
cu
Notary Public Ccrnm;�s cmnd as
T�AQfa1 A FL�✓ES '
Book: 1416 Page: 396 HeNumber:1994-00008768 Seq:4
Page5of5
�. I. C
L.• _ �('
VIRGINIA: IN THE CLERK'S OFFICE OF THE CIRCUIT COURT OF ALBEMARLE.
r THIS DEED WAS PRESEN`1'ED, AND WITH CERTIFICATE AHR=, IS AXOYT'11
TO RECORD ON
s [y CO , 3.9 qt4 AT O'CLOCK _j2-�F9.
STATE TAX
$ (039) I {
LOCAL TAX
$ (213) F
TRANSFER FEE
$ 1.00 (212)
VSLF
$ 1.00 (145) i
CLERK'S FEE
$ la •6D(301) i
PLAT
$ j
SEC.58.1-802:
TESTE: !
STATE TAX
$ (038) SHBI,B ,KARSRT.U,
LOCAL TAX
$ (220)
LOCAL TAX
$ (223) BY:
DEPUTY CrMM
TOTAL
$ 4. CDi
Book: 1416 Page: 396 FileNumber:1994-00008768 Seq:5
0
eK 1153x033*1
CERTIFICATE OF PLAT ON"
The attached plat, and courses and distaaces description made by
cercified Land Surveyor,
VA, datedRV
/�j r' l0 19�L•
of the lands Of
Districc, of the County of
situate in the said
Albemarle, Virginia, sad being the sage land S Qud�gdy of '
by dead dated /
19 S„�_ from
of record the Clerk's Office of the Circuit ;Court Of Albemarle
County, Virginia, in Deed Book 3 S , page
_Z�, is hereby
confirmed and submitted for record in the aforesaid Clerk's Office-
(� — day o f '
Given under my/our haad(s) this .,�
ACKNOWLEDGEMENT
STATE OF VIRGINIA
AT LARGE, TO -WIT:
a Notary Public• in the '' f
state of Virginia. do hereby certify that d
—, vhose names are signed to the foregoing
certificate of confirmation by owners, and Plat, bearing date of
19_2L_, have acknouledgad
the 26 day of -
the same before me- ,,gyp 19
Given under my hand this day of
NOTARY PUBLIC
My Commission as Notary Expires: � `
'~' �
/
. ^
� ' _.______-__'r
r'
eK ! 153P0334
VrPaIM: IN MW CLWIS OMCR OF TM CIRCUIT COM OF AI,SM=:
MnS DMM WAS PRBS@=, Alm VBM CBR MCATE MMM' ZS AI WZM
TO RECOM CH ,19-qj , AT 'L. O'CL04'� -M•
SBC.58.1-802:
STATE TAX
FOCAL TAX
LOCAL WAX
(039)
(213)
1.0�-(1!5)
$ 1�40_0A1)
(038)
;_ ( 220 )
(223)
W
• Y:1'i 'wY:/ M :4'1
AUTHORIZATION
LETTER
.SHENTEL
Always connected to you
September 14, 2016
To Whom It May Concern:
SHENANDOAH PERSONAL COMMUNICATIONS, LLC and SHENANDOAH MOBILE,
LLC., a Virginia limited liability company ("Shentel") has contracted with Network Building &
Consulting ("NB+C") to support it in upgrades to its wireless service. NB+C is authorized to
represent Shentel. acting as its agent, to our Landlords and to the municipal jurisdictions in which
our sites are located.
Should you have any questions about this matter, please feel free to contact Dan Meenan
at (540) 941-4362 or Dan.Meenan!u emp.shentel.com.
Shentel is looking forward to continuing its various business relationships and providing
enhanced wireless coverage within its wireless network.
Sincerely yours,
Da eenan
VP — Wireless Network Development
PHOTO
SIMULATIONS
Fairview Swim
AOL VIew 19 Tennis Club
4W
View 1 View 19!
low
View 2
CHAFEL H�LL3 View 20
s-Hitl Rd V �ew 3
�PIQ View 17
View 4 View 15
View 7
6meservPM Belived e
V view �10
iew 10
Vi 5, View 6
View 8 dL,6
View 16' —Mhil�
0
View 9
VII W1 31
AI& View 14
mr- - --
Rio Road East
Location Me;
ip
not visible V,isihle
LdY['t
PICTURES
T
J--,
�+•-wr
to] Fkb W� nmw Lim I
l 7m
owl - 0 -
"UMBRA SW 4008"'
I
Umbra SW 4008
GrapNte SW 4017 Slalo Gray
LRV 0%
LRV 69.
I
Bolt Broom SW 4001
Walnut Bmvm SW 4009
Tower Gray SW 4018 Galvano
LRV 8%
LRV 3%
LRV 18%
i
SW 4026
LRV 36%
SW 4027
LRV 58%
I
Mc;u:ar 7a, SW 4002
P1a11ke Slone SW 4010
FI'Nt Gray SW 4019
Gypsum •i SW 4026
LRV 26%
LRV 235.
I
LRV 47%
LRV 72%
Pallot Ten sw 4003
i
I
Mortar SW 4011
i
Zephyr SW 4020
Pi11ar Waite SW 4029
LRV 49%
LRV 43%
LRV 63%
I
LRV 77%
Tannery • SW 4004
Cirrus White SW 4012
Filament SW 4021
I
Nickel SW 4030
LRV 04%
LRV 74%
LRV 72%
LRV 47%
I'
i
Cylinder Cream sw 4005
Bwml Barrio SW 4013
Balwm SW 1.022
Srructural Gray SW 4031
LRV 74%.
LRV 65%
I.RV 62%
LRV 24%
I
i
I
I
Lodestone SW 4006
Cantilever Tan SW 4014
Mine SW 4023
Vamaim Black SW 4032
LRV 51%
LRV 48%
LRV 46%
LRV4%
Bronze SW 4007
Torque Tan SW 4015
EWro Green SW 4024
Brass ?• SW 4033
LRV 23%
LRV 351Y.
