Loading...
HomeMy WebLinkAboutSDP201700072 Review Comments Initial Site Plan 2018-01-09_ SubAppicahnnTypm: I Initial Site Plan Date Completed: 02/02/2018 Reviewer: Christopher Perez Division: CDD Planning Review Status: RequestedChanges Reviews Comments: Date Completed: 12/13/2017 Reviewer: E|ise_Kiewra Division: COO E011 Review Status: Requested Changes Reviews Comments: Isee uploaded letter, per site plan dated 12/4/17 -------------------------------------------------------------------------------------------------------------------- DatoComp|etod: 12y14/2017 Reviewer: Michael Dellinger Division: CDD Inspections Review Status: No Objection Reviews Comments: NO OBJECTIONS -------------------------------------------------------------------------------------------------------------------- DateComp|dud: 81/18/2018 Reviewer: Bobby_Jocz Division: CDD Engineering Review Status: Requested Changes Reviews Comments: RivannaVillage Phase ||—GDP2017O0072 Comments on plans dated 12-4'17 1. WPO plan must beapproved prior toFinal Site Plan Approval 2. Topography data must be field verified by designer within past year. Provide data of field verification. 3. Stormsewer profiles and details must be provided. Sheets 58-62 were missing from submittal. Evaluation of proposed oturmoewerouu|d not be completed. 4. Stationing for roadways should beprovided at 50'for both plan and profile. 5. Present design speed limits for each roadway. 6. Ensure all road names are included for streets shown oneach sheet. 7. Dimension all stream nroosinA/ou|vedson profiles. 8. Include all stormsewer draining stormwater from Public ROW in public drainage easements. 9. Indicate ROW/easement type for each roadway (Public, private, access). 10. SWM facilities must be placed in GVVK4 Facility easements. Access easement must be provided to facility. Deed of dedication and SVVK4 maintenance agreement must also be executed prior tuapproval. Show location ofSWM facility and access easements. 11. Show preserved buffer area overly on grading plan sheets. Ensure grading occurs outside of preserved buffers. 12. Show easements for areas to be placed in SVVK4 forest and open space areas. Forest and open space used in VRRM calculations to meet water quality requirements associated with VSMP regulations must be placed in SWM forest and Open Space easement, with deed of dedication and SWM maintenance agreement executed/recorded prior tofinal approval. 13. [Sheet 9] The dead end section of Terrapin Lane (station 10+14) should extend a minimum of 30'from the outside edge of the turnaround lane (VDOT Subdivision Street Design Guide). 14. [Sheet 12] Provide roadway/parking/etc. dimensions. 15. [Sheet 12] Provide explanation for hatch i ng/overlay provided for last 31' of Cattail Ct. 18. [Sheet 13] Identify street sign located at station 10+57 on the southwest bound roadway. The sign is adjacent to lot G'40. 17. [Sheet 13] Ensure parcel boundary lines are not blocking dimension/other labels. 18. [Sheet 1b]Show stationing for River Anna Road and Steamer Drive. |10. [Sheet 19] Remove profile for Village Avenue which is not included in the plans (incorrect | Page: 1 of 3 County ofAlbemarle Printed On: February 14.zo1u Date Completed Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed Reviewer: Review Status: Reviews Comments: Page: 2 of 3 label for River Anna Road?). 20. [Sheet 20] Profile for Cattail Trail incorrectly references intersection with Terrapin Lane at STA 10+00, and incorrectly references intersection with Butterfield "Court" at STA 14+23. 21. [Sheet 21] Correct profiles for Eastpark Drive and Creekside drive. Labels/titles do not match what is presented in plan views. 22. [Sheet 22] Correct Cattail Court Profile. Does not match stationing presented in plan views. 23. [Sheet 31] BMPs J1 and J2 are labeled as Dry Swales when they are modeled in the VSMP plan as wet swales. Please clarify. 24. [Sheets 31 — 32] Grading behind lots J20 -J27 and J28- J33 inconsistent with compost amended soil/sheet flow to open space BMP presented as water quality BMP in VSMP plan. Note: SWM facility easement must include 35' or 50' of down system grading associated with BMP as defined in VSMP clearinghouse. NOTE: Additional comments associated with drainage plan may be needed once SWM profiles are included in submittal. 01/09/2018 Margaret Maliszewski Division: CDD ARB No Objection This application has been deferred from the January 16, 2018 ARB meeting and will be rescheduled to a later, as yet undetermined, ARB meeting date. The following preliminary comments are provided: 1) Delineating the Reservation Zone and the Landscape Buffer on the landscape plan would be helpful during review of the plan; 2) Because white pines typically lose their screening ability in the lower limbs as they mature, an alternate evergreen tree(s) is recommended. 