I.RV 15%
LRV 48%
For INTERIORS use only will.
<• BAC's
■ EnvlroToners
Cornittate Brown SW 4016
Anchor Gray SW 4025
Junction Yellow • SW 4034
• BAC's or EnviroToners
LRV 24%
LRV 13%
LRV 69%
maximizing coating performance
Selecting the best coaling for protecting a structure from
corrosion and chemical attack is complex and critical. Sherwin-
Williams provides technical assistance for all aspects of coating
specification. The company's more than 200 trained Protective
and Marine Coatings representatives are available to help identify,
diagnose, and solve the most difficult coating problems. They are
also knowledgeable In local and federal environmental compli-
ance regulations, ASTM standards, and trade and association
recommended practices.
Coatings that can be
used in commercial buildings
and industrial....
r. •
INDUSTRIAL
Sherwin-Williams technical sales representatives are
That's right .,,Sherwin-Williams developed the most comprehen-
supported by a network of Corrosion Specification
Specialists. Their strong understanding of corro-
sive line of high performance coatings that work well for both
sionSpecialists.
control principles ensures you will get thheebest
commercial applications and light industrial facilities. Our commit-
a
advice
ado ce for applications In aggressive environments.
ment to product innovation and understanding your needs has
led to the Introduction of Pro industrial High performance Coat-
Ings.
With our new line of Pro industrial products, we have high perfor-
mance coaling solutions for Healthcare, Hospitality, Educational,
Commercial, and Industrial environments.
The Pro Industrial products include a variety of primers and
topcoats Including waterborne acrylics, alkyds, and high perfor-
mance epoxies. These new -technology products are low VOC,
easy to apply and offer the durability you need.
No matter what your coating needs may be, our trained Repre-
sentatives are always available to help you find the best coating
solution for your unique situation. And with 3400 servicing loca-
tions throughout North America, you can be assured you will get
your products when you need them.
S H E N T EL°
Always connected to you
RIO ROAD EAST
69202/CV911
1225 RIO ROAD EAST
CHARLOTTESVILLE, VA 22901
CONSTRUCTION OF A NEW 11T TALL STEEL MONOPOLE
AND ASSOCIATED TELECOM EQUIPMENT
I
Q
e
PROPERTY OWNER:
SHENTEL RF ENGINEER:
SHENTEL CONSTRUCTION MANAGER:
SHENTEL OPERATIONS MANAGER:
SITE ACQUISITION MANAGER.
VICINITY MAP
SITE DIRECTIONS
FROM 1150 SHENANDOAH VILLAGE DRIVE, WAYNESBORO. VA: TURN RIGHT ONTO ROSSER AVE. .1 M.
MERGE ONTO 1-64 E TOWARD RICHMOND FOR 23.76 MILES. MERGE ONTO US-29 N VIA EXIT 1188 TOWARD
CHARLOTTESVILLE FOR 4.31 Mi. STAY STRAIGHT TO GO ONTO US-250 E/250 BYP FOR .J3 MI. TURN LEFT
ONTO HYDRAULIC ROAD FOR .08 Mt. TURN RIGHT ONTO BRANDYWINE DR. FOR .95 MI. STAY STRAIGHT TO
GO ONTO GREENBRIER DR. FOR .33 MI. TURN LEFT TO STAY ON GREENBRIER DR. FOR .45 MI. TURN LEFT
ONTO RIO ROE FOR APPROX. .2 MI. CHURCH OF THE BRETHREN ON THE RIGHT,
CONSTRUCTION OF A NEW 113' TALL
STEEL MONOPOLE AND ASSOCIATED
TELECOM EQUIPMENT
(REWIRED B ARTMENTS)
9"
SIGNATURE BLOCK
SITE NAME
SHEET T-1
TITLE SHEET
RIO ROAD EAST
SHEET C-1
LOCATION MAP
SHEET C-2
SITE SURVEY
SITE NUMBER
SHEET C-3
EXISTING CONDITIONS
692021CV971
SHEET C-4
PROPOSED SITE PLAN
SHEET C-5
TREE SURVEY
SITE ADDRESS
SHEET C-6
GRADING PLAN
1225 RIO ROAD EAST
SHEET C-7
ANTENNA AND TOWER DETAILS
CHARLOTTESVILLE. VA 22901
SHEET C-8
ANTENNA MOUNT DETAILS
PROPERTY OWNER
SHEET C-9
EQUIPMENT PLATFORM PLAN
CHARLOTTESVILLE CHURCH
OF THE BRETHREN
1225 RIO ROAD EAST
CHARLOTTESVILLE, VIRGINIA
TAX MAP: 062A1-00—OK-00100
SITE DATA
NAD 83 LATITUDE 38.070014' N
NAD 8J LONGITUDE:—7B.467128' W
JURISDICTION
ALBEMARLE COUNTY
SHEET INDEX
POLIC
RESCUE
LEASE AREA
900 SF
CONTACTS
811
SHENTEL (CONSTRUCTION)
ELECTRIC POWER
DOMINION VA POWER
BRAD BAYS
(443) 454-0180 — PHONE
CONTACT:
PHONE#: 1-868-366-4357
CUSTOMER SERVICE
SHENTEL SITE ACQUISITION MANAGER
TELEPHONE
LUMOS
DEBBIE BALSER
(540) 941-4220 — PHONE
CONTACT.•
PHONE#'
CUSTOMER SERVICE
1-800-320-6144
(540) 947-3071 — FAX
EMERGENCY AND UTILITY CONTACTS
SHENTEL NOC
(800) 566-9568 — PHONE
CURRENT DIVISION (PLANNER) DATE
SIGNATURE PANEL
,SHENTE1:
Always connected to you
SITE NAME:
RIO ROAD EAST
SITE NUMBER:
69202/CV911
SITE ADDRESS:
1225 RIO ROAD EAST
CHARLOTTESVILLE, VA 22907
AREA:
LEASE AREA —900 SO. FT
PROPERTY OWNER:
CHARLOTTESVILLE CHURCH
OF THE BRETIEN
1225 RID ROAD
CHARLOTTESVILLE. VIRGINIA 22901
TAX MAP: 062A1-00—OK-00100
COUNTY.• ALBEMARLE COUNTY
LATITUOE: 38.070014' N
LONGITUDE:—78.467128' W
N0. REVISION/ISSUE DATE
1 I ZONING ORAWINGS 12/18/17
TIMMONS GROUP
IDUR N ACHIEVED TNROUGH OURS.