01/26/2018 Adam Moore Division: VDOT Requested Changes 01/03/2018 Alexander Morrison Division: ACSA Requested Changes 01/30/2018 Shawn Maddox Division: Fire Rescue Requested Changes 1. Cattail Court - emergency apparatus turn around is required due to the length of this street. 2. Cattail Court - hydrant spacing exceeds 500 feet on this street, none are shown. 3. If the buildings that are serviced on Cattail Court are going to exceed 30 feet in height then the width of 20' will not be sufficient. The buildings would also need a second means of emergency apparatus access if this height is exceeded. 4. Please verify hydrant spacing throughout the project doesn't exceed 500'. Some sections of Terrapin Lane specifically seem to exceed the distance and others are questionable. 5. Streets throughout the development shall be marked no parking based on proposed widths: Less than 28' - no parking on either side of the street. 28-35'- parking allowed on one side of the street Greater than or equal to 36' - parking allowed on both sides of the street. 02/01/2018 Dan Mahon Division: Parks Requested Changes County of Albemarle Printed On: February 14, 2018 Date Completed: 01/09/2018 Reviewer: Josh Kirtley Division: Health Department Review Status: Reviews Comments: No Objection Page: 3 of 3 County of Albemarle Printed On: February 14, 2018 COUNTY OF ALBEMARLE Department of Parks and Recreation 401 McIntire Road, Room 323 Charlottesville, Virginia 22902-4596 (434) 296 - 5844 MEMORANDUM TO: Christopher P. Perez I Senior Planner Planning and Community Development Department FROM: Dan Mahon, Greenway Coordinator Department of Parks and Recreation SUBJECT: SDP201700072 - RIVANNA VILLIAGE; PHASE 2 INITIAL DATE: Feb. 1, 2018 We have reviewed the plan for the Proffered Park and have the following observations, recommendations and concerns. 1. [COD Sec 8] Open Space/Greenspace Preservation. Throughout the plan label the park as "Hereby Dedicated to the County of Albemarle for Public use as a Public Park". 2. [COD Sec 8] Open Space/Greenspace Preservation. Prior to final site plan approval the Director of Parks and Recreation is required to approve a park plan, which shall ensure amenities provided meet the needs of the County and satisfy the rezoning. 3. [COD Sec 8] Open Space/Greenspace Preservation. The wetlands areas in the park shall be labeled as "preserved wetland areas". Omit the reference to "Future Park" on sheet 4, as this area shall be part of the park with phase 2 of development. 4. [COD Sec 8] Open Space/Greenspace Preservation. Depict, label, and design a maintenance facility within the development for use by the County Parks and Recreation Department to maintain the public park facility. Also, coordinate with Parks and Recreation Department on the width and design of the trails throughout the park. Once coordinated provide `typicals' of these access ways. Prior to approval engineering and the Parks and Rec department shall sign off that these trails are adequate for use by motorized maintenance vehicles. 5. [COD Sec 8] Open Space/Greenspace Preservation. The park has two required trail connects to the Eastpark Road. Currently these are depicted as easements; however, this is not appropriate and shall be revised to be fee simple dedications to the park. Depict, label, and dimension these trail connections. Additionally, the trail connections shall be increased in width above the 6' width as currently provided. These trail connections are to be utilized as access points for the public as well as used by Parks and Recreation Department to maintain the public park facility. Revise. 6. [COD Sec 8] Open Space/Greenspace Preservation. In those places where the park directly abuts private residential lots there needs to be a stronger and a more manageable boundary. The location, method, materials, and management policies for this concern will be addressed with the park plan as a condition of final approval. Stephen C. Brich, P.E. Commissioner COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper. Virginia 22701 January 26, 2018 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Christopher Perez Re: Rivanna Village Phase II -• Initial Site Plan SDP -2017-00072 Review #1 Dear Mr. Perez: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Alan Franklin PE, LLC, dated 4 December 20I7, and offers the following comments: 1. The eastbound left turn lane on Route 250 being proposed is not a requirement of the Department. However, if this is a requirement of the rezoning the Department would support it. 2. It appears that multiple arches and box culverts are being proposed for the crossing of intermittent streams. The size of all arches and box culverts will have to be hydraulically justified. The Department will not maintain oversized structures. 