TH 151DRAWINGIPREPARED AT THE
CHARLOTTE OFFICE
2030 S. TRYON STREET
CNARLOTTE, NC 2-3
TEL 704.375.1073
FAX 704.376.1076
ww.nmmonP.cam
wu 3Pel:
TG PRD3ECT # 39812
SHEET
TITLE SHEET T-1
Po i
GRAPHIC SCALE
500 250 0 Soo
1 INCH = 500 FEET
2000' SITE RADIUS
NOTES,
I. TOPOGRAPHY SHOWN WITHIN 2000 FEET
OF THE PROPOSED FACILITY IS SHOWN ON
THIS SHEET.
2. ALL RESIDENTIAL AND COMMERCIAL
STRUCTURES AND ZONING DISTRICT
BOUNDARIES WITHIN 2000 FEET OF THE
EXISTIING FACILITY ARE SHOW ON THIS
SHEET.
OCHARLOTTESVILLE CHURCH
OF THE BRETHREN
PARCEL ID: OMI-00-OK-00100
5.42 ACRES
ZONING: R-2
OCHARLOTTESVILLE CHURCH
OF THE BRETHREN
PARCEL ID: 082AI-00.OK-00200
0.60 ACRES
ZONING: R-2
OCHURCH OF OUR SAVIOR
PARCEL 10 06100-0"0-14400
6.16 ACRES
ZONING: R-2
OSHAH, HUSMUKH OR JUDY H
PARCEL 10: 062A1-00-OK-00300
1.72 ACRES
ZONING: R-2
OSINAN R KAMAL
PARCEL ID: 062A1.00-OK-01700
0.80 ACRES
ZONING: R-2
OZEDAN, ALLISON L
PARCEL ID: 062A1-00.OF-01500
0.51 ACRES
ZONING: R-2
OCOLEMAN. PATRICIAA
PARCEL ID: 062A1-00-OF-01 GA0
0.51 ACRES
ZONING: R-2
OVIRGINIA LAND TRUST
PARCEL ID: 062A1-00-OF-01900
0.44 ACRES
ZONING: R-2
ORIO SQUARE OWNERS ASSOC., INC
PARCEL ID 082A1-04-00-000A1
1.59 ACRES
PLANNED RESIDENTIAL DEVELOPMENT
,SHENTEL•
Always connected to you
SITE NAME.
RIO ROAD EAST
SITE NUMBER:
692021CVOII
SITE ADDRESS.
1225 RIO ROAD EAST
CHARLOTTESWLLE, VA 22907
AREA:
LEASE AREA m900 SO. FT
PROPERTY OWNER:
CHARLOTTESWLLE CHURCH
OF THE BRETHEN
1225 RIO ROAD
CHARLOTTESWLLE, WROINIA 22901
TAX MAP. 062AI-00—OK-00100
COUNTY. ALBEMARLE COUNTY
LATITUDE: 38.070014' N
LONGITUDE—78.467128' W
40. REVISION/1SSUE OATS
1 I ZONING DRAWINGS 19"191'17
•...%
TIMMONS GROUP
YOUR VISIO
V=N ACHIEVED THROUGH OURS.
I xoR
THIS DMWING PREPARED AT THE
CHA"olT OFFICE
3030 & TRYON STREET
CHARLOTTE, NC 26303
TEL 704.M.1073
FAX
704.376.1076
wmm—
ownnpmn �RRnuH .....
T--
19S11
TG PROJECT # 39812
SHEET
LOCATION MAP
C-1
PARC _' 062A1 00-0 S01B00 FL�PQ
y 0.44NING: ACRES rG\.Q N j \
lb
SNP h
i g z //h�'Z s6 SINAN R KAMAL
A id'�Gi9`a PARCELID:062A1-OMK-01700
0.80 ACRE \ •\
DEMAR
COORDINATE FINAL ZONING: ES
y POWERfrELCO
y o PROVIDERS
WITH S
\PROVIDERS / �•
Pe
D;LAghoo'
;G0 Fah• �\ � �
r� G Ln PROPOSED5' PROPOSED
�'\ a UTILITY / 30'x3O' SHENTEL a\61 j•
\ EASEMENT LEASE AREA a �O
SHAH, HUSMUKH OR JUDY H
•� {A2 L7L8 i �-? PARCEL ID: 062A1-00-OK-00300
1 m•./ L L6 L9 figg\ 1.72 ACRES
l Y ZONING: R-2 j
L10 PROPOSED TOWER /
I
98.1'
L3A
\ „ SETT
acw L2 sere
�y FALL ZONE /
\ a�R
• � E- PROPOSED 20' ACCESS \ 1
O- AND UTILITY EASEMENT
Ll
CHARLOTTESVILLE CHURCH '\ CHURCH OF OUR SAVIOR
RIO PARCEL
I OWNERS A 0-00G C OF THE BRETHREN
\ __-- PARCEL ID 08100.00.00-14400
_ PARCEL ID 082A1-04-00_-000a1 \ PARCEL ID: 062A1-00-OK-00100 6.18 ACRES
--1-59-ACRES` 5.42 ACRES ZONING: R-2
PLANNED RESIDENTIAL DEVELOPMEN\ \ ZONING: R-2
R,�03
14,
O rl�O �C
\P� CHARL" ESVI ECHURCH�
9 \ OF�E BREHREN
\ PARCEL! ii062A1-OOK-00200
\ OBOACRES
• \ \ Zb�11yG. R-2
GRAPHIC SCALE
6o 40 0 6D
1 INCH - 80 FEET ,\' � \ ✓ / / —
LINE TABLE
LINE
LENGTH
BEARING
L1
182.86
S57"03'08"W
1-2
33.39
S31"01'28"E
L3
72.37
S43"01'10"E
L4
46.66
S45"06'01"W
L5
21.30
N83"42'08"W
L6
3.52
S72"41'05"W
L7
10.80
S17"29'08"E
L8
30.00
S72"30'52"W
L9
30.00
N17"29'08"W
L10
30.00
N72"30'52"E
L11
19.20
S17"29-08"E
.1,SHENTEL°
AlWeya connected to you
SITE NAME:
RIO ROAD EAST
SITE NUMBER:
692021CV91I
SITE ADDRESS:
1225 RIO ROAD EAST
CHARLOTTESVILLE VA 22901
AREA:
LEASE AREA -900 SO. FT
PROPERTY OWNER:
CHARLOTTESWLLE CHURCH
OF THE BRETHEN
1226 RIO ROAD
CHARLOTTESVILLE, VIRGINIA 22901
TAX MAP:082A1-00—OK-00100
COUNTY. ALBEMARLE COUNTY
LATITUDE J8.070014• N
LONGITUDE:—78.467128' W
NO. REWSION,4SSUE OA-
I ZONING DRAWINGS 1211911;
....•
TIMMONS GROUP
YOUR V15ION ACHIEVED THROUGH OURS.
THIS ID-NG PREPARED AT THE
CHARLOTTE OFFICE
203C S. TRYON STREET
CHARLOTTE, NC 26E03
TEL 704.376.1073
FAX 704,37 AD16
ww.11mmR
Onapm,x I Ew1mPY 1 MHOw"w� I T�NM
]9912
TG PROTECT 9 39812
SHEET
SITE SURVEY
C-2
\ \ O
,mQ�'�aa
O1 ®I®I I� i 1111
/ \ ®i o12® cd
EXISTING GRAVEL DRIVE "
VARIES 8' 10' 511 \ \ I I 1 \ 11 \ \ ® o
CONC.
1225 RIO ROAD EAST
THE CHARLOTTESVILLE CHURCH OF
THE BRETHREN
TMP 62A 1-K-1
-TWO STORY BRICK BUILDING -
R
EXISTING ASPHALT
I o
r r I
r r
y\h / GG
/Ile PRO
j°P°G
EXISTING ASPHALT
GRAPHIC SCALE
30 15 0 30
I INCH - 30 FELT
EXISTING ASPHALT
JSHENTEL
Alw•y. ...—l•tl tO you
SITE NAME:
RIO ROAD EAST
SITE NUMBER:
69202/CV917
SITE ADDRESS:
7225 RIO ROAD EAST
CHARLOTTESVILLE. VA 22901
AREA:
LEASE AREA -900 SO. FT
PROPERTY OWNER:
CHARLOT7ESVILLE CHURCH
OF THE BRETHEN
1225 RIO RDAD
CHARLOTTESVILLE, VIRGINIA 22901
TAX MAP: 062AI-00-OK-00700
COUNTY. ALBEMARLE COUNTY
I LATITUDE: 38.070014' N I
— — — LEGENPROPERTY
LINE
—
TRACT LINE
— — —
LEASE LINE
— — —
ROW LINE
— % X —
EXISTING FENCE LINE
—%% XX—
PROPOSED FENCE LINE
—G —G —
GAS LINE
—E —E —
OVERHEAD POWER
—T —T —
OVERHEAD TELEPHONE
- - -UE - - -UE -
UNDERGROUND POWER
- - -UT - - -UT -
UNDERGROUND TELCO.
—ELT —ELT —
OVERHEAD POWER/TELEPHONE
OO
5/8- REBAR W/CAP SET
p
FOUND MONUMENTAVON
•
CALCULATED POINT
EXISTING UTILITY POLE
X
PROPOSED UTILITY POLE
LONGITUDE:-78.46712B• W
NO. REV/SION/ISSUE DATE
1 I ZONING DRAWINGS 72/19/17
TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
THIS DRAWING (PREPARED AT THE
CMARLOTTE OFFICE
2U10 S. TRYON STREET
CHARLOTTE, NC 262Q3
TEL 704.376.1073
FAX 704.376. 1076
www.nmmR
w 1 ..wwM I i ..en.en
I TG PROJECT # 39832 1
EXISTING
CONDITIONS IC-3
12' GRAVEL ACCESS
PROPOSED
9'x18' PARKING I PROPOSED EQUIPMENT (11) 8' TALL LEYLAND CYPRESS
TURNAROUND SPACE BATTERY CABINET CABINET TREES SPACED AT 8' O.C. a
UNDERGROUND TELECOM' > iy
,� ROAD PROPOSED PPC S H E N T E U
UNDERGROUND POWER 'QyL CENTERLINE 6' WIDE GATE ® PROPOSED FUTURE v Always connected to you
F( or—ai t EQUIPMENT CABINET °q
PROPOSED 5' UTILITY EASEMENT \� 1 T , i - PROPOSED FUTURE y�+ 2
7 F �I BATTERY CABINET n A SITE NAME:
?� RIO ROAD EAST
It �J t11, ® PROPOSED 20'X2O' EOUIPMENT AREA FENCED
WITH A G'TALL BROWN BOARD ON BOARD FENCE Id SITE NUMBER:
H-FRAME AND 69202/C1911
\"'• � �� 7` � METER BASE PROPOSED ICE BRIDGE S17F ADDRESS:
PROPOSED 1225 RIO ROAD EAST
/ DISTRIBUTION BOX CHARLOTTESVILLE, VA 22901
\ PROPOSED 113'SHENTEL TOWER
EXISTING GRAVEL DRIVE J PROPOSED AREA:
8I VARIES -10' \ 20' ACCESS AND LEASE AREA -900 SO. FT
`\G3 .. UTILITY EASEMENT
-� \G PROPERTY OWNER:
CHARLOTTESVILLE CHURCH
C PROPOSED 30'X.IO' OF THE BRETHEN
\ \ SHENTEL LEASE AREA 1225 RIO ROAD
CHARLOTTESVILLE. VIRGINIA 22901
TAX MAP,OE2AI-OO-OK-O0100
\ COUNTY. ALBEMARLE COUNTY
CONC.