3. Design plans for the proposed arch bridges, box culverts, and retaining walls that are located within the ROW or support structures within the ROW must be approved by the Culpeper District Structure & Bridge Section prior to permit issuance. A maintenance agreement with the County/HOA for retaining walls located in or supporting structures within the ROW should be recorded prior to street acceptance. 4. Also concerning the arches, box culverts, and walls, a Geotechnical report is required, including borings at each end wall. Borings must be performed in accordance with Chapter 3 of the VDOT Manual of Instructions (MOI). 5. A stop sign is needed on Crescent Ave. at the intersection of Terrapin Lane, removing the stop sign on Terrapin Lane. Intersection sight distance lines are also required here. Additionally, the entrance radius is too large, it should be smaller forming a regular tee intersection. 6. Eastpark Road and Cattail Trail should be a curve with Cattail Court intersecting, not a 3 - way stop. 7. All proposed guardrail along Route 250 should be removed and the slope graded such that guardrail is not warranted. 8. The improvements to Route 250 must include an 8 foot shoulder, 4 feet of which must be paved, sloped no greater than 5%. 9. Sight distance profiles must be provided on the plans. VirginiaDOT.org WE KEEP VIRGINIA MOVING January 26, 2018 Christopher Perez Page 2 10. Show areas that will permit parallel parking on plans. Note that parallel parking must be restricted where it may impede intersection sight distance. 11. Please clearly indicate on the plans whether proposed streets are intended to be private or public. Note that streets with perpendicular parking (Cattail Court) will not be eligible for public street acceptance. 12. Provide VDOT Standard details for curb & gutter (CG -2, -6, -7). 13. The culvert on Route 250 that is to be extended must be shown to be in good condition; otherwise the entire culvert will need to be replaced. Please coordinate with Andrew Scott (540-827-7876) for culvert inspection. 14. A drainage easement is required for the outfall of the proposed culvert extension on Route 250. 15. The proposed turnaround on Terrapin Lane does not meet the minimum dimensions required by Appendix B(1) of the Road Design Manual. 16. Why does the ROW extend 4 feet beyond the sidewalk on some of the proposed streets? 17. Where DI -3s are greater than 8 feet deep, DI-3AA, -3BB, or -3CC should be specified as applicable and those details should be provided. 18. The Drainage Manual states that pipe velocities that exceed 10 fps are to be avoided. 19. Please show HGL's on profiles. Also provide HGL calculations, which should be consistent with existing plans showing existing structures that are being tied in to. 20. Pavement Design: a. Provide a note stating that actual pavement designs should be based on CBR values of the actual subgrade material. b. SM -9.5A, the maximum lift thickness is 1.5" with the maximum number of lifts being 1. Additional lifts must be placed 1 year apart, per Appendix III of the 2014 VDOT Pavement Design Guide. This should be clearly noted. 21. Typical Sections; pavement materials should be daylighted to the shoulder/slope, not abruptly terminated as shown. 22. The Notes & Figures for the Maintenance of Traffic plan must be taken from the latest revision of the Virginia Work Area Protection Manual. 23. Note that the final site plan must show conformance with the VDOT Road Design Manual Appendices B(1) and F, as well as any other applicable standards, regulations or other requirements. Please provide two copies of the revised plan along with a comment response letter. If further information is desired, please contact Justin Deel at 434-422-9894. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, q4ZL----- Adam J. bore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING COMMONWEALTH of VIRGINIA In Cooperation with the Thomas Jefferson Health District ALBEMACHARLOTTESVILLE FLUVANNA COUNTY (PALMVRA) State Department of Health GREENE COUNTY (STANARDSVILLE) 1138 Rose Hill Drive LOUISA COUNTV(LOUISA) Phone (434) 972-6219 P O. Box 7546 NELSON COUNTY (LOVINGSTON) Fax (434) 972-4310 Charlottesville, Virginia 22906 January 16, 2018 Christopher Perez, Senior Planner Albemarle County Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Rivanna Village, Ph 2, Blks D, F, G, H, J, & I Initial Site Plan SDP2017- 72 Mr. Perez: As requested, I've reviewed the Initial Site Plan, dated December 4, 2017, for the proposed development, referenced above. Since the proposal is to