l F0cI2n , LATITUDE 39.070014' N
PROPERTY TRACT UNFINE i225 RIO ROAD EAST \ __ •wFE.„v
\ ��� LONGITUDE:-78.467128' W
LEASE LINE THECHARLO7-7"ESVILLECHURCNOF \l ` „cn,,,,q
— — — NOW LINE THE 6RE 1-K-I \\ \ _ '"�°"'°°n"" NO. RENSION/ISSUE va7E
— X % — EXISTING FENCE UNE TA4P 62A1-K-T \ � .°�.'�
—XX XX— PROPOSED FENCE LINE \ /� nut 1 ZONING DRAWINGS 72/19/17
-G —G - GAS UNE -TWO STORY BRICK BUILDING-
—E —E — OVERHEAD POWER p\�•�Ti'���,
—T —T — OVERHEAD TELEPHONE `�
-UE- - -UE- UNDERGROUND POWER �G• �" E
-UT - - -UT - UNDERGROUND TELCO. \ GO -
-ELT—ELT— OVERHEAD POWER/TELEPHONE
® 5/8' REBAR W/CAP SET //' / �'t .mrw•..m.a, -
�. FOUND MTED POINT
/ /' �G/ wF«F.EO
• CALCULATED POINT , _
EXISTING UTILITY POLE -�-��
X PROPOSED UTILITY POLE CONC.
EXIS G ASW,F L T
CONIFEROUS TREE PLANTING DETAIL -STAKING SPECIFIED
NO SCALE
1v61t6 BOARDS BOLTED TO
ANGLE RON FRAME.
EEL
//' ' (2PP�� 6. 1 ` l ` I,- 1x6 °PDSTTFFun'M°W GONG.
,...
k I TYPE HINGES
0�S sn. WT. SLEEVE
O 2xa T FINISHED GRADE TIMMONS GROUP
\ �� �, r VISION ACfrIEVED THROUGH OURS.
CSC 3D�- JI 2x2a3/16 CANE w6alxu I n06m rrAalNA
`� O G \ 3•- 4.6 P0575 iM BOOT OURTM16 D CM^RLOTTE OFFICEATTNE
iiiil [YET ANGL IRON
0 6' O.C. II 11 FRAME2030 S. TRYON STREET
\ \ Q I,lr CHARLOTTE,, SC 20203
OO ` •�` EL 77 ~� 1✓SOU1D• TEL 704.376. 1073
,d E,YISTING,4SPHALT (TYPICAL) TYPICAL WOODEN CATS FAX 70n.376.1076
'
m w. a..r«na I uF.mus I uA.ewr.. 1 ..+wF.
T- ix8 ROUGH SAWN TREATED
N-A Vi PLANKS (UNPAINTED) NOTE:
cb GRAPHIC SCALE -' •"' FENCE TO BE PAINTED SHERWIN
\ J WILLIAMS UMBRA SW4006
30 15 0 30 4,6 POSTS PLAN TG PROJECT # 39812
\ \ 0 6. O.C. (INDUSTRIAL AND MARINE COATING).
1 INCH a 30 FEET WOODEN PRIVACY FENCE DETAIL PROPOSED SITE PLAN SHEET
C-4
�
PROPOSED TOWER - STEEL MONOPOLE
z NOTE: ALL TREES THAT THE APPLICANT IS RELYING ON \
i LATITUDE: 38.070014' N TO PROVIDE SCREENING OF THE MONOPOLE ARE
r� LISTED IN THE TREES TABLE. SOME SMALLER/SHORTER
o ro m LONGITUDE:-78.467128' W TREES WERE NOT SURVEYED. \
GROUND ELEVATION: 501.4'AMSL
TOP OF TOWER: 113.0' AGL
r•I Ap°t*1,
i TOP OF LIGHTNING ROD: 114.5' AGL
-DENOTES "ABOVE MEAN SEA LEVEL"
AGL-OENOTES'ABOVE GROUND LEVEL" 771 O
ZONE
76B 7700 O
773
/67
TREE 726 O
/f1j762 0774
/ "- 0766 20'x20'EOUIPMEN \
J758 AREA
^A.
E'j776 e727
760 768
nt' 761 /
W 2 t
� IJ76 Q � `
/ 756 757 - 777
C` 7 764� � �
r - I� 50' TREE RADIUS FROM
\ 765 f„ 728 722 Ir CENTER OF MONOPOLE
750 729
\ (p}754 A 1
752�?
(�753 * X �� 30'x30' SHE TEL
l i 7ggf.Y / t�
I / 748� LEASE AREj1 I
// 0730 S 721 /J ^j
Ill/ 742 ,•",� 747 734 t33 PROPOSED TOWER
. " r 741 0746 f 720 I
:740 *;735732t;",�7 Q731 719 ,' 717
`` / %736
_711..]b
si i10 S712 /
REMOVE
13 -
\.\'•. \ 737� �jc'3709 7�
REMOVE
739 707 �70B REMOVE
\ j tw`j701 O REMOVE (WITHIN EASEMENT)
REMOVE
t`703 REMOVE
705A,pi- REMOVE
REMOVE
`N1� E;T / REMOVE
a\ 20' ACCESS/UTILITY EASEMENT
/ REMOVE
\ REMOVE
EAST 1`-\ 7
GONG.
-CHURCH OF \ REMOVE(VITHINEASEMENT)
:'.,�
'EN \' y REMOVE (WITHIN EASEMENT)
y REMOVE(WITHIN EASEMENT)
BUILDING- � / \
�\� /
`•�
\ REFERENCE TREE
GRAPHIC SCALE g10 `
zD to 0 20 � � � CONC.