utilize public water & sewer systems, I have no comments at this time. Recommendation: Approval Conditions: None If there are any questions or you wish to discuss, please give me a call, 434-972-4306. Sincerely, C1'� Alan Mazurowski Environmental Health Supervisor Thomas Jefferson Health District alan.mazurowski(c�r�,vdh.vir ig�nia.gov Service Auth6rit y TO: Christopher Perez FROM: Richard Nelson DATE: 1/3/2018 RE: Site Plan Technical Review for: SDP201700072 - Rivanna Village, Phase 2 (Blocks D, F, G, H, I, and J) — Initial Site Plan The below checked items apply to this site. 1. This site plan is within the Authority's jurisdictional area for: ✓ A. Water and sewer B. Water only C. Water only to existing structure D. Limited service ✓ 2. An 8 inch water line is located approximately (on site) distant. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. ✓ 4. A 8 inch sewer line is located approximately (on site) distant. 5. An Industrial Waste Ordinance survey form must be completed. ✓ 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8. and plans have been received and approved. 9. No plans are required. ✓ 10. Final water and sewer plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may/may not be signed. ✓ 12. RWSA approval for water and/or sewer connections. 13. City of Charlottesville approval for sewer. Comments: Submit 3 copies of water/sewer plans and water/sewer data sheets at final site plan stage. 168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977-4511 • Fax (434) 979-0698 www.serviceauthority.org County of Albemarle Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 PLAN REVIEW COMMENTS - E911 APPLICATION#: SDP201700072 TMP: 079000000025A0, 08000000004600, 080000000046A0, 080000000046C0,080000000046D0,080000000046E0, 08000000005000,08000000005100,080000000055A0, 080000000052A0,093A1000000300,093A1000000400 DATE: 12/13/2017 FROM: Elise Kiewra ekiewra(Dalbemarle.org Geographic Data Services (GDS) www.albemarle.org/qds (434) 296-5832 ext. 3030 The following road names are acceptable: STEAMER DR (existing) BUTTERFIELD LN TERRAPIN LN The following road names are will need to be changed: RIVER ANNA ROAD CRESCENT AVE CREEKSIDE DR CATTAIL CT or CATTAIL TRL EASTPARK RD Roads named RIVER ANNA ROAD and SYCAMORE LANE that start with River and Sycamore already exists elsewhere in the County. Per Part I, Section 4-i of the County's Road Naming and Property Numbering Manual (page 7 of PDF). "No proposed road name shall be approved which begins with a word that appears as the first word in five or more official road names." 1. RIVER and SYCAMORE are the first words in over 5 road names in the County. River Anna could also be confused with Rivanna as they sound very similar. CRESCENT AVE Per Part I, Section 4-a of the County's Road Naming and Property Numbering Manual (page 6 of PDF): "A proposed road name which duplicates an existing or reserved road name in Albemarle County or the City of Charlottesville shall not be approved. An exception may be made for cul-de-sacs which have the same name as the road from which they originate (example: "Amberfield Court" which originates from "Amberfield Drive")." CRESCENT LN is already in the reserved road name list for another subdivision. You could use a different word in front of is as long as the words, spaces, and designator are no longer than 16 characters. CREEKSIDE DR Per Part I, Section 4-i of the County's Road Naming and Property Numbering Manual (page 7 of PDF). "No proposed road name shall be approved which begins with a word that appears as the first word in five or more official road names." Z. CREEK is the first word in over 5 road names in the County. CATTAIL CT or CATTAIL TRL One or the other is allowed however since the road is a continuation it cannot have two separate road names. The entrances at an intersection must be 60 feet or more apart in order for it to change road names. EASTPARK RD Per Part I, Section 4-e of the County's Road Naming and Property Numbering Manual (page 7 of PDF). "Compass points such as NORTH and EAST shall not be used in road names." 3. EASTPARK begins with a compass point. We recommend providing three (3) candidate names for each road to our office for review, in case your first choices are not acceptable. A PDF version of the Ordinance and Manual can be found here: https://www.albemarle.org/upload/images/Forms Center/Departments/Geographic Data Service s/Forms/Road Naming and Property Numbering Ordinance and Manual.pdf Please consult the County's Road Name Index to check your road names prior to submittal. The Index can be found here: httD://www.albemarle.oro/albemarle/unload/images/webaoos/roads/ Parcel and mapping information can be found here: http://gisweb.albemarle.or