\� TRIM OR REMOVE AS NECESSARY
1 INCH = 20 FEET 1
REMOVE
TREES
TABLE
S H E N T E L°
Always con —tee to you
No
slicrtype
°t I:N°sii
r�ONxey°r
n cAoy n�
,°+
,a]
i•D.aw..d
a-w R...E I
eoo.o
wet
a+e.o
+a
iW
uae
,m
wnR,
ml. oa
aoee
elxe1.8
,oe
1e•wnu. on
ams
eoe.e
eoo.s
o.e
lD°
SITE NAME:
RIO ROAD EAST
.
°69202/cV911
sobs
BER:AMSL
N
tte.s
ESS:113'SETBACK/FALL
1225 RIO ROAD EAST
RLOT7ESVILLE, VA 22901
V
.
U17212-0.
tss!
os,
E."',
.•
oss
EASE AREA —900 SO.REFERENCE
o.]
tw.s
—
,tit
n,
t-Depreaad
AU
su,Y
OMER:
CHARLOTTESNLLE CHURCH
OF THE BRETHEN
1225 RIO ROAD
CHARLOTESVILLE. VIRGINIA 22901
TAX MAP: 062A1-00—OK-00100
ne
e•N.DN
n,s
ay.s
]!
,v
e•N.PIa
n
rl.pler
,A
1a-WNw Ort
ou
en.,
ee
ne
ie•Wnm D,e De,d
a eD
ab0.1
10]
COUNTY.. ALBEMARLE COUNTY
m
l"Maple
oe.t
,1e.e
Tn
,•D.tw..d
sal.!
ev.!
io
LARNDE: 36.07001a' N
,v
u-wnm o,v
soe!
ass
!]
rl,
e•°.cNxPu.
!as
°'°'
10
LONGITUDE:-76.467128' w
ns
.ow..e
lm.e
sloe
v
11,
.s —
eo,.s
ai,.e
1.
NO.
REWSION/ISSUE
DATE
• oosw.m
ii•nxA.n
es,.s
s]r.s
_ °
1
ZONING DRAWINGS
12/19/I7
l]a
soa.e
vl e
]s
]• cmrn
saes
ails
1.
„+
eor.a
sa,.a2.
„i
fit•Hlc].ry
o..ldu..,
sa,.a
erit
1e• °=.w--
so,.t
+,
-
r P.pNr
ou
]•D.sw..d
—:;
]o
w
sD
De"
"'De"p...
].,
—A
v
*!%
—cld—
w,
as
��
- =•ry
ssas413
111L5
e'Nw].ry
lse.e
ua.e
o
,ae
]•o.Pw..d
so,.a
a],.e
ip
I I.
14—pxr
sae.,
eoe.r
+oo
+e•
a
urA
xrA
+�
osldxw.
suss
wA
xrA
,e°
]•Hlcy.ry
lb,.e
lM.a
2!
.�-.�-
TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
]•xlp,.n
]o,.e
eL.e
]!
t• W=1•n
aa.x
ssu
]b
rP.Plw
,p,,p
ay.p
a
s•o.aRx.p,
eol.T
a]LT
IS
b w.A q NamNA
,es
rxww.n
eoee
ev.e
]o
THIS OMWING PREPARED AT THE
CHARLOTTE OfnCE
10305. TRYON STREET
CHARLOTTE, C 1e30]
TEL)Oe3]bC W
FAX )0eJ)b.10)e
ww.11mmona.com
e•Pepl,r
ppy,
tbefi
1al
-nwvery
wl.,
an.T
ss
,•O,clduou.
nv.a
ec
P.pi.r
-.t
abtt
P .w .r ,w pH l iN,.n .w rwm.m,
TG PROJECT p 39832
na
e'Poplu
10.)
OLT
°
m
]•cn..ry
,n.,
iP
n,
P.pi.r
es1.s
1oa
TREE SURVEY
SHEET
rn
o..w.
ea•N.pl. ..
ae.e
xu
^
xn
C-S
o NOTE: e ` O t lO \ \
ma�Ll1. THIS PARCEL IS NOT WITHIN STEEP \ \ 1 0 ' 'N S H E N T E L'
c SLOPES OVERLAY \ N. 1 t 1 \
N.
\ \ 1 1 \ Always connected to you
2 2. 3,068 SF DISTURBED 5 \ \ \ \ \ \ \
o A \ \ \ \ \ \ 1 1 1 1
n A 7 \
Z 3i 3. NO SLOPE TO EXCEED 2: i \ \ \ \ \ \ \ 1 to SITE NAME:
RIO ROAD EAST
1 1 I 1 SITE NUMBER:
1 1 I 4 1 69202/CV911
p \ �J \ \ \ 1 4 1 \ l 1 1 1 1 SITE ADDRESS:
a ` 1 \ \1 1 1 \ 1 I I I 1 I 1225 RIO ROAD EAST
1 \ \ 1 1 1 CHARLOTTESVILLE. VA 22901
O\
1 l 1 AREA:
LEASE AREA -900 SO. F7
11 I 11 ' GND 11 1 '\ 1 \, 1 1 Il \\ 1 II II I
1 / 508.37 \ \ ' S 1 ` \ \ 1 I I PROPERTY ESVILOMEL
1
L 1 ` 1 I 1 CHARLOTTESVILLE CHURCH
l 1 1 i 1 1225 1110 ROAD
I CHARLOTTESVILLE, VIRCINIA 22901
GND 1 1 1 A 1 1 1 TAX MAP:062A1-00—OK-00700
\ 508.93 1 \ \ \\ \\ 1 `\ �1 5o1.2d 1 p\p 1 '1 ' I II
\ \ 1 \ \ t I 1 1 1 1 I COUNTY.' ALBEMARLE COUNTY
\ , \ 1 1 I
\ ` � -1•�_ ` 1 \ 1 -� � 1 \\ 1 \I 1 1 1 I LATITUDE. 38.070014' N
1.01.1 DE:—78.46712W W
1 ` 1 GN�Cl
.l \ p p `508.\ p / \ a Z TOVV RBAS `L 1 \ ` a 1 ` t 1 I NO. REWSION/ISSUE DATE
GND \\ / / Vc0\.40 \I 501.211 1 20NING DRAWINGS 12/19/17
F` \ t)
��50H.87 \� \ � � did 1 501.2 Iv�ct `I 1 1
1
I I I I }�,
O 1 I 1:Ad I I ell
\ \ i / \
l
\ \ n v
\Qy 1 \ TIMMONS GROUP
1 �5 'u.r
GRAPHIC SCALE
10 5 0 10 \\ \ \ \ 1 1 N.
YOUR VISION ACHIEVED THROUGH DURS.
( TH15 DRING AWPREPARED AT THE
ARLOTTE OPHCE
2010 S. TRYON STREET
CHARLOTTE. NC 26203
TEL 7-376.1073
1- 70a.376.1076
r..�n I �•w-��+ I w� ��� I rwnway.
7se,:
TG PROJECT # 39812
SHEET
1 INCH - 10 FEET \ \I\ \ ` \ I \\ 1 \_ I \ \ ` GRADING PLAN C-6
NOTE:
CONTRACTOR 70 VERIFY ANTENNA
INFORMATION 48 HOURS PRIOR
r0 INSTALLATION.
PROPOSED STEEL MONOPOLE
1' DIAMETER LIGHTNG ROD
@114.5' (816.NI9' AMSL)
18" DIAMETER TOP
TOP OF TOWER AND ANTENNA'S
PROPOSED 4X45 RRH
@113.0- (614.4' AMSL)
51105 611. ' AMS )
PROPOSED RV4PX3101142 l
@108.5' (609.9' AMSL)
PROPOSED 2XS0 RRH
@106.5' (607.9' AMSL)
PROPOSED BX20 RRH & RADWIN 20000 PLUS
@ 1 02.5' (603.9' AMSL)
TOPEVAOF TALLEST TREE
m
ELTION ® 102.0' AC
(604.4•AMSL)
PROPOSED EQUIPMENT (110.5):
(3) ALU 4X4SW RRH
Cl) 6CHMT SIX SECTOR COLLAR MOUNT
PROPOSED EQUIPMENT 008.5T
(3) RV4PX31OR-V2 (1) PER SECTOR
(3) AFOP-NYTHYB-RI HYBRID CABLE
(2) 6CHMTSIX SECTOR COLLAR MOUNT
PROPOSED EQUIPMENT (106.51:
(3) ALU 2X50W RRH
(1) 6CHMT SIX SECTOR COLLAR MOUNT
PROPOSED EQUIPMENT (102.51:
(1) ALU 8X20W RRH
(1) RADWIN 2000D PLUS MW
(1) 6CHMT SIX SECTOR COLLAR MOUNT
(1) CATS CABLE
ELEV =501.4'
t0
D
N
(/1 O
r (n
o m
__j m
00
ZO COAX ROUTED
O WITHIN TOWER
--i m
;0
O
K PROPOSED 112.0' (113.0' AGL)
OSTEEL MONOPOLE
C (PAINTED BROWN-
Z SEE NOTE 2)
30" DIAMETER AT BASE
ELEV. = 502.4' (AMSL)
1'FOUNDATION
& BROWN BOARD ON BOARD
FENCE PAINTED SHERWIN
WILLIAMB UMBRA SW4008
(INDUSTRIAL AND MARINE
COATING)
502.4' AMSL
8.2�
I�
m
PROPOSED
Q1'
µel
113.8"
AREA = 144 IN'
PROPOSED RADWIN
AREA =1375.86IN-
2000D PLUS
PROPOSED RV4PX31GR-V2
DIMENSIONS
ANTENNA DIMENSIONS
SCALE: 114'
SCALE' 1-
N � 9.8�
'2
..SHENTELe
Always connected to you
SITE NAME:
RIO ROAD EAST
SITE NUMBER:
692021CV911
SITE ADDRESS:
1225 RIO ROAD EAST
CHARLOTTESVILLE. VA 22901
AREA:
LEASE AREA -DOD SO. FT
PROPERTY OWNER:
CHARLOTTESVILLE CHURCH
OF THE BRETHEN
1225 RIO ROAD
CHARLOTTESVILLE. VIRGINIA 22901
TAX MAP:062AI-00-OK-00100
COUNTY: ALBEMARLE COUNTY
LATITUDE 38.070014' N
LONGITUDE-78.487128' W
NO. REVISION/ISSUE I DATE
1 1 ZONING DRAWINGS 12/19/17
19.6^
1t1o^
TIMMONS GROUP
AREA = 485.46 INX
AREA = 278.39 IN'
AREA = 204.1 IN-
YOUR VISION ACHIEVED THROUGH OURS.
PROPOSED 8x20
PROPOSED 4x45
PROPOSED 2X50
YIwIHH I Hw1Hwn,N.
THIS O THE
RRH DIMENSIONS
RRH DIMENSIONS
RRH DIMENSIONS
NARLOTTEEOFKCEAT
SCALE: 1-•4'
SCALE:I'-W
SCALE: 1'-4'
2010 6. TRYON STREET
CHARLOTTE, NC 28203
NOTES:
TEL 704.376.1073
FAX 704.376.1076
1. THE ONLY ON -SITE LIGHTING PROPOSED IS MOUNTED ON
www.l'mm ..T6m
THE PROPOSED CABINETS. THE LIGHTING IS INTENDED
I .-R , ---
"`°nn04ry
FOR TEMPORARY MAINTENANCE USE ONLY.
- 1}
2. POLE, ANTENNAS, CONCRETE PADS, CABINETS, AND ALL
APPURTENANCES TO BE PAINTED SHERWIN WILLIAMS -
TGPR03ECT1 3se12
UMBRA - SW4008 (INDUSTRIAL AND MARINE COATING).
3. DISTANCE BETWEEN THE FACE OF THE POLE TO THE
ANTENNA AND
SHEET
BACK OF THE ANTENNAS SHOULD NOT EXCEED 12".
TOWER DETAILS
C-7
RADWIN 2000D PLUS
PROPOSED ALL
Iyfa 4x45W AND 2X50W
` RRH STACKED
,�L S H E N T E L
Always connected to you
PROPOSED
RV4PX310R-V2
SITE NAME:
RIO ROAD EAST
ANTENNA
SITE NUMBER:
69202/CV9I1
12"
MAX
SITE ADDRESS:
RIO ROAD EAST
PROPOSED ALU7225
4x45W AND 2X50W
CHARLOTTESVLLLE, VA 22901
RRH STACKED PROPOSED
AREA:
4� RV4PX71OR-V2
ANTENNA
1p0.
PROPOSED
RV4PX31OR-V2
ANTENNA ryry�
LEASE AREA -900 SD. FT
PROPERTY OWNER:
CHARLOTTESVILLE CHURCH
OF THE BRETHEN
1225 RIO ROAD
WOW RRH
CHARLOTTESVILLE. VIRGINIA 22901
TAX MAP: 062A1-00—OK—DOIOO
COUNTY.. ALBEMARLE COUNTY
PROPOSED ANTENNA ROUTING
LATITUDE: 38.070074• N
NO SCALE
LONGITUDE—78.487128- W
TOP OF LIGHTNING ROD 114.5'
NO.
REVISION/ISSUE
DATE
7
ZONING DRAWINGS
12/79/17
TOP OF TOWER 113.0' 12"
10.71 "�
PROPOSED
4X45W RRH
PROPOSED
CIL 110.5
RV4PX310R-V2
ANTENNA
PROPOSED 9.6
(C/L 106.5')
2X50W RRH
CIL 106.5
PROPOSED 6CHMT SITE
PRO COLLAR MOUNT
4
PROPOSED
%
PROPOSED
BX20W RRH
2000D RADWIN
PLUS (CIL 102.5')
(C/L 102.5')
,.•'
TIMMONS GROUP
YOUR VISION ACHUEVEO THROUGH OURS.
TOWER
PROPOSED 6CHMT SITE PRO
THIS DRAWING PREPARED AT THE
CHARLOTTE OFHCE
2030 S. TRYON STREET
CHARLOTTE, NC 26203
TEL 704.276.1073
FAx7a4.37 .1076
ww.nmmRn:.cum
COLLAR MOUNT
,.N..N, „,, ,TW
7 2
TG PROJECT Al 39812
PROPOSED ANTENNA AND RRH STANDOFF
ANTENNA MOUNT
SHEET
C-8
NO SCALE
DETAILS
GRAPHIC SCALE
2 0 2
1 INCH - 2 FEET
;
\ \,
SITE IS LOCATED WITHIN THE NRQZ AND
\\\\\\l
REQUIRES COORDINATION WITH THE
NRAO. THE SITE WILL RECEIVE A 9927 AND
BATTERY CABINET. AISG PORT 1 SHOULD BE
2 5 \
USED FOR CONTROL FROM 4X40 OR
\a\
4X45. IN DCC POWER CABLES, USE
\\� 4 \Z `
l
CONDUCTOR WITH BLACK INSULATION FOR
"RETURN". IN A -48VDC SYSTEM, USE
33'
CONDUCTOR WITH RED INSULATION FOR
-48VDC FOR 10-PORT MULTI -BAND
ANTENNAS, CONNECT 800 MHZ 2XSO RRH
'' - ---' -
PORT 1 TO ANTENNA PORT 1, 2X50 PORT 2
i
TO ANTENNA PORT 2, PCS 045 PORT 1 TO
ANTENNA PORT 3,4X45 PORT 2 TO
ANTENNA PORT4, 4X45 PORT 3 TO
�`.• _. _..i`y I \.
ANTENNA PORTS, AND4X45 PORT4 TO
--
ANTENNA PORT 6, CAP PORT AND PORT
8, 8X20 RRH PORT XTO ANTENNA PORTS),
- ,
AND SX20 PORT Y TO ANTENNA PORT 10.
•
FOR SECTOR 1, X IS PORT 1, AND Y IS PORT
• - - _ -' I--
5. FOR SECTOR 2, X IS PORT 3 AND Y IS
' l
PORT 7. FOR SECTOR 3, X IS PORT 2 AND Y
15 PORT 6. CAPS SHOULD REMAIN ON
UNUSED PORTS OF BX20.
..
(N) SHENTEL EMERSON BATTERY
CABINET
TEL ALU 9927 EQUIPMENT
CABINET
-
FUTURE SHENTEL EMERSON BATTERY
CABINET
- I FUTURE SHENTEL ALU 9927
��--•�.i i —� 4 `� _ — 8 ..-� �I `` - O EQUIPMENT CABINET
(N) SHENTEL DISTRIBUTION
BOX
_ ,,"��/ �--^� - �� � — -' '•� ; O (N) H-FRAME AND METER BASE
�� _ UEJ O (N) PPC
7\
,uT
1
lam` _-3 \. .-`.•r ' I\` ` t�$ (N) ICE BRIDGE
(N)SHENTEL TOWER
,SHENTEU
Always connected to you
SITE NAME:
RIO ROAD EAST
SITE NUMBER:
692021CM I
SITE ADDRESS:
1225 RIO ROAD EAST
CHARLOTTESVILLE. VA 22901
AREA:
LEASE AREA -900 SO. FT
PROPERTY OWNER:
CHARL077ESIALLE CHURCH
OF THE BRETHEN
1225 RIO ROAD
CHARLOTTESVILLE, VIRGINIA 22901
TAX MAP: 062AI-00-OK-00100
COUNTY: ALBEMARLE COUNTY
LA 77 TUDE. 38,070014' N
LONGITUDE-78.467128' IN
NO. REl1SION/ISSUE DATE
1 I ZONING DRAMNG6 I 12/19/17
e . �
TIMMONS GROUP
Y DR VISION ACHIEVED THROl3GH DARE.
THIS ( (DRAWING PREPARED AT THE
CIARLOTTE UFNCE
2030 S. TRYON STREET
CHARLOTTE, NC 26203
TEL 704.376. 1073
FAX 70C376.1071
.,.nmmR
,w,n 39612
TG PRO]ECT # 39812
EQUIPMENT SHEET